HomeMy WebLinkAbout2016-037 Board of County Commissioners
180127th Street
Vero Beach, Florida 32960
Telephone: (772) 567-8000 FAX: (772)-778-9391
Field and Laboratory Quality Control (QC)
For
Old Dixie Highway Resurfacing
(From 71St Street to CR 510)
IRC Project No. 1138
WORK ORDER NO. 2 (Engineering Division)
FOR
FOR PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT
FOR ANNUAL GEOTECHNICAL SERVICES CONTRACT, RFQ NO. 2014007
WITH
DUNKELBERGER ENGINEERING AND TESTING, INC.
All services performed under this contract shall be supervised and certified by a licensed Professional
Engineer(PE) registered with the State of Florida and staff employed directly with your firm.
Scope of Services
All work shall be performed on a unit price basis in accordance with the attached Proposal No.
PHB161007 (Exhibit A) dated March 2, 2016 and shall comply with Standards enumerated in the
ANNUAL GEOTECHNICAL SERVICES CONTRACT, RFQ 2014007 WITH DUNKELBERGER ENGINEERING AND
TESTING, INC. Effective Date: September 23, 2014.
Minimum Specification Requirements as follows:
Soil Compaction
Full Depth Reclamation Design Review
Asphaltic Roadway Surfacing Testing
Laboratory Testing
Field Observation
Engineering Reporting
All work shall also comply with the current Florida Minimum Technical Standards.
Work Order No. 2
Old Dixie Highway Resurfacing
(From 7111 Street to CR 510)
IRC Project No. 1138
COMPENSATION.
The COUNTY agrees to pay, and the Geotechnical Professional agrees to accept, a fee for services
rendered according to the Proposal No. PHB161007 identified in the attached EXHIBIT A Fee Schedule
and Man Hours.
A Not-to-Exceed Amount of: $37,860.00 to be paid on a unit price basis for actual work performed in
accordance with the schedule of services and fees set forth in Exhibit "A" of THE ANNUAL
GEOTECHNICAL SERVICES CONTRACT, RFQ 2014007 WITH DUNKELBERGER ENGINEERING AND TESTING,
INC. Effective Date:September 23, 2014.
TIME FOR COMPLETION
This Work Order No.2 shall run concurrently with the construction work for the resurfacing of Old Dixie
Highway(From 71"Street to CR 510), IRC Project No. 1138.
IN WITNESS HEREOF the parties hereto have executed these presents
This 15th day of March 2016.
OWNER DUNKELBERGER ENGINEERING&TESTING,
BOARD OF COUNTY COMMISSIONERS INC.
INDIAN RIVER COUNTY,.FLORIDA
a-w� "&.P
--bl --- - v,07-- -
-..pob Solari,Chairman David T. oungstr m Se for Project Manager
0*0 M ISSN
r�vgd by BCC Marrh 191, -)
_ n16
oJ'• *., Witnessed by:
*� EST:
S effreiQR.Smith, a of Courtand
me l
�`•ti/�fR C �
• • Deputy c (Printed name)
Approved as to Form and Legal
Suffici ncy-
William K.DeBraal,Deputy County
Attorney
eph A.B ird,County Administrato
F\Public Works\ENGIN'EERING DIVISION PROJECTS\1138-Old Dixie Hwy Resu f—g-71st St to CR 510Udmim\agendx items\agenda WO No.2 Dunkelberger 3-15-
16.doc
DUNKUBERGER
engineering &testing, inc.
Alfe'fra con COMPANY
March 2, 2016
Indian River County VF=An
1801 27t' Street
ILE11 T A
Vero Beach, Florida 32960
Attention: Mr. Michael Nixon P.E....via e-mail(mnixon@ircgov.com)
Roadway Production Manager
Subject: Materials Testing Services
Old Dixie Highway Resurfacing
IRC Project #1138
Indian River County, Florida
Terracon Proposal No. PHB161007
Dear Mr. Nixon:
Dunkelberger Engineering & Testing, Inc., A Terracon Company (Terracon) is providing
this revised proposal for Materials Testing Services during construction activities at
the subject project in Indian River County, Florida. As requested, we will perform the
field work on a unit rate (per test) basis instead of an hourly basis. As such, a four test
minimum charge per trip to the site will apply.
A. PROJECT INFORMATION
The subject project will include the reconstruction of the base course and asphaltic
concrete structural course and shoulder widening of the of Old Dixie Highway from 71st
Street to CR 510. The project length is approximately 10,070 lineal feet (1.9 miles). The
contract duration is unknown to us at this time.
The reconstruction (resurfacing) will involve building a 9-inch thick full-depth reclamation
(FDR) base course, a 1'/2-inch thick asphaltic concrete (AC) structural course, and 1'/2-
inch thick AC wearing course. The shoulder widening will involve constructing a 12-inch
deep stabilization (LBR 40) 3 to 4 feet wide on each side of the existing roadway. Also
associated with the project is installation of approximately 4,951 lineal feet (If) of drainage
pipe, 28 inlet structures, 144 If of box culvert, and construction of four concrete endwalls.
The purpose of our work is to provide quality assurance (QA) testing and inspection to
check the conformity of material composition with the project specifications.
Terracon Engineering&Testing,A Terracon Company 607 NW Commodity Cove Port St. Lucie, Florida 34986
P [772]343 9787 F [772] 343 9404 terracon corn
Proposal for Materials Testing Services Page 2
Old Dixie Highway Resurfacing ■ Indian River County, Florida
March 2, 2016 ■ Terracon Proposal No. PHB161007
B. SCOPE OF SERVICES
Based on our understanding of the project schedule and review of the project plans and
specifications, we envision that our field sampling/testing services will be required on a
periodic or as needed basis over the duration of the project. More specifically, our work
will involve the following.
Earthwork— Embankment and LBR 40 Shoulder Stabilization
• Laboratory Proctors (AASHTO T-99 and T-180) to determine maximum density
of the soils used for embankment and pipe backfill.
• In-place density tests of embankment at a frequency of 1 test per 500 If.
• In-place density tests of pipe backfill at a frequency of one test per 500 If (or
fraction thereof) for each lift of backfill placed.
• Limerock Bearing Ratio (LBR) tests of the in-place LBR materials for the
Stabilized Shoulders at a frequency of 1 test about every 2000 linear feet or 5
LBR samples on each side of roadway (total of 10 tests).
• Thickness verification of completed 12" LBR Shoulder Stabilization.
• In-place density tests of the LBR Shoulder Stabilization at a frequency of 1 test
per 500 linear feet each side of roadway (total of 42 tests).
FDR Base Course
• FDR mix design — Review and evaluate the mix design developed by the
Contractor for its design approach and procedure.
• Full Sieve Analysis test on the virgin materials before injection of emulsion at a
frequency of 1 test every 1000 linear feet per lane (estimated total of 22 tests).
• Maximum Density (Proctor) tests of the in-place FDR base materials at a
frequency of 1 test every 1000 linear feet per lane (estimated total of 22 tests)
• In-place density tests at a frequency of 1 test per 500 linear feet per lane
(estimated total of 42 tests).
• While on-site the technician will communicate with designated County and
Contractor personnel so that items of concern or identified deficiencies can be
immediately corrected.
• Verification of completed FDR base course — Review and evaluate the
verification testing plan as well as the testing results as provided by the
Contractor.
• As a contingency, we have listed our laboratory testing rates for FDR Mix Design
Verification and Resilient Modulus testing in case the contractor's QC laboratory
cannot provide these services.
1 rerralc®n
Proposal for Materials Testing Services Page 3
Old Dixie Highway Resurfacing ■ Indian River County, Florida
March 2, 2016 ■ Terracon Proposal No. PHB161007
Contractor QC Testing of Asphaltic Concrete (AC) Pavement
We understand that the Contractor is responsible for their own QC testing which shall
include performing at least one set of asphalt laboratory tests per day to evaluate the
materials and construction during paving. A minimum of three cores shall be cut by the
Contractor on daily basis to evaluate the in-place (constructed) density of the structural
course construction. The cores will be tested for bulk specific gravity, and the
compaction will be evaluated based on the percentage of the bulk specific gravity over
the maximum density determined in the plant on the bulk mix materials. As an option,
the density (% compaction) of the wearing course construction may be evaluated using
a calibrated nuclear gauge if a correction factor can be established using the core
densities from the first day of wearing course paving
Terracon will not be in the asphalt plant to perform any verification testing during asphalt
production.
Engineering & Reporting
• Engineering oversight and review during the construction to coordinate the
aforementioned test program, make site visits, and attend progress meetings.
• Submittal of brief engineering reports documenting our findings and test results.
Our materials testing services will be provided on an as-needed basis as dictated by the
pace and methods of construction.
C. COMPENSATION
The material testing services provided will be billed in accordance with our current
2014-2016 Continuing Geotechnical Services Agreement the line item unit rates
illustrated on the Projected Scope and Budget (Attachment A). As stated earlier a four
test minimum charge per trip to the site will apply. Terracon proposes to complete the
scope of services as described herein for an estimated fee of $37,860 and
invoiced on a unit rate basis. If additional services outside the listed project services
are required, Terracon will provide such under auspice of a Supplemental Proposal
using the same line item unit rates as provided herein.
The quantity of the work performed and factors beyond our control, such as weather
and the contractor's schedule/efficiency, will affect the actual cost for our services. You
will be invoiced at regular intervals but not less than monthly for services performed.
lrerracon
Proposal for Materials Testing Services Page 4
Old Dixie Highway Resurfacing ■ Indian River County, Florida
March 2, 2016 o Terracon Proposal No. PHB161007
Invoices for our services will be directed to the addressee of this letter unless we are
directed otherwise. Payment is due within thirty (30) days following receipt of an invoice.
D. SITE ACCESS AND SAFETY
Indian River County (IRC) shall secure all necessary site related approvals, permits,
licenses, and consents necessary to commence and complete the services and will
execute any necessary site access agreement.
At Terracon, we all have a personal and uncompromising commitment to everyone
going home safely each and every day. Our safety program, Incident and Injury Free®
is about care and concern for people. It is our personal and organizational commitment
at all levels of the company and is where safety is held as a core value as well as an
operational priority. Working safely is an inseparable part of working correctly, just as
much as other operational priorities, in particular quality, profitability and schedule. IIF
is our commitment to our people and others, who we value for who they are and what
they do. /IF is not just something we do, it's in everything we do.
As part of our IIF process, we will prepare a "Pre-Task Plan" to identify the potential site
safety and job hazards associated with your site. Our Pre-Task Plan will identify and
prepare our personnel to be able to handle conditions such as but not limited to traffic
control, environmental contamination, site access issues, overhead and underground
utilities, adverse weather conditions, and personal protection equipment and will
continually be reviewed and reevaluated throughout the field work activities. We
understand that each site is unique and may contain different safety conditions and as a
company to protect our personnel as well as others, we look at each site individually to
identify the potential concerns.
E. TESTING AND SAMPLING
The above services will be provided under an as-requested basis. Additionally, we
request a 48-hour notice to schedule our services.
IRC understands that testing and sampling are discrete procedures, and that such
procedures indicate conditions only at the depths, locations, and times the procedures
were performed. Terracon will provide test results and opinions based only on the
field/laboratory tests in the areas tested. IRC understands that testing and sampling are
1rerracon
Proposal for Materials Testing Services Page 5
Old Dixie Highway Resurfacing a Indian River County, Florida
March 2, 2016 n Terracon Proposal No. PHB161007
not continuous or exhaustive, and are conducted to reduce - not eliminate - project
risk. IRC agrees to the level or amount of testing performed and the associated risk.
IRC is responsible (even if delegated to contractor) for notifying and scheduling
Terracon so Terracon can perform these services. Terracon shall not be responsible for
the quality and completeness of IRC or its contractors work or their adherence to the
project documents, and Terracon's performance of testing and sampling services shall
not relieve contractor in any way from its responsibility for defects discovered in its
work, or create a warranty or guarantee. Terracon will not supervise or direct the work
performed by IRC or its contractors and is not responsible for their means and methods.
F. AUTHORIZATION
Terracon appreciates the opportunity to submit this proposal and looks forward to
rendering the services described herein. Should you accept this proposal, we
understand that this work will be performed under a Purchase Order issued by Indian
River County.
Should you have any questions concerning this proposal, please feel free to contact
Kimberly Roberts or Dave Youngstrom by e-mail (kimberly.roberts terracon.com or
dave.youngstrom(@terracon.com) or by phone at 772-343-9787.
Sincerely,
Dunkelberger Engineering and Testing, Inc.
A Terracon Company n
1--X ��
For Kimberly be s David T. Yo gst om
Project Manager Office Manager
Attachments:A- Projected Scope and Budget
lrerracon
Projected Scope and Budget Attachment A
Materials Testing Services
Old Dixie Highway Resurfacing Project
Indian River County,Florida
Project Name: Old Dixie Hwy Resurfacing IRC Project#11378 Dunkelberger Engineering&Testing, Inc.,A Terracon Company
Client. Indian River County Attn:Mr Michael Nixon,P.E. 607 NW Commodity Cove
Dunkelberger Proposal#• PHB161007 Port St.Lucie,Florida 34986
Date: Revised 3/2/2016 772 343-9787 FAX 772 343-9404 Contact: David T Youn strom
Remainingon ContractContract Amount
Itemized Services Qtyl Unit Price Amount Gty Amount Gty Aflieunt 4ty Ameunt Qty Amount
Field Testing
In-Place Density Testing' 870 test 1 $25.00 $21,750.00 9.06 $8-86 0 $6 09 9-99 $8 96 870 $21,750.00
"Four(4)test minimum per site visit.
Laboratory Testing
Proctor Test(T-1 80),FDR"" 22 each $90.00 $1,980.00 0 $9:90 6 $9-99 9 $6-69 22 $1,980.00
Proctor Test Embankment/Pipe Backfill/Agg Bas 5 each $9000 $45000 0 $0-09 0 $0-06 6 $0-00 5 $45000
Sieve Analysis of Fine and Coarse Agg(T-27) 22 each $7000 $1,54000 0 $0.09 6 $0.99 6 $6-06 22 $1,540.00
Limerock Bearing Ratio(LBR,FM-515) 10 each $300.00 $3,000.00 6 $0-06 0 $9-09 9 $6-06 10 $3,000.00
Concrete Compressive Strength(8 sets of 4 cylsi 8 each 1 $90.00 1 $720.00 0 $6-09 6 $6:09 0 $0.00 8 $720.00
The Proctor test for the FDR involves the laboratory density determination of the field-prepared FDR mixture with emulsions.
Asphalt Plant Testing
FDOT CTQP Certified Plant Inspector 0 hour $65.00 $0.00 6:08 $9-00 9 $9-99 0768 $84)9 0 $000
Engineering&Reporting
Project Engineer/Project Manager 55 hour $9500 $5,22500 9 $0.06 6 $9-99 9 $8:88 55 $5,225.00
Professional Engineer/Sr Project Manager 15 hour $130.00 $1,950.00 0 $0.06 9 $8-99 6 $8:06 15 $1,950.00
Contingency Laboratory Testing
FDR Mix Design Resilient Modulus Test 1 test $1,245.00 $1,245.00 6 $0-89 9 $8-09 0 $886 1 $1,245.00
Estimated Total $37,860.00 $&06 $0.66 $0.06 $37,860.00
PHB161007 Old Dixie Hwy FDR QA est—Rev 3-2-16.xls