HomeMy WebLinkAbout2016-019As Built (Final Reso.)
RESOLUTION NO. 2016- o19
A RESOLUTION OF INDIAN RIVER COUNTY, FLORIDA, CERTIFYING
"AS -BUILT" COSTS IN CONNECTION WITH WATER MAIN EXTENSION
FROM 13580 TO AND INCLUDING 13635 NORTH INDIAN RIVER DRIVE
(ALSO KNOWN AS RIVERSIDE DRIVE) IN INDIAN RIVER COUNTY,
FLORIDA, AND SUCH OTHER CONSTRUCTION NECESSITATED BY
SUCH PROJECT; PROVIDING FOR FORMAL COMPLETION DATE, AND
DATE FOR PAYMENT WITHOUT PENALTY AND INTEREST.
WHEREAS, the Board of County Commissioners of Indian River County ("Board")
determined that water main extension benefitting properties located from 13580 to and including
13635 North Indian River Drive (also known as Riverside Drive) in Indian River County,
Florida (the "Project"), is necessary to promote the public welfare of the county; and
WHEREAS, on Tuesday, March 10, 2015, the Board held a public hearing at which time
and place the owners of property to be assessed appeared before the Board to be heard as to
the propriety and advisability of making such improvements; and
WHEREAS, after such public hearing was held the Board adopted Resolution No. 2015-
037, which confirmed the special assessment cost per parcel specially benefited by the Project;
and
WHEREAS, now that the Project has been completed, the Director of Utility Services has
certified the actual "as -built" cost to be less than the cost in confirming Resolution No.
2015-037,
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, as follows.
The special assessment imposed per parcel shall be $4,346.96.
2. To avoid interest and penalty charges, payment may be made within ninety days after
passage of this resolution (Resolution No. 2016- 019 ).
3. Payments bearing interest at the rate of 5.00% per annum may be made in ten annual
installments, the first to be made twelve months from the due date. The due date is the date
of passage of this resolution
4. The final assessment roll for the Project listed in Resolution No. 2015-037 shall be as shown
on the attached Exhibit "A."
5. The assessments, as shown on the attached Exhibit 'A" shall stand confirmed, and will
remain legal, valid, and binding first liens against the property against which such
assessments are made until paid.
RESOLUTION NO. 2016- 019
6. The assessments shown on Exhibit 'A" attached to Resolution No. 2015-037, were
recorded by the County on the public records of Indian River County, and the lien shall
remain prima facie evidence of its validity.
The resolution was moved for adoption by Commissioner O'Brvan , and the
motion was seconded by Commissioner Davis , and, upon being put to a vote,
the vote was as follows:
Chairman Bob Solari AVF
Vice Chairman Joseph E Flescher AYE
Commissioner Wesley S. Davis AYE
Commissioner Tim Zorc AYE
Commissioner Peter D. O'Bryan AYE
The Chairman thereupon declared the resolution duly passed and adopted this _1t day
of March, 2016.
Attest: Jeffrey R. Smith, Clerk of the
Circuit Court and Comptroller
By &,,,,
Deputy
Clerk
d or fo ands ga ' ffici ncy:
Dylan Reingold, County Attorney
BOARD OF COUNTY COMMISSIONERS
INDIAN RIVER COUNTY, FLORIDA
Elm
2
By
Bob Solari, Chairman
V;
RESOLUTION NO. 2016- nia
6 The assessments shown on Exhibit 'A" attached to Resolution No. 2015-037, were recorded
by the County on the public records of Indian River County, and the lien shall remain prima
facie evidence of its validity
The resolution was moved for adoption by Commissioner o' Brvan , and the
motion was seconded by Commissioner navies and, upon being put to a vote,
the vote was as follows
Chairman Bob Solari AYER
Vice Chairman Wesley S. Davis AYE
Commissioner Joseph E. Flescher AYE
Commissioner Tim Zorc AYE
Commissioner Peter D O'Bryan AYR
The Chairman thereupon declared the resolution duly passed and adopted this 1st day
of March, 2016
Attest Jeffrey R
Circuit Q(
By
'Deputy
BOARD OF COUNTY COMMISSIONERS_
INDIAN RIVER COUNTY, FLORIDA
Clerk of ••,o��M1SSlONEgs•%
and Comp %� : ��: •.,*+,
Bob Solari, Chairman ;mac t
Ap�� forfor an eg 1fficie cy:
,Dylan Reingold, County Attorney
K
's
•t•� 'L�:qN RIVEN
SCHEDULE OF BID ITEMS -A
Indian River Drive- Scenario No.3
BID NUMBER 2015029
FINAL PROJECT COST
Date:
February 20, 2016
IIInstalled
Cost
Bid
Bid Item
Estimated
Unit of
Unit
Total
Item No.
(Description I
Quantity I
Measure I
Price I
Price
1
Install 8" PVC Water Main
14
LF
33.10
$463.40
Install 8" HDPE Directional Bore Including Fusion of
2
647
LF
33.10
$21,415.70
MJ Adaptors and Pipe
3
Driveway Bores
0
LF
33.10
$0.00
4
Install 8" NRS Resilient Seated Gate Valve and Box
1
EA
1,600.00
$1,600.00
5
Install Water Service - Single Short w/Yoke & Box
4
EA
925.00
$3,700.00
6
3
EA
1,800.00
$5,400.00
Install Water Service -Double Short w/Yoke &Box
7
Install Water Service - Single Long w/Yoke & Box
1
EA
925.00
$925.00
8
Install Water Service - Double Long w/Yoke & Box
2
EA
1,800.00
$3,600.00
Subtotal Water System
$37,104.10
9
Install 8" HDPE Directional Bore Including Fusion of
1,040
LF
$33.10
$34,424.00
MJ Adaptors and Pipe
10
Install Water Service - Single Short w/Yoke & Box
1
EA
$925.00
$925.00
11
Install Water Service - Double Short w/Yoke & Box
1
EA
$1,800.00
$1,800.00
12
Install Water Service - Single Long w/Yoke & Box
3
EA
$925.00
$2,775.00
Install New Fire Hydrant Assembly with 6" Gate Valve
1
EA
$4,000.00
$4,000.00
13
and Box
Subtotal Water System
$43,924.00
14
Public Construction Bond
1
LS
$2,882.76
$2,882.76
15
Mobilization, Demobilization, MOT
1.00
I LS
$4,804.60
$4,804.60
16
Contingency (Relocate 5 existing water services)
I 1.00
LS
3,500.00
$3,500.00
Ij
Subtotal
Mob., Demob., & MOT
$92,215.46
Engineering & Administration
1.00
LS
$4,000.00
$4,000.00
Surveying
1.00
LS
$19,250.00
$19,250.00
Geotechnical Testing
1.00
LS
$1,985.00
$1,985.00
Bidding & Award
1.00
LS
$1,648.50
$1,648.50
Permitting
1.00
LS
$650.00
$650.00
Construction Services
1.00
LS
$1,000.00
$1,000.00
TOTAL $120,748.96
ATTACHMENT NO. 2
APPLICATION AND CERTIFICATION FOR PAYMENT
TO OWNEI Indian River County; Department of Utility PROJECT 2015029
Services
FROM CONTRACTOR: VIA ARCHITECT -
General Underground
7650 NW 50th St
Chiefland , FI 32626
CONTRACT FOR:
CONTRACTOR'S APPLICATION FOR PAYMENT
Application is made for payment, as shown below, in connection with the Contract.
Continuation Sheet, AIA Document 0703, is attached.
1. ORIGINAL CONTRACT SUM
2. Net change by Change Orders
3. CONTRACT SUM TO DATE (Line 1 t 2)
4. TOTAL COMPLETED & STORED TO
DATE (Column G on G703)
5. RETAINAGE:
a. 0 % of Completed Work
(Column D + E on G703)
b. % of Stored Material
(Column F on G703)
Total Retainage (Lines 5a + 5b or
Total in Column I of G703)
6. TOTAL EARNED LESS RETAINAGE
(Line 4 Less Line 5 Total)
7 LESS PREVIOUS CERTIFICATES FOR
PAYMENT (Line 6 from prior Certificate)
8. CURRENT PAYMENT DUE
9. BALANCE TO FINISH, INCLUDING RETAINAGE
(Line 3 less Line 6)
CHANGE ORDER SUMMARY
Total changes approved
in previous months by Owner
Total approved this Month
TOTALS
NET CHANGES by Change Order
$ 123,779.36
$ 0.00
$ 123,779.36
$ 92,215.46
$ $0.00
$ Included in above
$ 0.00
$ 92,215.46
$ 83,839.46
4 8,376.001
$ 31,563.90
AIA DOCUMENT G702 PAGE 1 OF t
APPLICATION NO: Final Distribution to:
X OWNER
X ARCHITECT
PERIOD TO: 2/3/2016 X CONTRACTOR
PROJECT NOS. UCP#4109
CONTRACT DATE:
The undersigned Connector certifies that to the best of the Contractor's knowledge,
information and belief the Work covered by this Application for Payment has been
completed in accordance with the Contract Documents, that all amounts have been paid by
the Contractor for Work for which previous Certificates for Payment were issued and
payments received from the Owner, and that current payment shown herein is now due.
CONTRACTOR: General Underground
1
t
By Date: 2/3/2016
Stale of: %lG County of: (.0 V t
Subscribed an sw '' efore me this lvD day of ret-�y'-q XO (, �o
Notary Public: tiTl�� - &0kl\
My Commission ezpves: � ap ��
ARCHITECT'S CERTIFICATE FOR PAYMENT
In accordance with the Contract Documents, based on on-site observations and the data
comprising the application, the Architect certifies to the Owner that to the best of the
Architect's knowledge, information and belief the Work has progressed as indicated,
the quality of the Work is in accordance with the Contract Documents, and the Contractor
is entitled to payment of the AMOUNT CERTIFIED.
AMOUNT CERTIFIED $
ADDII70NSIDEDUCTIONS (Attarh explanation if amount certified differs from the amount applied. Initial all figures on this
Application and onlhe Continuation Sheet that are changed to conform with the amount certified.)
$0.00 $0.00 ARCHITECT
$0.00 $0.00 By Date:
$0.00 $0.00 This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the
Contractor named herein. Issuance, payment and acceptance of payment are without
$0.00 oreiudice to any fights of the Owner or Contractor under this Contract.
AIA DOCUMENT 0702, APPUCATION AND CERTIFICATION FOR PAYMENT 1882 EDITION AIA • 01992 THE AMERICAN INSTITUTE OF ARCHITECTS, 1795 NEW YORK AVE, N.W., WASHINGTON, DC 20000b292
Users may obtain validation of this document by requesting a completed AIA Document D401 - Certification of Document's Authenticity from the Licensee.
MAGGIE MING
* MY COMMISSION # FF 218581
EXPIRES: April 8, 2019
uMr.mdeBondedThru Budget Notary Seryket
Item
Description
Estimated Quantity
Unit Price
Total
QUANTITY
COST
WORK COMPLETED TO DATE
Part A
$463.40
CONTRACT QUANTITIES _
COMPLETED THROUGH LAST PERIOD
1
Install 8" PVC Water Main
500
LF
$33.10
$ 16,550.00
0
$0.00
0
Install 8" HDPE Directional Bore
0%
0
$0.00
1
$1,600.00
100%
2
Including Fusion of M1 Adaptors and
120
LF
$33.10
$ 3,972.00
647
$21,415.70
$3,700.00
Pipe
0
$0.00
3
$5,400.00
150%
0
3
Driveway Bores
40
LF
$33.10
$ 1,324.00
0
$0.00
4
Install 8" NRS Resilient Seated Gate
1
EA
$1,600.00
$ 1,600.00
1
$1,600.00
QUANTITY
Valve and Box
% Complete
COMPLETE THIS
PERIOD
WORK COMPLETED TO DATE
0
$0.00
$
Install 8" DI Water Main at Sewer
60
LF
$33.00
$ 1,980.00
0
$0.00
0
Lateral Crossing
0
$0.00
0%
;.'o
$0.00
0
6
Install Water Service -Single Short
4
EA
$925.00
$ 3,700.00
4
$3,700.00
$0.00
w/Yoke & Box
$925.00
100%
0
$0.00
1
$1,800.00
7
Install Water Service -Double Short
2
EA
$1,800.00
$ 3,600.001
3
$5,400.00 '
0
w/Yoko & Box
0%
0
$0.00
1
$4,000.00
10D%
8
Install Water Service-SingleLong
1
EA
$925.00
$ 925.00
1
$925.00
$2,882.76
w/Yoke & Box
0
$0.00
1
$4,804.60
100%
0
9
Install WaterService-Double Long
2
EA
$1,800.00
$ 3,600.00
2
$3,600.00
w/Yoke & Box
$3,500.00
$11,187.36
I Part A TOTAL
$ 37,251.00 1
Last Period
$36.640.70
Item
Description
Estimated
Quantity
Unit Price
Total
QUANTITY
COST
I
Part B
CONTRACT QUANTITIES
COMPLETED THROUGH LAST PERIOD
1
Install 8" PVC Water Main
1,150
LF
$33.10
$38,065.00
0
$0.00
Install 8" HDPE Directional Bore
2
Including Fusion of MJ Adaptors and
130
LF
$33.10
$4,303.00
1040
$34,424,00
Pipe
3
Driveway Bores
40
LF
$33.10
$1,324.00
0
$0.00
4
Install 8" NRS Resilient Seated Gate Valy
1
EA
$1,600.00
$1,600.001
0
$0.00
5
Install 8" DI Water Main at Sewer Latera
40
LF
$33.10
$1,324.001
0
$0.00
6
Install Water Service -Single Shortw/Yok
1
EA
$925.00
$925.00
1
$925.00
Install Water Service -Double Short
7
w/Yoke & Box
1
EA
$1,800.00
$1,BOO.OD
1
$1.800.00
8
Install Water Service -Single Longw/Yoke
4
EA
$925.00
$3,700.001
3
$2,775.00
Install Water Service -Double Long
9
w/Yoke & Box
1
EA
$1,800.00
$1,800.00
0
$0.00
Install New Fire Hydrant Assembly with
10
6" Gate Valve and Box
1
EA
$4,000.00
$4,000.00
1
$1.00
Part B TOTAL
$58,841.00 1
Last Period
$39.925.00
11
Public Construction Bond
1
IS
$2,882.76
$2,882.76
1
$2,882.76
12
Mobilization, Demobilization, MOT (Do
1
IS
1
$4,804,60
Not Exceed Amount Per Section 01025)
$4,804.60
$4,804.60
Force Account
1
$ 20,000.00
0
$0.00
Relocate 5 Exsisting Water Services
5
EA
700
$ 3,500.00
0
$0.00
Bond, Mobilization & Force Account
$27,687.36
$7,687.36
Quantity
COST
QUANTITY
TOTAL COST
%Complete
COMPLETE THIS
PERIOD
WORK COMPLETED TO DATE
14
$463.40
14
$463.40
0.028
0
$0.00
647
$21,415.70
539%
0
$0.00
0
$0.00
0%
0
$0.00
1
$1,600.00
100%
0
$0.00
0
$0.00
0%
0
$0.00
4
$3,700.00
100%
0
$0.00
3
$5,400.00
150%
0
$0.00
1
$925.00
100%
0
$0.00
2
$3,600.00
100%
I This Period
$463.40
1 Total
$37,104.10
Quantity.
COST
QUANTITY
TOTAL COST
% Complete
COMPLETE THIS
PERIOD
WORK COMPLETED TO DATE
0
$0.00
0
$0.00
0%
0
$0.00
1040
$34,424.00
800%
0
$0.00
0
$0.00
0%
;.'o
$0.00
0
$0.00
0%
�� 0
$0.00
0
$0.00
0%
0
$0.00
1
$925.00
100%
0
$0.00
1
$1,800.00
100%
0
$0.00 1
3
$2,775.00
75%
0
$0.00
0
$0.00
0%
0
$0.00
1
$4,000.00
10D%
I This Period
$0.00
1 Total
$43,924.00
1
0
$0.00
1
$2,882.76
100%
0
$0.00
1
$4,804.60
100%
0
$0.00
0
$0.00
0%
5
$3.500.00
5
$3,500.00
$3,500.00
$11,187.36
I TOTAL BID AMOUNT IA+B+11+12+FORCE ACCOUNT) $123,779.361 Last Period $ 84,253.06 1 This Period $ 3,963.40 1 Total $ 92,215.46 1 74%
Final Change order.doc
No 1
DATE OF ISSUANCE: March 1. 2016 EFFECTIVE DATE. March 1. 2016
OWNER. Indian River Countv
CONTRACTOR General Underaround. LLC
Project: Water Main Assessment Project Within North Indian River Drive
OWNER's Project No. 4109
You are directed to make the following changes in the Contract Documents'
Description:
Final changes to contract.
Reason for Change Order:
Reflect decreased project cost resulting from competitive contractor and value engineering.
Attachments: (List documents supporting change)
N/A
CHANGE IN CONTRACT
CHANGE IN CONTRACT TIMES
PRICE:
Description
Amount
Description
Time
Original Contract Price
$123.779.36
, Original Contract -Time:
(days or dates)
Substantial Completion:
90
Final Completion:
120
Net Increase (Decrease)
$0
Net change from previous Change
from previous Change
Orders No. N/A to N/A:
(days)
Orders No. N/A to N/A:
Substantial Completion:
0
Final Completion:
0
Contract Price prior to this
$123.779.36
Contract Time prior to this Change
J
Change Order:
Order:
(days or dates) ,
Substantial Completion:
90
Final Completion
120
Net increase (decrease) of
$(31,563.90)
Net increase (decrease) this
this Change Order-
Change Order:
(days or dates)
Substantial Completion:
0
Final Completion:
0
Contract Price with all
$92.215.46
Contract Time with all approved
approved Change Orders:
i
Change Orders:
(days or dates)
Substantial Completion:
90
Final Completion:_
120
ACCEPTED:
By:
CONTRAS T6R (Signature)
Date: 02,J;gJ1te
RECOMMENDED:
ENGINEER (Signatd're)
r
Date: 7 /2 q rf L -
change oRaer - 1
APPROVED:
By:
OWNER (Signature)
Date:
FINAL ASSESSMENT ROLL
NORTH INDIAN RIVER DRIVE - 10 LOTS
I
Parcel #
30-38-25-00000-0050-00009.0 I
Owner
JOLLEY, SAMUEL E-
ISecondary Owner
(Mailing Address
113590 INDIAN RIVER DR I
I SEBASTIAN, FL 32958 I
Legal
(FROM AN IRON PIPE ON THE N EDGE OF THE
'
IPAVING OF THE ROAD LEADING FROM STATE R# 4 TO THE TOWN OF
IROSELAND; & ON THE
(CENTERLINE OF OLD DIXIE HWY, RUN S 20
(DEG 08 MIN E ALONG THE CENTERLINE OF THE OLD DIXIE HWY
IA DIST OF 1270.1
(FT MORE OR LESS, THENCE RUN N 59 DEG 09
I
IMIN E A DIST OF 25 FT TO THE NW COR OF LOT 8, INLET VIEW
ISUB; THENCE CONT N 59
DEG 09 MIN E ALONG THE N LINE OF SAID
LOT 8 A DIST OF 244 4 FT TO THE POB; THENCE RUN A
ILONG THE SAME BEARING
I& ALONG THE N LINE OF LOT 6 OF INLET
(VIEW SUB TO A POINT ON THE W R/W LINE OU S HWY # 1, THENC I
IE RUN NWLY & ALONG THE y
IWR/W LINE OF U S HWY # 1108.38 FT; I
THENCE RUN S 59 DEG 09 MIN W & PARALLEL TO THE N LINE OF
LOT 6 A DIST OF 209
FT THENCE RUN SELY TO THE POB;(OR BK
I
488 PP 889)
Site Address
I
13615 & 13625 N INDIAN RIVER DR I
Parcel #
30-38-25-00000-0050-00010.0. I
Owner
GAFFNEY, JOHN D
(Secondary Owner
(Mailing Address
13620 N INDIAN RIVER DR
SEBASTIAN, FL 32958 I
Legal
SELY 100 FT OF PART OF LOTS 5 & 7, LYING
I
E OF OLD D/H AS IN D BK 42; PP 479; LYING E OF U S HWY
NO 1, AS IN D BK 83,
I
PP 131 I
Site Address
13620 & 13622 N INDIAN RIVER DR I
'EXHIBIT "A"
i
Assessment = $4,346.96
I
I I
I I
( I I
I I I
I Assessment = $4,346.961
i
2/24/2016
F•\Utilities\UTILITY - Engineering\Projects - Assessment Projects\000Assessments - 2012 Proposed\IR !rive - Roseland Rd to Inlet at Sebastian, Condos\BCC Agenda Items\As-Built Resolution\IR_Prelim Revised FinaUlsx
FINAL ASSESSMENT ROLL
NORTH INDIAN RIVER DRIVE - 10 LOTS
I
IParcel #
130-38-25-00000-0050-00011.0i
I I Assessment = $4,346.961
(Owner
JINDIAN RIDGE CORPORATION,
Secondary Owner
I )
(Mailing Address
113590 INDIAN RIVER DR ( I
1
SEBASTIAN, FL 32958 1
(Legal
TALL OF THE FOLL DES PROPERTY LYING WLY 0 I I 1 1
IF OLD US HWY #1 (NKA RIVERSIDE DR)- COM AT AN IRON PIPE ON I I
1
ITHE N EDGE OF THE PAV
I
ZING OF THE RD LEADING FROM ST RD NO 4 TO ( I I
1
ITHE TWN OF ROSELAND & ON THE CENTERLINE OF THE OLD DIXIE ( 1 I
(HWY RUN S 20 DEG 08 MI
I
�N 00 SEC E ALONG THE CENTERLINE OF THE I I I I
(OLD DIXIE HWY A DIST OF 1068.63 FT, TH RUN N 59 DEG 06 MI I
N 00 SEC E A DIST OF 2 I
15.50 FT FOR THE POB; TH RUN N 59 DEG 09 I I 1
i
(MIN 00 SEC E TO THE INDIAN RIVER (FOR NLY LINE); TH RUN S 1 I I
WLY ALONG THE IR TO A I
1
IPT ON THE W SHORE OF THE IR WHICH WOULD
IBE A DIST OF98.38 FT FROM THE PREVIOUS PT MEASURED ON A LI
INE PARA TO THE CENTERL 1 I
1
INE OF OLD US HWY #1 AS IT EXIST ON THE ( I
1
DATE OF THIS DEED (RIVERSIDE DR ROUTE); TH RUN S 59 DEG 09 I I
MIN 00 SEC W TO THE E I I
BDY LINE OF OLD US HWY #1,& WHICH PT IS I
98.38 FT SELY FROM NLY LINE OF SAID PROPERTY MEASURED ALO
I
�NG THE E R/W LINE OF 0 1
i
LD US HWY #1, TH RUN NWLY ALONG THE E R/
JW LINE OF OLD US HWY #1 A DIST OF 8.38FT; TH RUN S 59 DEG I I 1
09 MIN OOSECWTOA P I I
I
iT WHICH IS 209.00 FT W OF THE W R/W LINE I I I
OF US HWY #1, TH RUN NWLY ON A LINE PARA WITH THE W R/W L ( I I 1
INE OF OLD US HWY #1 A
DIST OF 90.00 FT TO THE POB 1
ISite Address
I
113635 & 13637 N INDIAN RIVER DR i
Parcel #
�
30-38-25-00000-0050-00012.0 I Assessment = $4,346.961
Owner
OLES, RALPH & SALLY
(secondary Owner
Address
13630 N INDIAN RIVER DR
+Wailing
I
SEBASTIAN, FL 32958 I
(Legal
N 98.38 FT OF THAT PART LYING BETWEEN I
OLD U S HIGHWAY NO 1 & RIVER; BEING PAROF LOTS 5 & 7, LYI
NG E OF OLD D/H AS R
BK 9; PP 294&R BK 180 PP 637 j
Site Address
13630 N INDIAN RIVER DR
2/24/2016
.F•\Utilities\UTILITY - Engineering\Projects - Assessment Projects\OOOAssessments - 2012 Proposed\IR?nva - Roseland Rd to Inlet at Sebastian Condos\BCC Agenda Items\As-Built Resolution\IR_Prelim Revised FinaLAsx
FINAL ASSESSMENT ROLL
NORTH INDIAN RIVER DRIVE - 10 LOTS
I
IParcel #
130-38-25-0000-0070-00001.0 Assessment = $4,346.961
Owner
1COALBY ARMS LLC, I
Secondary Owner
1
Mailing Address
1642 EAST RIDGEWOOD ST
I
1 ORLANDO, FL32803
(Legal
FROM INTERSECTION OF S LINE OF INLET
1
VIEW SUB & E R/W LINE OF OLD STATE RD NO 5, ALSO KNOWN A I
S RIVER ROAD; RUN
SELY ALONG SAID E R/W A DIST OF 60.00 F
1
THENCE ELY & PARALLEL TO S LINE OF INLET VIEW SUB TO W BAN
1
K OF IND RIV, THENCE
MEANDERING NWLY ALONG SAID IND RIV TO S
}
LINE OF INLET VIEW SUB, THENCE WLY ALONSAID S LINE OF INL I
ET VIEW SUB TO E R/W
1
OF OLD STATE RD NO 5, ALSO KNOWN AS THE i
RIVER ROAD TO THE POB; AS R BK 178 PP 675 ALSO PARCEL 0
1
F LAND AS DESC IN R BK
1
201 PP 644 I
(Site Address
13580 N INDIAN RIVER DR ( 1
i
(Parcel #
I
30-38-25-00004-0000-00006.0 Assessment = $4,346.961
Owner
FUNNELL, JUDI A (TR) tj
Secondary Owner
(Mailing Address
4685 69TH ST
I
VERO BEACH, FL 32967
`Legal
PLAT OF INLET VIEW SUBDIVISION
i{
LOT 6, LYING WLY-OF US HWY 1
PBI 2-64
Site Address
13605 N INDIAN RIVER DR I
2/24/2016
F•\Utilities\UTILITY - Engineering\Projects - Assessment Projects\OOOAssessments - 2012 Proposed\IR ?rive - Roseland Rd to Inlet at Sebastian Condos\BCC Agenda Items\As-Built Resolution\IR_Prelim Revised Final.Asx
FINAL ASSESSMENT ROLL
NORTH INDIAN RIVER DRIVE - 10 LOTS
I
IParcel #
j
30-38-25-00004-0000-00006.1 Assessment = $4,346.96
iOwner
MCELVEEN, STEPHEN A (TR) & KAREN S (TR)
Secondary Owner
Mailing Address
13600 N INDIAN RIVER DR
SEBASTIAN, FL 32958
(Legal
PLAT OF INLET VIEW SUBDIVISION
INLET VIEW SUB PBI 2-64 PARCEL OF LAND
'
BETWEEN U S HWY NO 1 & IND RIV BOUNDED ON N & S BY EXTENS
ION OF N & S LINES OF
LOT 6 TO IND RIV; ALSO BEG AT PT ON E T
IND RIV; ALSO BEG AT PT ON E BDRY LINE OF US NO 1 WHERE '
SAID BDRY LINE IS
INTERSECTED BY N LINE OF LOT 7 THENCE I
j
RUN SELY ALONG E BDRY LINE OF SAID HWY 61.5 FT, THENCE NE
LYON LINE PARALLEL TO
EXTENDED N LINE OF LOT 7 TO IND RIV;
I
THENCE NWLY ALONG RIV SHORE TO NE COR OF EXTENDED N LINE 0
F LOT 7; THENCE SWLY 0
EXTENDED LINE OF SAID LOT 7 TO POB; AS
IN R SK 171 PP 411 & 413 & R BK 181 PP 395 ALSO PARCEL OF
LAND AS DESC IN R BK
I
197 PP 152 & LESS FOLL DESC PROP; COM A
T E R/W ST RD #5 A/K/A OLD US HWY #1 & N LINE LOT 6; TH S
32 DEG 56 MIN 30 SEC E
I
ALONG ELY R/W LINE 5T RD #5 DIST OF 75. I
05 FT TO POB; TH CONT S 32 DEG 56 MIN 30 SEC E 81.85 FT TO
A 3/4 INCH IRON PIPE;
TH PROCEED N 59 DEG 24 MIN 30 SEC E 62.
00 FT TO A 4 INCH X 4 INCH CONCRETE MONUMENT, TH N 65 DEG
55 MIN 30 SEC E 155.00
FT, TH N 32 DEG 57 MIN 13 SEC W 76.78 F I
'
T, TH S 65 DEG 22 MIN 39 SEC W 217.26 FT TO POB.
ISite Address
13608 & 13610 N INDIAN RIVER DR I
i
Parcel #
I
30-38-25-00004-0000-00006.2 Assessment = $4,346.96
Owner
MCELVEEN, STEPHEN A (LE) & KAREN S (LE)
Secondary Owner
MCELVEEN, STEPHEN A & KAREN S (TR)
Mailing Address
13600 N INDIAN RIVER DR
SEBASTIAN, FL 32958-3435
Legal
PLAT OF INLET VIEW SUBDIVISION
PBI 2-64 COM AT E R/W ST RD #5 A/K/A OLD
US HWY #1 & N LINE LOT 6; TH S 32 DEG 56 MIN 30 SEC E ALO
NG ELY R/W LINE ST RD
#5 DIST OF 75.05 FT TO POB; TH CONT S 32 ,
DEG 56 MIN 30 SEC E 81.85 FT TO A 3/4 INCH IRON PIPE, TH
I
PROCEED N 59 DEG 24 MI
N 30 SEC E 62.00 FT TO A 4 INCH X 4 INCH
CONCRETE MONUMENT, TH N 65 DEG 55 MIN 30 SEC E 155.00 FT,
TH N 32 DEG 57 MIN 13
I
SEC W 76.78 FT, TH S 65 DEG 22 MIN 39 S
EC W 217.26 FT TO POB.
ISite Address
13600 & 13602 N INDIAN RIVER DR
2/24/2016
F•\Utilities\UTILITY- Engineering\Projects - Assessment Projects\OOOAssessments - 2012 Proposed\I114rive - Roseland Rd to Inlet at Sebastian Condos\BCC Agenda Items\As-Built Resolution\IR Prelim Revised Final.xlsx
FINAL ASSESSMENT ROLL
NORTH INDIAN RIVER DRIVE - 10 LOTS
I
IParcel #
I
30-38-25-00004-0000-00007.0 Assessment = $4,346.96
Owner
DOUBLE R & D INC,
Secondary Owner
IMailing Address
C/O CAROL HESS
I
1335 SHORELINE CIRCLE
I
SEBASTIAN, FL 32958
ILegal
PLAT OF INLET VIEW SUBDIVISION
LOT 7, LYING WLY OF US HWY 1
PBI 2-64
ISite Address
13595 N INDIAN RIVER DR I
I
IParcel #
I
30-38-25-00004-0000-00007 1 Assessment = $4,346.96
JOLLEY, SAMUEL E & RUTH ANN
(Owner
Secondary Owner
IMailing Address
13590 N INDIAN RIVER DR
I
SEBASTIAN, FL 32958 I
ILegal
PLAT OF INLET VIEW SUBDIVISION I
I
PBI 2-64 PAR OF LAND BTW US HWY 1 & IND
I
RIV BNDED ON N & 5 BY EXT OF N -S LINE OF LOT 7 TO IND RIV i
LESS BOONE, ALSO PARC it
IDESC IN OR BK 201 PP 64 (OR BK 423 PP 55
I
I1)
ISite Address
113590 N INDIAN RIVER DR I
2/24/2016
F•\Utilities\UTILITY - Engineering\Projects - Assessment Projects\000Assessments - 2012 Proposed\IR?rive - Roseland Rd to Inlet at Sebastian Condos\BCC Agenda Items\As-Built Resolution\IR_Prelim Revised Final.xlsx