HomeMy WebLinkAbout2015-019Board of County Commissioners 1801 27th Street Vero Beach, Florida 32960 Telephone: (772) 567-8000 FAX: (772)-778-9391 Construction Materials Testing For Intergenerational Recreation Facility at South County Regional Park IRC Project No. 1135 WORK ORDER NO. 1 (Engineering Division) FOR FOR PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT FOR ANNUAL GEOTECHNICAL SERVICES CONTRACT, RFQ NO. 2014007 WITH ANDERSEN ANDRE CONSULTING ENGINEER, INC. All services performed under this contract shall be supervised and certified by a licensed Professional Engineer (PE) registered with the State of Florida and staff employed directly with your firm. Scope of Services All work shall be performed on a unit price or hourly rate basis in accordance with the attached Scope of Services (Exhibit A) dated December 22, 2014 and shall comply with Standards enumerated in the ANNUAL GEOTECHNICAL SERVICES CONTRACT, RFQ 2014007 WITH ANDERSEN ANDRE CONSULTING ENGINEERS, INC. Effective Date- October 1, 2014 Minimum Specification Requirements as follows Site Work Testing • Mass Site Fill Density Testing • Parking Lots, Entrance Roadway, Access Drive and Curb Pad • Stormdrain System • Sanitary Sewer • Water Line and Fire Main • Miscellaneous Tie-ins, Valves, Hydrants Conflicts • Laboratory Testing • Concrete Testing Vertical Construction Testing • In -Place Soil Density Testing • Concrete Testing All work shall also comply with the current Florida Minimum Technical Standards. Work Order No. 1 Andersen Andre Consulting Engineers, Inc. IRC Project No. 1135 COMPENSATION. The COUNTY agrees to pay, and the Geotechnical Professional agrees to accept, a fee for services rendered according to the "Scope of Services" identified in the attached EXHIBIT "A" Fee Schedule and Man Hours. A Not -to -Exceed Amount of: $57,115.00 to be paid on a unit price or hourly rate basis for actual work performed in accordance with the schedule of services and fees set forth in Exhibit A of the ANNUAL GEOTECHNICAL SERVICES CONTRACT, RFQ 2014007 WITH ANDERSEN ANDRE CONSULTING ENGINEERS, INC. Effective Date: October 1, 2014. TIME FOR COMPLETION This Work Order No.1 shall run concurrently with the construction work for the Intergenerational Recreation Facility at South County Regional Park, IRC Project No. 1135. IN WITNESS HEREOF the_parties hereto have executed these presents This 10thgday of 'February' , 2015. OWNER laW /464sh BOARD OF COUNTY w=• COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA t Zs �'. EllS ,a4NDRE CONSULTING EE$S,\NC. •o og • o Wesley S. Davis, Chairman ..tavid P. Andre, P.E., Principal Engineer Approved by BCC February_ 10, 2015 ATTEST: Jeffrey R. Smith, Clerk of Court and Comptroller ett Clerk Approved as to Form and Legal Sufficienc an Reingold, ounty Attorney Josep':" Baird, County Administrator Witnessed by: (Printed name) Peter G. Andersen, P.E. t :d., , :.r:.; \t, k i; AACE'. ANDERSEN ANDRE CONSULTING ENGINEERS, INC. Geotechnical Engineering Construction Materials Testing Environmental Consulting Indian River County Engineering Department 1801 27th Street Vero Beach, Florida 32960 Attention: Mr Christopher J. Kafer Jr., P.E. County Engineer December 22, 2014 AACE Proposal No. P14-392 PROPOSAL FOR CONSTRUCTION MATERIALS TESTING INDIAN RIVER COUNTY INTERGENERATIONAL RECREATION CENTER INDIAN RIVER COUNTY, FLORIDA Per your request, Andersen Andre Consulting Engineers, Inc. (AACE) is pleased to present this proposal for performing construction materials testing for Indian River County's proposed Intergenerational Recreation Center located in Vero Beach, Florida. Based on our review of the Civil Plans prepared for the subject site by Masteller & Moler, Inc. (M&M) dated November 12, 2014 and provided to us by the County, we understand that the proposed recreational facility will be constructed on approximately 12 acres of the 75.11 -acre County -owned parent tract located at the northeast corner of Oslo Road and 20`h Avenue. This phase of the project (Phase I) includes the construction of a 37,753 square -foot recreation building, approximately 140,000 square feet of paved parking, a two -cell stormwater management pond (separated by a httoral planting area) and two dry retention ponds, as well as an outdoor event lawn, various patio areas, sidewalks and entranceway features. Additional project elements include drainage improvements and utility installations. Based on our review of M&M's Paving and Grading plans, it appears that approximately 3-4 feet of fill will be needed to raise the site to proposed grades. We understand that the services for which we are preparing this proposal include density testing of all soil and base rock as well as concrete testing associated with site work activities, and also for vertical construction. For the purposes of this proposal, we have separated our services (and costs) as follows: Site Work ► Density testing for building pads, parking lot, roadways, utility and stormdrain excavation backfill, sidewalk, and patio subgrade; ► Compressive strength of concrete testing for sidewalks and curbing; Vertical Construction ► Density testing for building footings, conduit backfill, etc.; ► Compressive strength of concrete testing for building construction and pads, 573 SW Biltmore Street, Port St. Lucie, Florida 34983 Ph: 772-807-9191 Fx: 772-807-9192 www.aaceinc.com Intergenerational Recreation Center Page -2- AACE Proposal No. P14-392 Based upon our cursory review of the project plans and our prior experience in the area and with sites and projects similar to this one, we estimate the cost of testing services will be $57,115.00 (itemized on pages 3 through 5). The actual cost of AACE's testing services will be a function of work actually performed in accordance with the attached unit fee schedule (per the Continuing Service Contract between Indian River County and RACE). Contractor efficiency, methodology and changes in testing frequencies may affect the testing cost. We will notify you in advance if it appears that the cost estimate will be exceeded. To authorize us to proceed with this project, please execute and return to us a copy of the attached Professional Services Agreement form or a Purchase Order number. If you have any questions or if we can provide any additional information, please feel free to contact us at your convenience. Best Regards, ANDERSEN ANDRE CONSULTING ENGINEERS, INC. David P Andre, P.E. Peter G. Andersen, P.E. Principal Engineer Principal Engineer ANDERSEN ANDRE CONSULTING ENGINEERS, INC. WWW.AACEINC.COM Intergenerauonal Recreation Center Page -3- AACE Proposal No. P14-392 Proposed Testing Frequency Unless otherwise requested, the following in-place density testing frequencies will be used for the subject project (based on the accepted industry standard for projects such as TMC). Mass Site Fill Natural Ground - 1 test performed 1 foot into natural ground (after stepping and grubbing) per 5,000 square feet; Embankment/Filled Area - 1 test per 5,000 square feet, per lift of fill, Roadways: Stabilized Subgrade - 1 test per 200 lineal feet, per travel direction; Base Course - 1 test (1 lift except for entrance road - 2 lifts) per 200 lineal feet, per travel direction, Curb pads - 1 test per 200 lineal feet; Sidewalks - 1 test per 200 lineal feet, per 12 -inch lift of embankment; Parking Lot: Natural Ground - 1 test performed 1 foot into natural ground (after stepping and grubbing) per 5,000 square feet; Embankment/Filled Area - 1 test per 5,000 square feet, per lift of fill; Stabilized Subgrade - 1 test per 5,000 square feet; Base Course - 1 test (assuming base constructed in one lift) per 5,000 square feet; Buildings: Pad Fill - 1 test per 2,000 square feet, per lift of fill; Continuous Footings - 1 test performed 1 foot into bottom of footing excavation per every 50 feet of footing; Column/Isolated Footings - Minimum of 1 test performed 1 foot into bottom of footing excavation per footing; Drainage: Structures - One (1) test per hft of backfill, from bottom of structure to top of structure. (Fill placed on all sides of structure is probed with a manual probe rod to confirm uniform compacuve effort); Piping - 1 test per 200 lineal feet (or per backfill/open cut operation) per lift along side of pipe to top -of -pipe, then every 1 foot of fill atop pipe thereafter; Utilities: Sanitary Sewer Pipe -1 test per 200 lineal feet (or per backfill/open cut operation) per hft along side of pipe to top - of -pipe, then every 1 foot of fill atop pipe thereafter; Water Main - 1 test per 200 lineal feet of pipe (or per backfill/open cut operation) per lift from top -of -pipe to finished grade + 1 test per 200 lineal feet for pipe bedding We have assumed a maximum of 3 feet of cover for water main backfill; Misc. Electrical/Plumbing/Irrigation/LT Conduit - 1 test per 200 lineal feet of pipe (or per backfill/open cut operation) per lift from top -of -pipe to finished grade. Concrete/Grout Testing; A minimum of one set of four (4) cylinders will be made for every pour, and for each 50 cubic yards for larger pours; One slump test will be performed for every pour, and for each 50 cubic yards for larger pours, Intergenerational Recreation Center Page -4- AACE Proposal No. P14-392 Site Work Testing Mass Site Fill Density Testing: ► 360,000 ft2 of filled area x 4 ft. of fill (+ 1' Natural Ground) x 1 test/5,000 ft2 = 360 In -Place Density Tests @ $23.00/test Parking Lots, Entrance Roadway, Access Drive and Curb Pad (top 1' of embankment + subgrade + base): ► 140,000 ft2 x 1 test/5,000 ft2 x 3 test/location; Assume 100 In -Place Density Tests @ $23.00/test $8,280.00 $2,300.00 Stormdrain System (Piping + Structures): ► Stormdrain Structure Backfill Testing = 150 In -Place Density Tests @ $23 00/test $3,450.00 ► Stormdrain Piping Backfill Testing = 130 In -Place Density Tests @ $23.00/test $2,990.00 Sanitary Sewer (Piping + Manholes): ► 90 In -Place Density Tests @ $23.00/test Water Line and Fire Main. • 40 In -Place Density Tests @ $23 00/test Miscellaneous Tie -ms, Valves, Hydrants, Conflicts, etc. ► 25 In -Place Density Tests @ $23.00/test Laboratory Testing• ► LBRs (parking lot and roadway subgrade and base rock) , 6 tests @ $295.00/test ► Proctor Tests; 8 tests @ $85.00/test Concrete Testing: ► Sidewalks and Curbing - 10 sets of 4-cyhnder concrete specimen (tested at 7, 28, 28 days and Hold) @ $85.00/set [$55.00/hour/technician charged for time spent beyond 1 hour per scheduled set of cylinders made] Misc. Man-hours $2,070.00 $920.00 $575.00 $1,770.00 $680.00 $850 00 We have included limited man-hours that may be necessary during standby dunng deflections, LBR/Proctor Sampling, subgrade inspecuons, field meetings, roadway restorations (i.e., 15th Street SW), etc. ► Senior Project Engineer; 3 hrs./week x 52 weeks x $110.00/hr. $17,160.00 • Senior Field Technician; 3 hrs./week x 52 weeks x $55.00/hr. $8,580 00 ► Technical Secretary; 25 hours x $45.00/hr. . $1,125.00 Site Work Testing Subtotal: $50,750.00 Intergenerational Recreation Center Page -5- AACE Proposal No. P14-392 Vertical Construction Testing In -Place Soil Density Testing• ► Recreauon Center Wall Footings; 50 density tests @ $23.00/test $1,150.00 • Isolated Footings, 20 density tests @ $23 00/test . $460 00 ► Misc. Conduit Trench Backfill; 25 density tests @ $23 00/test $575.00 Concrete Testing. It is difficult to accurately predict the number of concrete specimens needed for QA/QC for a project such as the Intergenerational Recreation Center since the number of tests is largely based on the number of pours (i.e., 1 set of cylinders for a 50 cubic yard pour vs. 5 sets of cyhnders for five separate 10 cubic yard pours, etc.). Without knowing the Contractor's methodology or pour schedule for this work element, we largely base the concrete testing budget on our expenence with similar projects. For this purpose, we have assumed the following. (1) Tilt -Up Panels: 86 panels (avg. width/height: 30'/20' x 4" = 7.5 yd3 per panel, pouring 10 panels/day, 2 sets of specimen/pour) ► 20 sets of 4 cyhnders for compressive strength testing @ $85.00/set $1,700.00 (2) Recreation Center Columns. ► 5 sets of 4 cylinders for compressive strength testing @ $85.00/set $425.00 (3) Recreation Center Slab (Assume 4 pours, 2 sets/pour) ► 8 sets of 4 cylinders for compressive strength testing @ $85.00/set $680.00 (4) Semor Technician for Standby during larger pours, extra slumping, etc. ► 25 hours @ $55.00/hour $1,375 00 Vertical Construction Testing Subtotal: $6,365.00 TOTAL ANTICIPATED TESTING BUDGET (SITE WORK + VERTICAL) $57,115.00 Intergenerational Recreation Center Page -6- AACE Proposal No. P14-392 The following conditions apply to this project: (1) A minimum of 4 density tests or 1 set of concrete testing will need to be performed per hour, per visit to the site. (2) Stand-by time will be charged at $55.00/hour per technician. (3) We note that density testing frequencies are approximate and based on our experience with similar projects and anticipated contractor methodologies. Allowances for re -tests (from failing density tests) are not included herein. (4) The contractor should contact Andersen Andre Consulting Engineers, Inc. at (772) 807-9191 a minimum of 24 hours prior to any testing and 48 hours pnor to weekend and evening work. Unit rates apply to standard working days, Monday through Friday, 7:00 a.m to 6:00 p.m. Testing and hourly rates will be increased by 50% for weekend, holiday or after-hours services. (5) (6) The following testing costs are not included within this estimate: costs associated with asphalt testing (either in the field or laboratory) or bacteriological testing of potable water (bac-t's). Such testing can be performed if requested using the rates included herein. (7) If our testing estimate for a specific work element is insufficient for that particular activity, resources from another work element can be used without prior authorization from the client as long as our total cost esumate is not exceeded. We will notify you in advance if it appears that the cost estimate presented in the attached unit fee schedule will be exceeded. (8) Soil sample pickup for laboratory testing (e.g., Proctor testing) will be billed at $55.00/hour if not scheduled with other work. (9) We note that the number of sets of concrete cylinders is dependent on numerous factors, such as the size and duration of pours. For example, if numerous "smaller" pours (e.g., 10 -yard pours) occur during construction, our estimate for the number of sets of concrete cylinders may be exceeded, thus requiring revision of this proposal to account for this testing cost increase. (10) No paint -thickness or fire proofing thickness testing, bolt -tightness, steel or weld inspections, or floor levelness testing are included herein; we would be pleased to revise this proposal to include such services if requested.