Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2013-090A
CONTRACT DOCUMENTS AND SPECIFICATIONS FOR CR 512 RESURFACING (EAST BOUND ONLY) (ROSELAND ROAD TO EASY STREET) BID NO. 2013006 PROJECT NO. 1132 ,�pz►3'v9DA PREPARED FOR THE BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA JOSEPH E. FLESCHER, CHAIRMAN WESLEY S. DAVIS, VICE CHAIRMAN COMMISSIONER BOB SOLARI COMMISSIONER PETER D. O'BRYAN COMMISSIONER TIM ZORC JOSEPH A. BAIRD, COUNTY ADMINISTRATOR JEFFREY R. SMITH, CLERK OF COURT AND COMPTROLLER ALAN S. POLACKWICH, SR., COUNTY ATTORNEY CHRISTOPHER R. MORA, P.E., PUBLIC WORKS DIRECTOR CHRISTOPHER J. KAFER, JR., P.E., COUNTY ENGINEER MICHAEL D. NIXON, P.E., ROADWAY PRODUCTION MANAGER VIit LIAM K. D i1j<A/m 00001 - Project Title Page - REV 04-07.doc 00001 -1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD 0926V\dmim\Contract Documents\00001 -Project Title Page - REV 04-07.doc TABLE OF CONTENTS Section No. Title DIVISION 0 - BIDDING DOCUMENTS CONTRACT FORMS AND CONDITIONS OF THE CONTRACT 00001 Cover Sheet 00010 Table of Contents BIDDING DOCUMENTS 00100 Advertisement for Bids 00200 Instructions to Bidders 00300 Bid Package Contents 00310 Bid Form & Itemized Bid Schedule 00430 Bid Bond 00452 Sworn Statement under Section 105.08, Indian River County Code, on Disclosure of Relationships 00454 Sworn Statement under the Florida Trench Safety Act 00456 Qualifications Questionnaire 00458 List of Subcontractors CONTRACT FORMS 00510 Notice of Award 00520 Agreement 00550 Notice to Proceed 00610 Public Construction Bond 00620 Sample Certificate of Liability Insurance 00622 Contractor's Application for Payment 00630 Certificate of Substantial Completion 00632 Contractor's Final Certification of the Work 00634 Professional Surveyor and Mapper's Certification as to the Elevations and Locations of the Work CONDITIONS OF THE CONTRACT 00700 EJCDC Standard General Conditions of the Construction Contract 00800 Supplementary Conditions to the General Conditions 00942 Change Order Form 00946 Field Order Form 00948 Work Change Directive 00010-1 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00010 - Table of Contents - REV 04-07.doc DIVISION 1 - GENERAL REQUIREMENTS DIVISION 2 - TECHNICAL PROVISIONS APPENDIX "A" - GEOTECHNICAL REPORTS + + END OF TABLE OF CONTENTS + + 00010-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\00010 - Table of Contents - REV 04-07.doc SECTION 00100 -Advertisement for Bids BOARD OF COUNTY COMMISSIONERS 180127"' Street Vero Beach, Florida 32960 Telephone: (772) 567-8000 FAX: (772) 770-5140 ADVERTISEMENT FOR BIDS INDIAN RIVER COUNTY Sealed bids will be received by Indian River County until 2:00 P.M. on Wednesday, April 24, 2013. Each bid shall be submitted in a sealed envelope and shall bear the name and address of the bidder on the outside and the words "CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street)' and Bid No. 2013006. Bids should be addressed to Purchasing Division, 1800 27th Street, Vero Beach, Florida 32960. All bids will be opened publicly and read aloud at 2:00 P.M. All bids received after 2:00 P.M., of the day specified above, will be returned unopened. INDIAN RIVER COUNTY PROJECT NO. 1132 INDIAN RIVER COUNTY BID NO. 2013006 PROJECT DESCRIPTION: The proposed improvements to CR -512 consist of refurbishing (full depth reclamation) of the dual eastbound lanes from Roseland Road to Easy Street. Also included with the project is the installation of vehicular detector assemblies and the signing and marking of the proposed resurfaced eastbound lanes. This is a F.D.O.T. Small County Outreach Program (SCOP) funded project FM No. 427572-1-58-01 All material and equipment furnished and all work performed shall be in strict accordance with the plans, specifications, and contract documents pertaining thereto, which may be obtained from the Public Works Department/Engineering Division, 1801 27th Street, Vero Beach, Florida, 32960, (772) 226-1283. Copies of the plans and specifications containing the necessary contract documents may be obtained by deposit of a check made payable to Indian River County, in the amount of $75.00 for each set, which represents cost of printing and handling, which is non-refundable. Communications concerning this bid shall be directed to IRC Purchasing Division at purchasing(o-),ircgov.com . All bidders shall submit one (1) original and one (1) copy of the Bid Proposal forms provided within the specifications. BID SECURITY must accompany each Bid, and must be in the form 00100 - Advertisement for Bids REV 04-07.doc 00100-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00100 - Advertisement for Bids REV 04-07.doc of an AIA Document A310 Bid Bond, properly executed by the Bidder and by a qualified surety, or a certified check or a cashier's check, drawn on any bank authorized to do business in the State of Florida. Bid Security must be in the sum of not less than Five Percent (5%) of the total amount of the bid, made payable to Indian River County Board of County Commissioners. In the event the Contract is awarded to the Bidder, Bidder will enter in a Contract with the County and furnish the required 100% Public Construction Bond within the timeframe set by the County. If Bidder fails to do so, the Bid Security shall be retained by the County as liquidated damages and not as penalty. Please note that the questionnaire must be filled out completely including the financial statement. The County reserves the right to delay awarding of the Contract for a period of ninety (90) days after the bid opening, to waive informalities in any bid, or reject any or all bids in whole or in part with or without cause/or to accept the bid that, in its judgement, will serve the best interest of Indian River County, Florida. The County will not reimburse any Bidder for bid preparation costs. A Pre -Bid Conference will be held on April 4, 2013 at 10:00 A.M., in the Public Works conference room Al -303 of the Indian River County Administration Building located at 1801 27`h Street, Vero Beach, Florida, 32960. ATTENDANCE AT THIS CONFERENCE BY ALL BIDDERS IS HIGHLY ENCOURAGED. INDIAN RIVER COUNTY By: Jerry Davis Purchasing Manager For Publication in the Vero Beach Press Journal Date: March 13, 2013 For: Vero Beach Press Journal Please furnish tear sheet and Affidavit of Publication to: INDIAN RIVER COUNTY PURCHASING DIVISION 1800 27th Street Building "B" Vero Beach, FL 32960 * * END OF SECTION * * 00100 - Advertisement for Bids REV 04-07.doc 00100-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00100 - Advertisement for Bids REV 04-07.doc SECTION 00200'InmtrUGtionsto Bidders TABLE OF CONTENTS Article No. - Title Egge ARTICLE1 - DEFINED TERMS ............................................................................................. 1 ARTICLE 2 - COPIES {}FBIDDING DOCUMENTS ................................................................ 1 ARTICLE 3 - QUALIFICATIONS C)FBIDDERS ...................................................................... 1 ARTICLE 4 - EXAMINATION OFBIDDING DOCUMENTS, OTHER RELATED DATA, ANDSITE ................................................................................................................... 2 ARTICLE 5 - PRE-BID CONFERENCE .................................................................................. 4 ARTICLE U - SITE AND OTHER AREAS ................................................................................ 4 ARTICLE 7 - INTERPRETATIONS AND ADDENDA .............................................................. 4 ARTICLE8 - BID SECURITY ................................................................................................. b ARTICLE9 - CONTRACT TIMES ........................................................................................... 5 ARTICLE 1O - LIQUIDATED DAMAGES ................................................................................ b ARTICLE 11 - SUBSTITUTE AND "C)R-EQU/\L"ITEMS ........................................................ 5 ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS ....................................... 0 ARTICLE 18 - PREPARATION C)FBID .................................................................................. O ARTICLE 14 - BASIS OFBID; EVALUATION C)FBIDS .......................................................... 7 ARTICLE 15 - SUBMITTAL OFBID ........................................................................................ U ARTICLE 1O - MODIFICATION AND WITHDRAWAL {]FBID ................................................ 8 ARTICLE17 -OPENING OFBIDS ......................................................................................... O ARTICLE 1O - BIDS TO REMAIN SUBJECT TOACCEPTANCE ........................................... 9 ARTICLE 1S - AWARD [)FCONTRACT ................................................................................ S ARTICLE 2O - CONTRACT SECURITY AND INSURANCE .................................................... 1O ARTICLE 21'SIGNING C)FAGREEMENT ............................................................................ 1O nO20O'Instructions mBidders REV o4-07.dno oouoo'i pAIP"mww"mmewn/wssmwoDIVISION rpmsCrvn1,2-onw2smmResurfacing Roseland numEasy St -SEE pno 0926mommx "m�mo�"m°m"mvom SECTION 00200 - Instructions to Bidders TABLE OF ARTICLES (Alphabetical by Subject) Subiect Article Awardof Contract.....................................................................................................................19 Basisof Bid; Evaluation of Bids................................................................................................14 BidSecurity................................................................................................................................8 Bids to Remain Subject to Acceptance.....................................................................................18 Contract Security and Insurance...............................................................................................20 ContractTimes...........................................................................................................................9 Copiesof Bidding Documents.....................................................................................................2 DefinedTerms............................................................................................................................1 Examination of Bidding Documents, Other Related Data, and Site .............................................4 Interpretationsand Addenda.......................................................................................................7 LiquidatedDamages.................................................................................................................10 Modification and Withdrawal of Bid...........................................................................................16 Openingof Bids........................................................................................................................17 Pre -Bid Conference....................................................................................................................5 Preparationof Bid.....................................................................................................................13 Qualificationsof Bidders............................................................................................................. 3 Signingof Agreement...............................................................................................................21 Siteand Other Areas..................................................................................................................6 Subcontractors, Suppliers and Others......................................................................................12 Submittalof Bid........................................................................................................................15 Substituteor "Or -Equal' Items..................................................................................................11 00200 - Instructions to Bidders REV 04-07.doc 00200 - ii FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00200 - Instructions to Bidders REV 04-07.doc SECTION 00200 - Instructions to Bidders ARTICLE 1 - DEFINED TERMS 1.01 Terms used in these Instructions to Bidders will have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below which are applicable to both the singular and plural thereof: A. Bidder --The individual or entity who submits a Bid directly to OWNER. B. Issuing Office --The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered. C. Successful Bidder --The lowest responsible Bidder submitting a responsive Bid to whom OWNER (on the basis of OWNER's evaluation as hereinafter provided) makes an award. ARTICLE 2 - COPIES OF BIDDING DOCUMENTS 2.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the Advertisement or Invitation to Bid may be obtained from the Issuing Office. 2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither OWNER nor ENGINEER assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.03 OWNER and ENGINEER in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use. ARTICLE 3 - QUALIFICATIONS OF BIDDERS 3.01 To demonstrate Bidder's qualifications to perform the Work, within five days of OWNER's request Bidder shall submit written evidence such as financial data, previous experience, present commitments, and such other data as may be called for below. A. Bidder must have at least five years' experience in the construction of similar projects of this size and larger. B. Bidder must have successfully constructed, as prime CONTRACTOR, at least three projects similar in scope to this project. C. Bidder must have good recommendations from at least three clients similar to the OWNER. D. The Bidder's superintendent and assistants must be qualified and experienced in similar projects in all categories. E. Bidder must be able to provide evidence of authority to conduct business in the jurisdiction in which the project is located. 00200 - Instructions to Bidders REV 04-07.doc 00200-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 3.02 Each bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract. 3.03 The OWNER reserves the right to reject bids from Bidders that are unable to meet the listed required qualifications. ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE 4.01 Subsurface and Physical Conditions A. The Supplementary Conditions identify: 1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Bidding Documents. 2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that ENGINEER has used in preparing the Bidding Documents. B. Copies of reports and drawings referenced in paragraph 4.01.A will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the technical data contained therein upon which Bidder is entitled to rely as provided in paragraph 4.02 of the General Conditions has been identified and established in paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any "technical data" or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings. 4.02 Underground Facilities A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to OWNER and ENGINEER by OWNERs of such Underground Facilities, including OWNER, or others. 4.03 Hazardous Environmental Condition A. The Supplementary Conditions identify those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that ENGINEER has used in preparing the Bidding Documents. B. Copies of reports and drawings referenced in paragraph 4.03.A will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in paragraph 4.06 of the General Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any "technical data" or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings. 4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in paragraphs 4.02, 4.03, and 4.04 of the General Conditions. 00200 - Instructions to Bidders REV 04-07.doc 00200-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926VAdmim\Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in paragraph 4.06 of the General Conditions. 4.05 Upon a request directed to the ENGINEER (Christopher J. Kafer Jr., P.E. 772-226- 1221), OWNER will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. 4.06 "[This paragraph has been deleted intentionally]"] 4.07 It is the responsibility of each Bidder before submitting a Bid to: A. examine and carefully study the Bidding Documents, including any Addenda and the other related data identified in the Bidding Documents; B. VISIT THE SITE AFTER CONTACTING THE ENGINEER (CHRISTOPHER J. KAFER JR, P.E., (772) 226-1221 TO MAKE ARRANGEMENTS IN ADVANCE, AND BECOME FAMILIAR WITH AND SATISFY BIDDER AS TO THE GENERAL, LOCAL, AND SITE CONDITIONS THAT MAY AFFECT COST, PROGRESS, AND PERFORMANCE OF THE WORK; C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, or performance of the Work; D. carefully study all reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions, and carefully study all reports and drawings of a Hazardous Environmental Condition, if any, at the Site which have been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions; E. obtain and carefully study (or assume responsibility for doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (overhead, surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto; F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times and in accordance with the other terms and conditions of the Bidding Documents; 00200 - Instructions to Bidders REV 04-07.doc 00200-3 FAI`ublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05101 G. become aware of the general nature of the work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents; H. correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents; I. promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by ENGINEER is acceptable to Bidder; and J. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work. 4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. ARTICLE 5 - PRE-BID CONFERENCE 5.01 5.01 The date, time, and location for a Pre -Bid conference, if any, are specified in the Advertisement for Bids. Representatives of OWNER and ENGINEER will be present to discuss the Project. Bidders are highly encouraged to attend and participate in the conference. ENGINEER will transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. ARTICLE 6 - SITE AND OTHER AREAS 6.01 The Site is identified in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents. ARTICLE 7 - INTERPRETATIONS AND ADDENDA 7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to PURCHASING (purchasing (a-),ircgov.com) in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties through the Issuing Office as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not 00200 - Instructions to Bidders REV 04-07.doc 00200-4 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\\dmim\Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05101 be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by OWNER or ENGINEER. ARTICLE 8 - BID SECURITY 8.01 Each Bid must be accompanied by Bid Security made payable to OWNER in the amount of five percent of the Bidder's maximum base bid price and in the form of a certified check; cashier's check; or an AIA Document A310 Bid Bond issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. The Bid Bond shall be executed by such sureties as are named in the current list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. The Surety must be authorized to issue surety bonds in Florida. The Bidder shall require the attorney-in-fact who executes any Bond, to affix to each a current certified copy of their Power of Attorney, reflecting such person's authority as Power of Attorney in the State of Florida. Further, at the time of execution of the Contract, the Successful Bidder shall for all Bonds, provide a copy of the Surety's current valid Certificate of Authority issued by the United States Department of the Treasury under 31 United States Code sections 9304- 9308. The Surety shall also meet the requirements of paragraphs 5.01 and 5.02 of the General Conditions. 8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, OWNER may annul the Notice of Award and the Bid security of that Bidder will be retained by the owner. The Bid Security of other Bidders whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of seven days after the Effective Date of the Agreement or 91 days after the Bid opening, whereupon Bid Security furnished by such Bidders will be returned. 8.03 Bid Security of other Bidders whom OWNER believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening. ARTICLE 9 - CONTRACT TIMES 9.01 The number of calendar days within which, or the dates by which, the Work is to be (a) Substantially Completed and (b) also completed and ready for final payment are set forth in the Agreement. ARTICLE 10 - LIQUIDATED DAMAGES 10.01 Provisions for liquidated damages, if any, are set forth in the Agreement. 00200 - Instructions to Bidders REV 04-07.doc 00200-5 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 ARTICLE 11 - SUBSTITUTE AND "OR -EQUAL" ITEMS 11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or "or -equal' items. Whenever it is specified or described in the Bidding Documents that a substitute or "or - equal' item of material or equipment may be furnished or used by CONTRACTOR if acceptable to ENGINEER, application for such acceptance will not be considered by ENGINEER until after the Effective Date of the Agreement. The procedure for submission of any such application by CONTRACTOR and consideration by ENGINEER is set forth in the General Conditions and may be supplemented in the General Requirements. ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS 12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to OWNER in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to OWNER a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by OWNER. If OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid. 12.02 If apparent Successful Bidder declines to make any such substitution, OWNER may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which OWNER or ENGINEER makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the Effective Date of the Agreement as provided in paragraph 6.06 of the General Conditions. 12.03 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom CONTRACTOR has reasonable objection. ARTICLE 13 - PREPARATION OF BID 13.01 The Bid form is included with the Bidding Documents. 13.02 All blanks on the Bid form shall be completed by printing in ink or by typewriter and the Bid signed. A Bid price shall be indicated for each section, Bid item, alternative, adjustment unit price item, and unit price item listed therein, or the words "No Bid," "No Change," or "Not Applicable" entered. 13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice- president or other corporate officer accompanied by evidence of authority to sign. The corporate 00200 - Instructions to Bidders REV 04-07.doc 00200-6 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00200 - Inslruclions to Bidders REV 04-07.doc Rev. 05/01 seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature. 13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown below the signature. 13.06 A Bid by an individual shall show the Bidder's name and official address. 13.07 A Bid by a joint venture shall be executed by each joint venturor in the manner indicated on the Bid form. The official address of the joint venture must be shown below the signature. 13.08 All names shall be typed or printed in ink below the signatures. 13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid form. 13.10 The address and telephone number for communications regarding the Bid shall be shown. 13.11 The Bid shall contain evidence of Bidder's authority and qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the Contract. Bidder's state contractor license number or county registration number for the state or county of the Project, if any, shall also be shown on the Bid form. 13.12 All supporting information requested in the Bid Form must be furnished. Do not leave any questions or requests unanswered. ARTICLE 14 - BASIS OF BID; EVALUATION OF BIDS 14.01 Unit Price A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid schedule. B. The total of all estimated prices will be determined as the sum of the products of the estimated quantity of each item and the unit price Bid for the item. The final quantities and Contract Price will be determined in accordance with paragraph 11.03 of the General Conditions. C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. 14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in paragraph 11.02 of the General Conditions. 14.03 The Bidder's attention is called to the fact that any estimate of quantities of work to be 00200 - Instructions to Bidders REV 04-07.doc 00200-7 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Mmim\Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 done and materials to be furnished under the Specifications as shown on the Bid Schedule, or elsewhere, is approximate only and not guaranteed. The OWNER does not assume any responsibility that the final quantities shall remain in strict accordance with the estimated quantities, nor shall the Bidder plead misunderstanding or deception because of such estimate of quantities or of the character, location of the work, or other conditions pertaining thereto. ARTICLE 15 - SUBMITTAL OF BID 15.01 The Bid form is to be completed and submitted with the Bid security and the following data: A. Sworn Statement under Section 105.08, Indian River County Code, on Disclosure of Relationships. B. Sworn Statement under the Florida Trench Safety Act. C. Qualifications Questionnaire D. List of Subcontractors. 15.02 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the advertisement or invitation to Bid and shall be enclosed in an opaque sealed envelope plainly marked with the Project Title and Bid Number (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If mail or other delivery system sends a Bid, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside with the notation "BID ENCLOSED." A mailed Bid shall be addressed to Indian River County, Purchasing Division, 1800 27th Street, Vero Beach, Florida, 32960. ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID 16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. 16.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with OWNER and promptly thereafter demonstrates to the reasonable satisfaction of OWNER that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work. ARTICLE 17 - OPENING OF BIDS 17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids. 00200 - Instructions to Bidders REV 04-07.doc 00200-8 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE 18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period. ARTICLE 19 - AWARD OF CONTRACT 19.01 OWNER reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. OWNER further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be non -responsible. OWNER may also reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder. OWNER also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder. The County will not reimburse any Bidder for bid preparation costs. Owner reserves the right to cancel the award of any Contract at any time before the execution of such Contract by all parties without any liability to the Owner. For and in consideration of the Owner considering Bids submitted, the Bidder, by submitting its Bid, expressly waives any claim to damages, of any kind whatsoever, in the event the Owner exercises its right to cancel the award in accordance herewith. 19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest. 19.03 In evaluating Bids, OWNER will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award. It is the OWNER's intent to accept alternates (if any are accepted) in the order in which they are listed on the Bid form, but OWNER may accept them in any order or combination. 19.04 In evaluating Bidders, OWNER will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions. 19.05 OWNER may conduct such investigations as OWNER deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents. 19.06 If the Contract is to be awarded, OWNER will award the Contract to the Bidder whose Bid is.in the best interests of the Project. 00200 - Instructions to Bidders REV 04-07.doc 00200-9 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 ARTICLE 20 - CONTRACT SECURITY AND INSURANCE 20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth OWNER's requirements as to Public Construction Bond and insurance. When the Successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by such Bond, unless the Bond has been waived due to the total contract being less than $100,000. ARTICLE 21 - SIGNING OF AGREEMENT 21.01 When OWNER gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within fifteen (15) days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER. 21.02 OWNER shall return one fully signed counterpart to Successful Bidder. 21.03 Should Bidder to whom the Contract has been awarded refuse or fail to complete the requirements of Article 21.01 above, the additional time in calendar days, required to correctly complete the documents will be deducted, in equal amount, from the Contract time. Or, the OWNER may elect to revoke the Award and the OWNER shall hold the Bid Bond for consequential damages incurred, and the Contract may be awarded as the OWNER desires. * * END OF SECTION * * 00200 - Instructions to Bidders REV 04-07.doc 00200-10 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00200 - Instruclions to Bidders REV 04-07.doc Rev. 05/01 SECTION 00300 - Bid Package Contents THIS PACKAGE CONTAINS: SECTION TITLE :�[:11117.Tiii1 Sworn Statement on Disclosure of Relationships Sworn Statement Under the Florida Trench Safety Act Qualifications Questionnaire List of Subcontractors SECTION NUMBER 00310 00430 00452 00454 00456 00458 SUBMIT ONE (1) ORIGINAL AND ONE (1) COPY OF THIS COMPLETE PACKAGE WITH YOUR BID * * END OF SECTION * * 00300 - Bid Package Contents - REV 04-07.doc 003001 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926V\dmim\Contract Documents\00300 - Bid Package Contents - REV 04-07.doc PROJECT IDENTIFICATION: Project Name: County Project Number: Bid Number: Project Address: Project Description: SECTION 00310 - Bid Form CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street) 1132 2013006 CR 612 Sebastian, Florida The proposed improvements to CR -512 consist of refurbishing (full depth reclamation) of the dual eastbound lanes from Roseland Road to Easy Street. Also included with the project is the installation of vehicular detector assemblies and the signing and marking of the proposed resurfaced eastbound lanes. THIS BID IS SUBMITTED TO: INDIAN RIVER COUNTY 1800 27th Street VERO BEACH, FLORIDA 32960 1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents. 2.01 Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. The Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER. 3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that: A. Bidder has examined and carefully studied the Bidding'Documents, the other related data identified in the Bidding Documents, and the following Addenda,- receipt of all which is hereby acknowledged. Addendum Date Addendum Number -// �, If J/-- B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work. C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work. D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface ! 00310 - Bid Form REV 04-07.doc 00310-1 F9Publie WorkMENGINEERING DIVISION PROJECTSX1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 09MAdmlmlConlract Documents100310- Rd Form REV 04-07.doc Rev. 05/16/01 conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at. or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions, and (2) reports and drawings of a Hazardous Environmental Condition, if any, which have been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions. j E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) 1 all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any ! aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, 1 and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto. J F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents. G. Bidder is aware of the general. nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents. H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents. I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution ' thereof by ENGINEER is acceptable to Bidder. J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted. .4.01 Bidder further represents that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. [The remainder of page intentionally left blank] 00310 - Bid Folin REV 04-07.doc 00310-2 F:IPublio WorWENGINEERING DIVISION PROJECTSX1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926AdmimlConVacl Documenl6100310 - Bid Form REV 04-07.doc Rev. 05/16/01 ° Addendum #14-94o ITEMIZGD.B|DocHEDULG PROJECT NAME:CRS1 RESURFACING L4NDROAD ToEASY STREET) IRG PROJECt #1 132/BID #2013006 nmnrn.SNAME xpnne,cnnsxmmIndustries, n�nmc. PROJECT TOTAL (IN WORDS) One Million Forty Nine Thousand Seven Hundred Eighty Seven and 70/100 Dollars AG=Assembly LG=Lump Sum LF=Linear Foot Bu=Each SY= TN=Ton CY=Cubic Yard mPublicworkskENnINEERINGDIVISION PRnJECmn132�CRmzEbndResurfacing Roseland RdmEasy St -SEE PRm Bid0031D-3 _ uf '101-1 MOBILIZATION (INCLUDES PUCBLIC CONSTRUCTION BOND) LS 1 $51,500.00 $51,500:00 102-1 MAINTENANCE OF TRAFFIC LS 1 $47,000.00 $47,000.00 102-61 BUSINESS SIGN (<12) (TEMPORARY) EA 30 $63.00 $1,890.00 104-1 EROSION AND WATER POLLUTION CONTROL LS 1 $11.000.00 $11,000.00 285-7 RECLAIMED ASPHALT BASE COURSE (FULL DEPTH RECLAMATION) SY 32,765 $4.35 $142,527.75 300-1 ASPHALT EMULSION TYPE CSS -1h GAL 87,126 $2.65 $230,883.90 334-1-13 SUPERPAVE ASPHALTIC CONCRETE I "SP -9.5 SY 3168 4.90 $155,241.80 334-1-13A SUPERPAVE ASPHALTIC CONCRETE 1-1/2" SPA 2.5 SY 31,682 $6.30 $199,596.60 570-1-2 PERFORMANCE TURF - SODDING (BAHIA) Sy.- 8,855 2 0 $18,595.50 570-1-2A MATCH EXISTING) $20,959.20 663-74-15 ECONOLITE VEHICLE DETECTOR ASSEMBLY AS 3 $3j.000.00 $93,000.00 700-20-11 SINGLE POST SIGN (<12) (W4 -2R MERGE) AS I t45Q.Qo $450.00 700-20-11 A SINGLE POST SIGN (<12) (R3 -7R RIGHT LANE MUST TURN RIGHT) AS 2 $420.00 $�40.00 706-3 RPM (BI-DIRECTIONAL (vVHITE/RED) EA 280 $4.2d $1,176.00 706-3 RPM (BI-DIRECTIONAL (AMBER/AMBER) -EA 64 $4.20 $226.80 706'3 RPM (BI-DIRECTIONAL (WHITE/MONO) EA 7 $4.20 $29.40 711-11-121 THERMOPLASTIC,TRAFFIC STRIPE, WHITE,SOLID,6" LF 9,830 $1.00 $9,830.00 711-11-123 THERMOPLAS�IC, TRAFFIC STRIPE,WHITE,SOLID, 12" LF 345 $2.20 $759.00 711-11-125 THER , MOPLASTIC, TRAFFIC STRIPE,WHITE,SOLID,24" LF 135 $5.36 $722.25 11-11-141 THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SKIP,6" (6'-10') LF 1-434 0.30 $430.20 711-11-141A THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SKIP,6" (10'-30') LF 7,991 $0 $2,397.30 711-11-160 THERIVIOPLASTIC, PAVEMENT MESSAGE (MERGE) EA 2 $175.00 $350.00 711-11-160A TH ERMOPLASTIC, PAVEMENT MESSAGE (ONLY) EA 2 $175.00 $350.00 7li-11-170 THERMOPLASTIC, STANDARD, WHITE, TURN ARROW. EA 16 $78.00 $1,248.00 711-11-170A THERMOPLASTIC, STANDARD, WHITE, MERGE ARROW EA 2 $78. $156.00 711-11-221 THERMOPLASTIC,TRAFFIC STRIPE,YELLOW,SOLID,6" LF 8,628 $1.00 $8,628.00 FA -1 ORCEACCOUNT LS 1 50,000.00 50,000.00 C.R. 512 ASPHALT RESURFACING TOTAL $1,049,787.70 PROJECT TOTAL (IN WORDS) One Million Forty Nine Thousand Seven Hundred Eighty Seven and 70/100 Dollars AG=Assembly LG=Lump Sum LF=Linear Foot Bu=Each SY= TN=Ton CY=Cubic Yard mPublicworkskENnINEERINGDIVISION PRnJECmn132�CRmzEbndResurfacing Roseland RdmEasy St -SEE PRm Bid0031D-3 5.01 Bidder shall complete the Work in accordance with the Contract Documents for the price(s) contained in the Bid Schedule: A. The Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. B. The Owner reserves the right to omit or add to the construction of any portion or portions of the work heretofore enumerated or shown on the plans. Furthermore, the Owner reserves the right to omit in its entirety any one or more items of the Contract without forfeiture of Contract or claims for loss of anticipated profits or any claims by the Contractor on account of such omissions. f C. Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided, The quantities actually required to complete the contract and work may be less or more than so estimated, and, if so, no action for damages or for loss of profits shall accrue to the Contractor by reason thereof. D. Unit Prices have been computed in accordance with paragraph 11.03.13 of the General Conditions. 6.01 Bidder agrees that the Work will be substantially completed and ready for final payment in accordance with paragraph 14.07.13 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement. 6.02 Bidder accepts the provisions of the Agreement as to liquidated damages .in the event of failure to complete the Work within the times specified, which shall be stated in the Agreement. 7.01 The following documents are attached to and made a condition of this Bid: A. Itemized Bid Schedule B. Required Bid security in the form of Bond C. Sworn Statement Under Section 105.08, Indian River County Code, on Disclosure of Relationships; D. Sworn Statement Under the Florida Trench Safety Act; E. Qualifications Questionnaire; F. List of Subcontractors; 00310 - Bid Form REV 04-07.doc 00310-4 F:\PubIlaWorkskENGINEERING DIVISION PROJECTS\1132-CR 512 Eland Resurfacing Roseland Rd to Easy St -SEE PROJ 0920Admfm\Contract Documents\00310 • Bid Form REV 04.07,doc 0.01 The terms used in this Bid with initial capital letters have the meanings indicated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions. SUBMITTED on April 24 , 2013 State Contractor License No. CGCO19416 If Bidder is: An Individual Name (typed or printed): By: (Individual's signature) Doing business as: Business address: Phone No.: FAX No.: A Partnership Partnership Name: By: (Signature of general partner-- attach evidence of authority to sign) Name (typed or printed): Business address: Phone No.: FAX No.: (SEAL) (SEAL) A Corporation Corporation Name: Ranger Construction Industries, Inc. (SEAL) State of Incorporation: Florida Type (General BILWIness, Profession I, Service, Limited Liability): General Business By: (Signator -- a aches id �ofuthorityZosign) Name (typed or printed): F. Scott Fowler Title: Vice PreA ent (C®RP®RATE SEAL) Attest (Signature of Corporate Secretary) Rick Fowler Asst. Secretary Business address: 1200 Elboc Way Winter Garden, FI. 3478.7 Phone No.: 407-656-9255 FAX No.: 407-656-3188 00310 - Bid Form REV 04-07.doc 00310-5 I'APublIc WorksIENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926WdmlmlConlract Documents\00310 - Bid Form REV 04-07.doc Date of Qualification to do business is 1981 A Joint Venture Joint Venture Name: By: (Signature of joint venture partner-- attach evidence of authority to sign) Name (typed or printed): Title: Business address: (SEAL) Phone No.: FAX No.: Joint Venture Name: (SEAL) By. (Signature -- attach evidence of authority to sign) Name (typed or printed): Title: Business address: Phone No.: FAX No.: Phone and FAX Number, and Address for receipt of official communications: (Each joint venturor must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.) * * END OF SECTION * * 00310 - Bid Form REV 04-07.doc 00310-6 FAPubllo Wofks\ENGINEERING DIVISION PROJECTS11132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD 0926Wdmlm\Contracl Documenls100310 - Bid Form REV 04.07.doc i SECTION 00430 AIA DOCUMENT A310 BID BOND '1 i J I The Contractor shall use the document form entitled "AIA Document A310 Bid Bond." END OF SECTION 00430-1 00430 - Bid Bond REV 04-07.doD F;1Public Works\ENGINEERING DIVISION PROJECTSM32-CR 512 Ebnd Resurfacing Roseland Rd to EasySt•SEE PROJ 0926\AdrrWConlract Documentsk00430 • Bid Bond REV 04-07.doc Rev. 05/01 SWORN STATEMENT UNDER SECTION 105.08, INDIAN RIVER COUNTY CODE, ! ON DISCLOSURE OF RELATIONSHIPS THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICER AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement MUST be submitted with Bid, Proposal or Contract No. 2013006 i for CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street) 2. This sworn statement is submitted by: Ranger Construction Industries, Inc. Mailing address: 1200 Elboc Way Winter Garden, FI. 34787 (Name of entity submitting Statement) whose business address is: Bidding Address: 4510 Glades Cut -Off Rd. Fort Pierce, FI. 34981 3. My name is F. Scott Fowler (Please print name of individual signing) and my relationship to the entity named above is Vice President 4. I understand that an "affiliate" as defined in Section 105.08, Indian River County Code, means: The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of the entity. 5. I understand that the relationship with a County Commissioner or County employee that must be disclosed as follows: Father, mother, son, daughter, brother, sister, uncle, aunt, first cousin, nephew, niece, husband, wife, father-in-law, mother-in-law, daughter-in-law, son-in-law, brother-in-law, sister-in-law, stepfather, stepmother, stepson, stepdaughter, stepbrother, stepsister, half brother, half sister, grandparent, or grandchild. 6. Based on information and belief, the statement, which I have marked below, is true in relation to the entity submitting this sworn statement. [Please indicate which statement applies.] X Neither the entity submitting this sworn statement, nor any officers, directors, executives, partners, shareholders, employees, members, or agents who are active in management of the entity, have any relationships as defined in section 105.08, Indian River County Code, with any County Commissioner or County employee. The entity submitting this sworn statement, or one or more of the officers, directors, executives, partners, shareholders, employees, members, or agents, who are active in management of the entity have the following relationships with a County Commissioner or County employee: 00452-1 F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD 0926V1dmim\Contract Documents\00452 Disclosure of Relationships.doc Name of Affiliate Name of County Commissioner Relationship or entity or employee N/A STATE OF Florida F. Scott Fowler ( attire) Vice President April 24, 2013 (Date) COUNTY OF Orange The foregoing instrument was acknowledged before me this 24th day of April 2013 by F. Scott Fowler , who is personally known to me or who has produced J as identification. NOTARY PUBLIC SIGN: PRINT: Penni L. Huddleston Notary Public, State at large My Commission Expires: (Seal) ,OO PAY *�sI,, PENNI L. bUDDLESTON Notary Public - State of Florida My Comm. Expires Oct 23, 2093 Commission EE 297707 III \\\\\ 00452-2 F;\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\AdmWContract Documents\00452 Disclosure of Relationships.doc SECTION 00454 - Sworn Statement Under the Florida Trench Safety Act ' THIS FORM MUST BE SIGNED BY THE BIDDER WHO WILL BE RESPONSIBLE FOR THE EXCAVATION WORK ("BIDDER"), OR ITS AUTHORIZED REPRESENTATIVE, IN THE PRESENCE OF A NOTARY PUBLIC AUTHORIZED TO ADMINISTER OATHS. 1. This Sworn Statement is submitted with Project No. 1132 for CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street) 2. This Sworn Statement is submitted by Ranger Construction Industries, Inc. (Legal Name of Entity Submitting Sworn Statement) hereinafter "BIDDER". The BIDDER's address is _ 1200 Elboc Way Winter Garden, FI. 34787 BIDDER's Federal Employer Identification Number (FEIN) is 59-2098662 I 3. My name is F. Scott Fowler and my relationship to the BIDDER (Print Name of Individual Signing) is Vice President (Position or Title) I certify, through my signature at the end of this Sworn Statement, that I am an authorized representative of the BIDDER. 4. The Trench Safety Standards that will be in effect during the construction of this Project are contained within the Trench Safetv Act, Section 553.60 et.seg. Florida Statutes and ' refer to the applicable Florida Statue(s) and/or OSHA Regulation(s) and include the "effective date" in the citation(s). Reference to and compliance with the applicable Florida Statute(s) and OSHA Regulation(s) is the complete and sole responsibility of the BIDDER. Such reference will not be checked by OWNER or ENGINEER and they shall have no responsibility to review or check the BIDDER's compliance with the Trench Safety Standards. 5. The BIDDER assures the OWNER that it will comply with the applicable Trench Safety Standards. 6. The BIDDER has allocated and included in its bid the total amount of $ , based on the linear feet of trench to be excavated over five (5) feet deep, for compliance with the applicable Trench Safety Standards, and intends to comply with said standards by instituting the following specific method(s) of compliance on this Project: /l The determination of the appropriate method(s) of compliance is the complete and sole responsibility of the BIDDER. Such methods will not be checked by the OWNER or ENGINEER for accuracy, completeness, or any other purpose. The OWNER and ENGINEER shall have no responsibility to review or check the BIDDER's compliance with the Trench Safety Standards. 7. The BIDDER has allocated and included in its bid the total amount of $ based on the square feet of shoring to be used for compliance with shoring safety requirements and intends to comply with said shoring requirements by instituting the following specific method(s) of compliance on this Project: 00454 - Florida Trench Safety Act - REV 04-07.doc 00454-1 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR S12 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926'Admim\Contract Documenls\00454 • Florida Trench Safely Act - REV 04-07.doc The determination of the appropriate method(s) of compliance is the complete and sole i responsibility of the BIDDER. Such methods will not be checked by the OWNER or ENGINEER for accuracy, completeness or any other purpose. The OWNER and ENGINEER shall have no responsibility to review or check the BIDDER's compliance with the Trench Safety Standards, 8. The BIDDER, in submitting this bid, represents that it has obtained and considered all available geotechnical information, has utilized said geotechnical information and that, based on such information and the BIDDER's own information, the BIDDER has sufficient knowledge of the Project's surface and subsurface site conditions and characteristics to assure BIDDER's compliance with the applicable Trench Safety Standards in designing the trench safety system(s) for the Project. BIDDER: Ranger Construction Industries, Inc. B' Position or Title: Vice sident Date: April 24, 2013 STATE OF Florida COUNTY OF Orange Personally appeared before me, the undersigned authority, F. Scott Fowler who after first being sworn by me, affixed his/her signature in the space provided above on this 24th day of April , 20 13 ("eat VPU�ii Notary Public, State at large PENNI L. WUDDLESTOPd My Commission Expires: Notary Public - Stste o4 Florida oN p +oQ My Comm. Expires Oct 23, 2013 Commission # EE 217707 * * END OF SECTION * * 00454 - Florida Trench Safety Act - REV 04-07,doc 00454-2 R.\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Vadmlm\Conlract Documents\00454 - Flodde Trench Safety Act - REV 04-07.doc i SECTION 00456 - QUALIFICATIONS QUESTIONNAIRE NOTICE: THE OWNER RETAINS THE DISCRETION TO REJECT THE BIDS OF NON - RESPONSIBLE BIDDERS. UNDER PENALTY OF PERJURY, the undersigned Bidder Guarantees the truth and accuracy of all statements and answers herein contained. Failure to comply with these requirements may be considered sufficient justification to disqualify a Bidder. Attach additional sheets as required. ' Documentation Submitted with Project No: 1132 Project Name: CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street) 1. Bidder's Name /Address: Ranger Construction Industries, Inc. 1200 Elboc Way Winter Garden, FI. 34787 2. Bidder's Telephone & FAX Numbers: PH: 407-656-9255 FX: 407-656-3188 J 3. Licensing and Corporate Status: a. Is Contractor License current? Yes j b. Bidder's Contractor License No: CGCO19416 [Attach a copy of Contractor's License to the bid] c. Attach documentation from the State of Florida Division of Corporations that indicates the business entity's status is active and that lists the names and titles of all officers. 4. Number of years the firm has performed business as a Contractor in construction work ' of the type involved in this contract: 31 5. What is the last project OF THIS NATURE that the firm has completed? - City,of Debary Resurfacing Vousia county. Resurfacing 6. Has the firm ever failed to complete work awarded to you? no [If your answer is `ryes, then attach a separate page to this questionnaire that explains the circumstances and list the project name, Owner, and the Owner's telephone number for each project in which the firm failed to complete the work.] j 7. Has the firm ever been assessed liquidated damages? no [If your answer is "yes, then attach a separate page to this questionnaire that explains the circumstances and list the project name, Owner, and the Owner's telephone number for each project in which liquidated damages have been assessed.] 8. Has the firm ever been charged by OSHA for violating any OSHA regulations? Yes see attached [If your answer is "yes, then attach a separate page to this questionnaire that explains the circumstances and list the project name, Owner, and the Owner's telephone number for each project in which OSHA violations were alleged.] 00456 - t 00456 - Qualifications Questionnaire,doc . FAPublic Works\ENGINEERING DIVISION PROJECTS11132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926MMmTontracl Documenls100456 - Qualifications Questionnaire,doc 9. Has the firm ever been charged with noncompliance of any public policy or rules? no [If your answer is `ryes, then attach a separate page to this questionnaire that explains the circumstances and list the project name, Owner, and the Owner's telephone number for each project.] '10. Attach to this questionnaire, a notarized financial statement and other information that documents the firm's financial strength and history. Provided upon Project Awarded 11. Has the firm ever defaulted on any of its projects? no [If your answer is "yes, then attach a separate page to this questionnaire that explains i the circumstances and list the project name, Owner, and the Owner's telephone number for each project in which a default occurred.] 12. Attach a separate page to this questionnaire that summarizes the firm's current workload and that demonstrates its ability to meet the project schedule. 13. Name of person who inspected the site of the proposed work for the firm: Name: Bill Yoder Date of Inspections: 14. Name of on-site Project Foreman: Terry Overcash Number of years of experience with similar projects as a Project Foreman: 22 15. Name of Project Manager: Bret Smith Number of years of experience with similar projects as a Project Manager: 24 16. State your total bonding capacity: $750,000,000 17. State your bonding capacity per job: $200,000,000 18. Please provide name, address, telephone number, and contact person of your bonding company: George H. Friedlander Company - William Phelps 321-254-8477 447 Montreal Ave. Melbourne, A. 32935 [The remainder of this page was left blank intentionally] 00456 - Qualifications Questlonnaire.doc P:\Public WorksIENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing 0049 Roseland Rd to Easy St -SEE PROJ 0926WdmIm\Contract Documents\00456. Qualifications Questionnaire.doc e— V O C V R LL v V W V 0 C O � L Z� � 0 d � IL Q. In 'a 0 V L d C 0 0 / V V d �O L a 0 d Z t^C W I�0NNNMOI�M NItNMNItNNNNN y� N O N O N O O W N I* O M O O 0 0 0 0 0 0 0 0 0 0 0 N N O O O N N N N (` O 'ct Q Q co O d' Oo W N r O� r M M r !f) r r M _M In O O O O O O N M O O O O N O d' O r M N M M ('9 0 f� Ln h M f� O M M CA r O m m ----- M O M i CA r W d' d' N LO LO I� r Lq d' r; Ln LO CA O M N M N d' M CA d' M CA 00 r M (o MMM M 00 _ i Q MNNO�ONc�M(Oaol�O�aot�N�rr�r rNM(0NN W WN NNNN(O(000 � � 00 � � i i i 00 i i i i i i � � 0 0 0 I� I� (o (o (O tC) I� I� 1� 1� (o (0 00 ' h N M O M t� t\ � M' O (� O t� O I� 0 0 0 O LLI O �t M M M M d- M O M M M M MMM M M O Co r r 000--00000-00 '�!' tt OO CO CO CO CO OO OO d' CO OO OO OJ OO CO CO 00 �Y d' U U U U U U U U U •c •U U U U U U U U CU .0 v=v= ��_� 00 0000 ® d ca.c CO O o (� 0000000 0 of F LO.- 1 +-� E v °I- F- c c� ch - F - H- -�- 000 C 0000 ®Z O(JJ)❑ �'�.� �,�❑m (U (Um❑❑❑❑❑�� c w ca LL Ir 0LL LL LL LL 0❑❑❑ LU:�L CJ c n ° O W (n m � g � � w -a w a: � W LL LL W LL LL LL 0) � Ln LOQ � O Ln Ln Ln LO o a) o t ro z o Ln LO LO LO y_ T w �❑ U c Z c (n E c Ln c > (n ,(n °° c >° c c O o J U ° Y o O 0 ° (U N D N cU N :� O nY cin in in in O c O (U mm �I0- -03m ❑Y❑YOC ❑0❑��❑❑O❑U�D��DUm❑ CC W N a�a�a�a�a��a�a�a�° se 3 a) 2 �.2 tmoa)z�a)a)a)��������ma)a)a)a)�a)a)a)� oa)� �+, a -T maw T a) a�aa o -a aa��° a�Qa aaa��aa n aaa� 0-0- ® O m E La Q E a a a E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E N �, 6n U o oC) o o 0000UUUUC�UUUUUUUUUUC-)C) UUUUU 0 ® UU UUU ® uj E E O 01 a m M O N a) W a) (1 W a) ® 0) a) 0)a) 0) � 62 (r U a) 0) (D '� Y o 0) 0)M Y -�e a) a) 0) a) (r o)-6 zn o cU 0).6 to 0) � N O J �cc :e c J O E5 15 T n T J O a J N cO�U 75 d J J J N p d U (o aS V O> 0 >000U)O cU w(mo > 000 O> OO> O0m0>OO .0 00 � O O O O CA O I� M O d• O O r r MO O LO O O N O O O LO r LO O 00 O LOO M O� O O O N LO (� LO O (4 O r 0 0 T M h O f� r,� O LO 0 0 M O M M 0 0 0 r LO M N M d• W 0 0 0 0 0 0 M LO O uj M M O O N It (9 0 m (- O M �t Lc) f- m O O d' N 00 O O It LO It W (0 C7 It O O d' N OD O O CA N 00 �« Q C O 'cF• M O M OCA M d' I� � tO O N N ('� �� r Cp M M O r r N M CA f� O N� (O � 00 O d• O M O i Q d' M N O rY a0 A N N Ob N LO 0) N CO d' M N C7 (o N r N d' N LO O r C6 [C C r r r 00 (9 (o N O O +� Q f- O M N I' CY) N- 00 O (0 N 4t LO O d' CO O O 00 N 00 CO LO LO r N (o LO r LO N 0) (o It Cl) M N �• O E O O N M 6a M N O LC) sa (o N O O O 03' Lo N f� N Ef3 d• M cA LO Co O O O O N r' LO MN CO r N O M T 6c, C6 4 NV N CC N r r to ca Q),N Ear Ln C7 N N r a0 to C r LO CA C7 () Q oa ca - b} rf} 6a O cn H> cfl to 6q H} t% cf} H} H3 to cf} cA NHl cA V> zz O O O °CY) O LO f� CA N r O co 't 't � N't CO N 00 N ® y N N 2 N C\jS M N LOLOLO M LN � LN Z r r z Z CO N LO M 00 (j N N r LO NLUV) U- co NF -W F~ �I-I-I- W W W W wl-�`n I-LohLOw LO O LO LO d O r LO w W r w CA O r r N It (p CC) _ N LU O p .0 NON w co O O 0 0 0 0 0 0 O O r p p M 0 O p p M co N O O N O L N LO N LOU co Q O M O N M Q r LD LO O c c. w N N N Lo N N N N N N N N N N N N M N N N N N N N 0 LO m r m m m m m m LO �% LO LO LO d' r LO LO '' rl LO '' Ln ® � V O O r o U O N r N N r T r r r r r r r r 0 p r co od r N o N �) , r LL LL U) (Tp M N U i d' O CA (MO N N 0 N O o N M o --� N w N N Op r- O O (O co N U �� \\ Or't i0 •'-'-Y1\ d' M CY) MCAOOr(oM Md' 000) NNOM00 Lo 't U.Q -° X j 'd' r N m Q sz CA O r �- r N N N O N M O N r d' (� 00 M I- LL. CP ® ci LOU (Oil ° N� pU�~ WQ� d 0�dNdN�dNdNIt' tNd It Q N�N't't'd OQN CF- C C a)F-F--FF-wF-0 LL F - f F-I-F-'f-F-�-� f-�'-f- W a)=i-'f-�--' �� =w�- ® o� ro `�❑ `� o ccaoo 0000 o0noo0o0000o0000•� T00000 T00 `J CAS W C'3LLC7�JLLLL0LLOLL�LLwLLLLLL.LLLLLLLLLLLLLLLLLL0dCL3LLLLLLLLLL00U- Z crj cc G1 oOC a°C Lu Eaa) 2 c U) � o FU C} Z o � -0 ani � a cOi aOi Co uJ m o v E a) CD ° c cc co C o o ca Lu aa)) w a m m (°n > >_ M U W ac) o O iD o) CL CO o > ° n N ® �. 0)) E � c E o � cU ❑ `� F- U) C\l c N � � � �! ° - °) ® m H C'°3 0 CU C j ~ 'O < ® rn � 2 Z5 - Z) z ❑ 0 o � Ln � r _' o � o M d' d' `� d' Q co N 00 co N (D O 00 O V% O N d' U M r co T r r U W N O (O - d' O co co N (U O tO O LO M N O Lo U C) Z) O 7 N r LO d' a)F)c U)'t' 0)0) Yt �0LOLodt9)LOd•d -'I-'t (oNLOrCe) LOLO(nN �LLOLotU) t c (n(n�(ncn_rcn(4c�((n❑O(n((n(�v�cn(n((n�i(4(D(q(n(n(ncn(n(�❑(nv)cn`_rcn °, L Q r N co d• LO (o N M m r N co [f' LO (o t- M CA O r N M t LO O r, M CA O r N M t LO (o N co o) O r a% Z d' It d' d' d' d' 'It 't d• M M M L O M LO M M M O O O O M O O O O O N N N N N N N N N N M M o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (� d C . LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO LO Lo LO LO LO LO LO LO LO LO LO LO LO LO LO LO tib cC L°nLOLOLonLOLOLLOLOLOOLOLLOL°nLOLLOLLOLLOLOLOLLOLLOLO Loo Lonloi)LonLonLooLOLonLOtoc)uoiL°c)LonLr) L�r)LOLonLO ® (L M (9 CO CO M Ce) M M (M M M M CO CO M M M M Co (M M (Y7 (M M Co M M M (M co M M M M M M M M 0 M &. a N N N r- t- r- N r- N r- M 00 O Lb M O CA W CA O CD CA CA O O O O O 0 0 0 0 0 0 r r r r r O O O O O O O O O O O O O O O O 00000000 r r T r r r r r r r-- \ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O d N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N CO M \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ r O Cl) N Co CA N (� LO LO N LO O r 00 d' 'cF• d' M 00 00 r O LO Co 'd' r 00 LO CA M 00 LO CA 00 I� r M \ \ \ \ ®\ r r r r\ N N N r N N N N\ N N\ N r r N\ \ N N N N\\ r\\ LO LO LO O M \ \ \ \ h \ \ \ \ \ \ \ \ N \ \ LO \ \ \ \ O r \ \ \ \ (p N \ r N N O O O r LO (o W O) r N r T r M 00LL r r r r O O r 0 0 0 d) t() Ln N O MON M OOJMCOCO(Omd•d'r —Cl) tod' O d' � ct M M M � d• Ln M � r O N Ln N r-r� N r r 6 L4- 4 00 O N d'd'd'64Ni,�6r d0'0d0' 0rnrnOd0'd0'a00rnMd0'OOD u U U U U U U 000 00 a)0 000momoo Eo O) p❑❑❑r W 7❑❑, O❑ C-C�LLLLLL N N OLL LL.�•�LL Z ca ❑?>i UU 5 V- Cl) O Ll L� +% 0) CL C U m p Q . V �' Z5 V) (n Q .0 .CN N ED CL 0' XM(L0 7 00-�)YDJ a) a) a) aa000 00 0 a�0 ��� O OCO LO 0 0 '_ a0M-N00-t 0O �OOo U U U L a) > ,a) v c N T T i pp M � u) (0 a 0 'o:awm�0006,00,� C: OOO NrOOr(.()O N L�M,t O t\ O M M N r 0 O (n M T M O O M O CV � O) � ('� OJ ((j O (fj 00 r '�i' to d• � ? MMM O r M M to N N M r -M 0 (0 (O NM d• r N N 00 N O (O L` (A 00 dit-d'C6Nr,7 pi c0aDN ('? O N t N r to 65caM O d' 6aT 6c.�r 6-� 6 -kr O Eft Ef} Eft Eft 6% Eft Eft co co Lf) Eft C O It Co C\j O O M (D "d.LO N T T i pp M � u) (0 a d2M-joowLO It (� 1 1 C700))WwF-W(ncnW~ 0J~.0 O LO It ❑i F- O O Q O ❑ t t 0 r p r O 0) 0) 0 0 0 Y� m N co N N NU- � N ' r TJ LO r T T E *- T T m T❑ 1 'It OM ' ' L 7O-mO N u) (6 w MMcO-F'F'M(00)c9 `OJ �t 000 OOOr- ON NcoF'd d } M it Q❑ �NQ NNN❑N N �(0to9N�'N Qd ❑ d �i ��ILLL �t d F -N d W W F- LL F- F- F-C56N N F- F- F- F- F- F- f0 O0 000.22000000 z. > 0 L LLLLLL000LLLLLLLLLLLL O 0 0 > fn O Q O o o LO a o o IW n U) a, °) LL — O co lr '- rn O 2 c L]C U) o 5' U m t() m 0 3 0) > O OO cn J¢ E CL Er E S a) > E to � F- p cd C,t O L,' C❑_ �.� p C m O W L Q) Vl U L O= LY p ^ C O 0-2 �m(DU) Q F - N p EL O T O p C15-000)— LO 0) m (o Q(n C C LL co (n LP) r r- w 0) —as i m m (n m O O cn (n w w (n 00c000 L(1000000MMMao OOO'd'd'O[h 00000o0c0o0o LO W 0 0 0 0 O t0 W m m m w m m O O O O O O O O O O O O O O O M M M M M M M M M M M M M M M r r N N N N N N N N N N M N M T r T T r T r T T r T r T T N N C9 O L N ((0 (0 co N N N N r N N NO N 0 O r0 T 0 O r O N O r 00 0 0 r 0 0 0 0 0 0 0 0 0 r r r 0-0 O0000000 't 0 r I- N N M r M M O ct d t O O O M 4 O d' d' r M (- 0 r d d d d M O O O O M In M 0 W Lo M O r O 0,t 0 d' o m O r O O M o O M O d' O d' 0 0 0 m d O 'ch d' m O O O to 117 M In M In r� O N M O t� 4 M r r M (O O M O O M N n m m m m r M LO Mf,- m mtotor�OMONMOMmmmd'O�tOmNmm�!'U)t`OU)to000ON�FOrd'NrctNNLOMMLo �'d''chO M O CO N M m r M O r Lo O W r 00 N m N N M N 00 CO m O N � m m N N N N N 0 d' to N N M N O a0 M U) r m N N M �' 1` O N r r, 1` t,,M m r, r-r� h M 1,- 6 1\ _ O M 1,� 1-� 1,� 1,� M 1" 1- Nr- (` CO O O O P� M (\ O 4 O r r 't Oro 0 N d It d aro w t It d0' d0' w d0' M It C � or0 It It d0' It w It It N d0 t M M M C o It w d0 d m d0' 0 It It It 0 M w d0• MWNO m 0 It 0 E 0 0 ca a) U v v - aNi C 0 a) 0 � CO u, rn _`o c c 0 3 a) O a`) °� c o c Y o o °) X E o L c c o m 0 c E a)0>0Oco Y° °0°?E0t0cro°:>0°0cov.� YYY i ca. 0co a)0E m Y c Y i a°i L •- '= o E= Y c �= O= 0 In o 0IL 0-- -° crs o o .- o E 0> 0 0 0 a�'i a cn lon (D 2 °) oCU Jim T�U��U� co ca �m� �(°��=0°C ����>U 23o�=� rnIL C `° U, 0 a a) - ac) m 0 ctY ca 0- 0 W� o> c c c c 0 c c c cis > c a) o o EMM E E E E..0 o °.0 O -tea o 0'> �-o-0 o 0 E m0U<0 < �mpm�m>>om(n-c�m05ml-crccda-aam¢IimJam<00-01-¢ocJJ�Ii 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a .. a) 0 0 ... «. a) c c 0 0 0 a) a) 0 0 0 a) a) a) 0 0 a) 0 0 0 a) c a) c c 0 a) 0 0 0 0 0 a) a) a) a) 0 a) a) o a) a) N Ig aaa moo as a an o n ao aaaaan atiaaaaaaaaao �o aaao Qo o n aaO f? O,c o E o o o E E E o o o o o o o o o o o o o o o o o o o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0000000()C) 00000000000U0()()U()0U0UUUUU0000U00()U0U00 N 0 O a) 0 2 N 0 0 0 0 0 0 a) 0 0 0 0° 0 o 0 0 0 0 O 0 0 o O c o o - F 0 0 6 0� 0` 0 0 0� `� o 0 0 0 C m �YO C C O �'3 �'3 .1 C �•C O C C N C C 7 7 .7 �'� C C C'_'� O C .OY �, E T E5 ca ci5 c� ca ma cEu E 12 EcL � o is om E i59 E0_ E E (a E E o 0-6 5 E5 E� 0 � o [5A E `� `� o oa E 6 w c15 0i 00000000 O 0o 0 O>0> 00u 0 ° 0z ° °»»0000>OLL °00» °> OO U) U) m U) U) U m U U) m m O O O Lo O m L.1) O m m 0 m M M N O 0 0 m 0 0 0 00 O M o O m m LO LO O O r 0 O M O M O O 4 O N O O H O N O C7 N O d; m 1� t` U) C� d' (O 'd [` M (0 M r q O W m O O r 00 1* 1` r*.:,' m Lp U)- � O M d. O m O LO r 1, m Lr) 1� N 0 m M N d' -0 It 0 m r O N O O O U) r 117 r N CO OD U) U) d' O U) r M N r U) O O 0 O r .�. +• cr r O m� m M U) m 1� O O U) O r m MmOMOU)U)N'tmmNllM�h�(OMM(RC LQ M1�rC'7 a) 0 0 0m O'd'I�d'O��NOrNr.0OMLO a) p, 0) V NOrOOMU)(`rOU)MChMrrt7)OO)U)NCA [YaoU)CO � C � Clnm cC�tf N1��OU)OMU)�1`rLo C Lo (O rl- O LO N 00 m 1- 00 Lor (O U) d d M N O 0 M LO It M M 0 M 't M M 0 N M U) It N 0 r N N O 0 (O 0 1\ r M N M r M rd'r 0M0613d'MMMd'Ei?NVf Mto61.}1,taEa0ffl0rtE9OM M rr N It Nr O M00 rm 6-3 sa 6a �.., 61 <f} 6a fU} r, 6% (si 1` tq EA cfi r 6s N 69 ca m CO m m Ef} 6,) m C\ E9 EA fH � Q). QA (i? vi 6% EH Efl 6a H} (a 6a Ei3 (f} ba C C i0) 0 o m U U �y O iC E h °I -Z i_ o a QT > co C 7 O T d c c c0 c ac) c c U X• -H °Q o °o mor co O 0 o E c .o c c O (n o W N Co O () e r r y U 0 o j C 0) C'4 O .' O O N m 0 c 0 r o 0 0 cr am On. T�m� p)NQ m O Y i0.. i o f U i> 2 C O O) +• 00 a) i +• N >,, CL() �' � i i d �+ O N h- � 0 F> a O ' LU c 0 t c O c aa)) � c� +- � 2 c(n C N � >,�' �' E c p > as c~ U) 0 0 0 o C ca c iC a) •> C a) o O o C O i '- o C C C C c C C O O C 0 cu O) C C O 0 0 .� O O o >, >, d' - C O O U oc o c 0co 0 0 oU �,U n QoU o oU c()c 2 o o o ol- ° o o EU c c�� °U o° c o0 °() °a E Dam °� o� oU cU �'- 0 Q 0 crsUUUU L ()U0o ODUUU� ODUUU ca cn 0() a) U U 0 is co its 0_ coo N U U N c N o ° 1� cri c� c� CLS •5 o N 0 0 0 0 w cu o o 0 0 7C-� C) U 0) U_ C C .fl ° :E C) :E U a) U c *-C' o U� O O cu o O N .N .N .6 m a) p •fA c° ,C C� '� 'O C o '(j � N O d E p O p T O O O N O W o ..-- N N '' O O O O .� (!� O O O O N (!� US 3:o o¢ -)U) 0) 3UcnCLcn2Ye U) (nUcnUz >>>> -YOU>oUcn00»t-cn2200 C: 0 o � a o c M 7° 0 m M 0 c U) 0 It CC 00 f1Y C ,~ .� a N c o c c- cm CL 0 .a) N E J C U O C N cn0UO oc a) Et� c Na�j c F E 0 ca _:t-- U cji� 0 0 0 Ea a)- '� m >,Ud E: rNMa o 0 c a) t 0M its a) a m a U o co m >> > (o a 1� 0 a 0 Q 0 0 0 0 0 a) > > o ca °if c CU o o m 0.0 M om oU>- r oaQ o 0 0 o U 2 cw rna a0) oC aci Em m a)J a) m� coif ao Eo�m o otS °m NNNNW oa:o E m cm co oc c= 0 c o prn O c� N cn 0 a oC 0 crs �' 0 as op 0 a) 0 `o Co C c U N C C O U -° C U E a) a E a) a) > (d () o C U .0 - c c C c '0 0 0 (b O" U d C E- m 0 .... c rn 0 a O 0 c o N c o �- m m > c U 0 Q � a O .- o m O .. a`) m L cn O co m �ii¢> o} c �(n LL -j c �Y 0) a- ca 0C)C)0 a � �o � a° �,aci�' � Ca mw � CU -O rnM rnmani (°)� 0 > and 0� ° o °o�Q cg -m oJm c� c� - c�YQocn��2 0m o��� «-a o o a) m ro ca m m o o cu CC m o. o M o> (Yu c'a >>o o �C ¢aQ aC o 0 0 o a co (°n a° a o ca co o ccc U) � a .�' � (°n 2� o U o 2 0 0 0 U� 2 00 5 cn 0 u. 0 W-1 o J> 2 m J Q()>>>>¢ 2 O a a� a o W m> U Z) J W U 0 00 't 1' 0 0 - N M It M 0 r- w 0 0 - N m 't m 0 w 0 0 Nmdtm0r,M00-NMIt00r-M00rNM'It 1� M M CO M M 00 m m m m m m m m m m 0 0 0 0 0 0 0 0 0 ---------- m rrrrrrrrrm to m m m m 0 m 0 U) M 0 M LO U) 0 m U) M LO M m 0 m m 0 0 M Lo to w 0 m m m 0 0 U) m 0 m m m 0 m m m 0 Lo Lo M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000000000000000000000000000000000000 0 0 0 0 0 0 0 0 M M m 00 m m m m m m m m m m m m m m m m m m m m m m 0 0 0 0 0 0 0 0 0 r r r r r r r r r r r r r r r r r r r O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ NMCOMOM�tNMMC\lN MN d'U)L!')MNrd•OOu7d'd'mmU)U)LnU)mMmmMONOOmMCO'd'Or �O r\ r\ r\ N\\ r N N N r\ N\\ r N r\ N N r\ N N N \_ \_ \_ \_ \ r r r r r N\ N r N N\ M r N r r 0 m m Or O r LC) r N r N M M (\O M �. to CO ,--' r m O O r r r r r N O\\ r (O \\\\ r\\\\\ r (� (D CF) r N 1� 00 O • r r r r r r r r r w 0 0 0 0 M M O r r m d O M ft M O 00 O O O to MN m d' O m d' No 0 r r O h CA f� —ON 0 0 N M O d' d' r (O N O r- 1 1 1 1 1 1 1 1 1 1 1 1 O In Cfl N M lf') d' O O d' 00 CO CA d' O r O O O m OO N to N N O N d' 00 to M O N�d'd'toCDOrNMN d' COCOMWt 1 i 1 1 1 1 1 1 1 1 I 1 It It td �tM��Yr�Mm��r�r >, a) a) O rn m o a a) tU U) 0 c a Y aa) a) o c v :3 3 0 a) o> a) = tU c its F c a v o f (a U) (n (7 a) = 0_ C 0= m o o U 0 c as j- c� a) -C N Z cc c c a) -3i U)Ym(n2ULLU❑n mU-50=> a) a) a) N a) a) a) a) a) a) O O O o a) N a) N 0 0 0 0 0 0 EEE OE E E E rE E E NN OO oO Oo O UUU UUUO UUUU o L a) > > L L a) a) rn CD O 'v rn rn rn 0)D: cm 0= °) 0) 'o'6) c c 3 c c c c c E c c 3 3 N E J (y tL C cm C Os cu 3 000(50000 pO pLLU) c�f� C c r 0 d' O N to O O M N O r 'c1• to O O 000 N(Od tof�l-I-OmItItmolt It0 N r-: r- t" O00 0 N M r Mr LO � 00rMM'�YmaorN01na0O Om N N to N 00 (O O M r ch O CJ 't I- co r 0 O CO r O O O d' N r M CO M to N N r N M O T M r r N T r T r 00 N r N 0_ * O Efl N Ef) ff3 Efl Efl Ef} Ef3 �} Eft csi fft Eft ff} Eft Eft 0_ ff} 4ft L O � N Q ? > N_ O U_ d 0 —0 O C N O) p Or 7 O , c U Na �U(n 6 oCr a �d o a) E! �� °fir c m Z cQ C� cm o ��_ � c+, 3 a) m a w Co 0) O L 3 U o w000m� > 0 Q)0 C) U Q)00 a) 0 L p6 o aC = (n C L , o a) a) O 0 0 •� CU to a c� 0' Q j 0DU(n(')(5(D0_—U) cn(nC40(nLL 0 v 0°C o cd O It �(v v a a) LL U)O 0: o fn E N o c a) a) O _ co 0 CL as - 0 w E X� > >, co �Qo �— c -006 03 20 1- O) U co (U N "O O U (d = T m CU �> W a0 3 0) (20 c. T o a) a) U (D .5, ,U�a) >a)m CM Oa W a a) It ) �j(n > (�U~ N 000(n(n0±3: 0RLL000(nN LO W P, to W O O r M N M d' to 0 4 M O MMMf�MM�d'Od'�d'd'd'd'd'd' M m m dM M M 0 0 m M m M M 0 m m to to 0 to In to O to to to to 00000000000000000 r N N N N N N N N N N N N N N M M r T T T r T r r r T r T r r T T r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N iq in m .= rn rn CO r LOrn CDrn LONN --- N N N S m 0 0 M— - O M d Ln LO W UO V7 O r r O r r r r IO � M to CO �t M d' 00 O d' O In O O r O l.!) B O O to O 11i T In tD N '[Y O O O M� CO LO Cf' O N O O O O d' T O Qi ci u)LnOCOOOMwMOOOOOOLn0InN(0000(DCOInInIOd oolntl7�NaoMNN�d TTToaoOO O .Q d' d• M 00 In O CO O 00 It O 0 OD CO CO CA O It In M O � cfl 00 � d' d• O £. 606666464 f� M I. 00 In In N T Cn f. O T T. CO N O 00 N N O M CO d ao ao N to COO M O f� In .i O MMION[FOIC>oIONOCON(OOd•OMf�(flOCOMN�MMNNOOO chNIpNMNI[>NNNMod•d• 0. Z N N N 00 N CO CO 00 (O M 0 c0 00 O O 00 CO N N N 00 d N a0 00 N N � f� M M N N� CO a0 N In m� f� f� t� 00 In IO f, I- M r, 6 N�� �� N M r C7 CYJ T I� N T N N r" r -t'- Nrl, h (O (, O T r r O O 00 O O I() O O O O LO (0 O CO 0 0 0 0 0 0 0 B O O MO O In IO O O O O In O O O O� N N N O O 00 O d'd'Md'MMd'�d'd'MCOd'a000tOd'd'd'd'd't�d'd'Ind'd'MM'U'd'd'd'M V rtM�i•I�MMM�d•MO) "O 'O C C c C (�:.+i d I -i �❑ F -F- f- O YC C C ° O O OOO c N y aN C aaOOO O o ` `q C a `) a) G O a � o E aao w L oa O E M a a a a) -o7�auua -0 -0 E EU�°a ° E E E o>>ai ai CZ W `UU.-2>ao cri �(D(D'c� c c� )ao❑NOw EO NN CO U cro ONO O VO Y E O E N v Y O O a) p �OF�. M W -J COF- �JCc Ir 202000>-OOa 2 N 1N d d �.,- N o N N N N N N N N N N N N N N N N � N a a2o tO d a O (Q n.aaaaaaaan.aaaaaaaaaaaaaaaa.aaaa.a°aaaaaa°-E E acwE E °-E N o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o U U o o U U o U 000000U000000000000000000000000000U000 UU U aroa�rorororoa�roa�roaroa�°�a�a� 00I)WWWWWOO 5ro°'a) rororororoororoa�a�roc� i 0)� '� 0) O) 0) 0) 0) 0) O; C Y C N '� D p)'_ '� Y CA CA '_ '_ CA •3 .55 O Iz woro(Lu� �( _,i5E�E oci5Ec.5E[5Jw Erowroc�oT6T00i2cEuoo VOO>000000>m00000 0000>000w0 O»�O 00>O>00000» 0 0 0 0 0 0 0 0 0 0 0 0 0 In o In o 0 0 o In o 0 o In o 0 0 o In Ino 0 0 0 0 0 0 0 In o ao o eo o ao ++ ,fir �� (CYO)T N r 6 Cn CV 00 LO O� 00 O (6 00 00 0 0 0 CV O 4 CO CO IC) O N N r -:O N O O 6 0 6 6 6 N6 O (O O CO :� O to M O O N (D 0) t Ip N d' T It N O O T O T 00 00 O r� I, O M T 00 O M O O D M O fl, r M fl, O N N M NI- O O T r f, O lA CO N In (7 CO r (0 N r M O O M O M C7 N T CA f� CO If) O M O OTT N T r O f, +L+ O X0000 r,0) tNIAN00NNTd-MOd N(OhrlCOCl) 00(DNr--NLO-It0-In(000(O'tr,It nNr- i N64NMNIt (D0 0Mf"�(0(00000'tM00M0MNNMOONr0N N Nr(,d•f�Mr-MM O E (� N T M r 0 r r M -,6% 64 C% 69 T M 64 T T r T N r 6% T 69 6% 6% 64 64 69 69 64 r r 64 (0 (& 69 64 (& 64 69 M 0 Q 64 69 69 6O 6% 64 69 69 63 64 69 64 69 64 (9 69 6% 64 69 Ef3 Ef3 i U U U C 0) C) C) J J J U NN C C C - O c: t! C C +VLCL+ (❑nc❑n (n >,c- ' c c: c ap E E °L >oc a) � tr a) C0) o OO aa Qo° O a a a 0) . c .; .� 3OasC °0 -NaO) Sroc EE aroo Doc° .00in o o0o vO aacEro oto O O O O O LL ro ,L ��NNMUO a2NG) (c 06 °2 M ❑❑ C C N ECC O C ❑ O+O O O O O O (D O c C � O 0 ( o on U o ro •- a) ❑ a) (D(DO> O o aU >, U Omcasa°oib)Oaa) a) a_o u❑cccvoa U=*=Ua)0)0EE0U) U)(ncmwa-CDTcUa)a)--3wcn0 E Mo0 m =aC NCo0°c0��3-°'a2cc a_ �cEaaoo U0 itNro0o�oz� a) cr U) 0 c� 3 t at) ,E ❑ o❑ ro E ac) v aci ac: cEcp u N a) (°a (D m .� c L a`) o ❑ ca E E 0(B 0 UUP P=5F-(nF-2L5U000..Ua22C :CLUU>�-��2-F-F-3:CCW0000 n(nCC)?>' �o - roO N O i O O d a) O ro N 4) O UO ) (a 03 C O(v "O a (n M O E ca a) pC U ui - m a c °� OC O N m ac) a) (sJ rn c rn a) ro y U ti w c a) o Q m a M a`) d E rn Z 0 LL a- .- a) d c Q A C ro- Y "O O 0 N c O. > W Q v(jv°i a)ac(D(a03'a 3o�E(00Ec�O°ccnnca �� QU °o=°o '5'cc�U06- C p Eo°C��c�J(°)mcccl- �aWYmW0FL���W w� ❑�v`ni�a���❑roCC 0cED. o IL W o J o `N o) of o 0) o � � c a) (n N c 3 a>i w o °) c(D a) s c o ro ro ro ca ca v asp �aQaainz CD- ii>,J3a°icoaoc�U�OS�o�(�ia)a'0 >��av-(�0Ud LO O _❑ o Ua Cn ❑ ro .J c o ro Q > U) o J O Q a) a) a) a [C c {f} E-°� a>i c a)� 0 >' a a>i ac) c oU �� (aro0 ac) ate) 3�[C CU oo' °c_�� ` o Ma a) (D °c My o ° oa 0) E '- E �a o `�� o o >Y ��� aEi o aci� (Yov 0 0 0 0010 ro ro ^ o> r. o CC ro o o ._ N c U> Q❑❑=J(n22(n❑=(0M-i (nJCL W M WOCL0LLQ(nLLMOrn❑O2SJJ-01 fro CL *,Mj ++ (D 00 O O CO (O t- CO T N d' In (0 4 00 O T C0 O O N M (0 r- M Mt M O O N M d• M O r- M O O T M't W O R M CA V NN MMMMM'td lhd•�td In tntnIOIOOCOCOOOO� ��aOaDMaoaOMMaoMOCAOOOOOOO d Ln In I!') L,() LO Ln l() IA I!y In Ln O I.n to Ln lC) In to Ln L.() Ln O Ln Ln Ln Ln Ln L(') IC) If') Iti L() Ln Ln Ln Ln Ll) IC) Ln O Il") I() IC) Ln In O •.-� � lI) LC) LC) In LC) L() LO In O I!') Iq It) LO I,() IO to IO Ln O In O In L() I(') In In O In In In to IA t!) In Ip In In In I.() IO O In ID In I1) In " M O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 L 0 rO 0 0 0 0 0 0 0 0 0- 0 0 0 0 00 00 00 00 00 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000000000000000000000000000000000000 (O'N'd'OOONr(OCCOTN MMONtnOCOOOIOrII)�aOTOMOIC)OTd'OO W r-lf)----N > Q r N r N T N T T M r N N N M r T r N N M r M r T N T r r N M T r T r r r r r N T r r N M M M d' lO tf) Iq to In (O COO (O O a0 00 O M M CO f� f� t� 00 O O r T O O r r N N •L T T T T T T a O LOM It r d' -0 r, M O O 0 O O [t O O O d' O M M N Mt 0 0 0 0 0 0 r- O O N M M-0 r LO CA It 1� 0- M O M r 0 M M O O r 0 L() rl O O O It O O dt 00 CO It M O 0 r, r M M d' O O O O LO N N Mr� r, M M r- O 0 r N r 0 O O CA O N CA 'd' M d' m O CO C` (` O M I.f) d' Ln CO O CC) O O r r Ln lA Cq M M LO LO Ln o a0 o r r� r O M M M V' O O M O O r- rl- (O N to r M (` r N N N d' O LO �' r d' CO d' N CO 00 M f g O d' r d' d' d' M 1� r N N f� C�7 f� N W� 1 O T Ln M 4 00' 4 M O 0) 00 r (O r 00 N N M N m 0 O r� M r (O CA rz. r� N ao N N N O m r, M r r N m M (0 m N CA r 1� O o O NN0)(Od'(0LON00NLOLO0)(0NMOd'(OMNOLOM00r-MONNNNNItmr-wNNOONOOLOOOOO r�LOLO M00MOLO0w00Mr-r�TCNT9MLn9OMCnN00000(0LO00MMMOMMrlMML.()d'r�IN m m 0 m r-(0(0 d Mr�r,�rNt`rf��r-CO(0(OMNrM�f�NNrNMNNNN Nt`(\ OOL www000Od' N00000000(OOOONLOOO000000000rd'Nr00r,r�N rlrl1,r-r, r, 1� OO d d'MMMCIO d'It It't0)co ItItcoC)d•O)001' d• d'MMd'rtd'd'd'MMM0ONM00ItIt lI-Mr-oorl.t-tl�1l. r-ItIt C Y .Y ca >' E -FD "O V) 0C O N a) 0 3 0 CO c o a- ro E a`) ca c Z aci ro -a c E ro Cl) 2 c c N ro a) roav c -- c o U O C N N y L 'V X co ro ,4? co V L N C ,> J C 'V 'V 'V V i Q N N O .E W Y� d 0) O U a) OC p Y P *' = -0 0 0 O U o -a) 1 3 3 0° (n Y C c >, Ln (n rn ro co - ro Q o ra z z a m - m a) ro c C7 - ro ro ro ro a) a) ro ro a) a) � T y TTQT� c o-�� ro�YOmU��C7m� 0m2 croaJ��2 °)�a22� Wmv EL'c �, c E E E �c E� >.:F; 0) � O r -O w -0 � ��� i� c� 0 0 0� 0-C n� �= � 0 0 L ca S E E ro9E0=00 roa):30)o•-ro(a°(aoa)O._� moa)�'roa)rororoa)otf000 0= ro O._._ -�OC�❑m❑I-(DmmmZ��J����mmzU- -1 3->>2JJJC'3C'3�amm❑�mml-�❑J� Q1 0 41 N N N N N a a) ro m N '0 0 O N 0 0 a) N 0 0 N a) 0 a) 0 0 0 N N N N N 0 0 0 N 0 0 0 N 0 O 0 0 0 0 N 0 a) a) ro a) a) 0 a) a) ro a) a) _ a) a) a) a) ro a) 0 a) a) a) ro a) a) a) a) ro a) a) a) a) a) a) a) a) a) a) a) a) o m m a) a) a) a) o a) EEE E E EE ES EE EE cc EEEEEEE EE EEEEEEEEEEEEEE E EE EEEEE EEEE� E 0 0 0 0 0 0 0 0 ca o 0 0 o ro 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U (� a) ro ro N (Oa 0 O a) a) .> C > C c0 > ,> 'N 0) a) 0)'6 0) O) C 0) 0) O ro O '� rn '= O '_ rn O rn '� '� c :E :E (A > m `1a) o f o E ro N U cca o .E o v 'E c0 c` cL N ro N c� o cru N c� c ro c ro c c c c i c ro ro ro g ro 5w o 0 w w ro c J J >0 0>00 000Om00>O0>p�>00000000»Lr-Om0000 c � > c5 5m o o o 0 o o o o o m o 'd' o m o o o o o m o m o o o o o o o o o o o o o o o o O o o o o o o o o o m o o o O O r LO O O N M d' CO O O O O O tO O O a0 O� O l() O O O CA x 0 0 0 0 LO � r 0 Ln d' O O r O O O O LOM t\ d1 N O O (o LO r- LO LO 0) M N LO O N M LO Ln O O O O M d' MO r-, I' to O M MO I' O O O [` N N r r 00 M, M, O O Ln O O C7 O (A LO O O rO(C)P,MMMrrMrNd dtMOLOrLONW�LOr�r�r�tNO(0MtoM(0WMLOrM(0NMNNOMMMNMOr r r M CA 00 n M 00 � O M M O to O r (\ O O MO CA 00 O d' 00 CC) r O M N M r O r O O f� L17 MO r O O LO N O d' L.O 117 O tl0 N 00 d 00 M N 00 N O M r` (O 00 O 0) d) M 00 0)d t ) t` to (O d M N N O (O LO d' 00 LO O r 'It It N (O C7 (O M Cl) M Cl) d LO Cl) 00 r�OrOM LOrr-r-OO�d 099 (Y) f}LOOrr�Nr-00(aNr�OMLf)LOLOCOONNrd'd'r,Md'M000D (OMCON- d' 03; 6a (fl 0{} to m EH (a (a ffl 6% EFJ (fl 'd' r 6c3 Cl) r Cl) r 69 r O N ({} 6a r 69 LO tci 6a r (F? (si (f} N 61 N (f} (fl 6a r 09, N r UT r y} Efl 61> 613.6c> Ef3 69} EA - r Ef3 r ff3 (R EA to lfl 6a 6q 6s E E 0 C:o C U C_cu CL U) _ N E C C C CLQ ❑ '- 7 to a) N ro O ° o _ a) (D a ° 1- c c c �a) o CLc C� vU -� 0 c �m o :D C: is c .0 0 0 n `� c ti ° ° N a '� '� C c c cz C7 °) o c T a) c o rn rn 0 0 0 O D U c 'OMCo0 00cco «- a) c0roc0 oOO E a jU to >o(�0 cc 000 0 �ro �o� a) a)° Eao2c0� - «.F- ca EEro crorn a)��0a via t��ina)a t>W U)ia "c-c❑o❑0c00 6000- �%Nccu �a)a) -0 ❑v-�°>> T CO m CO N CO N ... o O o O ro U a) U cu S S- - - 00. 0. CL m -0 a) a) a) O 0 C j d C -C 4) ro ro coU�U❑U❑� o a oU EL -�._..0 aa) °m w- �_ p `O 0 c_ c~~•cdZ roUd m F a� >+X X 0 o U 0 E r °) co U? o i U 0 (n � m cca Eo X 0 0> LL o� U U U c> o N� c� o W� 0 +. �- `� S o W W r- :03 o° ro ca to >� U... CL ° 3 0 E o rn ro aa))' U. QmmUI- roU ro c°� Q a m _j 0) 0W o��m��°?o�o��aa))ocoaa))�a) ��E�a) C��(Na�Uo oct��oc>aaiiaaEi�O� a) a) a�mmmmw0UI-(nJU) mcr?:3: )Z:03:NUUSw❑n22P000)CJL 1 -LL -3 aUY0m-j ❑ a i a a as (0 co (n a 75 c cc N o cz o CL OC r a) cd ~ o U) = m aa)) �_ a > co C)T O fl L a _� C N (ate O O a) '- p) a) (Ja C T ro N� d a) p V U E ro (� U U O a Q' •.O� 'C ro 0 ° cu Q Y c c W? a 0 0) fa > J > 0 a) ro V 0) O C'3 c ro Co o ro a°i C7 C 0- a a) O ro 0 (0 •- .«_. C O cu U) c°�- CO a) 3 U v m ate) c 0 c c % c 0 m: o ca U m d M >, Y ro ro ro '> Q Od 5 ° a) 0) i 0) -0 LO •- a) o '0 O U 0 c T a) m (D a) O U 0 w (0 a) rn u ro ° m a- (n ca o rn0Cf)O❑c a) ror�o ��=U° ca oOa�ro E a 2aaoc� Y 0 @) Jia �E TS ° 0(nUU (1)ccom o Y OIn ro_j c om c�- ca nam m o 0 3 �" od a) F- ro CO 30%> o E❑ c a)a=LL a) >, Q0 ro E c a) oU a) LU$UUU cnm OJJ T"=T. 0)0 00 mN ? ro 000>-U isZOE rnc°)i(nv°Em2>1 d c2 c� o Ea .gip vi a.� o a0i-->' c ro uci ofO po:s Ya 0� LOcu w 06 o o 0 0 0.. .� a) ro 0 a) (n a) O J O O a) ro m ro a) ro U 2 a) ._ N .-• ._ ._ f- ro ca m ro ro a) O) m❑Z❑(n(na(n❑�maac2❑w0n.(n�CnmN 0 0 00 ) <mJWJJJ co(DU) v) CL>S(n O r N CO It LO 0 r�, 00 O) O r N co d' LO (0 r- m m O M 't (O r� O O O r N M d' m 0 h w O O O M r (0 N ao LO O r d' O M d' OOOOOOOOOO----- ---- '(Owwmr-w t t (0(0(000OOo(0G0O(0(0(0O(0 0 00000000000 (00O(0(0(0000(0Itd'd'It0d'd'It�'�td'OO LO LO LO In tO LO tO LO Lf) M() LO Lf) In LO t.O lO MO LO MO (O t.() LO LO Lf) LO LO LO tO LO tO LC) IO LO MO MO LO LO lO O O O O LO O O O O O O M.0 t.O 0 0 0 0 0 0 0 0 0 0 0 LO M m M LO M 0 M LO M LO 0 0 m 0 m m M LO 0 m 0 m M LO M 0 0 0 0 0 m 0 0 0 0 0 0 0 0 LO Ln LO Ln LO LO MO LO MO LO LO Ln LO Ln (f) MO LO cA LO LO MO LO cA cO cO L() (O (O (O LO LO LO LO tO LO tf) MO N N N N LO N N N N N N m Ln CO M M M coMMM (9 M M M M co co co M co co co M ('7 M co co co co M co co ('9 ('9 C9 M (YJ CO (9 C9 M CO M M M CO CO M M M M M M M O O O O O 0) 0) 0) O 0) O 0) CA 0) O O 0) 0) O O O o CA O O O O O O O O O r r r N N N N N N N N N N N N N N N N O O O O O O O O O O O O O O O O O O O O O O O r r r r r r r r r r r r r r r r r r r r r r r r r r r r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N (� (0 (0 LO (O (O (0 r N r r O (` a d' Lq O (0 N M d' CA d' (O N CC) O r M M M M (O N LO CO CA CAN (0 r Cl) M LO r (0 CAN O CO N N N N N N N N N N N N N N N N T r r r N r r C� N M N N N N N N N r r r M M M d' d' MO O CO COO (0 0 (0 rzz M 1p CA O O M L0 (0 Cri r r r r M LOO r r \§\S$EG/ =¥=n¥¥o= #m##-@#_ +G&&6-6& 2$$O$%\7 &¥AK*¥mR §?%?\?%% a tf E 9) a) \ W 2 / % § CO U) /Ez 0 =mac=�:,9 e�e2eo�= =dols=off e e e 7/7 \\\�&000 mk»ma)7\ ; 2e=eooel -j § % § § § - § «ofo006) ocoocmoo o§oom§�o G=omc=ac eaR«¥¥oa n�c�¥¥@ &ea/Nese e k § o 2 £ E ¢ E E o 3 0<00 _ >m>Z5 � 3&/?\bt I®It§/t§ $/mcI a®4' ELI aco Moo E$Eg\e£a 2A2�:/ --- b/ mc¥=o 737$$$0$ §§§0§000 mmmommom momommom 2222222/ \G\\E\\& \d$\\\�} S \ / / m k ƒ m f k k (a A k ■ � CL 0 � k k k _ } [NOTE: If requested by the County, the Bidder shall furnish references, and other information, sufficiently comprehensive to permit an appraisal of its abilities as a contract (Signature) F. Scott Fowler Vice President (Position or Title) April 24, 2013 (Date) * END OF SECTION 00456 - Qualifications Questlonnalre.doe 00456-4 j FAPublic WofWENGINEERING DIVISION PROJECTSM32-CR 512 Ebnd Resurfacing Roseland Rd to Easy SI -SEE PROJ 09261Admirn Contract Documenls100456 - Qualifications Queslionnalre.doc SECTION 00453 - List of Subcontractors The Bidder SHALL list below the name and address of each Subcontractor who will perform work under this Contract in excess of one-half percent of the total bid price, and shall also list the portion of the work which will be done by such Subcontractor. After the opening of Bids, changes or substitutions will not be allowed unless approved by Indian River County after a request for such a change has been submitted in writing by the Contractor, which shall include reasons for such request. Subcontractors must be properly licensed and hold a valid Certificate of Competency. Documentation Submitted with Project No. 1132 for CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street) Work to be Performed Subcontractor's Name/Address i 2. 3. i 1 4. 5. 6. f 1 7. 8. i 9. r 10. I 11. 12. - i 13. 14. 15. 16. 17. Note; Attach additional sheets if required. * * END OF SECTION 00458 - List of Subcontractors REV 04-07.doc 00458-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl-SEE PROJ 0926V\dmim\Contracl Documents\00458 -List of Subcontractors REV 04-07.doc Ranger Construction Industries, Inc. 1304088 CR512 Resurfacing *** Steve Skubal Selected Vendors Page 1 04/22/2013 09:08 Quote Folder: 4RECLAIM Reclaim Cub Client # Description RECLAIMED ASPHALT BASE COURSE(FULL DEPTH RECLAMATI ASPHALT EMULSION TYPE CSS -1H Ranger Construction Industries, Inc. 1304088 CR512 Resurfacing *** Steve Skubal Selected Vendors Page 3 04/22/2013 09:08 Quote Folder: SIGNAL Signalization Client # Description MOBILIZATION (INCLUDES PUBLIC CONSTRUCTION BOND ECONOLITE VEHICLE DETECTOR ASSEMBLY Ranger Construction Industries, Inc. 1304088 CR512 Resurfacing *** Steve Skubal Selected Vendors Page 1 04/24/2013 10:05 Quote Folder: SEED Seed / Sod Description PREFORMANCE TURF SODDING (BAHIA) PREFORMANCE TURF SODDING (sT. AUGUSTINE, FLORITAM) Quantity Unit 8,855.00 SY 5,904.00 SY Ranger Construction Industries, Inc. 1304088 CR512 Resurfacing *** Steve Skubal Selected Vendors Page 2 04/24/2013 10:05 Quote Folder: STP Striping Description Quantity Unit SINGLE POST SIGN <12 W4 -2R MERGE 1.00 AS SINGLE POST SIGN <12 R3 -7R RIGHT LANE MUST TURN RI 2.00 AS RPM BI-DIRECTIONAL WHITE/RED 280.00 EA RPM BI-DIRECTIONAL AMBER/AMBER 54.00 EA RPM BI-DIRECTIONAL WHITE/MONO 7.00 EA THERMOPLASTIC, TRAFFIC STRIPE WHITE SOLID 6" 9,830.00 LF THERMOPLASTIC, TRAFFIC STRIPE WHITE SOLID 12" 345.00 LF THERMOPLASTIC, TRAFFIC STRIPE WHITE SOLID 6" 135.00 LF THERMOPLASTIC, TRAFFIC STRIPE WHITE SKIP 6" 6'-10' 1,434.00 LF THERMOPLASTIC, TRAFFIC STRIPE WHITE SKIP 6" 10'-30' 7,991.00 LF THERMOPLASTIC, TRAFFIC MESSAGE MERGE 2.00 EA THERMOPLASTIC, TRAFFIC MESSAGE ONLY 2.00 EA THERMOPLASTIC, TRAFFIC WHITE TURN ARROW 16.00 EA THERMOPLASTIC, TRAFFIC WHITE TURN MERGE ARROW 2.00 EA THERMOPLASTIC, TRAFFIC STRIPE YELLOW SOLID 6" 8,628.00 LF Bhp BOND Travelers Casualty and Surety Company of America Hartford, CT 06183 CONTRACTOR: (Name, legal status and address) Ranger Construction Industries, Inc. 1200 Elboc Way Winter Garden, FL 34787 OWNER: (Name, legal status and address) Indian River County 1801 27th Street Vero Beach, FL 32960 BOND AMOUNT: Five Percent (5%) of the total amount of bid PROJECT: (Name, location or address, and Project number, if any) CR 512 Resurfacing (East Bound Only) Roseland to Easy Street Project No.: 1132 Bid No.: 2013006 SURETY: (Name, legal status and principal place of business) Travelers Casualty and Surety Company of America One Tower Square, 5PB, Hartford, CT 06183 800/242-8744 Hartford, CT 06183 The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. The Company executing this bond vouches that this document conforms to American Institute of Architects Document A310, 2010 edition Signed and sealed this 24th day of April 2013 (Witness) The Company executing this bond vouches that this document conforms to American Institute of Architects Document A310, 2010 edition QUALIFICATIONS QUESTIONNAIRE CR 512 Resurfacing (East Bound Only)(Roseland Rd to Easy St.) RFB #2013006 Answer to question # 8 page 00456-1— OSHA Violations Job Location: Hypoluxo Road, West Palm Beach, FL Owner: Palm Beach County Owner's telephone #: 561-684-4180 On April 24, 2009, Ranger Construction Industries, Inc. was cited under subpart 1926.701(b) Concrete and Masonry Construction: Reinforcing steel. All protruding reinforcing steel, onto and into which employees could fall, shall be guarded to eliminate the hazard of impalement. Circumstances: A gap was present in a barrier wall where rebar protruded from the walls edge into the gap. The gap was very small and would prove to be difficult for a person to attempt to use the area as a means of passing from one side of the wall to the other. OSHA asserted that an employee could choose to attempt to use the gap as a walkway, and receive lacerations or abrasions from the rebar. The condition was quickly abated. A reduced citation in the amount of $526.00 was paid. Mark E Ligon Vice President - Safety TATE OF FLORIDA DSpARnmNT OF aUSIORS6 AND PROFESSIONAL RHOULATION COXSTRUCTION INDUSTRY LICENSING BOARD J 85 0) 487 -1395 1040 .NORTH MONROE STREET TALLAHASSEE FL 3235500783 CORREA, NI'GURL QUIZ ,$R1 O R_A_NGI. CONSTRUCTION INDUSTRIES INC P 0 SDX 15065 NEST PALM BCH FL 33415 Cvngratulationsl With this license you become one of the neatly ono mill on 1'landlans licensed by -the Department of 6wir,ess and: Professrortal Regulation. Ovr pro k feselbnals and businesses range from arctutdots to yacht brokers, from boxers to barbequo restaurants, and thby keep Flodda.'s economy strong. Every day we work to improve the way gra da. business In order to,serve you better For infcrrnation about our servlces, pCease lig-onto www.myflo�rAatioerse:corrrE. There you can And more- information a-bubt our divisions and the regulations that impact you, 60 -knee to departmentnewstbtters and learn more about the DeparWhent s initiatives. our mission at the Department Is,. License Efficiently, Regulate Fairly. We constantly stdve to serve you better so thatsou can serve your customers. Thunk you for doing business in Florida, and-conaratulegons on your new license! L V CEi��S ITB1 Thd S`09t�#'A-L� N ZCteic� Uald* TS ;TIFF °� Under title psi vii as of Ch4t wj HX Ix�tion date, AUG 31. 2'0 C i 6ETACH HEM= 'STATE gat ACS _ 3 ,7 2 >�RA>SS>Tli fEGi.ATI DN CGCO19416"' F of 12 �1200754t5 CER'7t'�P'T>3�� tf ��QC1'OR - C IiO$R' C •f �,:�ID�USTRTES i .'Jte. RS i- 5U 3�'i�T�FL► uc�det'-ie'i?f©aiaigps `off c.88 P�.. , r � yy1 LATION SEWL1208170-1540 t;UBLNZLLSRMO E ° :L COq�i+;TE�+ii�CTIN IfJSTIHs SNC F. WEST PALM BO.. = FL 31-3411 .,� Rick Ct TT, _ KEN LPlii�5Q2q ' Vit` VARKOR SECRETARY DISPLAY AS REQUIRED BY LAW Ranger Construction Industries, Inc. WRITTEN CONSENT IN LIEU OF A SPECIAL MEETING OF THE BOARD OF DIRECTORS OF RANGER CONSTRUCTION INDUSTRIES, INC. THE UNDERSIGNED, being all of the Directors of Ranger Construction Industries, Inc., a Florida Corporation (the "Corporation"), do hereby consent -and subscribe to the following resolution, in lieu of holding a formal special meeting, pursuant to the terms of Florida Statutes 607.0704. WHEREAS, it is deemed to be in the best interest of the Corporation that the Board of Directors elect Frank Scott Fowler, as Vice President of Operations for the Central Florida Area effective October 22, 2012. RESOLVED, effective October 22, 2012, Frank Scott Fowler be elected Vice President of Operations for the Central Florida Area; and be it further RESOLVED, that effective October 22nd, 2012, Frank Scott Fowler, as Vice President of the Corporation, be authorized to sign any bid documents, contracts, leases and other documents considered to be "in the ordinary course" of this Corporation's business. This authorization does not include "major decisions" including, but not limited to, potential business acquisitions or dispositions greater than $3 million, major restructurings, distributions greater than $1 million, windups, mergers, liquidations, the sale of a portion of the business, or any other decision other than "in the ordinary course." IN WITNESS WHEREOF, the undersigned hereby executes this written consent as of October 22, 2012. o A. Vecellio, Jr., Directory Ka yn C. If ecellio, Director Christop e�SVecellio, Director'Michael A. Vec lio, Director Central Division Office & Company Headquarters: 101 Sansbury's Way, West Palm Beach, Florida 33411 Corporate Mailing Address: P.O. Box 15065, West Palm Beach, Florida 33416 - www.RangerConstruction.com Phone: (561) 793-9400 - Toll-free: (800) 969-9402 - Fax: (561) 790-4332 2013 FLORIDA PROFIT CORPORATION ANNUAL REPORT DOCUMENT# F40180 Entity Name: RANGER CONSTRUCTION INDUSTRIES, INC. Current Principal Place of Business: 101 SANSBURY'S WAY WEST PALM BCH, FL 33411 Current Mailing Address: 101 SANSBURY'S WAY WEST PALM BCH, FL 33411 FEI Number: 59-2098662 Name and Address of Current Registered Agent: BROWNING, DOUGLAS 101 SANSBURY'S WAY WEST PALM BEACH, FL 33411 US FILED Jan 28, 2013 Secretary of State Certificate of Status Desired: No The above named entity submits this statement for the purpose of changing its registered office or registered agent, orboth, in the State of Florida. SIGNATURE: Electronic Signature of Registered Agent Date Officer/Director Detail : Title ST Title PRESIDENT Name BROWNING, DOUGLAS J Name SCHAFER, ROBERT Address 101 SANSBURYS WAY Address 101 SANSBURYS WAY City -State -Zip: WEST PALM BEACH FL 33411 City -State -Zip: WEST PALM BEACH FL 33411 Title VP Title CHAIRMAN, CEO Name FRANK, SCOTT Name VECELLIO JR, LEO A Address 101 SANSBURY'S WAY Address 101 SANSBURY'S WAY City -State -Zip: WEST PALM BEACH FL 33411 City -State -Zip: WEST PALM BEACH FL 33411 Title VP Title VP Name CORREA, MIGUEL G Name FOWLER, F. SCOTT Address 101 SANSBURY'S WAY Address 101 SANSBURY'S WAY City -State -Zip: WEST PALM BEACH FL 33411 City -State -Zip: WEST PALM BCH FL 33411 Title VP Title VP Name VECELLIO, MICHAEL A Name VECELLIO, CHRISTOPHER S Address 101 SANSBURY'S WAY Address 101 SANSBURY'S WAY City -State -Zip: WEST PALM BCH FL 33411 City -State -Zip: WEST PALM BCH FL 33411 Continues on page 2 . 1 hereby certify that the information Indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under oath; that I am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607, Florida Statutes, and that my name appears above, or on an attachment with all other like empowered. SIGNATURE: DOUGLAS BROWNING SECRETARY/TREASURER 01/28/2013 Electronic Signature of Signing Officer/Director Date Officer/Director Detail Continued : Title VP Name VECELLIO, KATHRYN C Address 101 SANSBURY'S WAY City -State -Zip: WEST PALM BCH FL 33411 Title SR VICE PRESIDENT -FINANCE Name SMITH, ROBERT D Address 101 SANSBURY'S WAY City -State -Zip: WEST PALM BCH FL 33411 Indian River County Purchasing Division 180027 th Street Vero Reach, FL 32960 X �OR11011* Phone (772) 226-1416 Fax (772) 770-5140 ADDENDUM NO. 1 Date: April 9, 2013 Project Name: CR512 RESURFACING (EASTBOUND ONLY) ROSELAND ROAD TO EASY STREET Project Number: IRC 1132 Bid Number: 2013006 Bid Opening Date: The Bid Opening date is Wednesday, April 24, 2013 at 2:00 p.m. A Pre -Bid Conference was held on Thursday, April 4, 2013 at 10:00 a.m. in Indian River County Admin Bldg "A", Room A1-303; 1800 27th Street Vero Beach, FL 32960. The meeting minutes are hereby incorporated into the subject addendum as an attachment. TO ALL PROSPECTIVE BIDDERS: TO PROSPECTIVE BIDDERS AND OTHERS CONCERNED: This ADDENDUM is intended to clarify, correct, or change the Bid Documents. Therefore, it hereby supersedes anything to the contrary in the Bid Documents. This ADDENDUM is hereby made a part of and shall be attached to the subject Bid Documents. All questions about the meaning or intent of the Bid Documents are to be submitted to PURCHASING MANAGER in writing to purchasing@ircgov.com. Interpretations or clarifications considered necessary by PURCHAING MANAGER in response to such questions will be issued by Addenda mailed or delivered to all parties through the Issuing Office as having received the Bid Documents. Questions received less than ten 10 calendar days prior to the date for opening of Bids (April 24, 2013) shall not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarification will be without legal effect. Deadline date for submittal of questions is Sunday, April 14, 2013. All Bids must be received by the Purchasing Division office located at 1800 27th Street, Vero Beach, FL 32960 prior to the date and time shown above. Late bids will be returned unopened. Addenda may be issued to clarify, correct, or change the Bid Documents as deemed advisable by OWNER or ENGINEER. Page 1 of 3 FA\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Addendums\Addendum No. 1 04-09-2013.doc CLARIFICATIONS / CORRECTIONS Questions that were asked during the Pre -Bid Meeting that were not answered are as follow: 1. Would blue and white business signs be required? Yes. Bid schedule has been modified to include signs for businesses. 2. Would the side streets be allowed to be closed for short period of time (i.e. one to two hours) to allow for mixing through intersections? Side streets cannot be closed (per the City of Sebastian) but the Contractor could delay traffic through the work area for short periods of time (i.e. 10 minute intervals). 3. Could night and weekend work be authorized? Yes. However, any additional cost for inspection and testing services would be the responsibility of the Contractor. ATTACHMENTS: 1. Revised Itemized Bid Schedule (Pages 00310-3) 2. Pre Bid Meeting Minutes (3 pages) 3. Sign In Sheet from Pre -Bid Meeting (2 pages) Page 2 of 3 FAPublic Works\ENGINEERING DIVISION PROJECTSU 132 -CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\AdminAAddendums\Addendum No. 1 04-09-2013.doc AIL I Oil i *************This Addendum MUST be returned with your Bid************** ChristopW.`kafer,X., P,W,'tg4 %)(tngineer and C� J r Davi , Purch sing Mjv4er Company Name XU/7v, Name: ZL✓Cr Title: (Type / Printed) Authorized Signature: Date: Telephone: 7%2-' Z��/- 6/ 61 6'1-) Fax: 7 7�,,- Pare 3 of 3 HPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resuifacing Roseland Rd to Easy St -SEE PROD 0926\Admim\Addendums\Addendum No. 104-09-2013.doc �gIVER� Board of C®uni�v Commissioners A 180127th Street Vero Beach, Florida 32960-3365 #�LoR1pA Telephone: (772) 567-8000 Fax: (772) 778-9391 PRE-BID MEETING MINUTES APRIL 4, 2013 INDIAN RIVER COUNTY ADMINISTRATION BUILDING Room Al -303 Date: April 4, 2013 Project Name: CR512 Resurfacing (Eastbound Only) Roseland Road to Easy Street Project Number: IRC 1132 Bid Number: 2013006 Owner: Indian River County The following meeting notes set forth our understanding of the discussions and decisions made at this meeting. INTRODUCTIONS SIGN IN SHEET: The meeting was called to order by Christopher J. Kafer, Jr., P.E., County Engineer. The following is a list of the attendees: Chris Kafer, IRC Engineering Dan Dunlap, Dickerson Florida, Inc. Moe Moussavi, JW Cheatham, LLC Jill Williams, IRC Engineering Bill Yoder, Ranger Construction, Ind. Sue Zheng, Dunkelberger Engineering Mike Heller, IRC Engineering D. Howard, IRC Engineering John Ankeny, IRC Traffic Engineering Ted Bitomski, Asphalt Recycling, Inc. Terry Cook, IRC Road & Bridge Jeanne Bresett, IRC Traffic Engineering CONTRACT DETAILS: Bid opening: April 24, 2013 at 2:00 p.m. Contract time: Substantial Completion —120 calendar days from Notice to Proceed Final Completion —150 calendar days from Notice to Proceed Liquidated Damages - $1,148.00 per calendar day Estimated Cost of Project approximately $872,000.00 Request for Information (RFI) or Clarification: Cut -Off -Date and Time is: SUNDAY, APRIL 14, 2013 Late Bids will not be accepted. FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Meetings\Pre-bid Meeting Minutes.doc PROJECT DESCRIPTION: The proposed improvements to CR -512 consist of refurbishing (full depth reclamation) of the dual eastbound lanes from Roseland Road to Easy Street. Also included with the project is the installation of vehicular detector assemblies and the signing and marking of the proposed resurfaced eastbound lanes. CORRESPONDENCEILINES OF AUTHORITY: All project correspondence during the bidding process should be addressed to Jerry Davis, Purchasing Manager, Indian River County, Engineering Division, 1800 27th Street, Vero Beach, Florida 32960 purchasing@ircgov.com. CONTACT INFORMATION Jerry Davis, Purchasing Manager (772) 226-1418 E-mail: purchasing@ircgov.com PROJECT DISCUSSION: ® FULL DEPTH RECLAMATION ® MOT One (1) eastbound through lane must remain open at all times. Access for businesses must be maintained at all times. Blue and white signs required for businesses??? 72 hour public notification for lane switches or closings Traffic control plan is not required to be signed and sealed by FL licensed engineer— submittals may be sent via email to Jeanne Bresett Cones will be used for traffic during the day; barrels or barricades must be used in the evening Speed limit reduction will be reviewed after project has begun Detour of side streets?????? Check with City of Sebastian Working nights/weekends - ?????? Approximate hourly rates for inspector: Hourly $40.00 Overtime $60.00 FAPublic Works\ENGINEERING DIVISION PROJECTSU 132 -CR 512 Ebnd Reswfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Mcctings\Pre-bid Meeting Minutes.doc ® UTILITIES - MAYBE PRESENT ALONG LIMITS OF PROJECT FP&L AT&T IRC Utilities Comcast Cable Communications IRC Telecommunications (Fiber) Crossings of utility facilities and sleeves exist though out project. Some utility trenches may have been backfilled with concrete or flowable fill. County will try to determine if any crossing would affect the construction of the project. • OPEN DISCUSSION Driveways shall be saw cut and match. Contractor should pave first lift of asphalt to protect base before shifting traffic. Testing Traffic Test prior to injection of emulsion Consistent gradation prior to inject of emulsion After injection —test of in-place material for maximum density of reclaimed base. Reclaimed base to have structural coefficient (2.0 desirable, 1.8 minimum accepted) Contractor pays for design testing for mixing and structural coefficient IRC is responsible for testing cost of compaction and density testing costs and verification of Contractor testing results. There are 3 intersections with traffic signals and detector loops — prior to milling up intersection, Contractor must have new video detection system in place - (Econolite) and a Type 1 cabinet are County standards. No asbuilt drawings required. Sheets 13 — 28 are for informational purposes only — do not follow construction turnouts Anticipated start date is June, 2013 Sue Zheng, Dunkelberger, stated water may need to be added in order to obtain optimum moisture of reclaimed base prior to compacting. F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Adinim\Meetings\Pre-bid Meeting Minutes.doc PRE-BID CONFERENCE SIGN-IN SHEET INDIAN RIVER COUNTY ENGINEERING / ROADWAY PRODUCTION INDIAN RIVER COUNTY ADMINISTRATION BUILDING Building A - Al-303 CR 512 RESURFACING (EASTBOUND ONLY) (Roseland Road to Easy Street) IRC PROJECT # 1132 April 4, 2013 at 10:00 A.M. NAME COMPANY & ADDRESS PHONE # / FAX # / CELL # EMAIL ADDRESS 3 � iR'7v{��..7 /St?"e -772-/ -?7�-77F-93,91 n a �r e 7 72 - 3 _ �FZS� / rc19v�, Y ►►u����N C- Gcc 7�Z�Z��-����� r� ����e�� LLS C< W;:) Llr 31Z2-P- 2'�: i �y ' ce� `i 11001,:�I2iJ .7120 ��y:,d ��z�.;.�� `%yz- Zz�• %s 3 r� ops uslAj, 3.`-✓. C e.,tL,Gti , ���� l��l— jut/( 42 �L G Ll -7 r - Z33Lt� J�vc��11� (_5_�) 7Zz, r3t C�, nhfi Af1ken ��, art ((i c__ -77 7%g'' PRE-BID CONFERENCE SIGN -IN SHEET INDIAN RIVER COUNTY ENGINEERING / ROADWAY PRODUCTION INDIAN RIVER COUNTY ADMINISTRATION BUILDING Building A -AI-303 CR 512 RESURFACING (EASTBOUND ONLY) (Roseland Road to Easy Street) IRC PROJECT # 1132 April 4, 2013 at 10:00 A.M. NAME COMPANY & ADDRESS PHONE # / FAX # / CELL # EMAIL ADDRESS %d� I�i`�� ���c 3% 3-�—a�v���t /f! �� (,��,�r ��¢.y.�lPr Ct+�.f �Y�'G�li7✓ZAc�� For f 1p �- L". � CJf�� / �!?d rr C:y ra iCa•�c� �R �cf'1 �1�1 '1'% o —5 0� 70 c� i ,Q C C� v '✓ , CC 77 •'� 7 -2, Z 7 119 1• 7/ -13ZO r� BOARD OF COUNTY COMMISSIONERS May 14, 2013 Ranger Construction Ind., Inc. Attn: Mr. F. Scott Fofvler 1200 Elboc Way Winter Garden, FL 34787 NOTICE OF AWARD Reference: Indian River County Bid No. 2013006 CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street) Dear Mr. Fowler: I am pleased to inform you that on May 14, 2013, the Board of County Commissioners awarded the above -referenced project to your company. In accordance with section 255.05(1)(a), Florida Statutes, you are required to execute a Public Construction Bond for the above referenced project. The following documents are required before the applicable County department can issue a "Notice to Proceed" letter: 1. Public Construction Bond in the amount of 100% of the contract amount. ($1,049,787.70). 2. Certificate of Insurance, must name Indian River County as an additional insured and must provide for a 30 day Notice of Cancellation. 3. Two Signedpies of Enclosed Agreement. Please execute both copies of the enclosed Agreement and return them together with the required Bond, and Certificate of Insurance to this office at the address provided below no later than May 29, 2013. Failure to comply with the established deadline for submittal of required documents may be grounds for cancellation of the award. Thank you for your prompt attention and if you have any questions, please do not hesitate to contact this office. Sincerely, Jerry Davis, Purchasing Manager cc: Christopher J. Kafer, Jr., P.E., County Engineer Office of Management and Budget • Purchasing Division 180027 1h Street, Vero Beach, Florida 32960•(772) 226-1416•Fax: (772) 770-5140 E-mail: purchasing(a)irc1zov.com SECTION 00520 - Agreement (Public Works) THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) Ranger Construction industriess, 1111C. and (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1 -WORK 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: The proposed improvements to CR -512 consist of refurbishing (full depth reclamation) of the dual eastbound lanes from Roseland Road to Easy Street. Also included with the project is the installation of vehicular detector assemblies and the signing and marking of the proposed resurfaced eastbound lanes. ARTICLE 2 - THE PROJECT 2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Project Name: CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street) County Project Number: 1132 Bid Number: 2013006 Project Address: CR 512 Sebastian, Florida ARTICLE 3 — ENGINEER 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and will act as OWNER's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4 - CONTRACT TIMES 4.01 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment A. The Work will be substantially completed on or before the 120th day after the date when the Contract Times commence to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraph 00520 - Agreement (Public Works) REV 04.07 (9) 00520 - 2 C:\Documents and Seltings\mmclaughlin\Local Settings\Temporary Internet Files\Content.Outlook\24026LX8\00520 - Agreement (Public Works) REV 04-07 (9).doc 14.07 of the General Conditions on or before the 150th day after the date when the Contract Times commence to run. 4.03 Liquidated Damages A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. Liquidated damages will commence for this portion of work. The parties also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER $1,148.00 for each calendar day that expires after the time specified in paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER $1,148.00 for each calendar day that expires after the time specified in paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment. ARTICLE 5 - CONTRACT PRICE 5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents, an amount in current funds equal to the sum of the amounts determined pursuant to paragraph 5.01.A and summarized in paragraph 5.01.13, below: A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. B. THE CONTRACT SUM subject to additions and deductions provided in the Contract:: Numerical Amount: $= Written Amount: ARTICLE 6 - PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions and the Contract Documents. 6.02 Progress Payments, A. The OWNER shall make progress payments to the CONTRACTOR on the basis of the approved partial payment request as recommended by ENGINEER in accordance with the provisions of the Local Government Prompt Payment Act, Florida Statutes section 218.70 et. seq. The OWNER shall retain ten percent (10%) of the payment amounts due to the CONTRACTOR until fifty percent 00520 - Agreement (Public Works) REV 04-07 (9) 00520 - 3 C:Wocuments and settings\mmclaughtin\Local Settings\Temporary Internet Files\Content.Outfook\24026LX8\00520 -Agreement (Public Works) REV 04-07 (9).doc (50%) completion of the work. After fifty percent (50%) completion of the work is attained as certified to OWNER by ENGINEER in writing, OWNER shall retain five percent (5%) of the payment amount due to CONTRACTOR until final completion and acceptance of all work to be performed by CONTRACTOR under the Contract Documents. Pursuant to Florida Statutes section 218.735(8)(b), fifty percent (50%) completion means the point at which the County as OWNER has expended fifty percent (50%) of the total cost of the construction services work purchased under the Contract Documents, together with all costs associated with existing change orders and other additions or modifications to the construction services work provided under the Contract Documents. 6.03 Pay Requests. A. Each request for a progress payment shall be submitted on the application for payment form supplied by OWNER and the application for payment shall contain the CONTRACTOR'S certification. All progress payments will be on the basis of progress of the work measured by the schedule of values established, or in the case of unit price work based on the number of units completed. After fifty percent (50%) completion, and pursuant to Florida Statutes section 218.735(8)(d), the CONTRACTOR may submit a pay request to the County as OWNER for up to one half (1/2) of the retainage held by the County as OWNER, and the County as OWNER shall promptly make payment to the CONTRACTOR unless such amounts are the subject of a good faith dispute; the subject of a claim pursuant to Florida Statutes section 255.05(2005); or otherwise the subject of a claim or demand by the County as OWNER or the CONTRACTOR. The CONTRACTOR acknowledges that where such retainage is attributable to the labor, services, or materials supplied by one or more subcontractors or suppliers, the Contractor shall timely remit payment of such retainage to those subcontractors and suppliers. Pursuant to Florida Statutes section 218.735(8)(c)(2005), CONTRACTOR further acknowledges and agrees that: 1) the County as OWNER shall receive immediate written notice of all decisions made by CONTRACTOR to withhold retainage on any subcontractor at greater than five percent (5%) after fifty percent (50%) completion; and 2) CONTRACTOR will not seek release from the County as OWNER of the withheld retainage until the final pay request. 6.04 Paragraphs 6.02 and 6.03 do not apply to construction services work purchased by the County as OWNER which are paid for, in whole or in part, with federal funds and are subject to federal grantor laws and regulations or requirements that are contrary to any provision of the Local Government Prompt Payment Act. In such event, payment and retainage provisions shall be governed by the applicable grant requirements and guidelines. 6.05 Acceptance of Final Payment as Release. A. The acceptance by the CONTRACTOR of final payment shall be and shall operate as a release to the OWNER from all claims and all liability to the CONTRACTOR other than claims in stated amounts as may be specifically excepted by the CONTRACTOR for all things done or furnished in connection with the work under this Contract and for every act and neglect of the OWNER and others relating to or arising out of the work. Any payment, however, final or otherwise, shall not release the CONTRACTOR or its sureties from any obligations under the Contract Documents or the Public Construction Bond. 00520 - Agreement (Public Works) REV 04-07 (9) 00520-4 C:\Documents and Settings\mmclaughlin\Local Settings\Temporary Internet Files\Conlent.Outlook\24026LX8\00520 -Agreement (Public Works) REV 04-07 (9).doc ARTICLE 7 - INDEMNIFICATION 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS 8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations: A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work. D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site which have been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions. E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by CONTRACTOR, including applying the specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the Contract Documents to be employed by CONTRACTOR, and safety precautions and programs incident thereto F. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Contract Documents. H. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. 00520-5 00520 - Agreement (Public Works) REV 04-07 (9) C:1Documents and SettingslmmclaughlinlLocal SettingslTemporary Internet FIIesXContent.Outlook124026LX8100520 - Agreement (Public Works) REV 04.07 (9).doc J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. ARTICLE 9 - CONTRACT DOCUMENTS 9.01 Contents A. The Contract Documents consist of the following: 1. This Agreement (pages 1 to 8, inclusive); 2. Notice to Proceed (page 00550-1) 3. Public Construction Bond (pages 00610-1 to 00610-3, inclusive); 4. Sample Certificate of Liability Insurance (page 00620-1); 5. Contractor's Application for Payment (pages 00622-1 to 00622-6, inclusive); 6. General Conditions (pages 00700-1 to 00700-44, inclusive); 7. Supplementary Conditions (pages 00800-1 to 00800-9, inclusive); 8. Specifications as listed in the table of contents of the Project Manual; 9. Drawings consisting of a cover sheet and sheets numbered 1 through 28, inclusive, with each sheet bearing the following general title: CR 512; 10. Addenda (numbers to , inclusive); 11. Appendices to this Agreement (enumerated as follows): Appendix A — Permits 12. CONTRACTOR'S BID (pages 00310-1 to 00310-6, inclusive) 13. Bid Bond (pages 1 to 4, inclusive), Qualifications Questionnaire (page 1 to 4, inclusive), List of Subcontractors (page 1 inclusive). 14. Sworn Statement Under the Florida Trench Safety Act (pages 1 to 2, inclusive) 15. Sworn Statement Under Section 105.08, Indian River County Code, on Disclosure of Relationships (pages 1 to 2, inclusive) 16. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto: a) Written Amendments; b) Work Change Directives; c) Change Order(s). 17. Contractor's Final Certificate of the Work (page 00632 — 1 & 2 of the Specifications) 00520-6 00520 - Agreement (Public Works) REV 04-07 (9) C:\Documents and Settingslmmclaughlin\Local Settingffemporary Internet FileslConlenl.Oullook124026LX8100520 -Agreement (Public Works) REV 04-07 (9).doc ARTICLE 10 - MISCELLANEOUS 10.01 Terms A. Terms used in this Agreement will have the meanings indicated in the General Conditions, 10.02 Assignment of Contract A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 10.03 Successors and Assigns A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 10.04 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 10.05 Venue A. This Contract shall be governed by the laws of the State of Florida. Venue for any lawsuit brought by either party against the other party or otherwise arising out of this Contract shall be in Indian River County, Florida, or, in the event of a federal jurisdiction, in the United States District Court for the Southern District of Florida. 00520 -Agreement (Public Works) REV 04-07 (g) C:1Documents and Settings\mmclaughlinlLocal Settings\Temporary Internet Files1005e 00 �ook\24026LX8\00520 - Agreement (Public Works) REV 04-07 (g).doc IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to OWNER and CONTRACTOR. All portions of the Contract Documents have been signed or identified by OWNER and CONTRACTOR or on their behalf. This Agreement will be effective on " 1 , 203 (the date the Contract is approved by the Indian River County Board of Co my Commissioners, which is the Effective Date of the Agreement). OWNER: CONTRACTOR: INDIAN RIVER COUNTY Ranger Consiruction , I;uu sE. lescher, Chairman ontractor) oseph A. Baird, County Administrator APPROVED AS TO FORM AND LEGAL SUFFI CY: By: r, Alan S. Polackwich, Sr., County Attorney Jeffrey R. Smith, Clerk of Court and Comptroller Attest: Deputy Clerk (SEAL) Designated Representative: Name: Christopher J. Kafer Jr., P. E, Title: County Engineer 1801 27th Street Vero Beach, Florida 32960 (772) 226-1221 Facsimile: (772) 778-9391` F a'tp / (CORPORATE $EAL) Attest —Ly'Z4 ,-, Address for iving notices: `tC` License No. CC - (Where _ ,(Where applicable) Agent for service of process: Designated Representative: Name:'`\.�� Title: "S 13 - Address: t i6 r Phone: Facsimile: 1,,v - t, (If CONTRACTOR is a corporation or a partnership, attach evidence of authority to sign.) * * END OF SECTION * * 00520-8 00520 - Agreement (Public Works) REV 04-07 (9) GVocumenls and Settings\mmclaughlin\Local Settings\Temporary Internet Files\Content.Outlook\24026LX8\00520 -Agreement (Public Works) REV 04-07 (9).doc SECTION 00550 - Notice to Proceed [Certified Mail -- Return Receipt Requested] TO: ADDRESS: Contract For: (ttiuUER) CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street) IRC Project No: 1132 IRC Bid No. 2013006 Dated You are notified that the Contract Times under the above contract will commence to run on By that date, you are to start performing your obligations under the Contract Documents. The contract has allocated 120 days for Substantial Completion of this project and 150 days for Final Completion. In accordance with Article 4 of the Agreement the date of Substantial Completion is and the date of readiness for final payment is CONTRACTOR shall not commence work under this Contract until he has obtained all insurance required under Article 5 and such insurance has been delivered to the OWNER and approved by the OWNER, nor shall the CONTRACTOR allow any Subcontractor to commence work on his subcontract until all similar insurance required of the Subcontractor has been so obtained and approved. All such insurance shall remain in effect until final payment and at all times thereafter when CONTRACTOR may be correcting, removing or replacing defective Work in accordance with Article 13. Also, before you may start any Work at the Site, you must: (add other requirements, if applicable) INDIAN RIVER COUNTY (OWNER) (AUTHORIZED SIGNATURE) (TITLE) 00550-1 00550 - Notice to Proceed REV 1-4-11.doc FAPublic WorWENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Mrnim\Contract Documents\00550 - Notice to Proceed REV 1-4-11.doc Rev. 05/01 PUBLIC CONSTRUCTION BOND BOND NUMBER: 105907109 BOND AMOUNT: 1,049,787.70 CONTRACT AMOUNT: CONTRACTOR'S NAME: 1,049,787.70 Ranger Construction Industries, Inc. CONTRACTOR'S ADDRESS: 1200 Elboc Wad Winter Garden FL 34787 CONTRACTOR'S PHONE: 407-656-9255 SURETY COMPANY: Travelers Casualty and Surety Company of America SURETY'S ADDRESS: One Tower Square 5PB Hartford CT 06183 OWNER'S NAME: Indian River County, Florida OWNER'S ADDRESS: 1800 27th Street, ero eac , OWNER'S PHONE: 772-226-1416 DESCRIPTION OF WORK: Improvements to CR 512 PROJECT LOCATION: CR 512 Sebastian, FL LEGAL DESCRIPTION: CR 512 Resurfacing (East Bond Only) (Roseland Road to Easy Street) County Project Number: 1132/Bid Number: 2013006 This Bond is issued in favor of the County conditioned on the full and faithful performance of the Contract. 3120130031399 RECORDED IN THE PUBLIC RECORDS OF JEFFREY R SMITH, CLERK OF COURT INDIAN RIVER COUNTY FL BK: 2668 PG: 1696 Page 1 of 5 5/20/2013 1:19 PM SECTION 00320 PUBLIC CONSTRUCTION BOND BY THIS BOND, We Ranger Construction Industries, Inc. , as Principal, and Travelers Casualty and Surety Company of America a Corporation, as Surety, are bound to the Indian River County , herein called County. , in the sum of $1,049,787.70 for payment of which we bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and severally. THE CONDITION OF THIS BOND is that if Principal: 1. Performs the Contract dated M a" i , 2Qa73 between Principal and for the construction of the ' CR 512 Resurfacing/Bid No. 2013006 located within Indian River County, Florida, the Contract being made a part of this bond reference, at the times and in the manner prescribed in the Contract; and 2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida Statues, supplying Principal with labor, materials, or supplies, used directly or indirectly by Principal in the prosecution of the work provided for in the Contract; and 3. Pays County all losses, damages including but not limited to delay damages, expenses, costs, and attorney's fees, including appellate proceedings, that County sustains because of a default by Principal under the Contract; and 4. Performs the guarantee of all work and materials furnished under the Contract for the time specked in the Contract, then this bond is void; otherwise it remains in full force. Any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. Any changes in or under the contract documents and compliance or noncompliance with any forrnalities connected with the contract or the changes does not affect Surety's obligation under this bond. Principal agrees to record this bond in the Official Records for Indian River County before the commencement of the work subject of this bond. DATED ON: May 17 , 2013 PRINCIPAL. Ranger Construction Industries, ,Inc. Address: 1200 Elboc Way, Winter Garden, FL 34787 cott. 0 resident SURETY: Travelers Casualty aitd' Surety,6661parij( bf America Address: By: / illi Phelps (As Attomey-in-Fact) CERTIFICATES AS TO CORPORATE PRINCIPAL li Rick Fowler ,certify that I am the Secretary of the Corporation named as Principal in the within bond; that Scott Fowler who signed the said bond on behalf of the Principal, was then vice President of said Corporation; that I know his signature, and his signature hereto is genuine; and that said bond was duly signed, sealed; and attested for and in behalf of said Corporation by authority o its governing body. Secretary (Corporate SeaO` STATE OF FLORIDA) li i�- s$ COUNTY OF Orange The foregoing instrument was acknowledged before me this 17th day of May , 20'13 , by William Phelps , on behalf of the corporation (Surety). He/She [please check as applicable] X is personally known to me, his/her (state) driver's license, his/her (type of identification) as identification, who being by me first duly swom upon oath, says that he/she is the Attomey-in-Fact, for the P rincipal and that he has been authorized by the Principal to execute the foregoing bond on behalf of the Principal named therein in favor of Indian River County, Florida. Subscribed and sworn to before me this 17ti day of May 2013 A.D. Notary ublic State of Florida -at -Large (Attach Power of Attorney) BqA�%�iy `�`� 5•. M�sstoNF *:� CP p NEE 154184 Q� 9••.ia? B017dedth0 VVANNI U: I rn5 F'UVVtH Ur AI IUHNEY IS INVALID WITHOUT THE RED BORDER AdW POWER OF ATTORNEY TRAVELERSJ Farmington Casualty Company St. Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St. Paul Guardian Insurance Company Attorney -In Fact No. 215719 Certificate No. 0 0 4 7 3 4 8 3 9 KNOW ALL MEN BY THESE PRESENTS: That St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty Company is a corporation duly organized tinder the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint William Phelps of the City of Melbourne , State of Florida , their true and lawful Attomey(s)-in-Fact, each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this day of February 2012 State of Connecticut City of Hartford ss. Farmington Casualty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. St. Paul Fire and Marine Insurance Company St. Paul Guardian Insurance Company 16th St. Paul Mercury Insurance Company Travelers Casualty and Surety Company Travelers Casualty and Surety Company of America United States Fidelity and Guaranty Company J� 6�� O\�,!!..I NSG9 at �Nsu V•.` JPItY apo aw �tiY,(,� WCQ4fORATFD� m� a/iuRv^.rt�>e.m IW :'eORPORATE>•°ie? °e y �4 1951 �'• sE �; SERLo: �0'+ �`:, AL �o: '•�d:.,•'3 �, CONN. o° � COWL$ u+ 1896 ,-.�, b D V By: GeorgVTh.,ompso, enior ice President On this the 16th day of February 2012 ,before me personally appeared George W. Thompson, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters. Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do. executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duty authorized officer. o ,TAP 'er In Witness Whereof, I hereunto set my hand and official seal. TAO My Commission expires the 30th day of June, 2016. p�00 58440-6-11 Printed in U.S.A. EY Marie C. Tetreault, Notary Public WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force and effect and has not been revoked. �IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this � ay of 11AK 2013. r ' 4tw ' ( . tl Kevin E. Hughes, Assistant Sec tary N •� •.NSUq •. JP�SY AN°9 NIOY YY'Y�i 19 8 2 0 1977 d �' � i ; ; Z : --- : n W HAflTFORD, < IumFORo, Ts less ZOr r 1951 J'•SEA �" •o; [ X01 SBSL:D To verify the authenticity of this Power of Attorney, call 1-800-42 t-3880 or contact us at www.travelersbond.com. Please refer to the Attorney -In -Fact number, the above-named individuals and the details of the bond to which the power is attached. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER CERTIFICATE OF LIABILITY INSURANCE DATE 17/2 /Y ACORO® os/7/zo13 v THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANTIf the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). 1-304-357-4520 CONTACT PRODUCER NAME: George H. Friedlander Co. PHONE FAX ren:- Nn. exu: AIC No IPO Box 2466 1566 Kanawha Blvd. S. Charleston, WV 25329 INSURED Ranger Construction Industries, Inc. 11200 Elboc Way A: Travelers Property Casualty Company of B: Travelers Property Casualty Company Iiucucoo r. Travelers Insurance I I INSURER E: Winter Garden, FL 34787 INSURER F COVERAGES CERTIFICATE NUMBER: 33642197 REVISION NUMBER. _ n I.= Dn1 irV DCDInn THIS IS TO CERTIFY THAT THE POLICIES OF INSURANUt LIS1to tstwvvnhvc Dery ioov�� ��. i .. �.......� •. - • -•- - --- INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILTR POLICY EFF POLICY EXP LIMITS TYPE OF INSURANCE POLICY NUMBER MM/DD/YYYY MM/DD/YYYY A GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE OCCU17PERSONAL X Contractual Liabilit CO -5807B217-13 04/01/1 04/01/14 EACH OCCURRENCE $ 1,000,000 DAMAGE O REN ED 500,000 PREMISES Ea occurrence)$ MED EXP (Any one person) $ 10,000 &ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 PRODUCTS - COMP/OPAGG $2,000,000 CAP -5807H186-13 GEN'L AGGREGATE LIMIT APPLIES PER: X POLICY PRO• LOC AUTOMOBILE LIABILITY $ COMBINED SINGLE LIMIT Ea accident 1,000,000 H BODILY INJURY (Per person) $ X ANY AUTO ALL OWNEDSCHEDULED AUTOS AUTOSNED X HIRED AUTOS X AUTOS BODILY INJURY (Per accident) $ PROPERTY DAMAGE $ Per accident A X UMBRELLALIAB EXCESS LIAR X OCCUR CLAIMS -MADE CQP-5807H198-13 04/01/1 04/01/14 EACH OCCURRENCE $3,000,000 AGGREGATE $ 3,000,000 DED RETENTION $-[WC WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE Y / N OFFICER/MEMBER EXCLUDED? N (Mandatory In NH) If yes, describe under DESCRIPTION OF OPERATIONS below N / A IIB -6339B488-13 04/01/1 04/01/14 STATU- OTH- X C E.L. EACH ACCIDENT $ 1,000,000 E.L. DISEASE - EA EMPLOYE $ 1,000,000 E.L. DISEASE- POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space is required) Indian River County is an Additional Insured but only with respect to work conducted by the insured and at the specified project. Project: CR 512 Resurfacing (EB) Roseland Road to Easy Street IRC Project # 1132 CERTIFICATE HULUtK - SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Indian River County THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 11800 27th Street AUTHORIZED REPRESENTATIVE Vero Beach, FL 32960 I Il USA an )non Arrnon r1l100r10ATInW All riahts reserved. ACORD 25 (20 10/05) The ACORD name and logo are registered marks of ACORD sbarber CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. COMMERCIAL AUTO THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO EXTENSION ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modi- fied by the endorsement. GENERAL DESCRIPTION OF COVERAGE — This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to the Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general cover- age description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this en- dorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered. A. BROAD FORM NAMED INSURED H. HIREDPHYSICAL MAGE — LOSS IUSE INCREASED —t LIMIT B. BLANKET ADDITIONAL INSURED 1. PHYSICALTRANSPORTATION IES DAMAMA EASED EXPENMIT C. EMPLOYEE HIRED AUTO J. PERSONAL EFFECTS D. EMPLOYEES AS INSURED K. AIRBAGS E. SUPPLEMENTARY PAYMENTS — INCREASED L. NOTICE AND KNOWLEDGE OF ACCIDENT LIMITS OR LOSS F. HIRED AUTO — LIMITED WORLDWIDE M. BLANKET WAIVER OF SUBROGATION COVERAGE — INDEMNITY BASIS a..... G. WAIVER OF DEDUCTIBLE —GLASS N. UNINTENTIONAL ERRORS OR OMISSIONS M ,= PROVISIONS A. BROAD FORM NAMED INSURED executed by you before the "bodily injury" or that is in effect �'—'— The following is added to Paragraph A.1., Who Is property damage" occurs and during the policy period, to be named as an addi- 0~ An Insured, of SECTION II —LIABILITY COV- tional insured is an "insured" for Liability Cover- _ ERAGE: age, but only for damages to which this insurance Any organization you newly acquire or form dur- applies and only to the extent that person or or - Ing the policy period over which you maintain ganization qualifies as an "insured" under the "= 50% or more ownership interest and that is not Who Is An Insured provision contained in Section separately insured for Business Auto Coverage. Coverage under this provision is afforded only un- C. EMPLOYEE HIRED AUTO �� til the 180th day after you acquire or form the or- or the end of the policy period, which- 1. The following is added to Paragraph A.1., ganization Who Is An Insured, of SECTION it — LI- ever is earlier. ABILITY COVERAGE: 0—NAL BLANKET ADDITIONAL INSURED An "employee" of yours is an "insured" while ^— The following is added to Paragraph c. in A.1., operating an "auto" hired or rented under a . Who is An insured, of SECTION II — LIABILITY contract or agreement in that "employee's" '— COVERAGE: name, with your permission, while performing Any person or organization who is required under duties related to the conduct of your busi- 1 a written contract or agreement between you and Hess. that person or organization, that is signed and CA T3 53 06 09 © 2009 The Travelers Insurance companies, Inc. Page 1 of 4 Services Office, Inc. with its permission. Includes the copyrighted material of 013134 COMMERCIAL AUTO 2. The following replaces Paragraph b. in B.5., United States of America applies to and pro - transaction of business with or Other Insurance, of SECTION IV — BUSI- hibits the such country or jurisdiction, for Liability NESS AUTO CONDITIONS: within Coverage for any covered "auto" that you b. For Hired Auto Physical Damage Cover- lease, hire, rent or borrow without a driver for age, the following are deemed to be cov- a period of 30 days or less and that is not an ered "autos" you own: "auto" you lease, hire, rent or borrow from (1) Any covered "auto" you lease, hire, any of your "employees", partners (if you are (if you are a limited rent or borrow; and a partnership), members liability company) or members of their house - (2) Any covered "auto" hired or rented by holds. your "employee" under a contract in that individual "employee's" name, (1) With respect to any claim made or "suit" with your permission, while perform- brought outside the United States of territories and possessions ing duties related to the conduct of America, the United States of America, Puerto your business, of the However, any "auto" that is leased, hired, Rico and Canada: rented or borrowed with a driver is not a (a) You must arrange to defend the covered "auto". "insured" against, and investigate "suit" or settle any such claim or D. EMPLOYEES AS INSURED and keep us advised of all pro - The following is added to Paragraph A.1., Who Is ceedings and actions. An Insured, of SECTION it — LIABILITY COV- (b) Neither you nor any other in- ERAGE: volved "insured" will make any Any "employee" of yours is an "insured" while us- settlement without our consent. ing a covered auto you dont own, hire or borrow (c) We may, at our discretion, par - In your business or your personal affairs, ticipate in defending the "insured" SUPPLEMENTARY PAYMENTS -- INCREASED against, or in the settlement of, E. any claim or "suit". LIMITS 1. The following replaces Paragraph A.2.a.(2), (d) We will reimburse the "insured": of SECTION II — LIABILITY COVERAGE: (I) For sums that the "insured" (2) Up to $3,000 for cost of bail bonds (in- legally must pay as damages "bodily or eluding bonds for related traffic law viola- because of injury" tions) required because of an "accident" "property damage" to which Insurance applies, that we cover. We do not have to furnish this the "insured" pays with our these bonds. consent, but only up to the 2. The following replaces Paragraph A.2.a.(4), limn described in Paragraph of SECTION Il —LIABILITY COVERAGE: C., Limit Of Insurance, of (4) All reasonable expenses incurred by the SECTION II — LIABILITY "Insured" at our request, including actual COVERAGE; loss of earnings up to $500 a day be- (li) For the reasonable expenses cause of time off from work. incurred with our consent for F. HIRED AUTO -- LIMITED WORLDWIDE COV- yourinandtigaflon of your defense such ERAGE — INDEMNITY BASIS the "Insured" against any The following replaces Subparagraph e, in Para- and such "suit but only up to and graph B.7., Policy Term, Coverage Territory, of included within the limit SECTION IV —BUSINESS AUTO CONDITIONS: scribed in Paragraph C., Limit e. Anywhere in the world, except any country or Of Insurance, of SECTION 11 jurisdiction while any trade sanction, em- — LIABILITY COVERAGE, bargo, or similar regulation imposed by the CA T3 53 06 09 Page 2 of 4 © 2009 The Travelers companies, Inca Includes the copyrighted material of insurance services Office, Inc. with its permission. COMMERCIAL AUTO and not in addition to such I. PHYSICAL DAMAGE – TRANSPORTATION EXPENSES – INCREASED LIMIT limit. Our duty to make such payments ends when we The following replaces the first sentence in Para - have used up the applicable graph AA.a., Transportation Expenses, of SEC - limit of insurance in payments TION III – PHYSICAL DAMAGE COVERAGE: for damages, settlements or We will pay up to $50 per day to a maximum of defense expenses. $1,500 for temporary transportation expense in - (2) This insurance is excess over any valid curred by you because of the total theft of a cov- type. and collectible other insurance available ered "auto" of the private passenger to the "insured" whether primary, excess J. PERSONAL EFFECTS contingent or on any other basis. The following is added to Paragraph AA., Cover - (3) This insurance is not a substitute for re- age Extensions, of SECTION ill – PHYSICAL quired or compulsory insurance in any DAMAGE COVERAGE: country outside the United States, its ter- personal Effects ritories and possessions, Puerto Rico and We e will pay up to $400 for "loss" to wearing ap- parel and other personal effects which are: You agree to maintain all required or insurance in any such coun- () Owned by an"insured";and compulsory try up to the minimum limits required by (2) In or on your covered "auto". local law. Your failure to comply with This coverage applies only in the event of a total compulsory insurance requirements will theft of your covered "auto". not invalidate the coverage afforded by but we will only be liable to the deductibles apply to this Personal Effects this policy, extent we would have been liable coverage.No same had you complied with the compulsory in- K. AIRBAGS surance requirements. The following is added to Paragraph B.3., Exclu- (4) It is understood that we are not an admit- sions, of SECTION III – PHYSICAL DAMAGE •~— ted or authorized insurer outside the COVERAGE: United States of America, its territories Exclusion 3.a. does not apply to "loss" to one or m� and possessions, Puerto Rico and Can- more airbags in a covered "auto" you own that in- "loss" ada. We assume no responsibility for the flate due to a cause other than a cause of furnishing of certificates of insurance, or set forth in Paragraphs A.1.b. and A.1.c., but for compliance in any way with the laws only: o= of other countries relating to insurance. a. If that "auto" is a covered "auto" for Compre- �' G. WAIVER OF DEDUCTIBLE – GLASS hensive Coverage under this policy; The following is added to Paragraph D., Deducti- b. The airbags are not covered under any war- ble, of SECTION III – PHYSICAL DAMAGE ranty; and COVERAGE: c. The airbags were not intentionally inflated. No deductible for a covered "auto" will apply to We will pay up to a maximum of $1,000 for any glass damage if the glass is repaired rather than one. "loss". replaced. L. NOTICE AND KNOWLEDGE OF ACCIDENT OR –•— H. HIRED AUTO PHYSICAL DAMAGE – LOSS OF LOSS USE – INCREASED LIMIT The following Is added to Paragraph A.2.a., of ��_ — The following replaces the last sentence of Para- SECTION IV – BUSINESS AUTO CONDITIONS: graph AA.b., Loss Of Use Expenses, of SEC- Your duty to give us or our authorized representa- �_ TION III – PHYSICAL DAMAGE COVERAGE: tive prompt notice of the "accident" or "loss" ap- • However, the most we will pay for any expenses plies only when the "accident" or "loss" is known for loss of use is $65 per day, to a maximum of to: $750 for any one "accident". (a) You (if you are an individual); CA T3 53 06 09 © 2009 The Travelers companies, Inc. Page 3 of 4 Includes the copyrighted material or Insurance Services Office, Inc. with its permission. COMMERCIAL AUTO (b) A partner Of you are a partnership); (c) A member Cf you are a limited liability com- pany); (d) An executive officer, director or insurance manager (If you are a corporation or other or- ganization); or (e) Any "employee" authorized by you to give no- tice of the "accident" or "loss". M. BLANKET WAIVER OF SUBROGATION The following replaces Paragraph A.S., Transfer Of Rights Of Recovery Against Others To Us, of SECTION IV — BUSINESS AUTO CONDI- TIONS: 5. Transfer Of Rights Of Recovery Against Others To Us We waive any right of recovery we may have against any person or organization to the ex- tent required of you by a written contract signed and executed prior to any "accident" or "loss", provided that the "accident" or "loss" arises out of operations contemplated by such contract. The waiver applies only to the person or organization designated In such contract. N. UNINTENTIONAL. ERRORS OR OMISSIONS The following is added to Paragraph B.2., Con- cealment, Misrepresentation, Or Fraud, of SECTION IV — BUSINESS AUTO CONDITIONS: The unintentional omission of, or unintentional error in, any information given by you shall not prejudice your rights under this insurance. How- ever this provision does not affect our right to col- lect additional premium or exercise our right of cancellation or non -renewal. Page 4 of 4 © 2009 The Travelers Companies, Inc. CA T3 53 06 09 includes the copyrighted material of Insurance Services Office, Inc. with its permission. WC 00 0313 00 WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT We have the right to recover or organization zationfrom named in heone iable for an Schedule. (This agreement covered applithisesoon y othewill extent that our right against the person o g you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit any one not named in the Schedule. SCHEDULE DESIGNATED PERSON: Any person or organization for whom the Named insured has DESIGNATED ORGANIZATION: agreed by written contract, executed prior to loss, to furnish this waiver. WC 00 0313 00 ®2044 The S4 Paul Travelers Companies, Inc. COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONTRACTORS XTEND ENDORSEMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART GENERAL DESCRIPTION OF COVERAGE — Provisions A. -H. and J. -N. of this endorsement broaden coverage, and provision I. of this endorsement may limit coverage. The following listing is a general coverage description only. Limitations and exclusions may apply to these coverages. Read all the PROVISIONS of this endorsement carefully to determine rights, duties, and what is and is not covered. A. Broadened Named Insured B. Extension of Coverage — Damage To Premises Rented To You • Perils of fire, explosion, lightning, smoke, water • Limit increased to $300,000 C. Blanket Waiver of Subrogation D. Blanket Additional Insured — Managers or Lessors of Premises E. Incidental Medical Malpractice F. Extension of Coverage— Bodily Injury G. Contractual Liability — Railroads PROVISIONS A. BROADENED NAMED INSURED 1. The Named Insured in Item 1. of the Declara- tions is as follows: The person or organization named in Item 1. of the Declarations and any organization, other than a partnership, joint venture or lim- ited liability company, of which you maintain ownership or in which you maintain the major- ity interest on the effective date of the policy. However, coverage for any such additional organization will cease as of the date, if any, during the policy period, that you no longer maintain ownership of, or the majority interest in, such organization. 2. WHO IS AN INSURED (Section II) Item 4.a. is deleted and replaced by the following: a. Coverage under this provision is afforded only until the 180th day after you acquire or form the organization or the end of the policy period, whichever is earlier. H. Additional Insured —State or Political Subdivisions I. Other Insurance Condition J. Increased Supplementary Payments • Cost of bail bonds increased to $2,500 • Loss of earnings increased to $500 per day K. Knowledge and Notice of Occurrence or Offense L. Unintentional Omission M. Personal Injury —Assumed by Contract N. Blanket Additional Insured —Lessor of Leased Equipment 3. This Provision A. does not apply to any per- son or organization for which coverage is ex- cluded by endorsement. B. EXTENSION OF COVERAGE — DAMAGE TO PREMISES RENTED TO YOU 1. The last paragraph of COVERAGE A. BOD- ILY INJURY AND PROPERTY DAMAGE LI- ABILITY (Section I — Coverages) is deleted and replaced by the following: Exclusions c. through n. do not apply to dam- age to premises while rented to you, or tem- porarily occupied by you with permission of the owner, caused by: a. Fire; b. Explosion; c. Lightning; d. Smoke resulting from such fire, explosion, or lightning; or e. Water. A separate limit of insurance applies to this coverage as described in Section III Limits Of Insurance. CG D3 16 07 04 Copyright, The Travelers Indemnity Company, 2004 Page 1 of 6 COMMERCIAL GENERAL LIABILITY 2. This insurance does not apply to damage to premises while rented to you, or temporarily occupied by you with permission of the owner, caused by: a. Rupture, bursting, or operation of pres- sure relief devices; b. Rupture or bursting due to expansion or swelling of the contents of any building or structure, caused by or resulting from wa- ter; c. Explosion of steam boilers, steam pipes, steam engines, or steam turbines. 3. Paragraph 6. of LIMITS OF INSURANCE (Section III) is deleted and replaced by the following: Subject to S. above, the Damage To Prem- ises Rented To You Limit is the most we will pay under COVERAGE A. for the sum of all damages because of "property damage" to any one premises while rented to you, or temporarily occupied by you with permission of the owner, caused by: fire; explosion; light- ning; smoke resulting from such fire, explo- sion, or lightning; or water. The Damage To Premises Rented To You Limit will apply to all "property damage proximately caused by the same 'occurrence", whether such damage results from: fire; explosion; lightning; smoke resulting from such fire, explosion, or light- ning; or water; or any combination of any of these causes. The Damage To Premises Rented To You Limit will be the higher of: a. $300,000; or b. The amount shown on the Declarations for Damage To Premises Rented To You Limit. 4. Paragraph a. of the definition of "insured con- tract" (DEFINITIONS — Section V) is deleted and replaced by the following: a. A contract for a lease of premises. How- ever, that portion of the contract for a lease of premises that indemnifies any person or organization for damage to premises while rented to you, or tempo- rarily occupied by you with permission of the owner, caused by: fire; explosion; lightning; smoke resulting from such fire, explosion, or lightning; or water, is not an "Insured contract"; 5. This Provision B. does not apply if coverage for Damage To Premises Rented To You of COVERAGE A. BODILY INJURY AND PROPERTY DAMAGE LIABILITY (Section I — Coverages) is excluded by endorsement. C. BLANKET WAIVER OF SUBROGATION We waive any right of recovery we may have against any person or organization because of payments we make for injury or damage arising out of: premises owned or occupied by or rented or loaned to you; ongoing operations performed by you or on your behalf, done under a contract with that person or organization; "your work"; or "your products". We waive this right where you have agreed to do so as part of a written contract, executed by you before the "bodily injury" or "property damage" occurs or the "personal injury" or "advertising injury" offense is committed. D. BLANKET ADDITIONAL INSURED — MANAG- ERS OR LESSORS OF PREMISES WHO IS AN INSURED (Section II) is amended to include as an insured any person or organization (referred to below as "additional insured") with whom you have agreed in a written contract, exe- cuted before the "bodily injury" or "property dam- age" occurs or the "personal injury" or "advertis- ing injuryoffense is committed, to name as an additional insured, but only with respect to liability arising out of the ownership, maintenance or use of that part of any premises leased to you, subject to the following provisions: 1. Limits of Insurance. The limits of insurance afforded to the additional insured shall be the limits which you agreed to provide in the writ- ten contract, or the limits shown on the Decla- rations, whichever are less. 2. The insurance afforded to the additional in- sured does not apply to: a. Any "bodily injury" or "property damage" that occurs, or "personal injury" or"adver- tising injurycaused by an offense which is committed, after you cease to be a ten- ant in that premises; b. Any premises for which coverage is ex- cluded by endorsement; or c. Structural alterations, new construction or demolition operations performed by or on behalf of such additional insured. 3. The insurance afforded to the additional in- sured is excess over any valid and collectible Page 2 of 6 Copyright, The Travelers Indemnity Company, 2004 CG D3 16 07 04 "other insurance" available to such additional insured, unless you have agreed in the writ- ten contract that this insurance must be pri- mary to, or non-contributory with, such "other insurance". E. INCIDENTAL MEDICAL MALPRACTICE 1. The following is added to paragraph 1. Insur- ing Agreement of COVERAGE A. — BODILY INJURY AND PROPERTY DAMAGE LIABIL- ITY (Section I — Coverages): "Bodily injury" arising out of the rendering of, or failure to render, the following will be deemed to be caused by an "occurrence": a. Medical, surgical, dental, laboratory, x-ray or nursing service, advice or instruction, or the related furnishing of food or bever- ages; b. The furnishing or dispensing of drugs or medical, dental, or surgical supplies or appliances; c. First aid; or d. "Good Samaritan services." As used in this Provision E., "Good Samaritan ser- vices" are those medical services ren- dered or provided in an emergency and for which no remuneration is demanded or received. 2. Paragraph 2.a.(1)(d) of WHO IS AN IN- SURED (Section 11) does not apply to any registered nurse, licensed practical nurse, emergency medical technician or paramedic employed by you, but only while performing the services described in paragraph 1. above and while acting within the scope of their em- ployment by you. Any "employees" rendering "Good Samaritan services" will be deemed to be acting within the scope of their employ- ment by you. 3. The following exclusion is added to paragraph 2. Exclusions of COVERAGE A. — BODILY INJURY AND PROPERTY DAMAGE LIABIL- ITY (Section I — Coverages): (This insurance does not apply to:) Bodily in- jury" or "property damage" arising out of the willful violation of a penal statute or ordinance relating to the sale of pharmaceuticals com- mitted by or with the knowledge or consent of the insured. 4. For the purposes of determining the applica- ble limits of insurance, any act or omission COMMERCIAL GENERAL LIABILITY together with all related acts or omissions in the furnishing of the services described in paragraph 1. above to any one person will be deemed one "occurrence". 5. This Provision E. does not apply if you are in the business or occupation of providing any of the services described in paragraph 1. above. 6. The insurance provided by this Provision E. shall be excess over any valid and collectible "other insurance" available to the insured, whether primary, excess, contingent or on any other basis, except for insurance that you bought specifically to apply in excess of the Limits of Insurance shown on the Declara- tions of this Coverage Part. F. EXTENSION OF COVERAGE — BODILY IN- JURY The definition of "bodily injury" (DEFINITIONS — Section V) is deleted and replaced by the follow- ing: "Bodily injury" means bodily injury, mental an- guish, mental injury, shock, fright, disability, hu- miliation, sickness or disease sustained by a per- son, including death resulting from any of these at any time. G. CONTRACTUAL LIABILITY — RAILROADS 1. Paragraph c. of the definition of "insured con- tract" (DEFINITIONS — Section V) is deleted and replaced by the following: c. Any easement or license agreement; 2. Paragraph f.(1) of the definition of "insured contract" (DEFINITIONS — Section V) is de- leted. H. ADDITIONAL INSURED — STATE OR POLITI- CAL SUBDIVISIONS —PERMITS WHO IS AN INSURED (Section 11) is amended to include as an insured any state or political subdi- vision, subject to the following provisions: 1. This insurance applies only when required to be provided by you by an ordinance, law or building code and only with respect to opera- tions performed by you or on your behalf for which the state or political subdivision has is- sued a permit. 2. This insurance does not apply to: a. "Bodily injury," "property damage," "per- sonal injury" or "advertising injury" arising out of operations performed for the state or political subdivision; or CG D3 16 07 04 Copyright, The Travelers Indemnity Company, 2004 Page 3 of 6 COMMERCIAL GENERAL LIABILITY b. "Bodily injury" or "property damage" in- cluded in the "products -completed opera- tions hazard". I. OTHER INSURANCE CONDITION A. COMMERCIAL GENERAL LIABILITY CON- DITIONS (Section IV), paragraph 4. (Other Insurance) is deleted and replaced by the fol- lowing: 4. Other Insurance If valid and collectible "other insurance" is available to the insured for a loss we cover under Coverages A or B of this Coverage Part, our obligations are limited as follows: a. Primary Insurance This insurance is primary except when b. below applies. If this insur- ance is primary, our obligations are not affected unless any of the "other insurance" is also primary. Then, we will share with all that"other insur- ance" by the method described in c. below. b. Excess Insurance This insurance is excess over any of the "other insurance", whether pri- mary, excess, contingent or on any other basis: (1) That is Fire, Extended Coverage, Builder's Risk, Installation Risk, or similar coverage for "your work"; (2) That is Fire insurance for prem- ises rented to you or temporarily occupied by you with permission of the owner; (3) That is insurance purchased by you to cover your liability as a tenant for "property damage" to premises rented to you or tempo- rarily occupied by you with per- mission of the owner; or (4) If the loss arises out of the main- tenance or use of aircraft, "autos", or watercraft to the ex- tent not subject to Exclusion g. of Section I — Coverage A — Bodily Injury And Property Damage Li- ability; or (6) That is available to the insured when the insured is an additional insured under any other policy, including any umbrella or excess policy. When this insurance is excess, we will have no duty under Coverages A or B to defend the insured against any "suit" if any provider of "other in- surance" has a duty to defend the in- sured against that "suit". If no pro- vider of "other insurance" defends, we will undertake to do so, but we will be entitled to the insured's rights against all those providers of "other insurance". When this insurance is excess over "other insurance", we will pay only our share of the amount of the loss, if any, that exceeds the sum of: (1) The total amount that all such "other insurance" would pay for the loss in the absence of this in- surance; and (2) The total of all deductible and self-insured amounts under that "other insurance". We will share the remaining loss, if any, with any "other insurance" that is not described in this Excess Insur- ance provision. c. Method Of Sharing If all of the "other insurance" permits contribution by equal shares, we will follow this method also. Under this approach each provider of insurance contributes equal amounts until it has paid its applicable limit of insurance or none of the loss remains, which- ever comes first. If any of the "other insurance" does not permit contribution by equal shares, we will contribute by limits. Under this method, the share of each provider of insurance is based on the ratio of its applicable limit of insur- ance to the total applicable limits of insurance of all providers of insur- ance. B. The following definition is added to DEFINITIONS (Section V): "Other insurance": a. Means insurance, or the funding of losses, that is provided by, through or on behalf of: Page 4 of 6 Copyright, The Travelers Indemnity Company, 2004 CG D3 16 07 04 (1) Another insurance company; (2) Us or any of our affiliated insurance com- panies, except when the Non cumulation of Each Occurrence Limit section of Paragraph 5 of LIMITS OF INSURANCE (Section III) or the Non cumulation of Per- sonal and Advertising Injury limit sections of Paragraph 4 of LIMITS OF INSUR- ANCE (Section III) applies; (3) Any risk retention group; (4) Any self-insurance method or program, other than any funded by you and over which this Coverage Part applies; or (5) Any similar risk transfer or risk manage- ment method. b. Does not include umbrella insurance, or ex- cess insurance, that you bought specifically to apply in excess of the Limits of Insurance shown on the Declarations of this Coverage Part. J. INCREASED SUPPLEMENTARY PAYMENTS Paragraphs 1.b. and 1.d. of SUPPLEMENTARY PAYMENTS — COVERAGES A AND B (Section — Coverages) are amended as follows: 1. In paragraph 1.1b., the amount we will pay for the cost of bail bonds is increased to $2500. 2. In paragraph 1.d., the amount we will pay for loss of earnings is increased to $500 a day. K. KNOWLEDGE AND NOTICE OF OCCUR- RENCE OR OFFENSE 1. The following is added to COMMERCIAL GENERAL LIABILITY CONDITIONS (Section IV), paragraph 2. (Duties In The Event of Oc- currence, Offense, Claim or Suit): Notice of an "occurrence" or of an offense which may result in a claim must be given as soon as practicable after knowledge of the "occurrence" or offense has been reported to you, one of your "executive officers" (if you are a corporation), one of your partners who is an individual (if you are a partnership), one of your managers (if you are a limited liability company), or an "employee" (such as an in- surance, loss control or risk manager or ad- ministrator) designated by you to give such notice. Knowledge by any other "employee" of an "occurrence" or offense does not imply that you also have such knowledge. COMMERCIAL GENERAL LIABILITY 2. Notice of an "occurrence" or of an offense which may result in a claim will be deemed to be given as soon as practicable to us if it is given in good faith as soon as practicable to your workers' compensation insurer. This ap- plies only if you subsequently give notice of the "occurrence" or offense to us as soon as practicable after you, one of your "executive officers" (if you are a corporation), one of your partners who is an individual (if you are a partnership), one of your managers (if you are a limited liability company), or an "employee" (such as an insurance, loss control or risk manager or administrator) designated by you to give such notice discovers that the "occur- rence" or offense may involve this policy. 3. This Provision K. does not apply as respects the specific number of days within which you are required to notify us in writing of the abrupt commencement of a discharge, re- lease or escape of "pollutants" that causes "bodily injury" or "property damage" which may otherwise be covered under this policy. L. UNINTENTIONAL OMISSION The following is added to COMMERCIAL GEN- ERAL LIABILITY CONDITIONS (Section IV), paragraph 6. (Representations): The unintentional omission of, or unintentional error in, any information provided by you which we relied upon in issuing this policy shall not prejudice your rights under this insurance. How- ever, this Provision L. does not affect our right to collect additional premium or to exercise our right of cancellation or nonrenewal in accordance with applicable state insurance laws, codes or regula- tions. M. PERSONAL INJURY — ASSUMED BY CON- TRACT 1. The following is added to Exclusion e. (1) of Paragraph 2., Exclusions of Coverage B. Personal Injury, Advertising Injury, and Web Site Injury Liability of the Web XTEND Liability endorsement: Solely for the purposes of liability assumed in an "insured contract", reasonable attorney fees and necessary litigation expenses in- curred by or for a party other than an insured are deemed to be damages because of "per- sonal injury" provided: (a) Liability to such party for, or for the cost of, that party's defense has also been as - CG D3 16 07 04 Copyright, The Travelers Indemnity Company, 2004 Page 5 of 6 COMMERCIAL GENERAL LIABILITY sumed in the same "insured contract'; and (b) Such attorney fees and litigation ex- penses are for defense of that party against a civil or alternative dispute reso- lution proceeding in which damages to which this insurance applies are alleged. 2. Paragraph 2.d. of SUPPLEMENTARY PAY- MENTS — COVERAGES A AND B (Section I — Coverages) is deleted and replaced by the following: d. The allegations in the "suit" and the in- formation we know about the occur- rence" or offense are such that no conflict appears to exist between the interests of the insured and the interests of the in- demnitee; 3. The third sentence of Paragraph 2 of SUP- PLEMENTARY PAYMENTS — COVERAGES A AND B (Section I — Coverages) is deleted and replaced by the following: Notwithstanding the provisions of Paragraph 2.b.(2) of Section I — Coverage A — Bodily In- jury And Property Damage Liability, or the provisions of Paragraph 2.e.(1) of Section I — Coverage B — Personal Injury, Advertising In- jury And Web Site Injury Liability, such pay- ments will not be deemed to be damages for "bodily injury" and "property damage", or damages for "personal injury", and will not re- duce the limits of insurance. 4. This provision for "personal endorsement. M. does not apply if coverage injury" liability is excluded by N. BLANKET ADDITIONAL INSURED — LESSOR OF LEASED EQUIPMENT WHO IS AN INSURED (Section II) is amended to include as an insured any person or organization (referred to below as additional insured") with whom you have agreed in a written contract, exe- cuted before the "bodily injury" or "property dam- age" occurs or the "personal injury" or "advertis- ing injury offense is committed, to name as an additional insured, but only with respect to their li- ability for "bodily injury", "property damage", "per- sonal injury" or "advertising injury" caused, in whole or in part, by your acts or omissions in the maintenance, operation or use of equipment leased to you by such additional insured, subject to the following provisions: 1. Limits of Insurance. The limits of insurance afforded to the additional insured shall be the limits which you agreed to provide in the writ- ten contract, or the limits shown on the Decla- rations, whichever are less. 2. The insurance afforded to the additional in- sured does not apply to any "bodily injury" or "property damage" that occurs, or "personal injury" or "advertising injury" caused by an of- fense which is committed, after the equipment lease expires. 3. The insurance afforded to the additional in- sured is excess over any valid and collectible "other insurance" available to such additional insured, unless you have agreed in the writ- ten contract that this insurance must be pri- mary to, or non-contributory with, such 'other insurance". Page 6 of 6 Copyright, The Travelers Indemnity Company, 2004 CG D3 16 07 04 COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY BLANKET ADDITIONAL INSURED (CONTRACTORS) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART 1. WHO IS AN INSURED — (Section II) is amended to include any person or organization that you agree in a written contract requiring insurance" to include as an additional insured on this Cover- age Part, but: a) Only with respect to liability for "bodily injury", "property damage" or "personal injury"; and b) If, and only to the extent that, the injury or damage is caused by acts or omissions of you or your subcontractor in the performance of "your work" to which the "written contract requiring insurance" applies. The person or organization does not qualify as an additional insured with respect to the independent acts or omissions of such person or organization. 2. The insurance provided to the additional insured by this endorsement is limited as follows: a) b) In the event that the Limits of Insurance of this Coverage Part shown in the Declarations exceed the limits of liability required by the "written contract requiring insurance", the in- surance provided to the additional insured shall be limited to the limits of liability re- quired by that written contract requiring in- surance". This endorsement shall not in- crease the limits of insurance described in Section III — Limits Of Insurance. The insurance provided to the additional in- sured does not apply to "bodily injury", "prop- erty damage" or "personal injury" arising out of the rendering of, or failure to render, any professional architectural, engineering or sur- veying services, including: L The preparing, approving, or failing to prepare or approve, maps, shop draw- ings, opinions, reports, surveys, field or- ders or change orders, or the preparing, approving, or failing to prepare or ap- prove, drawings and specifications; and ii. Supervisory, inspection, architectural or engineering activities. c) The insurance provided to the additional in- sured does not apply to "bodily injury" or "property damage" caused by "your work" and included in the "products -completed op- erations hazard" unless the "written contract requiring insurance specifically requires you to provide such coverage for that additional insured, and then the insurance provided to the additional insured applies only to such "bodily injury" or "property damage" that oc- curs before the end of the period of time for which the "written contract requiring insur- ance requires you to provide such coverage or the end of the policy period, whichever is earlier. 3. The insurance provided to the additional insured by this endorsement is excess over any valid and collectible "other insurance", whether primary, excess, contingent or on any other basis, that is available to the additional insured for a loss we cover under this endorsement. However, if the "written contract requiring insurance" specifically requires that this insurance apply on a primary basis or a primary and non-contributory basis, this insurance is primary to "other insurance" available to the additional insured which covers that person or organization as a named insured for such loss, and we will not share with that "other insurance". But the insurance provided to the additional insured by this endorsement still is excess over any valid and collectible 'other in- surance", whether primary, excess, contingent or on any other basis, that is available to the addi- tional insured when that person or organization is an additional insured under such "other insur- ance". 4. As a condition of coverage provided to the additional insured by this endorsement: a) The additional insured must give us written notice as soon as practicable of an "occur- rence" or an offense which may result in a claim. To the extent possible, such notice should include: CG D2 46 08 05 © 2005 The St. Paul Travelers Companies, Inc. Page 1 of 2 COMMERCIAL GENERAL LIABILITY I. How, when and where the 'occurrence" or offense took place; ii. The names and addresses of any injured persons and witnesses; and iii. The nature and location of any injury or damage arising out of the 'occurrence" or offense. b) If a claim is made or "suit" is brought against the additional insured, the additional insured must L Immediately record the specifics of the claim or "suit" and the date received; and ii. Notify us as soon as practicable. The additional insured must see to it that we receive written notice of the claim or "suit" as soon as practicable. c) The additional insured must immediately send us copies of all legal papers received in connection with the claim or "suit', cooperate with us in the investigation or settlement of the claim or defense against the "suit', and otherwise comply with all policy conditions. d) The additional insured must tender the de- fense and indemnity of any claim or "suit' to any provider of "other insurance" which would cover the additional insured for a loss we cover under this endorsement. However, this condition does not affect whether the insur- ance provided to the additional. insured by this endorsement is primary to 'other insur- ance" available to the additional insured which covers that person or organization as a named insured as described in paragraph 3. above. 5. The following definition is added to SECTION V. — DEFINITIONS: "Written contract requiring insurance" means that part of any written contract or agreement under which you are required to include a person or organization as an additional in- sured on this Coverage Part, provided that the "bodily injury" and "property damage" oc- curs and the "personal injury" is caused by an offense committed: a. After the signing and execution of the contract or agreement by you; b. While that part of the contract or agreement is in effect; and c. Before the end of the policy period. Page 2 of 2 © 2005 The St. Paul Travelers Companies, Inc. CG D2 46 08 05 SECTION 00622 - Contractor's Application for Payment CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street) Application for Payment No. For Work Accomplished through the period of through To: Indian River County (OWNER) From: (CONTRACTOR) Bid: 2013006 Project: 1132 1) Attach detailed schedule and copies of all paid invoices. 1. Original Contract Price: 2. Net change by Change Orders and Written Amendments (+ or 3. Current Contract Price (1 plus 2): 4. Total completed and stored to date: 5. Retainage (per Agreement): % of completed Work: • of retainage: Total Retainage: 6. Total completed and stored to date less retainage (4 minus 5): 7. Less previous Application for Payments: 8. DUE THIS APPLICATION (6 MINUS 7): CONTRACTOR'S CERTIFICATION: UNDER PENALTY OF PERJURY, the undersigned CONTRACTOR certifies that (1) the labor and materials listed on this request for payment have been used in the construction of this Work; (2) payment received from the last pay request has been used to make payments to all subcontractors, laborers, materialmen and suppliers except as listed on Attachment A, below; (3) title of all Work, materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all Liens, security interests and encumbrances (except such as are covered by a Bond acceptable to OWNER indemnifying OWNER against any such Lien, security interest or encumbrance); (4) all Work covered by this Application for Payment is in accordance with the Contract Documents and not defective; and (5) If this Periodic Estimate is for a Final Payment to project or improvement, I further certify that all persons doing work upon or furnishing materials or supplies for this project or improvement under this foregoing contract have been paid in full, and that all taxes imposed by Chapter 212 Florida Statutes, (Sales and Use Tax Act, as Amended) have been paid and discharged, and that I have no claims against the OWNER. Attached to or submitted with this form are: 1. Signed release of lien forms (partial or final as applicable) from all subcontractors, laborers, materialmen and suppliers except as listed on Attachment A, together with an explanation as to why any release of lien form is not included; 00622 - Contractor's Application for Payment - 03-10 rev.doc 00622-1 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00622 - Contractor's Application for Payment - 03-10 rev.doc Rev. 05/01 Page 2 of 6 2. Updated Construction Schedule per Specification Section 01310, and Dated By: (CONTRACTOR — must be signed by an Officer of the Corporation) Print Name and Title STATE OF FLORIDA COUNTY OF INDIAN RIVER Before me, a Notary Public, duly commissioned, qualified, and acting, personally appeared who being by me first duly sworn upon oath, says that he/she is the of the CONTRACTOR mentioned above and that he/she has been duly authorized to act on behalf of it, and that he/she executed the above Contractor's Application for Payment and Contractor's Certification statement on behalf of said CONTRACTOR; and that all of the statements contained herein are true, correct, and complete. Subscribed and sworn to before me this day of 20 (SEAL) is personally known to me or has produced as identification. NOTARY PUBLIC: Printed name: Commission No.: Commission Expiration: [The remainder of this page was left blank intentionally] 00622 - Contractor's Application for Payment - 03-10 rev.doc 00622-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00622 - Contractor's Application for Payment - 03-10 rev.doc Rev. 05/01 Page 3 of 6 SURETY'S CONSENT OF PAYMENT TO CONTRACTOR: The Surety, ,a corporation, in accordance with Public Construction Bond Number , hereby consents to payment by the OWNER to the CONTRACTOR, for the amounts specified in this CONTRACTOR's APPLICATION FOR PAYMENT. TO BE EXECUTED BY CORPORATE SURETY: Attest: Secretary Corporate Surety Business Address BY: Print Name: Title: STATE OF FLORIDA COUNTY OF INDIAN RIVER (Affix Corporate SEAL) Before me, a Notary Public, duly commissioned, qualified, and acting, personally appeared , to me well known or who produced as identification, who being by me first duly sworn upon oath, says that he/she is the for and that he/she has been authorized by it to approve payment by the OWNER to the CONTRACTOR of the foregoing Contractor's Application for Payment. Subscribed and sworn to before me this day of 20 Notary Public, State of _ My Commission Expires: [The remainder of this page was left blank intentionally] 00622 - Contractor's Application for Payment - 03-10 rev.doc 00622-3 R\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926V1dmim\Contract Documents\00622 - Contractor's Application for Payment - 03-10 rev.doc Rev. 05/01 Page 4 of 6 CERTIFICATION OF ENGINEER: I certify that I have reviewed the above and foregoing Periodic Estimate for Partial Payment; that to the best of my knowledge and belief it appears to be a reasonably accurate statement of the work performed and/or material supplied by the Contractor. I am not certifying as to whether or not the Contractor has paid all subcontractors, laborers, materialmen and suppliers because I am not in a position to accurately determine that issue. Dated SIGNATURE CERTIFICATION OF INSPECTOR: I have checked the estimate against the Contractor's Schedule of Amounts for Contract Payments and the notes and reports of my inspections of the project. To the best of my knowledge, this statement of work performed and/or materials supplied appears to be reasonably accurate, that the Contractor appears to be observing the requirements of the Contract with respect to construction, and that the Contractor should be paid the amount requested above, unless otherwise noted by me. I am not certifying as to whether or not the Contractor has paid all subcontractors, laborers, materialmen and suppliers because I am not in a position to accurately determine that issue. Dated SIGNATURE [The Remainder of This Page Was Left Blank Intentionally] 00622 - Contractor's Application for Payment - 03-10 rev.doc 00622-4 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00622 - Contractors Application for Payment - 03-10 rev.doc Rev. 05/01 Page 5 of 6 ATTACHMENT A 1. List of all subcontractors, laborers, materialmen and suppliers who have not been paid from the payment received from the last Pay Request and the reason why they were not paid (attach additional pages as necessary): 2. List of all subcontractors, laborers, materialmen and suppliers for which a signed release of lien form (partial or final as applicable) is not included with this Pay Request, together with an explanation as to why the release of lien form is not included (attach additional pages as necessary): 00622 - Contractor's Application for Payment - 03-10 rev.doc 00622-5 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926VAdmim\Contract Documents\00622 - Contractor's Application for Payment - 03-10 rev.doc Rev. 05/01 IIIIIIIIIIIIIIII mm sommommommom 0 O 6 V) w C E O i' z O O O O O O O O O 69 69 69 O F W C7 W W a F O LU v w O A a A A �] CD o LU a F Foy �z� wF A [~ , o A W F � O w o opo O GL A o O U O F � C'1 N O � cc A O o O C O m p • a z w.. IL O O o • x CO z F U U .V ca v Q W O Q tic L Q o O a1 tq O F O O o �F O coo O U �• n uj aa. N s Q z � cr- U w� Q c Q o � W J O = F- M m 0 O 6 V) w C E O i' z O O O O O O O O O 69 69 69 O F W C7 W W a F O v � A a A A �] Foy �z� wF A [~ , o A W F � O w opo O GL A PAGE 00622-6 a) Ln O w eA U S O . -0 u ai x E a) a' m x W -0 N a) W -C N N LO a) v L 0- y U N N +1 m c rHau rJ E U a - UJ O `2 U: o Z O U L a > °- 0 a C7 0 z 0 � U W W +.i _z c 3 U Z' W N / N N O L O O 0 N U C: a E E % O W 0 SECTION 00630 - Certificate of Substantial Completion Date of Issuance: 20 OWNER: Indian River County CONTRACTOR: Bid No.: 2013006 Project: CR 512 Resurfacinq (East Bound Only) (Roseland Road to Easy Street) ENGINEER's Project No. 1132 CONTRACT FOR: CR 512 Resurfacinq (East Bound Only) (Roseland Road to Easy Street) This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: T And T OWNER CONTRACTOR The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on DATE OF SUBSTANTIAL COMPLETION A tentative list of items to be completed or corrected is attached hereto. This list may not be all- inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR within days of the above date of Substantial Completion. 00630 - Certificate of Substantial Completion REV 04-07.doc 00630-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD 0926\Admim\Contract Documents\00630 - Certificale of Substantial Completion REV 04-07.doc The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: OWNER:- WNER: CONTRACTOR:- CONTRACTOR: The The following documents are attached to and made a part of this Certificate: [For items to be attached see definition of Substantial Completion as supplemented and other specifically noted conditions precedent to achieving Substantial Completion as required by Contract Documents.] This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR's obligation to complete the Work in accordance with the Contract Documents. Executed by ENGINEER on: I:11,41[CIMM11:40 IN (Authorized Signature) (Date). CONTRACTOR accepts this Certificate of Substantial Completion on (date). CONTRACTOR: (Authorized Signature) OWNER accepts this Certificate of Substantial Completion on (date). OWNER: INDIAN RIVER COUNTY 0 (Authorized Signature) * * END OF SECTION * * 00630 - Certificate of Substantial Completion REV 04-07.doc 00630-2 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl -SEE PROJ 0926\Admim\Contract Documents\00630 - Certificate of Substantial Completion REV 04-07.doc SECTION 00632 - CONTRACTOR'S FINAL CERTIFICATION OF THE WORK (TO ACCOMPANY CONTRACTOR'S FINAL APPLICATION FOR PAYMENT) STATE OF _ COUNTY OF Personally before me the undersigned officer, authorized by the laws of said state to administer oaths, comes , who on oath says: That he is the CONTRACTOR with whom Indian River County, Florida, a political subdivision of said state, did on the day of ,20 , enter into a contract for the performance of certain work, more particularly described as follows: UNDER PENALTY OF PERJURY, affiant further says that said construction has been completed and the Contract therefore fully performed and final payment is now due and that all liens of all firms and individuals contracting directly with or directly employed by such CONTRACTOR have been paid in full EXCEPT: Name Description/Amount who have not been paid and who are due the amount set forth. Affiant further says that: CONTRACTOR has reviewed the Contract Documents. 2. CONTRACTOR has reviewed the Work for compliance with the Contract Documents. 3. CONTRACTOR has completed the Work in accordance with the Contract Documents. 4. All equipment and systems have been tested in the presence of the ENGINEER or his representative and are fully operational with no defects or deficiencies except as listed below. 5. The Work is complete and ready for final acceptance by the OWNER. 6. CONTRACTOR hereby certifies that it has no claims against the OWNER. 00632-1 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00632 - Contractor's Final Certification REV 04-07.doc (Corporate Seal) (Contractor) 0 Subscribed and sworn to before me this _ day of , 20 Notary Public State of Florida at Large My Commission expires: + + END OF SECTION + + 00632-2 F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00632 - Contractor's Final Certification REV 04-07.doc SECTION 00634 - PROFESSIONAL SURVEYOR AND MAPPER'S CERTIFICATION AS TO ELEVATIONS AND LOCATIONS OF THE WORK (TO BE COMPLETED BY A FLORIDA PROFESSIONAL SURVEYOR AND MAPPER RETAINED BY THE CONTRACTOR AND TO ACCOMPANY CONTRACTOR'S FINAL APPLICATION FOR PAYMENT) I CERTIFY that I am a Florida Professional Surveyor and Mapper retained by: (Insert name of CONTRACTOR) Who is the CONTRACTOR for the following Project: PROJECT NAME: CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street) INDIAN RIVER COUNTY PROJECT # 1132 I FURTHER CERTIFY that I have personally performed the survey work for the preparation of Record Drawings for the CONTRACTOR for this project or that such work was performed under my direct control and supervision. I FURTHER CERTIFY that all constructed elevations and locations of the Work are in conformance with the Contract Documents, except for discrepancies listed below. [Attach additional sheets as necessary] (SURVEYOR'S SEAL) CERTIFIED BY: Printed Name: Florida Professional Surveyor and Mapper Registration Number: Date Signed and Sealed by Professional Surveyor and Mapper: Company Name: Company Address: Telephone Number: 00634 - Professional Surveyor and Mapper's Certification as to Elevations and Locations of the Work REV 04-07.doc 00634-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl -SEE PROD 0926Mrnim\Contract Documents\00634 - Professional Surveyor and Mapper's Certification as to Elevations and Locations of the Work REV 04-07.doc Rev. 06/01 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT Prepared by ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE and Issued and Published Jointly By PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE a practice division of the NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS AMERICAN CONSULTING ENGINEERS COUNCIL AMERICAN SOCIETY OF CIVIL ENGINEERS This document has been approved and endorsed by The Associated General Contractors of America Construction Specifications Institute Copyright ©1996 National Society of Professional Engineers 1420 King Street, Alexandria, VA 22314 American Consulting Engineers Council 1015 15th Street N.W., Washington, DC 20005 American Society of Civil Engineers 345 East 47th Street, New York, NY 10017 TABLE OF CONTENTS Title Page ARTICLE 1 - DEFINITIONS AND TERMINOLOGY.....................................................................................................5 1.01 Defined Terms...................................................................................................................................5 1.02 Terminology.......................................................................................................................................7 ARTICLE 2 - PRELIMINARY MATTERS......................................................................................................................8 2.01 Delivery of Bonds..............................................................................................................................8 2.02 Copies of Documents........................................................................................................................8 2.03 Commencement of Contract Times; Notice to Proceed...................................................................8 2.04 Starting the Work...............................................................................................................................8 2.05 Before Starting Construction.............................................................................................................8 2.06 Preconstruction Conference.............................................................................................................9 2.07 Initial Acceptance of Schedules........................................................................................................9 ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE................................................................9 3.01 Intent..................................................................................................................................................9 3.02 Reference Standards........................................................................................................................10 3.03 Reporting and Resolving Discrepancies...........................................................................................10 3.04 Amending and Supplementing Contract Documents.......................................................................10 3.05 Reuse of Documents..........................................................................................................................10 ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS.....................................................................................................................................................11 4.01 Availability of Lands...........................................................................................................................11 4.02 Subsurface and Physical Conditions................................................................................................11 4.03 Differing Subsurface or Physical Conditions.....................................................................................11 4.04 Underground Facilities......................................................................................................................12 4.05 Reference Points...............................................................................................................................13 4.06 Hazardous Environmental Condition at Site.....................................................................................13 ARTICLE 5 - BONDS AND INSURANCE.....................................................................................................................14 5.01 Performance, Payment, and Other Bonds........................................................................................14 5.02 Licensed Sureties and Insurers........................................................................................................15 5.03 Certificates of Insurance...................................................................................................................15 5.04 CONTRACTOR's Liability Insurance................................................................................................15 5.05 OWNER's Liability Insurance............................................................................................................16 5.06 Property Insurance............................................................................................................................16 5.07 Waiver of Rights................................................................................................................................17 5.08 Receipt and Application of Insurance Proceeds...............................................................................18 5.09 Acceptance of Bonds and Insurance; Option to Replace.................................................................18 5.10 Partial Utilization, Acknowledgment of Property Insurer...................................................................18 ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES.................................................................................................18 6.01 Supervision and Superintendence....................................................................................................18 6.02 Labor, Working Hours.......................................................................................................................19 6.03 Services, Materials, and Equipment.................................................................................................19 6.04 Progress Schedule............................................................................................................................19 6.05 Substitutes and "Or-Equals"..............................................................................................................19 6.07 Patent Fees and Royalties................................................................................................................22 00700 - General Conditions REV 04-07.doc 00700-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\I 132 -CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\00700 - General Conditions REV 04-07.doc 6.08 Permits...............................................................................................................................................22 6.09 Laws and Regulations.......................................................................................................................22 6.10 Taxes.................................................................................................................................................22 6.11 Use of Site and Other Areas.............................................................................................................22 6.13 Safety and Protection........................................................................................................................23 6.14 Safety Representative.......................................................................................................................24 6.15 Hazard Communication Programs....................................................................................................23 6.16 Emergencies......................................................................................................................................24 6.17 Shop Drawings and Samples............................................................................................................24 6.18 Continuing the Work..........................................................................................................................25 6.19 CONTRACTOR's General Warranty and Guarantee.......................................................................25 6.20 Indemnification..................................................................................................................................26 ARTICLE7 - OTHER WORK........................................................................................................................................26 7.01 Related Work at Site.........................................................................................................................26 7.02 Coordination......................................................................................................................................27 ARTICLE 8 - OWNER'S RESPONSIBILITIES.............................................................................................................27 8.01 Communications to Contractor.........................................................................................................27 8.02 Replacement of ENGINEER.............................................................................................................27 8.03 Furnish Data......................................................................................................................................27 8.04 Pay Promptly When Due...................................................................................................................27 8.05 Lands and Easements; Reports and Tests......................................................................................27 8.06 Insurance...........................................................................................................................................28 8.07 Change Orders..................................................................................................................................28 8.08 Inspections, Tests, and Approvals....................................................................................................28 8.09 Limitations on OWNER's Responsibilities........................................................................................28 8.10 Undisclosed Hazardous Environmental Condition...........................................................................28 8.11 Evidence of Financial Arrangements................................................................................................28 ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION.............................................................................28 9.01 OWNER'S Representative................................................................................................................28 9.02 Visits to Site.......................................................................................................................................28 9.03 Project Representative......................................................................................................................28 9.04 Clarifications and Interpretations.......................................................................................................29 9.05 Authorized Variations in Work...........................................................................................................29 9.06 Rejecting Defective Work..................................................................................................................29 9.07 Shop Drawings, Change Orders and Payments..............................................................................29 9.09 Decisions on Requirements of Contract Documents and Acceptability of Work .............................29 9.10 Limitations on ENGINEER's Authority and Responsibilities.............................................................30 ARTICLE 10 - CHANGES IN THE WORK; CLAIMS....................................................................................................30 10.01 Authorized Changes in the Work....................................................................................................30 10.02 Unauthorized Changes in the Work................................................................................................30 10.03 Execution of Change Orders...........................................................................................................30 10.04 Notification to Surety.......................................................................................................................31 10.05 Claims and Disputes.......................................................................................................................31 ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK...............................................31 11.01 Cost of the Work..............................................................................................................................31 11.02 Cash Allowances.............................................................................................................................33 11.03 Unit Price Work...............................................................................................................................34 ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES..............................................34 00700 - General Conditions REV 04-07.doc 00700-3 FAPublic Works%NGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc 12.01 Change of Contract Price................................................................................................................34 12.02 Change of Contract Times..............................................................................................................35 12.03 Delays Beyond CONTRACTOR's Control......................................................................................35 12.04 Delays Within CONTRACTOR's Control........................................................................................35 12.06 Delay Damages...............................................................................................................................35 ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVEWORK..................................................................................................................................36 13.01 Notice of Defects.............................................................................................................................36 13.02 Access to Work...............................................................................................................................36 13.03 Tests and Inspections.....................................................................................................................36 13.04 Uncovering Work.............................................................................................................................36 13.05 OWNER May Stop the Work..........................................................................................................37 13.06 Correction or Removal of Defective Work......................................................................................37 13.07 Correction Period............................................................................................................................37 13.08 Acceptance of Defective Work........................................................................................................37 13.09 OWNER May Correct Defective Work............................................................................................38 ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION.......................................................................38 14.01 Schedule of Values.........................................................................................................................38 14.02 Progress Payments.........................................................................................................................38 14.03 CONTRACTOR's Warranty of Title................................................................................................40 14.04 Substantial Completion...................................................................................................................40 14.05 Partial Utilization..............................................................................................................................41 14.06 Final Inspection...............................................................................................................................41 14.07 Final Payment.................................................................................................................................41 14.08 Final Completion Delayed..............................................................................................41 14.09 Waiver of Claims.............................................................................................................................42 ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION.................................................................................42 15.01 OWNER May Suspend Work.........................................................................................................42 15.02 OWNER May Terminate for Cause................................................................................................43 15.03 OWNER May Terminate For Convenience....................................................................................43 15.04 CONTRACTOR May Stop Work or Terminate...............................................................................43 ARTICLE16 - DISPUTE RESOLUTION......................................................................................................................44 16.01 Methods and Procedures................................................................................................................44 ARTICLE17 - MISCELLANEOUS................................................................................................................................44 17.01 Giving Notice...................................................................................................................................44 17.02 Computation of Times.....................................................................................................................44 17.03 Cumulative Remedies.....................................................................................................................44 17.04 Survival of Obligations.....................................................................................................................44 17.05 Controlling Law................................................................................................................................44 00700 - General Conditions REV 04-07.doe 00700-4 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc GENERAL CONDITIONS ARTICLE 1 - DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in the Contract Documents and printed with initial or all capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural thereof. 1. Addenda --Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the Contract Documents. 2. Agreement --The written instrument which is evidence of the agreement between OWNER and CONTRACTOR covering the Work. 3. Application for Payment --The form acceptable to ENGINEER which is to be used by CONTRACTOR during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos --Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupa- tional Safety and Health Administration. 5. Bid --The offer or proposal of a bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 6. Bidding Documents --The Bidding Requirements and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 7. Bidding Requirements --The Advertisement or Invitation to Bid, Instructions to Bidders, Bid security form, if any, and the Bid form with any supplements. 8. Bonds --Performance and payment bonds and other instruments of security. 9. Change Order --A document recommend- ed by ENGINEER which is signed by CONTRACTOR and OWNER and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Agreement. 10. Claim --A demand or assertion by OWNER or CONTRACTOR seeking an adjustment of Contract Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim. 11. Contract --The entire and integrated written agreement between the OWNER and CONTRACTOR concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 12. Contract Documents --The Contract Documents establish the rights and obligations of the parties and include the Agreement, Addenda (which pertain to the Contract Documents),. CONTRACTOR's Bid (including documentation accompanying the Bid and any post Bid documentation submitted prior to the Notice of Award) when attached as an exhibit to the Agreement, the Notice to Proceed, the Bonds, these General Conditions, the Supplementary Conditions, the Specifications and the Drawings as the same are more specifically identified in the Agreement, together with all Written Amendments, Change Orders, Work Change Directives, Field Orders, and ENGINEER's written interpretations and clarifications issued on or after the Effective Date of the Agreement. Approved Shop Drawings and the reports and drawings of subsurface and physical conditions are not Contract Documents. Only printed or hard copies of the items listed in this paragraph are Contract Documents. Files in electronic media format of text, data, graphics, and the like that may be furnished by OWNER to CONTRACTOR are not Contract Documents. 13. Contract Price --The moneys payable by OWNER to CONTRACTOR for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of paragraph 11.03 in the case of Unit Price Work). 14. Contract Times --The number of days or the dates stated in the Agreement to: (i) achieve Substantial Completion; and (ii) complete the Work so that it is ready for final payment as evidenced by ENGINEER's written recommendation of final pay- ment. 15. CONTRACTOR --The individual or entity with whom OWNER has entered into the Agreement. 16. Cost of the Work --See paragraph 11.01.A for definition. 00700 - General Conditions REV 04-07.doc 00700-5 FAPublic Works\ENGINEERING DIVISION PROJECTS\I 132 -CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc 17. Drawings --That part of the Contract Documents prepared or approved by ENGINEER which graphically shows the scope, extent, and character of the Work to be performed by CONTRACTOR. Shop Drawings and other CONTRACTOR submittals are not Drawings as so defined. 18. Effective Date of the Agreement --The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 19. ENGINEER --The individual or entity named as such in the Agreement. 20. ENGWEER�s 09n&Uffant AR iRE-14 AA. 1-1 entity having a contract with ENGINEE rnish services as ENGINEER's in ent professional associate or consult respect to the Project and who is ed as such in the Supplementary 21. Field Order --A written order issued by ENGINEER which requires minor changes in the Work but which does not involve a change in the Contract Price or the Contract Times. 22. General Requirements --Sections of Division 1 of the Specifications. The General Requirements pertain to all sections of the Specifica- tions. 23. Hazardous Environmental Condition --The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, or Radioactive Material in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto in connection with the Work. 24. Hazardous Waste --The term Hazardous Waste shall have the meaning provided in Section 1004 of the Solid Waste Disposal Act (42 USC Section 6903) as amended from time to time. 25. Laws and Regulations; Laws or Regulat- ions --Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all govern- mental bodies, agencies, authorities, and courts having jurisdiction. 26. Liens --Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 27. Milestone --A principal event specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Comple- tion of all the Work. 28. Notice of Award --The written notice by OWNER to the apparent successful bidder stating that upon timely compliance by the apparent successful bidder with the conditions precedent listed therein, OWNER will sign and deliver the Agreement. 29. Notice to Proceed --A written notice given by OWNER to CONTRACTOR fixing the date on which the Contract Times will commence to run and on which CONTRACTOR shall start to perform the Work under the Contract Documents. 30. OWNER --The individual, entity, public body, or authority with whom CONTRACTOR has entered into the Agreement and for whom the Work is to be performed. 31. Partial Utilization --Use by OWNER of a substantially completed part of the Work for the pur- pose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. 32. PCBs --Polychlorinated biphenyls. 33. Petroleum --Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non -Hazardous Waste and crude oils. 34. Project --The total construction of which the Work to be performed under the Contract Documents may be the whole, or a part as may be indicated elsewhere in the Contract Documents, 35. Project Manual --The bound documentary information prepared for bidding and constructing the Work. A listing of the contents of the Project Manual, which may be bound in one or more volumes, is contained in the table(s) of contents. 36. Radioactive Material --Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 37. Resident Project Representative --The authorized representative of ENGINEER who may be assigned to the Site or any part thereof. 00700-6 00700 - General Conditions REV 04.07.doc FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\00700 - General Conditions REV 04-07.doc 38. Samples --Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 39. Shop Drawings --All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for CONTRACTOR and submitted by CONTRACTOR to illustrate some portion of the Work. 40. Site --Lands or areas indicated in the Contract Documents as being furnished by OWNER upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by OWNER which are designated for the use of CONTRACTOR. 41. Specifications --That part of the Contract Documents consisting of written technical descriptions of materials, equipment, systems, standards, and workmanship as applied to the Work and certain administrative details applicable thereto. 42. Subcontractor --An individual or entity having a direct contract with CONTRACTOR or with any other Subcontractor for the performance of a part of the Work at the Site. 43. Substantial Completion --The time at which the Work (or a specified part thereof) has progressed to the point where, in the opinion of ENGINEER, the Work (or a specified part thereof) is sufficiently complete, in accordance with the Contract Documents, so that the Work (or a specified part thereof) can be utilized for the purposes for which it is intended. The terms "substantially complete" and "substantially completed" as applied to all or part of the Work refer to Substantial Completion thereof. 44. Supplementary Conditions --That part of the Contract Documents which amends or supplements these General Conditions. 45. Supplier --A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with CONTRACTOR or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by CONTRACTOR or any Subcontractor. 46, Underground Facilities --All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 47. Unit Price Work --Work to be paid for on the basis of unit prices. 48. Work --The entire completed construction or the various separately identifiable parts thereof re- quired to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 49. Work Change Directive --A written statement to CONTRACTOR issued on or after the Effective Date of the Agreement and signed by OWNER and recommended by ENGINEER ordering an addition, deletion, or revision in the Work, or responding to differing or unforeseen subsurface or physical conditions under which the Work is to be performed or to emergencies. A Work Change Directive will not change the Contract Price or the Contract Times but is evidence that the parties expect that the change ordered or documented by a Work Change Directive will be incorporated in a subse- quently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Times. 50. Written Amendment --A written statement modifying the Contract Documents, signed by OWNER and CONTRACTOR on or after the Effective Date of the Agreement and normally dealing with the nonengineering or nontechnical rather than strictly construction -related aspects of the Contract Docu- ments. 1.02 Terminology A. Intent of Certain Terms or Adjectives 1. Whenever in the Contract Documents the terms "as allowed," "as approved," or terms of like effect or import are used, or the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of ENGINEER as to the Work, it is intended that such action or determination will be solely to evaluate, in general, the completed Work for compliance with the requirements of and information in the Contract Documents and conformance with the design 00700 - General Conditions REV 04-07.doc 00700-7 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc concept of the completed Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). The use of any such term or adjective shall not be effective to assign to ENGI- NEER any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility contrary to the provisions of paragraph 9.10 or any other provision of the Contract Documents. B. Day 1. The word "day" shall constitute a calendar day of 24 hours measured from midnight to the next midnight. C. Defective 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it does not conform to the Contract Documents or does not meet the requirements of any inspection, reference standard, test, or approval referred to in the Contract Documents, or has been damaged prior to ENGINEER's recom- mendation of final payment (unless responsi- bility for the protection thereof has been assumed by OWNER at Substantial Completion in accordance with paragraph 14.04 or 14.05). D. Furnish, Install, Perform, Provide "furnish," 1. hall rnean to s 9drine - +ori I nr sepSite (or sorn i other SpeGifi ad use er and in ssnd+tier supply and delive on„ir�mnni.��'he IGGation) ready for usable er eperable 4. When "furnish," "install," "perform," or "provide" is not used in connection with services, materials, or equipment in a context clearly requiring an obligation of CONTRACTOR, "provide" is implied. E. Unless stated otherwise in the Contract Docu- ments, words or phrases which have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 - PRELIMINARY MATTERS 2.01 Delivery of Bonds A. When CONTRACTOR delivers the executed Agreements to OWNER, CONTRACTOR shall also deliver to OWNER such Bonds as CONTRACTOR may be required to furnish. 2.02 Copies of Documents A. OWNER shall furnish to CONTRACTOR up to ten copies of the Contract Documents. Additional copies will be furnished upon request at the cost of reproduction. 2.03 Commencement of Contract Times; Notice to Proceed A. The Contract Times will commence to run on the thirtieth day after the Effective Date of the Agree- ment or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. A Notice to Pro- ceed may be given at any time within 30 days after the Effective Date of the Agreement. In no event will the Contract Times commence to run later than the ninetieth day after the day of Bid opening or the thirtieth day after the Effective Date of the Agreement, whichever date is earlier. 2.04 Starting the Work A. CONTRACTOR shall start to perform the Work on the date when the Contract Times com- mence to run. No Work shall be done at the Site prior to the date on which the Contract Times commence to run. 2.05 Before Starting Construction A. CONTRACTOR's Review of Contract Docu- ments: Before undertaking each part of the Work, CONTRACTOR shall carefully study and compare the 00700 - General Conditions REV 04-07.doc 00700-8 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc Contract Documents and check and verify pertinent figures therein and all applicable field measurements. CONTRACTOR shall promptly report in writing to ENGINEER any conflict, error, ambiguity, or discrepancy which CONTRACTOR may discover and shall obtain a written interpretation or clarification from ENGINEER before proceeding with any Work affected thereby; however, CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless CONTRACTOR knew or reasonably should have known thereof. B. Preliminary Schedules: Within ten days after the Effective Date of the Agreement (unless otherwise specified in the General Requirements), CONTRAC- TOR shall submit to ENGINEER for its timely review: 1. a preliminary progress schedule indicating the times (numbers of days or dates) for starting and completing the various stages of the Work, including any Milestones specified in the Contract Documents; 2. a preliminary schedule of Shop Drawing and Sample submittals which will list each required submittal and the times for sub- mitting, reviewing, and processing such submittal; and 3. a preliminary schedule of values for all of the Work which includes quantities and prices of items which when added together equal the Contract Price and subdivides the Work into component parts in sufficient detail to serve as the basis for progress payments during performance of the Work. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work. the Site is started, CONTRACTOR and OWNE all each deliver to the other, with copi o each additional insured identified in t upplementary Conditions, certificates of ' urance (and other evidence of insurance ich either of them or any additional insur may reasonably request) which r-nNTRA(' and OWNER respectively are 2.06 Preconstruction Conference Work and to discuss the schedules referred to in para- graph 2.05.13, procedures for handling Shop Drawings and other submittals, processing Applications for 2.07 Initial Acceptance of Schedules A. Unless otherwise provided in the Contract Documents, at least ten days before submission of the first Application for Payment a conference attended by CONTRACTOR, ENGINEER, and others as appropri- ate will be held to review for acceptability to ENGI- NEER as provided below the schedules submitted in accordance with paragraph 2.05.13. CONTRACTOR shall have an additional ten days to make corrections and adjustments and to complete and resubmit the schedules. No progress payment shall be made to CONTRACTOR until acceptable schedules are submitted to ENGINEER. 1. The progress schedule will be acceptable to ENGINEER if it provides an orderly progression of the Work to completion within any specified Milestones and the Contract Times. Such acceptance will not impose on ENGINEER responsibility for the progress schedule, for sequencing, scheduling, or progress of the Work nor interfere with or relieve CONTRACTOR from CONTRACTOR's full responsibility therefor. 2. CONTRACTOR's schedule of Shop Drawing and Sample submittals will be acceptable to ENGINEER if it provides a workable arrangement for reviewing and processing the required submittals. 3. CONTRACTOR's schedule of values will be acceptable to ENGINEER as to form and substance if it provides a reasonable allocation of the Contract Price to component parts of the Work. ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are comple- mentary; what is called for by one is as binding as if called for by all. to run, but before any Wo ite SGIN ed, a B. It is the intent of the Contract Documents to conference y CONTRACTOR, EER, describe a functionally complete Project (or part there- conference as appropriate will be held to establish a of) to be constructed in accordance with the Contract 00700 -General Conditions REV 04-07.doc 00700-9 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc Documents. Any labor, documentation, services, materials, or equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the intended result will be provided whether or not specifically called for at no additional cost to OWNER. C. Clarifications and interpretations of the Contract Documents shall be issued by ENGINEER as provided in Article 9. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifica- tions, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the stan- dard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual or code, or any instruction of a Supplier shall be effective to change the duties or responsibilities of OWNER, CONTRACTOR, or ENGINEER, or any of their subcontractors, consultants, agents, or employ- ees from those set forth in the Contract Documents, nor shall any such provision or instruction be effective to assign to OWNER, ENGINEER, or any of ENGINEER's Consultants, agents, or employees any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies 1. if, during the performance of the Work, CONTRACTOR discovers any conflict, error, ambiguity, or discrepancy within the Con- tract Documents or between the Contract Documents and any provision of any Law or Regulation applicable to the performance of the Work or of any standard, specification, manual or code, or of any instruction of any Supplier, CONTRACTOR shall report it to ENGINEER in writing at once. CONTRACTOR shall not proceed with the Work affected thereby (except in an emergency as required by paragraph 6.16.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in paragraph 3.04; provided, however, that CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report any such conflict, error, ambiguity, or discrepancy unless CON- TRACTOR knew or reasonably should have known thereof. B. Resolving Discrepancies 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and: a. the provisions of any standard, specification, manual, code, or instruction (whether or not specifically incorporated by reference in the Contract Documents); or b. the provisions of any Laws or Regulations applicable to the performance of the Work (unless such an interpretation of the provisions of the Contract Documents would result in violation of such Law or Regulation). 3.04 Amending and Supplementing Contract Documents A. The ContractDocuments may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof in one or more of the following ways: (i) a Written Amendment; (ii) a Change Order; or (iii) a Work Change Directive. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, by one or more of the following ways: (i) a Field Order; (ii) ENGINEER's approval of a Shop Drawing or Sample; or (iii) ENGINEER's written interpretation or clarifi- cation. 3.05 Reuse of Documents A. CONTRACTOR and any Subcontractor or Supplier or other individual or entity performing or 00700 - General Conditions REV 04-07.doc 00700- 10 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl -SEE PROJ 0926VAdmim\Con1ract Documents\00700 - General Conditions REV 04-07.doc furnishing any of the Work under a direct or indirect contract with OWNER: (i) shall not have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of ENGINEER or ENGINEER's Consultant, including electronic media editions; and (ii) shall not reuse any of such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of OWNER and ENGINEER and specific written verification or adaption by ENGINEER. This prohibition will survive final payment, completion, and acceptance of the Work, or termination or completion of the Contract. Nothing herein shall preclude CONTRACTOR from retaining copies of the Contract Documents for record purposes. ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. OWNER shall furnish the Site. OWNER shall notify CONTRACTOR of any encumbrances or restrictions not of general application but specifically related to use of the Site with which CONTRACTOR must comply in performing the Work. OWNER will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. If CONTRACTOR and OWNER are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, as a result of any delay in OWNER's furnishing the Site, CONTRACTOR may make a Claim therefor as provided in paragraph 10.05. B. Upon reasonable written request, OWNER shall furnish CONTRACTOR with a current statement of record legal title and legal description of the lands upon which the Work is to be performed and OWNER's interest therein as necessary for giving notice of or filing a mechanic's or construction lien against such lands in accordance with applicable Laws and Regulations. C. CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports of explorations and tests of subsurface conditions at or contiguous to the Site that ENGINEER has used in preparing the Contract Documents; and 2. those drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) that ENGI- NEER has used in preparing the Contract Documents. B. Limited Reliance by CONTRACTOR on Technical Data Authorized: CONTRACTOR may rely upon the general accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementa- ry Conditions. Except for such reliance on such "technical data," CONTRACTOR may not rely upon or make any Claim against OWNER, ENGINEER, or any of ENGINEER's Consultants with respect to: 1. the completeness of such reports and drawings for CONTRACTOR's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by CONTRACTOR, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any CONTRACTOR interpretation of or conclusion drawn from any technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If CONTRACTOR believes that any subsurface or physical condition at or contiguous to the Site that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which CONTRAC- TOR is entitled to rely as provided in paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require change in the Contract Documents; or 00700 - General Conditions REV 04-07.doc 00700-11 I'APublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926VAdmim\Contract Documents\00700 - General Conditions REV 04-07.doc 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inher- ent in work of the character provided for in the Contract Documents; then CONTRACTOR shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by paragraph 6.16.A), notify OWNER and ENGINEER in writing about such condition. CONTRACTOR shall not further disturb such condition or perform any Work in connection therewith (except as aforesaid) until receipt of written order to do so. B. ENGINEER's Review. After receipt of written notice as required by paragraph 4.03.A, ENGINEER will promptly review the pertinent condition, determine the necessity of OWNER's obtaining additional exploration or tests with respect thereto, and advise OWNER in writing (with a copy to CONTRACTOR) of ENGINEER's findings and conclusions. C. Possible Price and Times Adjustments 1. The Contract Price or the Contract Times, or both, will be equitably adjusted to the extent that the existence of such differing subsurface or physical condition causes an in- crease or decrease in CONTRACTOR's cost of, or time required for, performance of the Work; subject, however, to the following: a. such condition must meet any one or more of the categories described in para- graph 4.03.A; and b, with respect to Work that is paid for on a Unit Price Basis, any adjustment in Contract Price will be subject to the provisions of paragraphs 9.08 and 11.03. 2. CONTRACTOR shall not be entitled to any adjustment in the Contract Price or Contract Times if: a. CONTRACTOR knew of the existence of such conditions at the time CONTRACTOR made a final commitment to OWNER in respect of Contract Price and Contract Times by the submission of a Bid or becoming bound under a negotiated contract; or b. the existence of such condition could reasonably have been discovered or revealed as a result of any examination, investigation, exploration, test, or study of the Site and contiguous areas required by the Bidding Requirements or Contract Documents to be conducted by or for CON- TRACTOR prior to CONTRACTOR's making such final commitment; or c. CONTRACTOR failed to give the written notice within the time and as re- quired by paragraph 4.03.A. 3. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, a Claim may be made therefor as provided in paragraph 10.05. However, OWNER, ENGINEER, and ENGINEER's Consultants shall not be liable to CONTRACTOR for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by CONTRACTOR on or in connection with any other project or anticipated project. 4.04 Underground Facilities A. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to OWNER or ENGINEER by the owners of such Underground Facilities, including OWNER, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. OWNER and ENGINEER shall not be responsible for the accuracy or com- pleteness of any such information or data; and 2. the cost of all of the following will be included in the Contract Price, and CONTRAC- TOR shall have full responsibility for: a. reviewing and checking all such information and data, 00700 - General Conditions REV 04-07.doc 00700-12 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 092Mdmim\Contract Documents\00700 - General Conditions REV 04-07.doc A b. locating all Underground Facilities shown or indicated in the Contract Documents, c. coordination of the Work with the owners of such Underground Facilities, including OWNER, during construction, and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. Not Shown or Indicated 1. If an Underground Facility is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, CONTRACTOR shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any Work in connection therewith (except in an emergency as required by paragraph 6.16.A), identify the owner of such Underground Facility and give written notice to that owner and to OWNER and ENGI- NEER. ENGINEER will promptly review the Underground Facility and determine the extent, if any, to which a change is required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. During such time, CONTRACTOR shall be responsible for the safety and protection of such Underground Facility. 2. If ENGINEER concludes that a change in the Contract Documents is required, a Work Change Directive or a Change Order will be issued to reflect and document such consequences. An equitable adjustment shall be made in the Contract Price or Contract Times, or both, to the extent that they are attributable to the existence or location of any Underground Facility that was not shown or indicated or not shown or indicated with reasonable accuracy in the Contract Documents and that CONTRACTOR did not know of and could not reasonably have been expected to be aware of or to have anticipated. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment in Contract Price or Contract Times, OWNER or CONTRACTOR may make a Claim therefor as provided in paragraph 10.05. 4.05 Reference Points A. OWNER shall provide engineering surveys to establish reference points for construction which in ENGINEER's judgment are necessary to enable CONTRACTOR to proceed with the Work. CON- TRACTOR shall be responsible for laying out the Work, shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations without the prior written approval of OWNER. CONTRACTOR shall report to ENGINEER whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for the accurate replacement or relocation of such reference points or property monuments by professionally qualified personnel. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: Reference is made to the Supplementary Conditions for the identification of those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that have been utilized by the ENGINEER in the preparation of the Contract Documents. B. Limited Reliance by CONTRACTOR on Technical Data Authorized: CONTRACTOR may rely upon the general accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Except for such reliance on such "technical data," CONTRACTOR may not rely upon or make any Claim against OWNER, ENGINEER or any of ENGINEER's Consultants with respect to: 1. the completeness of such reports and drawings for CONTRACTOR's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any CONTRACTOR interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. 00700 - General Conditions REV 04-07.doc 00700- 13 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Adm m\Contract Documents\00700 - General Conditions REV 04-07.doc C. CONTRACTOR shall not be responsible for. any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. CONTRACTOR shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by CONTRACTOR, Subcontractors, Suppliers, or anyone else for whom CONTRACTOR is responsible. D. If CONTRACTOR encounters a Hazardous Environmental Condition or if CONTRACTOR or anyone for whom CONTRACTOR is responsible creates a Hazardous Environmental Condition, CONTRACTOR shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by paragraph 6.16); and (iii) notify OWNER and ENGI- NEER (and promptly thereafter confirm such notice in writing). OWNER shall promptly consult with ENGINEER concerning the necessity for OWNER to retain a qualified expert to evaluate such condition or take corrective action, if any. E. CONTRACTOR shall not be required to resume Work in connection with such condition or in any affected area until after OWNER has obtained any required permits related thereto and delivered to CONTRACTOR written notice: (i) specifying that such condition and any affected area is or has been rendered safe for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed safely. If OWNER and CONTRACTOR cannot agree as to entitlement to or on the amount or extent, if any, of any adjustment in Contract Price or Contract Times, or both, as a result of such Work stoppage or such special conditions under which Work is agreed to be resumed by CONTRACTOR, either party may make a Claim therefor as provided in paragraph 10.05. F. If after receipt of such written notice CONTRACTOR does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special condi- tions, then OWNER may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. If OWNER and CON- TRACTOR cannot agree as to entitlement to or on the amount or extent, if any, of an adjustment in Contract Price or Contract Times as a result of deleting such portion of the Work, then either party may make a Claim therefor as provided in paragraph 10.05. OWNER may have such deleted portion of the Work performed by OWNER's own forces or others in accordance with Article 7. G. To the fullest extent permitted by Laws and Regulations, OWNER shall indemnify and hold harmless CONTRACTOR, Subcontractors, ENGI- NEER, ENGINEER's Consultants and the officers, directors, partners, employees, agents, other consultants, and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition, provided that such Hazardous Environmental Condition: (i) was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be included within the scope of the Work, and (ii) was not created by CONTRACTOR or by anyone for whom CONTRACTOR is responsible. Nothing in this para- graph 4.06.E shall obligate OWNER to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER'S Consultants, and the officers, directors, partners, employees, agents, other consultants, and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by CONTRACTOR or by anyone for whom CONTRACTOR is responsible. Nothing in this paragraph 4.06.F shall obligate CONTRACTOR to indemnify any individual or entity from and against the consequences of that individual's or entity's own negli- gence. I. The provisions of paragraphs 4.02, 4.03, and 4.04 are not intended to apply to a Hazardous Environmental Condition uncovered or revealed at the Site. ARTICLE 5 - BONDS AND INSURANCE 5.01 Performance, Payment, and Other Bonds 00700 - General Conditions REV 04-07.doc 00700-14 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 092Mdmim\Contract Documents\00700 - General Conditions REV 04-07.doc B. All Bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the current list of "Com- panies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All Bonds signed by an agent must be accompanied by a certified copy of such agent's authority to act. C. If the surety on any Bond furnished by CON- TRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements of paragraph 5.01.13, CONTRACTOR shall within 20 days thereafter substitute another Bond and surety, both of which shall comply with the requirements of paragraphs 5.01.13 and 5.02. 5.02 Licensed Sureties and Insurers A. All Bonds and insurance required by the Contract Documents to be purchased and maintained by OWNER or CONTRACTOR shall be obtained from surety or insurance companies that are duly licensed or authorized in the jurisdiction in which the Project is located to issue Bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.03 Certificates of Insurance A. CONTRACTOR shall deliver to OWNER, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by OWN- ER or any other additional insured) which COW TRACTOR is required to purchase and maintain. aw�,F=R shall deliveF to CONTRACTOR, With GGI 5.04 CONTRACTOR's Liability Insurance A. CONTRACTOR shall purchase and maintain such liability and other insurance as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from CONTRACTOR's performance of the Work and CONTRACTOR's other obligations under the Contract Documents, whether it is to be per- formed by CONTRACTOR, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of CONTRACTOR's employees; 3. claims for damages because of bodily injury, sickness or disease, or death of any person other than CONTRACTOR's employees; 4. claims for damages insured by reasonably available personal injury liability coverage which are sustained: (i) by any person as a result of an offense directly or indirectly related to the employment of such person by CONTRACTOR, or (ii) by any other person for any other reason; 5. claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including loss of use resulting therefrom; and 6. claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, mainte- nance or use of any motor vehicle. B. The policies of insurance so required by this paragraph 5.04 to be purchased and maintained shall: 1. with respect to insurance required by paragraphs 5.04.A.3 through 5.04.A.6 inclusive, include as additional insureds (subject to any customary exclusion in respect of professional liability) OWNER, ENGINEER, ENGINEER's 00700 - General Conditions REV 04.07.doc 00700- 15 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdn rn\Contract Documents\00700 - General Conditions REV 04-07.doc Consultants, and any other individuals or entities identified in the Supplementary Condi- tions, all of whom shall be listed as additional insureds, and include coverage for the respec- tive officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of all such additional insureds, and the insurance afforded to these additional insureds shall provide primary coverage for all claims covered thereby; 2. include at least the specific coverages and be written for not less than the limits of liability provided in the Supplementary Conditions or required by Laws or Regulations, whichever is greater; 3. include completed operations insurance; 4. include contractual liability insurance covering CONTRACTOR's indemnity obligations under paragraphs 6.07, 6.11, and 6.20; 5. contain a provision or endorsement that the coverage afforded will not be canceled, materially changed or renewal refused until at least thirty days prior written notice has been given to OWNER and CONTRACTOR and to each other additional insured identified in the Supplementary Conditions to whom a certificate of insurance has been issued (and the certificates of insurance furnished by the CON- TRACTOR pursuant to paragraph 5.03 will so provide); 6. remain in effect at least until final payment and at all times thereafter when CON- TRACTOR may be correcting, removing, or replacing defective Work in accordance with paragraph 13.07; and 7. with respect to completed operations insurance, and any insurance coverage written on a claims -made basis, remain in effect for at least two years after final payment (and CONTRACTOR shall furnish OWNER and each other additional insured identified in the Supplementary Conditions, to whom a certificate of insurance has been issued, evidence satisfactory to OWNER and any such additional insured of continuation of such insurance at final payment and one year thereafter). 5.05 OWNER's Liability Insurance provided by CONTRACTOR under par 5.04, OWNER, at OWNER's option y purchase and maintain at OWNERRIs pxpeffsb OWNER's own liability insurance as protect OWNER against_ claims 5.06 Property Insurance _ 00700 - General Conditions REV 04-07.doc 00700-16 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD 0926VAdmim\Contract Documents\00700 - General Conditions REV 04-07.doc D. OWNER shall not be responsible for purchas- ing and maintaining any property insurance specified in this paragraph 5.06 to protect the interests of CONTRACTOR, Subcontractors, or others in the Work to the extent of any deductible amounts that are identified in the Supplementary Conditions. The risk of loss within such identified deductible amount will be borne by CONTRACTOR, Subcontractors, or others suffering any such loss, and if any of them wishes property insurance coverage within the limits of such amounts, each may purchase and maintain it at the purchaser's own expense. 5.07 Waiver of Rights -aaz.fln =:. irH 00700 - General Conditions REV 04-07.doc 00700-17 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc 5.08 Receipt and Application of Insurance Proceeds days after the OGG''FrAnGe Of 10 tA 0WNr=W'& arnOR9 the parties iR interest- is; F.R_;_;G_hPd, OWNER A& ss with the 5.09 Acceptance of Bonds and Insurance; Option to Replace 5.10 Partial Utilization, Acknowledgment of Property Insurer A. if OWNER finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work as provided in paragraph 14.05, no such use or occupancy shall commence before the insurers providing the property insurance pursuant to paragraph 5.06 have acknowledged notice thereof and in writing effected any changes in cover- age necessitated thereby. The insurers providing the property insurance shall consent by endorsement on the policy or policies, but the property insurance shall not be canceled or permitted to lapse on account of any such partial use or occupancy. ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. CONTRACTOR shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. CON- TRACTOR shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction, but CONTRACTOR shall not be responsible for the negligence of OWNER or ENGINEER in the design or specification of a specific 00700 - General Conditions REV 04-07.doc 00700-18 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\00700 -General Conditions REV 04-07.doc means, method, technique, sequence, or procedure of construction which is shown or indicated in and expressly required by the Contract Documents. CON- TRACTOR shall be responsible to see that the completed Work complies accurately with the Contract Documents. B. At all times during the progress of the Work, CONTRACTOR shall assign a competent resident superintendent thereto who shall not be replaced without written notice to OWNER and ENGINEER except under extraordinary circumstances. The superintendent will be CONTRACTOR's representative at the Site and shall have authority to act on behalf of CONTRACTOR. All communications given to or received from the superintendent shall be binding on CONTRACTOR. 6.02 Labor, Working Hours A. CONTRACTOR shall provide competent, suitably qualified personnel to survey, lay out, and construct the Work as required by the Contract Docu- ments. CONTRACTOR shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during regular working hours, and CONTRACTOR will not permit overtime work or the performance of Work on Saturday, Sunday, or any legal holiday without OWNER's written consent (which will not be unreasonably withheld) given after prior written notice to ENGINEER. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the General Re- quirements, CONTRACTOR shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All warranties and guarantees specifically called for by the Specifica- tions shall expressly run to the benefit of OWNER. If required by ENGINEER, CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. All materials and equipment shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 6.04 Progress Schedule A. CONTRACTOR shall adhere to the progress schedule established in accordance with paragraph 2.07 as it may be adjusted from time to time as provided below. 1. CONTRACTOR shall submit to ENGINEER for acceptance (to the extent indi- cated in paragraph 2.07) proposed adjustments in the progress schedule that will not result in changing the Contract Times (or Milestones). Such adjustments will conform generally to the progress schedule then in effect and additional- ly will comply with any provisions of the General Requirements applicable thereto. 2. Proposed adjustments in the progress schedule that will change the Contract Times (or Milestones) shall be submitted in accordance with the requirements of Article 12. Such adjustments may only be made by a Change Order or Written Amendment in accor- dance with Article 12. 6.05 Substitutes and "Or -Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be submitted to ENGINEER for review under the circumstances described below. 1. "Or -Equal" Items: If in ENGINEER's sole discretion an item of material or equipment proposed by CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by ENGINEER as an "or -equal" item, in which case review and approval of the proposed item may, in 00700 - General Conditions REV 04-07.doc 00700-19 FAPublic Works\ENGINEERING DIVISION PROJECTS\1 1 32 -CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl -SEE PROJ 0926VAdmim\Contract Documents\00700 - General Conditions REV 04-07.doc ENGINEER's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substi- tute items. For the purposes of this paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a, in the exercise of reasonable judgment ENGINEER determines that: (i) it is at least equal in quality, durability, appearance, strength, and design characteristics; (ii) it will reliably perform at least equally well the function imposed by the design concept of the completed Project as a functioning whole, and; b. CONTRACTOR certifies that: (i) there is no increase in cost to the OWNER; and (ii) it will conform substantially, even with deviations, to the detailed requirements of the item named in the Contract Documents. Substitute Items a. If in ENGINEER's sole discretion an item of material or equipment proposed by CONTRACTOR does not qualify as an "or -equal" item under paragraph 6.05.A.1, it will be considered a proposed substitute item. b. CONTRACTOR shall submit suffi- cient information as provided below to allow ENGINEER to determine that the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by ENGINEER from anyone other than CONTRACTOR. c. The procedure for review by ENGI- NEER will be as set forth in paragraph 6.05.A.2.d, as supplemented in the General Requirements and as ENGINEER may decide is appropriate under the circumstances. d. CONTRACTOR shall first make written application to ENGINEER for review of a proposed substitute item of material or equipment that CONTRACTOR seeks to furnish or use. The application shall certify that the proposed substitute item will perform adequately the functions and achieve the results called for by the general design, be similar in substance to that specified, and be suited to the same use as that specified. The application will state the extent, if any, to which the use of the pro- posed substitute item will prejudice CONTRACTOR's achievement of Substan- tial Completion on time, whether or not use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with OWNER for work on the Project) to adapt the design to the proposed substitute item and whether or not incorporation or use of the proposed substi- tute item in connection with the Work is sub- ject to payment of any license fee or royalty. All variations of the proposed substitute item from that specified will be identified in the application, and available engineering, sales, maintenance, repair, and replacement services will be indicated. The application will also contain an itemized esti- mate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and claims of other contractors affected by any resulting change, all of which will be considered by ENGINEER in evaluating the proposed substitute item. ENGINEER may require CONTRACTOR to furnish additional data about the proposed substitute item. B. Substitute Construction Methods or Proce- dures: If a specific means, method, technique, se- quence, or procedure of construction is shown or indicated in and expressly required by the Contract Documents, CONTRACTOR may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by ENGINEER. CONTRACTOR shall submit sufficient information to allow ENGINEER, in ENGINEER's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. The procedure for review by ENGINEER will be similar to that provided in subparagraph 6.05.A.2. C. Engineer's Evaluation: ENGINEER will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to para- graphs 6.05.A and 6.05.6. ENGINEER will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until ENGINEER's review is complete, which will be evidenced by either a Change Order for a substitute or an approved Shop Drawing for an `or equal." ENGINEER will advise 00700 - General Conditions REV 04-07.doc 00700-20 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00700 -General Conditions REV 04-07.doc CONTRACTOR in writing of any negative determination. D. Special Guarantee: OWNER may require CONTRACTOR to furnish at CONTRACTOR's ex- pense a special performance guarantee or other surety with respect to any substitute. E. ENGINEER's Cost Reimbursement: ENGINEER will record time required by ENGINEER and ENGINEER's Consultants in evaluating substitute proposed or submitted by CONTRACTOR pursuant to paragraphs 6.05.A.2 and 6.05.13 and in making changes in the Contract Documents (or in the provisions of any other direct contract with OWNER for work on the Project) occasioned thereby. Whether or not ENGINEER approves a substitute item so pro- posed or submitted by CONTRACTOR, CON- TRACTOR shall reimburse OWNER for the charges of ENGINEER and ENGINEER's Consultants for evaluating each such proposed substitute. F. CONTRACTOR's Expense: CONTRACTOR shall provide all data in support of any proposed substitute or "or -equal" at CONTRACTOR's expense. 6.06 Concerning Subcontractors, Suppliers, and Others A. CONTRACTOR shall not employ any Subcontractor, Supplier, or other individual or entity (including those acceptable to OWNER as indicated in paragraph 6.06.13), whether initially or as a replacement, against whom OWNER may have reasonable objection. CONTRACTOR shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom CONTRACTOR has reason- able objection. B. If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, or other individuals or entities to be submitted to OWNER in advance for acceptance by OWNER by a specified date prior to the Effective Date of the Agreement, and if CONTRACTOR has submitted a list thereof in accordance with the Supplementary Conditions, OWNER's acceptance (either in writing or by failing to make written objection thereto by the date indicated for acceptance or objection in the Bidding Documents or the Contract Documents) of any such Subcon- tractor, Supplier, or other individual or entity so identified may be revoked on the basis of reasonable objection after due investigation. CONTRACTOR shall submit an acceptable replacement for the rejected Subcontractor, Supplier, or other individual or entity, and the Contract Price will be adjusted by the difference in the cost occasioned by such replacement, and an appropriate Change Order will be issued or Written Amendment signed. No acceptance by OWNER of any such Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, shall constitute a waiver of any right of OWNER or ENGINEER to reject defective Work. C. CONTRACTOR shall be fully responsible to OWNER and ENGINEER for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as CONTRACTOR is responsible for CONTRACTOR's own acts and omissions. Nothing in the Contract Documents shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between OWNER or ENGINEER and any such Subcontractor, Supplier or other individual or entity, nor shall it create any obligation on the part of OWNER or ENGINEER to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. D. CONTRACTOR shall be solely responsible for scheduling and coordinating the Work of Subcon- tractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with CONTRACTOR. E. CONTRACTOR shall require all Subcontrac- tors, Suppliers, and such other individuals or entities performing or furnishing any of the Work to commu- nicate with ENGINEER through CONTRACTOR. F. The divisions and sections of the Specifica- tions and the identifications of any Drawings shall not control CONTRACTOR in dividing the Work among Subcontractors or Suppliers or delineating the Work to be performed by any specific trade. G. All Work performed for CONTRACTOR by a Subcontractor or Supplier will be pursuant to an appropriate agreement between CONTRACTOR and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of OWNER and ENGINEER. Whenever any such agreement is with a Subcontractor or Supplier who is listed as an additional insured on the property insurance provided in paragraph 5.06, the agreement between the CONTRACTOR and the Subcontractor or Supplier will contain provisions whereby the Subcontractor or Supplier waives all rights against OWNER, CONTRACTOR, ENGINEER, ENGINEER's Consultants, and all other individuals or entities 00700 - General Conditions REV 04.07.doc 00700-21 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl -SEE PROJ 0926\Admim\Contract Documents\00700 -General Conditions REV 04-07.doc identified in the Supplementary Conditions to be listed as insureds or additional insureds (and the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them) for all losses and damages caused by, arising out of, relating to, or resulting from any of the perils or causes of loss covered by such policies and any other property insurance applicable to the Work. If the insurers on any such policies require separate waiver forms to be signed by any Subcontractor or Supplier, CONTRACTOR will obtain the same. 6.07 Patent Fees and Royalties A. CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if to the actual knowledge of OWNER or ENGINEER its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by OWNER in the Contract Documents. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultants, and the officers, directors, partners, employees or agents, and other consultants of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.08 Permits A. Unless otherwise provided in the Supple- mentary Conditions, CONTRACTOR shall obtain and pay for all construction permits and licenses. OWNER shall assist CONTRACTOR, when necessary, in obtaining such permits and licenses. CONTRACTOR shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement. CONTRACTOR shall pay all charges of utility owners for connections to the Work, and OWNER shall pay all charges of such utility owners for capital costs related thereto, such as plant investment fees. 6.09 Laws and Regulations A. CONTRACTOR shall give all notices and comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, neither OWNER nor ENGINEER shall be responsible for monitoring CONTRACTOR's compli- ance with any Laws or Regulations. B. If CONTRACTOR performs any Work know- ing or having reason to know that it is contrary to Laws or Regulations, CONTRACTOR shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work; however, it shall not be CONTRACTOR's primary responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve CONTRACTOR of CONTRACTOR's obligations under paragraph 3.03. C. Changes in Laws or Regulations not known at the time of opening of Bids (or, on the Effective Date of the Agreement if there were no Bids) having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Times. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment, a Claim may be made therefor as provided in paragraph 10.05. 6.10 Taxes A. CONTRACTOR shall pay all sales, consum- er, use, and other similar taxes required to be paid by CONTRACTOR in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance of the Work. B. OWNER qualifies for state and local sales tax exemption in the purchase of all material and equipment. 6.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas 1. CONTRACTOR shall confine construction equipment, the storage of 00700 - General Conditions REV 04-07.doc 00700-22 F:\PublicWorksNENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdm m\Contract Documents\00700 -General Conditions REV 04-07.doc materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. Should any claim be made by any such owner or occupant because of the performance of the Work, CONTRACTOR shall promptly settle with such other party by negotiation or otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law. 3. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultant, and the officers, directors, partners, employees, agents, and other consultants of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against OWNER, ENGINEER, or any other party indemnified hereunder to the extent caused by or based upon CONTRACTOR's performance of the Work. B. Removal of Debris During Performance of the Work: During the progress of the Work CONTRAC- TOR shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materi- als, rubbish, and other debris shall conform to applica- ble Laws and Regulations. C. Cleaning: Prior to Substantial Completion of the Work CONTRACTOR shall clean the Site and make it ready for utilization by OWNER. At the com- pletion of the Work CONTRACTOR shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition all property not designated for alteration by the Contract Documents. D. Loading Structures: CONTRACTOR shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.12 Record Documents A. CONTRACTOR shall maintain in a safe place at the Site one record copy of all Drawings, Specifica- tions, Addenda, Written Amendments, Change Orders, Work Change Directives, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all approved Shop Drawings will be available to ENGI- NEER for reference. Upon completion of the Work, these record documents, Samples, and Shop Drawings will be delivered to ENGINEER for OWNER. 6.13 Safety and Protection A. CONTRACTOR shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. CONTRACTOR shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equip- ment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. CONTRACTOR shall comply with all applica- ble Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. CONTRACTOR shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. All damage, injury, or loss to any property referred to in paragraph 6.13.A.2 or 6.13.A.3 caused, directly or indirectly, in whole or in part, by 00700 - General Conditions REV 04-07.doc 00700-23 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926V\dmim\Contract Documents\00700 - General Conditions REV 04-07.doc CONTRACTOR, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of OWNER or ENGINEER or ENGINEER's Consultant, or anyone employed by any of them, or anyone for whose acts any of them may be liable, and not attributable, directly or indirectly, in whole or in part, to the fault or negligence of CONTRACTOR or any Subcontractor, Supplier, or other individual or entity directly or indirectly employed by any of them). CONTRACTOR's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and ENGINEER has issued a notice to OWNER and CONTRACTOR in accordance with paragraph 14.07.13 that the Work is acceptable (except as otherwise expressly provided in connection with Substantial Completion). 6.14 Safety Representative A. CONTRACTOR shall designate a qualified and experienced safety representative at the Site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of safety precautions and programs. 6.15 Hazard Communication Programs A. CONTRACTOR shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged be- tween or among employers at the Site in accordance with Laws or Regulations. 6.16 Emergencies A. In emergencies affecting the safety or protec- tion of persons or the Work or property at the Site or adjacent thereto, CONTRACTOR is obligated to act to prevent threatened damage, injury, or loss. CONTRACTOR shall give ENGINEER prompt written notice if CONTRACTOR believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If ENGINEER determines that a change in the Contract Documents is required be- cause of the action taken by CONTRACTOR in response to such an emergency, a Work Change Directive or Change Order will be issued. 6.17 Shop Drawings and Samples A. CONTRACTOR shall submit Shop Drawings to ENGINEER for review and approval in accordance with the acceptable schedule of Shop Drawings and Sample submittals. All submittals will be identified as ENGINEER may require and in the number of copies specified in the General Requirements. The data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified perfor- mance and design criteria, materials, and similar data to show ENGINEER the services, materials, and equipment CONTRACTOR proposes to provide and to enable ENGINEER to review the information for the limited purposes required by paragraph 6.17.E. B. CONTRACTOR shall also submit Samples to ENGINEER for review and approval in accordance with the acceptable schedule of Shop Drawings and Sample submittals. Each Sample will be identified clearly as to material, Supplier, pertinent data such as catalog numbers, and the use for which intended and otherwise as ENGINEER may require to enable ENGI- NEER to review the submittal for the limited purposes required by paragraph 6.17.E. The numbers of each Sample to be submitted will be as specified in the Specifications. C. Where a Shop Drawing or Sample is required by the Contract Documents or the schedule of Shop Drawings and Sample submittals acceptable to ENGI- NEER as required by paragraph 2.07, any related Work performed prior to ENGINEER's review and approval of the pertinent submittal will be at the sole expense and responsibility of CONTRACTOR. D. Submittal Procedures 1. Before submitting each Shop Drawing or Sample, CONTRACTOR shall have determined and verified: a. all field measurements, quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers, and similar information with respect thereto; b. all materials with respect to intended use, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; c. all information relative to means, methods, techniques, sequences, and procedures of construction and safety 00700 - General Conditions REV 04-07.doc 00700-24 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl -SEE PROD 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc A precautions and programs incident thereto; and d. CONTRACTOR shall also have reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents. 2. Each submittal shall bear a stamp or specific written indication that CONTRACTOR has satisfied CONTRACTOR's obligations under the Contract Documents with respect to CONTRACTOR's review and approval of that submittal. 3. At the time of each submittal, CON- TRACTOR shall give ENGINEER specific written notice of such variations, if any, that the Shop Drawing or Sample submitted may have from the requirements of the Contract Documents, such notice to be in a written com- munication separate from the submittal; and, in addition, shall cause a specific notation to be made on each Shop Drawing and Sample sub- mitted to ENGINEER for review and approval of each such variation. ENGINEER's Review 1. ENGINEER will timely review and approve Shop Drawings and Samples in accordance with the schedule of Shop Drawings and Sample submittals acceptable to ENGINEER. ENGINEER's review and approval will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. ENGINEER's review and approval will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of con- struction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. 3. ENGINEER's review and approval of Shop Drawings or Samples shall not relieve CONTRACTOR from responsibility for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called ENGINEER's attention to each such variation at the time of each submittal as required by paragraph 6.17.D.3 and ENGI- NEER has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample approval; nor will any approval by ENGINEER relieve CON- TRACTOR from responsibility for complying with the requirements of paragraph 6.17.D.1. F. Resubmittal Procedures 1. CONTRACTOR shall make correc- tions required by ENGINEER and shall return the required number of corrected copies of Shop Drawings and submit as required new Samples for review and approval. CON- TRACTOR shall direct specific attention in writing to revisions other than the corrections called for by ENGINEER on previous submittals. 6.18 Continuing the Work A. CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as permitted by paragraph 15.04 or as OWNER and CONTRACTOR may otherwise agree in writing. 6.19 CONTRACTOR's General Warranty and Guarantee A. CONTRACTOR warrants and guarantees to OWNER, ENGINEER, and ENGINEER's Consultants that all Work will be in accordance with the Contract Documents and will not be defective. CONTRACTOR's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than CONTRACTOR, Subcontractors, Suppliers, or any other individual or entity for whom CONTRACTOR is responsible; or 2. normal wear and tear under normal usage. 00700 - General Conditions REV 04-07.doc 00700-25 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 092Mdmim\Contrac1 Documents\00700 - General Conditions REV 04-07.doc B. CONTRACTOR's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of CONTRACTOR's obligation to perform the Work in accordance with the Contract Documents: 1. observations by ENGINEER; 2. recommendation by ENGINEER or payment by OWNER of any progress or final payment; 3. the issuance of a certificate of Sub- stantial Completion by ENGINEER or any payment related thereto by OWNER; 4. use or occupancy of the Work or any part thereof by OWNER; 5. any acceptance by OWNER or any failure to do so; 6. any review and approval of a Shop Drawing or Sample submittal or the issuance of a notice of acceptability by ENGINEER; 7. any inspection, test, or approval by others; or 8. any correction of defective Work by OWNER. 6.20 Indemnification A. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultants, and the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to the performance of the Work, provided that any such claim, cost, loss, or damage: 1. is attributable to bodily injury, sickness, disease, or death, or to injury to or destruction of tangible property (other than the Work itself), including the loss of use resulting therefrom; and 2. is caused in whole or in part by any negligent act or omission of CONTRACTOR, any Subcontractor, any Supplier, or any individual or entity directly or indirectly employed by any of them to perform any of the Work or anyone for whose acts any of them may be liable, regardless of whether or not caused in part by any negligence or omission of an individual or entity indemnified hereunder or whether liability is imposed upon such indemni- fied party by Laws and Regulations regardless of the negligence of any such individual or entity. B. In any and all claims against OWNER or ENGINEER or any of their respective consultants, agents, officers, directors, partners, or employees by any employee (or the survivor or personal representative of such employee) of CONTRACTOR, any Subcontractor, any Supplier, or any individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, the indemnification obligation under paragraph 6.20.A shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for CONTRACTOR or any such Subcontractor, Supplier, or other individual or entity under workers' compen- sation acts, disability benefit acts, or other employee benefit acts. C. The indemnification obligations of COW TRACTOR under paragraph 6.20.A shall not extend to the liability of ENGINEER and ENGINEER's Consultants or to the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them arising out of: 1. the preparation or approval of, or the failure to prepare or approve, maps, Drawings, opinions, reports, surveys, Change Orders, designs, or Specifications; or 2. giving directions or instructions, or failing to give them, if that is the primary cause of the injury or damage. ARTICLE 7 - OTHER WORK 7.01 Related Work at Site A. OWNER may perform other work related to the Project at the Site by OWNER's employees, or let other direct contracts therefor, or have other work 00700 - General Conditions REV 04-07.doc 00700-26 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Con1ract Documents\00700 - General Conditions REV 04-07.doc performed by utility owners. If such other work is not noted in the Contract Documents, then: 1. written notice thereof will be given to CONTRACTOR prior to starting any such other work; and 2. if OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times that should be allowed as a result of such other work, a Claim may be made therefor as provided in paragraph 10.05. B. CONTRACTOR shall afford each other contractor who is a party to such a direct contract and each utility owner (and OWNER, if OWNER is per- forming the other work with OWNER's employees) proper and safe access to the Site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, CONTRACTOR shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. CONTRACTOR shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only cut or alter their work with the written consent of ENGINEER and the others whose work will be affected. The duties and responsibilities of CONTRACTOR under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of CONTRACTOR in said direct contracts between OWNER and such utility owners and other contractors. C. If the proper execution or results of any part of CONTRACTOR's Work depends upon work per- formed by others under this Article 7, CONTRACTOR shall inspect such other work and promptly report to ENGINEER in writing any delays, defects, or deficien- cies in such other work that render it unavailable or unsuitable for the proper execution and results of CONTRACTOR's Work. CONTRACTOR's failure to so report will constitute an acceptance of such other work as fit and proper for integration with CONTRACTOR's Work except for latent defects and deficiencies in such other work. 7.02 Coordination A. If OWNER intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, OWNER shall have sole authority and responsibility for such coordination. ARTICLE 8 - OWNER'S RESPONSIBILITIES 8.01 Communications to Contractor A. Except as otherwise provided in these General Conditions, OWNER shall issue all communi- cations to CONTRACTOR through ENGINEER. 8.02 Replacement of ENGINEER A. In case of termination of the employment of ENGINEER, OWNER shall appoint an engineer to whom CONTRACTOR makes no reasonable objection, whose status under the Contract Documents shall be that of the former ENGINEER. 8.03 Furnish Data A. OWNER shall promptly furnish the data required of OWNER under the Contract Documents. 8.04 Pay Promptly When Due A. OWNER shall make payments to CONTRAC- TOR promptly when they are due as provided in paragraphs 14.02.0 and 14.07.C. 8.05 Lands and Easements; Reports and Tests A. OWNER's duties in respect of providing lands and easements and providing engineering surveys to establish reference points are set forth in paragraphs 00700 - General Conditions REV 04-07.doc 00700-27 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl -SEE PROJ 092Mcin- m\Contract Documents\00700 - General Conditions REV 04-07.doc 4.01 and 4.05. Paragraph 4.02 refers to OWNER's identifying and making available to CONTRACTOR copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by ENGINEER in preparing the Contract Documents. 8.06 Insurance A. OWNER's responsibilities, if any, in respect to purchasing and maintaining liability and property insur- ance are set forth in Article 5. 8.07 Change Orders A. OWNER is obligated to execute Change Orders as indicated in paragraph 10.03. 8.08 Inspections, Tests, and Approvals A. OWNER's responsibility in respect to certain inspections, tests, and approvals is set forth in paragraph 13.03.8. 8.09 Limitations on OWNER's Responsibilities A. The OWNER shall not supervise, direct, or have control or authority over, nor be responsible for, CONTRACTOR's means, methods, techniques, se- quences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the performance of the Work. OWNER will not be responsible for CONTRACTOR's failure to perform the Work in accordance with the Contract Documents. 8.10 Undisclosed Hazardous Environmental Condition A. OWNER's responsibility in respect to an undisclosed Hazardous Environmental Condition is set forth in paragraph 4.06. 8.11 Evidence of Financial Arrangements A. If and to the extent OWNER has agreed to furnish CONTRACTOR reasonable evidence that financial arrangements have been made to satisfy OWNER's obligations under the Contract Documents, OWNER's responsibility in respect thereof will be as set forth in the Supplementary Conditions. ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION 9.01 OWNER'S Representative A. ENGINEER will be OWNER's representative during the construction period. The duties and responsibilities and the limitations of authority of ENGINEER as OWNER's representative during construction are set forth in the Contract Documents and will not be changed without written consent of OWNER and ENGINEER. 9.02 Visits to Site A. ENGINEER will make visits to the Site at intervals appropriate to the various stages of construc- tion as ENGINEER deems necessary in order to observe as an experienced and qualified design professional the progress that has been made and the quality of the various aspects of CONTRACTOR's executed Work. Based on information obtained during such visits and observations, ENGINEER, for the benefit of OWNER, will determine, in general, if the Work is proceeding in accordance with the Con- tract Documents. ENGINEER will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. ENGINEER's efforts will be directed toward providing for OWNER a greater degree of confidence that the completed Work will conform generally to the Contract Documents. On the basis of such visits and observations, ENGINEER will keep OWNER informed of the progress of the Work and will endeavor to guard OWNER against defective Work. B. ENGINEER's visits and observations are subject to all the limitations on ENGINEER's authority and responsibility set forth in paragraph 9.10, and particularly, but without limitation, during or as a result of ENGINEER's visits or observations of CONTRACTOR's Work ENGINEER will not supervise, direct, control, or have authority over or be responsible for CONTRACTOR's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the performance of the Work. 9.03 Project Representative A. If OWNER and ENGINEER agree, ENGI- NEER will furnish a Resident Project Representative to assist ENGINEER in providing more extensive observation of the Work. The responsibilities and 00700 • General Conditions REV 04-07.doc 00700-28 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc authority and limitations thereon of any such Resident Project Representative and assistants will be as provided in paragraph 9.10 and in the Supplementary Conditions. If OWNER designates another represen- tative or agent to represent OWNER at the Site who is not ENGINEER's Consultant, agent or employee, the responsibilities and authority and limitations thereon of such other individual or entity will be as provided in the Supplementary Conditions. 9.04 Clarifications and Interpretations A. ENGINEER will issue with reasonable promptness such written clarifications or interpreta- tions of the requirements of the Contract Documents as ENGINEER may determine necessary, which shall be consistent with the intent of and reasonably inferable from the Contract Documents. Such written clarifications and interpretations will be binding on OWNER and CONTRACTOR. If OWNER and CON- TRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, that should be allowed as a result of a written clarification or interpretation, a Claim may be made therefor as provided in paragraph 10.05. 9.05 Authorized Variations in Work A. ENGINEER may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Times and are compati- ble with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on OWNER and also on CONTRACTOR, who shall perform the Work involved promptly. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, as a result of a Field Order, a Claim may be made therefor as provided in paragraph 10.05. 9.06 Rejecting Defective Work A. ENGINEER will have authority to disapprove or reject Work which ENGINEER believes to be defective, or that ENGINEER believes will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. ENGINEER will also have authority to require special inspection or testing of the Work as provided in paragraph 13.04, whether or not the Work is fabricated, installed, or completed. 9.07 Shop Drawings, Change Orders and Payments A. In connection with ENGINEER's authority as to Shop Drawings and Samples, see paragraph 6.17. B. In connection with ENGINEER's authority as to Change Orders, see Articles 10, 11, and 12. C. In connection with ENGINEER's authority as to Applications for Payment, see Article 14. 9.08 Determinations for Unit Price Work A. ENGINEER will determine the actual quanti- ties and classifications of Unit Price Work performed by CONTRACTOR. ENGINEER will review with CONTRACTOR the ENGINEER's preliminary determinations on such matters before rendering a written decision thereon (by recommendation of an Application for Payment or otherwise). ENGINEER's written decision thereon will be final and binding (except as modified by ENGINEER to reflect changed factual conditions or more accurate data) upon OWNER and CONTRACTOR, subject to the provisions of paragraph 10.05. 9.09 Decisions on Requirements of Contract Documents and Acceptability of Work A. ENGINEER will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. Claims, disputes and other matters relating to the acceptability of the Work, the quantities and classifications of Unit Price Work, the interpretation of the requirements of the Contract Documents pertaining to the performance of the Work, and Claims seeking changes in the Contract Price or Contract Times will be referred initially to ENGINEER in writing, in accordance with the provisions of paragraph 10.05, with a request for a formal decision. B. When functioning as interpreter and judge under this paragraph 9.09, ENGINEER will not show partiality to OWNER or CONTRACTOR and will not be liable in connection with any interpretation or decision rendered in good faith in such capacity. The rendering of a decision by ENGINEER pursuant to this paragraph 9.09 with respect to any such Claim, dispute, or other matter (except any which have been waived by the making or acceptance of final payment as provided in paragraph 14.07) will be a condition precedent to any exercise by OWNER or 00700 - General Conditions REV 04-07.doc 00700-29 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD 0926V1drrim\Contract Documents\00700 - General Conditions REV 04-07.doc CONTRACTOR of such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any such Claim, dispute, or other matter. 9.10 Limitations on ENGINEER's Authority and Responsibilities A. Neither ENGINEER's authority or respon- sibility under this Article 9 or under any other provision of the Contract Documents nor any decision made by ENGINEER in good faith either to exercise or not exercise such authority or responsibility or the undertaking, exercise, or performance of any authority or responsibility by ENGINEER shall create, impose, or give rise to any duty in contract, tort, or otherwise owed by ENGINEER to CONTRACTOR, any Subcon- tractor, any Supplier, any other individual or entity, or to any surety for or employee or agent of any of them. B. ENGINEER will not supervise, direct, control, or have authority over or be responsible for CONTRACTOR's means, methods, techniques, se- quences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the performance of the Work. ENGINEER will not be responsible for CONTRACTOR's failure to perform the Work in accordance with the Contract Documents. C. ENGINEER will not be responsible for the acts or omissions of CONTRACTOR or of any Subcontractor, any Supplier, or of any other individual or entity performing any of the Work. D. ENGINEER's review of the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, Bonds, certificates of inspection, tests and approvals, and other documentation required to be delivered by paragraph 14.07.A will only be to determine generally that their content complies with the requirements of, and in the case of certificates of inspections, tests, and approvals that the results certified indicate compliance with, the Contract Documents. E. The limitations upon authority and responsibil- ity set forth in this paragraph 9.10 shall also apply to ENGINEER's Consultants, Resident Project Repre- sentative, and assistants. ARTICLE 10 - CHANGES IN THE WORK; CLAIMS 10.01 Authorized Changes in the Work A. Without invalidating the Agreement and without notice to any surety, OWNER may, at any time or from time to time, order additions, deletions, or revisions in the Work by a Written Amendment, a Change Order, or a Work Change Directive. Upon receipt of any such document, CONTRACTOR shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). B. If OWNER and CONTRACTOR are unable to agree on entitlement to, or on the amount or extent, if any, of an adjustment in the Contract Price or Contract Times, or both, that should be allowed as a result of a Work Change Directive, a Claim may be made therefor as provided in paragraph 10.05. 10.02 Unauthorized Changes in the Work A. CONTRACTOR shall not be entitled to an increase in the Contract Price or an extension of the Contract Times with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in paragraph 3.04, except in the case of an emergency as provided in paragraph 6.16 or in the case of uncovering Work as provided in paragraph 13.04.B. 10.03 Execution of Change Orders A. OWNER and CONTRACTOR shall execute appropriate Change Orders recommended by ENGI- NEER (or Written Amendments) covering: 1. changes in the Work which are: (i) ordered by OWNER pursuant to paragraph 10.01.A, (ii) required because of acceptance of defective Work under paragraph 13.08.A or OWNER's correction of defective Work under paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Times which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed in accordance with a Work Change Directive; and 3. changes in the Contract Price or Contract Times which embody the substance of any written decision rendered by ENGINEER 00700 - General Conditions REV 04-07.doc 00700-30 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\00700 - General Conditions REV 04-07.doc pursuant to paragraph 10.05; provided that, in lieu of executing any such Change Order, an appeal may be taken from any such decision in accordance with the provisions of the Contract Documents and applicable Laws and Regula- tions, but during any such appeal, CONTRACTOR shall carry on the Work and adhere to the progress schedule as provided in paragraph 6.18.A. 10.04 Notification to Surety A. If notice of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Times) is required by the provisions of any Bond to be given to a surety, the giving of any such notice will be CONTRACTOR's responsibility. The amount of each applicable Bond will be adjusted to reflect the effect of any such change. 10.05 Claims and Disputes A. Notice: Written notice stating the general nature of each Claim, dispute, or other matter shall be delivered by the claimant to ENGINEER and the other party to the Contract promptly (but in no event later than 30 days) after the start of the event giving rise thereto. Notice of the amount or extent of the Claim, dispute, or other matter with supporting data shall be delivered to the ENGINEER and the other party to the Contract within 60 days after the start of such event (unless ENGINEER allows additional time for claimant to submit additional or more accurate data in support of such Claim, dispute, or other matter). A Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of paragraph 12.01.13. A Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of paragraph 12.02.B. Each Claim shall be accom- panied by claimant's written statement that the adjust- ment claimed is the entire adjustment to which the claimant believes it is entitled as a result of said event. The opposing party shall submit any response to ENGINEER and the claimant within 30 days after receipt of the claimant's last submittal (unless ENGINEER allows additional time). B. ENGINEER's Decision: ENGINEER will render a formal decision in writing within 30 days after receipt of the last submittal of the claimant or the last submittal of the opposing party, if any. ENGINEER's written decision on such Claim, dispute, or other matter will be final and binding upon OWNER and CONTRACTOR unless: 1. an appeal from ENGINEER's decision is taken within the time limits and in accordance with the dispute resolution procedures set forth in Article 16; or 2. if no such dispute resolution procedures have been set forth in Article 16, a written notice of intention to appeal from ENGINEER's written decision is delivered by OWNER or CONTRACTOR to the other and to ENGINEER within 30 days after the date of such decision, and a formal proceeding is instituted by the appealing party in a forum of competent jurisdiction within 60 days after the date of such decision or within 60 days after Substantial Completion, whichever is later (unless otherwise agreed in writing by OWNER and CONTRACTOR), to exercise such rights or remedies as the appealing party may have with respect to such Claim, dispute, or other matter in accordance with applicable Laws and Regulations. C. If ENGINEER does not render a formal decision in writing within the time stated in paragraph 10.05.8, a decision denying the Claim in its entirety shall be deemed to have been issued 31 days after receipt of the last submittal of the claimant or the last submittal of the opposing party, if any. D. No Claim for an adjustment in Contract Price or Contract Times (or Milestones) will be valid if not submitted in accordance with this paragraph 10.05. ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK 11.01 Cost of the Work A. Costs Included: The term Cost of the Work means the sum of all costs necessarily incurred and paid by CONTRACTOR in the proper performance of the Work. When the value of any Work covered by a Change Order or when a Claim for an adjustment in Contract Price is determined on the basis of Cost of the Work, the costs to be reimbursed to CONTRACTOR will be only those additional or incremental costs required because of the change in the Work or because of the event giving rise to the Claim. Except as otherwise may be agreed to in writing by OWNER, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items, and shall not include any of the costs itemized in para- graph 11.01.13. 00700 - General Conditions REV 04-07.doc 00700-31 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc 2. Cost of all materials and equipment furnished and incorporated in the Work, includ- ing costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. All cash discounts shall accrue to CONTRACTOR unless OWNER deposits funds with CONTRACTOR with which to make payments, in which case the cash discounts shall accrue to OWNER. All trade discounts, rebates and refunds and returns from sale of surplus materials and equipment shall accrue to OWNER, and CONTRACTOR shall make provisions so that they may be obtained. 3. Payments made by CONTRACTOR to Subcontractors for Work performed by Subcontractors. If required by OWNER, CON- TRACTOR shall obtain competitive bids from subcontractors acceptable to OWNER and CONTRACTOR and shall deliver such bids to OWNER, who will then determine, with the advice of ENGINEER, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as CONTRACTOR's Cost of the Work and fee as provided in this para- graph 11.01. 4. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 5. Supplemental costs including the following: a. The proportion of necessary trans- portation, travel, and subsistence expenses of CONTRACTOR's employees incurred in dis- charge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equip- ment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not con- sumed which remain the property of CON- TRACTOR. C. Rentals of all construction equip- ment and machinery, and the parts thereof whether rented from CONTRACTOR or others in accordance with rental agreements approved by OWNER with the advice of ENGINEER, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. d. Sales, consumer, use, and other similar taxes related to the Work, and for which CONTRACTOR is liable, imposed by Laws and Regulations. e . Deposits lost for causes other than negligence of CONTRACTOR, any Sub- contractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. f. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sus- tained by CONTRACTOR in connection with the performance of the Work (except losses and damages within the deductible amounts of property insurance established in accordance with paragraph 5.06.D), provided such losses and damages have resulted from causes other than the negligence of CONTRACTOR, any Subcontractor, or anyone directly or indirectly 00700 - General Conditions REV 04-07.doc 00700-32 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmlm\Contract Documents\00700 - General Conditions REV 04-07.doc employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of OWNER. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining CONTRACTOR's fee. g. The cost of utilities, fuel, and sanitary facilities at the Site. h. Minor expenses such as telegrams, long distance telephone calls, telephone service at the Site, expressage, and similar petty cash items in connection with the Work. L When the Cost of the Work is used to determine the value of a Change Order or of a Claim, the cost of premiums for additional Bonds and insurance required because of the changes in the Work or caused by the event giving rise to the Claim. j. When all the Work is performed on the basis of cost-plus, the costs of premiums for all Bonds and insurance CONTRACTOR is required by the Contract Documents to purchase and maintain. B. Costs Excluded. The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of CONTRACTOR's officers, executives, princi- pals (of partnerships and sole proprietorships), general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by CONTRACTOR, whether at the Site or in CONTRACTOR's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in paragraph 11.01.A.1 or specifically covered by paragraph 11.01.A.4, all of which are to be considered administrative costs covered by the CONTRACTOR's fee. 2. Expenses of CONTRACTOR's princi- pal and branch offices other than CONTRACTOR's office at the Site. 3. Any part of CONTRACTOR's capital expenses, including interest on CONTRACTOR's capital employed for the Work and charges against CONTRACTOR for delinquent payments. 4. Costs due to the negligence of CON- TRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind and the costs of any item not specifically and expressly included in paragraphs 11.01.A and 11.01.13. C. CONTRACTOR's Fee: When all the Work is performed on the basis of cost-plus, CONTRACTOR's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order or when a Claim for an adjustment in Contract Price is determined on the basis of Cost of the Work, CONTRACTOR's fee shall be determined as set forth in paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to paragraphs 11.01.A and 11.01.13, CONTRACTOR will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to ENGINEER an itemized cost breakdown together with supporting data. 11.02 Cash Allowances A. It is understood that CONTRACTOR has in- cluded in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums as may be acceptable to OWNER and ENGINEER. CONTRACTOR agrees that: 1. the allowances include the cost to CONTRACTOR (less any applicable trade discounts) of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and 2. CONTRACTOR's costs for unloading and handling on the Site, labor, installation costs, overhead, profit, and other expenses contemplated for the allowances have been included in the Contract Price and not in the allowances, and no demand for additional 00700 - General Conditions REV 04-07.doc 00700-33 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc payment on account of any of the foregoing will ARTICLE 12 - CHANGE OF CONTRACT PRICE; be valid. CHANGE OF CONTRACT TIMES B. Prior to final payment, an appropriate Change Order will be issued as recommended by ENGINEER to reflect actual amounts due CONTRACTOR on account of Work covered by allowances, and the Con- tract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. The estimated quantities of items of Unit Price Work are not guaran- teed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Deter- minations of the actual quantities and classifications of Unit Price Work performed by CONTRACTOR will be made by ENGINEER subject to the provisions of paragraph 9.08. B. Each unit price will be deemed to include an amount considered by CONTRACTOR to be ade- quate to cover CONTRACTOR's overhead and profit for each separately identified item. C. OWNER or CONTRACTOR may make a Claim for an adjustment in the Contract Price in accor- dance with paragraph 10.05 if: 1. the quantity of any item of Unit Price Work performed by CONTRACTOR differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect any other item of Work; and 3. if CONTRACTOR believes that CONTRACTOR is entitled to an increase in Contract Price as a result of having incurred additional expense or OWNER believes that OWNER is entitled to a decrease in Contract Price and the parties are unable to agree as to the amount of any such increase or decrease. 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order or by a Written Amendment. Any Claim for an adjustment in the Contract Price shall be based on written notice submitted by the party making the Claim to the ENGINEER and the other party to the Contract in accordance with the provisions of para- graph 10.05. B. The value of any Work covered by a Change Order or of any Claim for an adjustment in the Contract Price will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of paragraph 11.03 ); or 2. where the Work involved is not cov- ered by unit prices contained in the Contract Documents, by a mutually agreed lump sum (which may include an allowance for overhead and profit not necessarily in accordance with paragraph 12.01.C.2); or 3. where the Work involved is not cov- ered by unit prices contained in the Contract Documents and agreement to a lump sum is not reached under paragraph 12.01.13.2, on the basis of the Cost of the Work (determined as provided in paragraph 11.01) plus a CONTRACTOR's fee for overhead and profit (determined as provided in paragraph 12.01.C). C. CONTRACTOR's Fee: The CONTRACTOR's fee for overhead and profit shall be determined as follows: a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under para- graphs 11.01.A.1 and 11.01.A.2, the CONTRACTOR's fee shall be 15 percent; b. for costs incurred under paragraph 11.01.A.3, the CONTRACTOR's fee shall be five percent; 00700 - General Conditions REV 04-07.doc 00700-34 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926V\dmim\Contract Documents\00700 - General Conditions REV 04-07.doc c. where one or more tiers of subcon- tracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of paragraph 12.01.C.2.a is that the Subcontractor who actually performs the Work, at whatever tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under paragraphs 11.01.A.1 and 11.01.A.2 and that any higher tier Subcontractor and CONTRACTOR will each be paid a fee of five percent of the amount paid to the next lower tier Subcon- tractor; d. no fee shall be payable on the basis of costs itemized under paragraphs 11.01.A.4, 11.01.A.5, and 11.01.13; e. the amount of credit to be allowed by CONTRACTOR to OWNER for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in CONTRACTOR's fee by an amount equal to five percent of such net decrease; and f. when both additions and credits are involved in any one change, the adjustment in CONTRACTOR's fee shall be computed on the basis of the net change in accordance with paragraphs 12.01.C.2.a through 12.01.C.2.e, inclusive. 12.02 Change of Contract Times A. The Contract Times (or Milestones) may only be changed by a Change Order or by a Written Amendment. Any Claim for an adjustment in the Contract Times (or Milestones) shall be based on written notice submitted by the party making the claim to the ENGINEER and the other party to the Contract in accordance with the provisions of paragraph 10.05. B. Any adjustment of the Contract Times (or Milestones) covered by a Change Order or of any Claim for an adjustment in the Contract Times (or Milestones) will be determined in accordance with the provisions of this Article 12. 12.03 Delays Beyond CONTRACTOR's Control A. Where CONTRACTOR is prevented from completing any part of the Work within the Contract Times (or Milestones) due to delay beyond the control of CONTRACTOR, the Contract Times (or Milestones) will be extended in an amount equal to the time lost due to such delay if a Claim is made therefor as provided in paragraph 12.02.A. Delays beyond the control of CONTRACTOR shall include, but not be limited to, acts or neglect by OWNER, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. 12.04 Delays Within CONTRACTOR's Control A. The Contract Times (or Milestones) will not be extended due to delays within the control of CONTRACTOR. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of CONTRAC- TOR. 12.05 Delays Beyond OWNER's and CONTRACTOR's Control A. Where CONTRACTOR is prevented from completing any part of the Work within the Contract Times (or Milestones) due to delay beyond the control of both OWNER and CONTRACTOR, an extension of the Contract Times (or Milestones) in an amount equal to the time lost due to such delay shall be CONTRACTOR's sole and exclusive remedy for such delay. 12.06 Delay Damages A. In no event shall OWNER or ENGINEER be liable to CONTRACTOR, any Subcontractor, any Supplier, or any other person or organization, or to any surety for or employee or agent of any of them, for damages arising out of or resulting from: 1. delays caused by or within the control of CONTRACTOR; or 2. delays beyond the control of both OWNER and CONTRACTOR including but not limited to fires, floods, epidemics, abnormal weather conditions, acts of God, or acts or neglect by utility owners or other contractors performing other work as contemplated by Article 7. B. Nothing in this paragraph 12.06 bars a change in Contract Price pursuant to this Article 12 to compensate CONTRACTOR due to delay, interference, or disruption directly attributable to actions or inactions of OWNER or anyone for whom OWNER is responsible. 00700 - General Conditions REV 04-07.doc 00700-35 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926 Admim\Contract Documents\00700 - General Conditions REV 04-07.doc ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects A. Prompt notice of all defective Work of which OWNER or ENGINEER has actual knowledge will be given to CONTRACTOR. All defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work A. OWNER, ENGINEER, ENGINEER's Con- sultants, other representatives and personnel of OWNER, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspecting, and testing. CONTRACTOR shall provide them proper and safe conditions for such access and advise them of CONTRACTOR's Site safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. CONTRACTOR shall give ENGINEER timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. MWIMM.r= NX -Mr -NMR. LAI-- - C. If Laws or Regulations of any public body having jurisdiction require any Work (or part thereof) specifically to be inspected, tested, or approved by an employee or other representative of such public body, CONTRACTOR shall assume full responsibility for arranging and obtaining such inspections, tests, or approvals, pay all costs in connection therewith, and furnish ENGINEER the required certificates of inspec- tion or approval. D. CONTRACTOR shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, or approvals required for OWNER's and ENGINEER's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to CONTRACTOR's purchase thereof for incorporation in the Work. Such inspections, tests, or approvals shall be performed by organizations acceptable to OWNER and ENGINEER. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by CON- TRACTOR without written concurrence of ENGI- NEER, it must, if requested by ENGINEER, be uncov- ered for observation. F. Uncovering Work as provided in paragraph 13.03.E shall be at CONTRACTOR's expense unless CONTRACTOR has given ENGINEER timely notice of CONTRACTOR's intention to cover the same and ENGINEER has not acted with reasonable prompt- ness in response to such notice. 13.04 Uncovering Work A. If any Work is covered contrary to the written request of ENGINEER, it must, if requested by ENGI- NEER, be uncovered for ENGINEER's observation and replaced at CONTRACTOR's expense. B. If ENGINEER considers it necessary or advisable that covered Work be observed by ENGI- NEER or inspected or tested by others, CONTRAC- TOR, at ENGINEER's request, shall uncover, expose, or otherwise make available for observation, inspec- tion, or testing as ENGINEER may require, that portion of the Work in question, furnishing all neces- sary labor, material, and equipment. If it is found that such Work is defective, CONTRACTOR shall pay all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observa- tion, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); and OWNER shall be entitled to an appropriate decrease in the Contract Price. If the parties are unable to agree as to the amount thereof, 00700 - General Conditions REV 04-07.doc 00700-36 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl -SEE PROJ 0926VAdmim\Contract Documents\00700 - General Conditions REV 04-07.doc OWNER may make a Claim therefor as provided in paragraph 10.05. If, however, such Work is not found to be defective, CONTRACTOR shall be allowed an increase in the Contract Price or an extension of the Contract Times (or Milestones), or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. If the parties are unable to agree as to the amount or extent thereof, CONTRACTOR may make a Claim therefor as provided in paragraph 10.05. 13.05 OWNER May Stop the Work 13.06 Correction or Removal of Defective Work A. CONTRACTOR shall correct all defective Work, whether or not fabricated, installed, or completed, or, if the Work has been rejected by ENGI- NEER, remove it from the Project and replace it with Work that is not defective. CONTRACTOR shall pay all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). 13.07 Correction Period A. If within one year after the date of Final Acceptance or such longer period of time as may be prescribed by Laws or Regulations or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, any Work is found to be defective, or if the repair of any damages to the land or areas made available for CONTRACTOR's use by OWNER or permitted by Laws and Regulations as contemplated in paragraph 6.11.A is found to be defective, CONTRACTOR shall promptly, without cost to OWNER and in accordance with OWNER's written instructions: (i) repair such defective land or areas, or (ii) correct such defective Work or, if the defective Work has been rejected by OWNER, remove it from the Project and replace it with Work that is not defective, and (iii) satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting there- from. If CONTRACTOR does not promptly comply with the terms of such instructions, or in an emergency where delay would cause serious risk of loss or damage, OWNER may have the defective Work corrected or repaired or may have the rejected Work removed and replaced, and all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by CONTRACTOR. B. In special circumstances where a particular item of equipment is placed in continuous service before Substantial Completion of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Specifications or by Written Amendment. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this paragraph 13.07, the correction period hereunder with respect to such Work will be extended for an additional period of one year after such correction or removal and replacement has been satisfactorily completed. D. CONTRACTOR's obligations under this paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this paragraph 13.07 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work A. If, instead of requiring correction or removal and replacement of defective Work, OWNER (and, prior to ENGINEER's recommendation of final pay- ment, ENGINEER) prefers to accept it, OWNER may do so. CONTRACTOR shall pay all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) attributable to OWNER's evaluation of and determination to accept such defective Work (such costs to be approved by 00700 - General Conditions REV 04-07.doc 00700-37 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 092MAdmim\Contract Documents\00700 - General Conditions REV 04-07.doc ENGINEER as to reasonableness) and the diminished value of the Work to the extent not otherwise paid by CONTRACTOR pursuant to this sentence. If any such acceptance occurs prior to ENGINEER's recom- mendation of final payment, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and OWNER shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. If the parties are unable to agree as to the amount thereof, OWNER may make a Claim therefor as provided in paragraph 10.05. If the acceptance occurs after such recommendation, an appropriate amount will be paid by CONTRACTOR to OWNER. 13.09 OWNER May Correct Defective Work A. If CONTRACTOR fails within a reasonable time after written notice from ENGINEER to correct defective Work or to remove and replace rejected Work as required by ENGINEER in accordance with paragraph 13.06.A, or if CONTRACTOR fails to perform the Work in accordance with the Contract Documents, or if CONTRACTOR fails to comply with any other provision of the Contract Documents, OWNER may, after seven days written notice to CONTRACTOR, correct and remedy any such deficiency. B. In exercising the rights and remedies under this paragraph, OWNER shall proceed expeditiously. In connection with such corrective and remedial action, OWNER may exclude CONTRACTOR from all or part of the Site, take possession of all or part of the Work and suspend CONTRACTOR's services related thereto, take possession of CONTRACTOR's tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for which OWNER has paid CONTRACTOR but which are stored elsewhere. CONTRACTOR shall allow OWNER, OWNER's representatives, agents and employees, OWNER's other contractors, and ENGINEER and ENGINEER's Consultants access to the Site to enable OWNER to exercise the rights and remedies under this paragraph. C. All Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred or sustained by OWNER in exercising the rights and remedies under this paragraph 13.09 will be charged against CON- TRACTOR, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and OWNER shall be entitled to an appropriate decrease in the Contract Price. If the parties are unable to agree as to the amount of the adjustment, OWNER may make a Claim therefor as provided in paragraph 10.05. Such claims, costs, losses and damages will include but not be limited to all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of CONTRACTOR's defective Work. D. CONTRACTOR shall not be allowed an extension of the Contract Times (or Milestones) because of any delay in the performance of the Work attributable to the exercise by OWNER of OWNER's rights and remedies under this paragraph 13.09. ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values A. The schedule of values established as provid- ed in paragraph 2.07.A will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to ENGI- NEER. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments 1. At least 20 days before the date established for each progress payment (but not more often than once a month), CONTRACTOR shall submit to ENGINEER for review an Application for Payment filled out and signed by CONTRACTOR covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that OWNER has received the materials and equip- ment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect OWNER's interest 00700 - General Conditions REV 04-07.doc 00700-38 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc therein, all of which must be satisfactory to OWNER. 2. Beginning with the second Application for Payment, each Application shall include an affidavit of CONTRACTOR stating that all previous progress payments received on account of the Work have been applied on account to discharge CONTRACTOR's legitimate obligations associated with prior Applications for Payment. 3. The amount of retainage with respect to progress payments will be as stipulated in the Agreement. B. Review of Applications 1. ENGINEER will, within 10 days after receipt of each Application for Payment, either indicate in writing a recommendation of payment and present the Application to OWNER or return the Application to CONTRACTOR indicating in writing ENGINEER's reasons for refusing to recommend payment. In the latter case, CON- TRACTOR may make the necessary corrections and resubmit the Application. 2. ENGINEER's recommendation of any payment requested in an Application for Payment will constitute a representation by ENGINEER to OWNER, based on ENGINEER's observations on the Site of the executed Work as an experienced and qualified design professional and on ENGINEER's review of the Application for Payment and the accompanying data and schedules, that to the best of ENGINEER's knowledge, information and belief: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents, to a final determination of quantities and classifications for Unit Price Work under paragraph 9.08, and to any other qualifications stated in the recommendation); and c. The conditions precedent to CONTRACTOR's being entitled to such payment appear to have been fulfilled in so far as it is ENGINEER's responsibility to observe the Work. 3. By recommending any such payment ENGINEER will not thereby be deemed to have represented that: (i) inspec- tions made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsi- bilities specifically assigned to ENGINEER in the Contract Documents; or (ii) that there may not be other matters or issues between the parties that might entitle CONTRACTOR to be paid additionally by OWNER or entitle OWNER to withhold payment to CONTRACTOR. 4. Neither ENGINEER's review of CONTRACTOR's Work for the purposes of recommending payments nor ENGINEER's recommendation of any payment, including final payment, will impose responsibility on ENGINEER to supervise, direct, or control the Work or for the means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for CONTRACTOR's failure to comply with Laws and Regulations applicable to CONTRACTOR's performance of the Work. Additionally, said review or recommendation will not impose responsibility on ENGINEER to make any examination to ascertain how or for what purposes CONTRACTOR has used the moneys paid on account of the Contract Price, or to determine that title to any of the Work, materials, or equipment has passed to OWNER free and clear of any Liens. 5. ENGINEER may refuse to recom- mend the whole or any part of any payment if, in ENGINEER's opinion, it would be incorrect to make the representations to OWNER referred to in paragraph 14.02.13.2. ENGINEER may also refuse to recommend any such payment or, because of subsequently discovered evidence or the results of subsequent inspections or tests, revise or revoke any such payment recommendation previously made, to such extent as may be necessary in ENGINEER's opinion to protect OWNER from loss because: 00700 - General Conditions REV 04-07.doc 00700-39 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD 0926Wdrrtim\Contract Documents\00700 - General Conditions REV 04-07.doc a. the Work is defective, or completed Work has been damaged, requiring correction or replacement; b. the Contract Price has been reduced by Written Amendment or Change Orders; c. OWNER has been required to correct defective Work or complete Work in accor- dance with paragraph 13.09; or d CAIGINIPER has arfi,al kRGWledge of ated !R paFagraph 15.02.A. C. Payment Becomes Due D. Reduction in Payment 1. OWNER may refuse to make payment of the full amount recommended by ENGINEER because: a. claims have been made against OWNER on account of CONTRACTOR's performance or furnishing of the Work; b. Liens have been filed in connection with the Work, except where CONTRACTOR has delivered a specific Bond satisfactory to OWNER to secure the satisfaction and discharge of such Liens; c. there are other items entitling OWN- ER to a set-off against the amount recommended; or d. OWNER has actual knowledge of the occurrence of any of the events enumerated in paragraphs 14.02.B.5.a through 14.02.B.5.c or paragraph 15.02.A. 2. If OWNER refuses to make payment of the full amount recommended by ENGINEER, OWNER must give CONTRACTOR immediate written notice (with a copy to ENGINEER) stating the reasons for such action and promptly pay CONTRACTOR any amount remaining after deduction of the amount so withheld. OWNER shall promptly pay CONTRACTOR the amount so withheld, or any adjustment thereto agreed to by OWNER and CONTRACTOR, when CONTRACTOR corrects to OWNER's satisfaction the reasons for such action. 3. If it is subsequently determined that OWNER's refusal of payment was not justified, the amount wrongfully withheld shall be treated as an amount due as determined by paragraph 14.02.C.1. 14.03 CONTRACTOR's Warranty of Title A. CONTRACTOR warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to OWNER no later than the time of payment free and clear of all Liens. 14.04 Substantial Completion A. When CONTRACTOR considers the entire Work ready for its intended use CONTRACTOR shall notify OWNER and ENGINEER in writing that the entire Work is substantially complete (except for items specifically listed by CONTRACTOR as incomplete) and request that ENGINEER issue a certificate of Substantial Completion. Promptly thereafter, OWNER, CONTRACTOR, and ENGINEER shall make an inspection of the Work to determine the status of completion. If ENGINEER does not consider the Work substantially complete, ENGINEER will notify CONTRACTOR in writing giving the reasons therefore. If €NGINE€R—sensideKs the WArk Will prepare - Completion WhiGh shall fix the d-a-te- of &AbstaRtial -before- final payment. OWNER shall have selfen days mane iuri#Fon nhiertinn to ENGINEER as to any 1_19-1111g s„rh ehiertinns ENGINEER rnnrl„rles that the Werk is pat 611hiStARtially seMplete-, FNICMIFFR will within 14 mays after s„bmissinn of the iR writing, stating the reasarnstrerefer. If, after oonsideratien of CANN€R's ObjeetaerIG, ENGIN substantially €N SIN€€R��vill�wthirl said 14 days ever„te ad- n as ENGINEER EER believes justified after rrnsirleratinn of 00700 - General Conditions REV 04-07.doc 00700-40 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc B. OWNER shall have the right to exclude CONTRACTOR from the Site after the date of Substantial Completion, but OWNER shall allow CON- TRACTOR reasonable access to complete or correct items on the tentative list. 14.05 Partial Utilization A. Use by OWNER at OWNER's option of any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which OWNER, ENGINEER, and CONTRACTOR agree constitutes a separately functioning and usable part of the Work that can be used by OWNER for its intended purpose without significant interference with CONTRACTOR's performance of the remainder of the Work, may be accomplished prior to Substantial Completion of all the Work subject to the following conditions. 1. OWNER at any time may request CONTRACTOR in writing to permit OWNER to use any such part of the Work which OWNER believes to be ready for its intended use and substantially complete. If CONTRACTOR agrees that such part of the Work is substantially complete, CONTRACTOR will certify to OWNER and ENGINEER that such part of the Work is substantially complete and request ENGINEER to issue a certificate of Substantial Completion for that part of the Work. CONTRACTOR at any time may notify OWNER and ENGINEER in writing that CONTRACTOR considers any such part of the Work ready for its intended use and substan- tially complete and request ENGINEER to issue a certificate of Substantial Completion for that part of the Work. Within a reasonable time after either such request, OWNER, CONTRACTOR, and ENGINEER shall make an inspection of that part of the Work to determine its status of completion. If ENGINEER does not consider that part of the Work to be substantially complete, ENGINEER will notify OWNER and CONTRACTOR in writing giving the reasons therefor. If ENGINEER considers that part of the Work to be substantially complete, the provisions of paragraph 14.04 will apply with respect to certification of Substantial Completion of that part of the Work and the division of responsibility in respect thereof and access thereto. 2. No occupancy or separate operation of part of the Work may occur prior to compliance with the requirements of paragraph 5.10 regarding property insurance. 14.06 Final Inspection A. Upon written notice from CONTRACTOR that the entire Work or an agreed portion thereof is complete, ENGINEER will promptly make a final inspection with OWNER and CONTRACTOR and will notify CONTRACTOR in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. CONTRACTOR shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 14.07 Final Payment A. Application for Payment 1. After CONTRACTOR has, in the opinion of ENGINEER, satisfactorily completed all corrections identified during the final inspection and has delivered, in accordance with the Contract Documents, all maintenance and operating instructions, schedules, guaran- tees, Bonds, certificates or other evidence of insurance certificates of inspection, marked -up record documents (as provided in paragraph 6.12), and other documents, CONTRACTOR may make application for final payment follow- ing the procedure for progress payments. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: (i) all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by subparagraph 5.04.6.7; (ii) consent of the surety, if any, to final payment; and (iii) complete and legally effective releases or waivers (satisfactory to OWNER) of all Lien 00700 - General Conditions REV 04-07.doc 00700-41 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc rights arising out of or Liens filed in connection with the Work. 3. In lieu of the releases or waivers of Liens specified in paragraph 14.07.A.2 and as approved by OWNER, CONTRACTOR may furnish receipts or releases in full and an affidavit of CONTRACTOR that: (i) the releases and receipts include all labor, services, material, and equipment for which a Lien could be filed; and (ii) all payrolls, material and equipment bills, and other indebtedness connected with the Work for which OWNER or OWNER's property might in any way be responsible have been paid or otherwise satis- fied. If any Subcontractor or Supplier fails to furnish such a release or receipt in full, CON- TRACTOR may furnish a Bond or other collateral satisfactory to OWNER to indemnify OWNER against any Lien. B. Review of Application and Acceptance 1. If, on the basis of ENGINEER's observation of the Work during construction and final inspection, and ENGINEER's review of the final Application for Payment and accompanying documentation as required by the Contract Documents, ENGINEER is satisfied that the Work has been completed and CONTRACTOR's other obligations under the Contract Documents have been fulfilled, ENGINEER will, within ten days after receipt of the final Application for Payment, indicate in writing ENGINEER's recommendation of payment and present the Application for Payment to OWNER for payment. At the same time ENGINEER will also give written notice to OWNER and CONTRACTOR that the Work is acceptable subject to the provisions of paragraph 14.09. Otherwise, ENGINEER will return the Application for Payment to CONTRACTOR, indicating in writing the reasons for refusing to recommend final payment, in which case CONTRACTOR shall make the necessary corrections and resubmit the Application for Payment. C. Payment Becomes Due 14.08 Final Completion Delayed A. If, through no fault of CONTRACTOR, final completion of the Work is significantly delayed, and if ENGINEER so confirms, OWNER shall, upon receipt of CONTRACTOR's final Application for Payment and recommendation of ENGINEER, and without terminat- ing the Agreement, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by OWNER for Work not fully completed or corrected is less than the retainage stipulated in the Agreement, and if Bonds have been furnished as required in paragraph 5.01, the written consent of the surety to the payment of the balance due for that portion of the Work fully completed and accepted shall be submitted by CONTRACTOR to ENGINEER with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Claims. 14.09 Waiver of Claims A. The making and acceptance of final payment will constitute: 1. a waiver of all Claims by OWNER against CONTRACTOR, except Claims arising from unsettled Liens, from defective Work appearing after final inspection pursuant to paragraph 14.06, from failure to comply with the Contract Documents or the terms of any special guarantees specified therein, or from CONTRACTOR's continuing obligations under the Contract Documents; and 2. a waiver of all Claims by CONTRAC- TOR against OWNER other than those previously made in writing which are still unsettled. ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION 15.01 OWNER May Suspend Work A. At any time and without cause, OWNER may suspend the Work or any portion thereof for a period of not more than 90 consecutive days by notice in writing to CONTRACTOR and ENGINEER which will fix the date on which Work will be resumed. CON- TRACTOR shall resume the Work on the date so fixed. e Q Atror# Drino nr on ov#oncinn of #ho ('nn#r+n# 00700 - General Conditions REV 04-07.doc 00700-42 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl -SEE PROJ 0926\Admim\Contract Documents\00700 - General Conditions REV 04-07.doc 15.02 OWNER May Terminate for Cause A. The occurrence of any one or more of the following events will justify termination for cause: 1. CONTRACTOR's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment or failure to adhere to the progress schedule established under paragraph 2.07 as adjusted from time to time pursuant to paragraph 6.04); 2. CONTRACTOR's disregard of Laws or Regulations of any public body having jurisdiction; 3. CONTRACTOR's disregard of the authority of ENGINEER; or 4. CONTRACTOR's violation in any substantial way of any provisions of the Contract Documents. B. If one or more of the events identified in paragraph 15.02.A occur, OWNER may, after giving CONTRACTOR (and the surety, if any) seven days written notice, terminate the services of CONTRACTOR, exclude CONTRACTOR from the Site, and take possession of the Work and of all CONTRACTOR's tools, appliances, construction equipment, and machinery at the Site, and use the same to the full extent they could be used by CONTRACTOR (without liability to CONTRACTOR for trespass or conversion), incorporate in the Work all materials and equipment stored at the Site or for which OWNER has paid CONTRACTOR but which are stored elsewhere, and finish the Work as OWNER may deem expedient. In such case, CONTRACTOR shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by OWNER arising out of or relating to completing the Work, such excess will be paid to CONTRACTOR. If such claims, costs, losses, and damages exceed such unpaid balance, CONTRACTOR shall pay the difference to OWNER. Such claims, costs, losses, and damages incurred by OWNER will be reviewed by ENGINEER as to their reasonableness and, when so approved by ENGINEER, incorporated in a Change Order. When exercising any rights or remedies under this paragraph OWNER shall not be required to obtain the lowest price for the Work performed. C. Where CONTRACTOR's services have been so terminated by OWNER, the termination will not affect any rights or remedies of OWNER against CONTRACTOR then existing or which may thereafter accrue. Any retention or payment of moneys due CONTRACTOR by OWNER will not release CON- TRACTOR from liability. 15.03 OWNER May Terminate For Convenience A. Upon seven days written notice to CON- TRACTOR and ENGINEER, OWNER may, without cause and without prejudice to any other right or remedy of OWNER, elect to terminate the Contract. In such case, CONTRACTOR shall be paid (without duplication of any items): 1. for completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. for expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; 3. for all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) in- curred in settlement of terminated contracts with Subcontractors, Suppliers, and others; and 4. for reasonable expenses directly attributable to termination. B. CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other eco- nomic loss arising out of or resulting from such termination. 15.04 CONTRACTOR May Stop Work or Terminate 00700 - General Conditions REV 04-07.doc 00700-43 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Adrrim\Contract Documents\00700 - General Conditions REV 04-07.doc A. If, through no act or fault of CONTRACTOR, the Work is suspended for more than 90 consecutive days by OWNER or under an order of court or other public authority, or ENGINEER fails to act on any Application for Payment within 30 days after it is submitted, e due, then CONTRACTOR may, upon seven days written notice to OWNER and ENGINEER, and provided OWNER or ENGINEER do not remedy such suspension or failure within that time, terminate the Contract and recover from OWNER payment on the same terms as provided in paragraph 15.03. In lieu of terminating the Contract and without prejudice to any other right or remedy, if ENGINEER has failed to act on an Application for Payment within 30 days after it is submitted, er Q_�.NNIER has failed fe-F 30 days to pay CONTRACTOR may, seven days after written notice to OWNER and ENGINEER, stop the Work until payment is made of all such amounts due CONTRACTOR, including interest thereon. The provisions of this paragraph 15.04 are not intended to preclude CONTRACTOR from making a Claim under paragraph 10.05 for an adjustment in Contract Price or Contract Times or otherwise for expenses or damage directly attributable to CONTRACTOR's stopping the Work as permitted by this paragraph. ARTICLE 16 - DISPUTE RESOLUTION 16.01 Methods and Procedures A. Dispute resolution methods and procedures, if any, shall be as set forth in the Supplementary Conditions. If no method and procedure has been set forth, and subject to the provisions of paragraphs 9.09 and 10.05, OWNER and CONTRACTOR may exercise such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any dispute. ARTICLE 17 - MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. 17.02 Computation of Times A. When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day will be omitted from the computation. 17.03 Cumulative Remedies A. The duties and obligations imposed by these General Conditions and the rights and remedies avail- able hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents, and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. 17.04 Survival of Obligations A. All representations, indemnifications, warran- ties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or comple- tion of the Agreement. 17.05 Controlling Law A. This Contract is to be governed by the law of the state in which the Project is located. 00700 - General Conditions REV 04-07.doc 00700-44 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admlm\Contract Documents\00700 - General Conditions REV 04-07.doc SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE GENERAL CONDITIONS Article Title Article Number Introduction SC - 1.00 Defined Terms SC —1.01 Before Starting Construction SC —2.05 Preconstruction Conference SC — 2.06 Coordination of Plans, Specifications, and Special Provisions SC — 3.06 Subsurface and Physical Conditions SC — 4.02 Performance, Payment and Other Bonds SC — 5.01 Certificates of Insurance SC — 5.03 CONTRACTOR'S Liability Insurance SC — 5.04 OWNER'S Liability Insurance SC — 5.05 Property Insurance SC — 5.06 Waiver of Rights SC — 5.07 Receipt and Application of Insurance Proceeds SC — 5.08 Labor; Working Hours SC — 6.02 Permits SC — 6.06 Cost of the Work SC —11.01 Test and Inspections SC — 13.03 Progress Payments SC — 14.02 Mediation SC —16.02 Arbitration SC — 16.03 Liens SC — 17.06 00800-i 00800 - Supplementary Conditions 10-12 rev.doc 00800 IF:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\00800 - Supplementary Conditions 10-12 rev.doc SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE GENERAL CONDITIONS SC -1.00 Introduction These Supplementary Conditions amend or supplement the Standard General Conditions of the Construction Contract (No. 1910-8, 1996 Edition) and other provisions of the Contract Documents as indicated below. All provisions, which are not so amended or supplemented, remain in full force and effect. The terms used in these Supplementary Conditions will have the meanings indicated in the General Conditions. SC -1.01 Defined Terms SC -1.01.A.20. Delete paragraph GC 1.01.A.20 in its entirety. SC -1.02 Terminology SC -1.02.D.1, 2, and 3 Delete paragraphs GC -1.02.D.1, 2, and 3 in their entirety and insert the following paragraphs in their place: D. Furnish, Install, Perform, Provide 1. The word "furnish" shall mean to supply and deliver services, materials, or equipment to the Site (or some other specified location) ready for use or installation and in usable or operable condition. 2. The word "install' shall mean to put into use or place in final position services, materials, or equipment complete and ready for intended use. 3. The words "perform" or "provide" shall mean to furnish and install services, materials, or equipment complete and ready for intended use. SC -2.05 Before Starting Construction SC -2.05.C. Delete paragraph GC 2.05.0 in its entirety and insert the following paragraph in its place: C. Evidence of Insurance: CONTRACTOR shall not commence work under this Contract until he has obtained all insurance required under Article 5 and such insurance has been delivered to the OWNER and approved by the OWNER, nor shall the CONTRACTOR allow any Subcontractor to commence work on his subcontract until all similar insurance required of the Subcontractor has been so obtained and approved. All such insurance shall remain in effect until final payment and at all times thereafter when CONTRACTOR may be correcting, removing or replacing defective Work in accordance with Article 13, SC -2.06 Preconstruction Conference SC -2.06 Delete paragraph GC -2.06.A in its entirety and insert the following paragraph in its place: A. Immediately after awarding the contract, but before the CONTRACTOR begins work, the Project Manager will call a preconstruction conference at a place the ENGINEER designates to establish an understanding among the parties as to the work and to discuss schedules referred to in paragraph 2.05.13, procedures 00800-1 00800 - Supplementary Conditions 10-12 rev.doc 00800 1 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926V1dmim\Contract Documents\00800 - Supplementary Conditions 10-12 rev.doc for handling Shop Drawings and other submittals, and maintaining required records. Utility companies and others as appropriate will be requested to attend to discuss and coordinate work. B. Per the FDOT Standard Specifications for Road and Bridge Construction, the Contractor will certify to the Engineer the following: 1. A listing of on-site clerical staff, supervisory personnel and their pro -rated time assigned to the contract, 2. Actual Rate for items listed in Table 4-3.2.1 (see below), 3. Existence of employee benefit plan for Holiday, Sick and Vacation benefits and a Retirement Plan, and, 4. Payment of Per Diem is a company practice for instances when compensation for Per Diem is requested. Such certification must be made by an officer or director of the Contractor with authority to bind the Contractor. Timely certification is a condition precedent to any right of the Contractor to recover compensations for such costs, and failure to timely submit the certification will constitute a full, complete, absolute and irrevocable waiver by the Contractor of any right to recover such costs. Any subsequent changes shall be certified to the Engineer as part of the cost proposal or seven calendar days in advance of performing such extra work. FDOT Table 4-3.2.1 Item Rate FICA Rate established by Law FUTA/SUTA Rate established by Law Medical Insurance Actual Holidays, Sick & Vacation Benefits Actual Retirement Benefits Actual Workers Compensation Rates based on the National Council on Compensation Insurance basic rates tables adjusted by Contractor's actual experience modification factor in effect at the time of the additional work or unforeseen work Per Diem Actual but not to exceed State of Florida's rate Insurance* Actual *Compensation for Insurance is limited solely to General Liability Coverage and does not include any other insurance coverage (such as, but not limited to, Umbrella Coverage, Automobile Insurance, etc.). SC -3.06 Coordination of Plans, Specifications, and Special Provisions SC -3.06 Add the following new paragraphs immediately after paragraph GC -3.05: SC -3.06 Coordination of Plans, Specifications, and Special Provisions A. In case of discrepancy, the governing order of the documents shall be as follows: 1. Written Interpretations 2. Addenda 3. Specifications 4. Supplementary Conditions to the General Conditions 5. General Conditions 6. Approved Shop Drawings 7. Drawings 8. Referenced Standards. B. Written/computed dimensions shall govern over scaled dimensions. 00800-2 00800 - Supplementary Conditions 10-12 rev.doc 00800 2FAPub1ic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00800 - Supplementary Conditions 10-12 rev.doc SC -4.02 Subsurface and Physical Conditions SC -4.02 Add the following new paragraphs immediately after paragraph GC -4.02.8: C. In the preparation of Drawings and Specifications, ENGINEER or ENGINEER's Consultants relied upon the following reports of explorations and tests of subsurface conditions at the Site: Engineering Services — Pavement Coring Services CR -512 from Roseland Road to Easy Street. D. Reports and drawings itemized in SC -4.02.0 are not included with the Bidding Documents. Copies may be examined at Indian River County Administration Building, Public Works, 1801 27th Street Vero Beach FL 32960 durinq regular business hours. These reports and drawings are not part of the Contract Documents. SC -5.01 Performance, Payment and Other Bonds SC -5.01.A. Delete paragraph GC -5.01.A in its entirety and insert the following paragraphs in its place: Within fifteen (15) days of receipt of the Contract Documents for execution, the CONTRACTOR shall furnish a Public Construction Bond in an amount equal to 100% of the Contract Price. 1. In lieu of the Public Construction Bond, the CONTRACTOR may furnish an alternative form of security in the form of cash, money order, certified check, cashier's check, irrevocable letter of credit or a security as listed in Part II of F.S. Chapter 625. Any such alternative form of security shall be for the same purpose, and be for the same amount and subject to the same conditions as those applicable to the bond otherwise required. The determination of the value of an alternative form of security shall be made by the OWNER. 2. Such Bond shall continue in effect for one (1) year after Final Acceptance of the Work by the OWNER. 3. The OWNER shall record, the Public Construction Bond with the Public Record Section of the Indian River County Courthouse located at 2000 16th Avenue, Vero Beach, Florida 32960. The recorded bonds shall be forwarded to the Indian River County Purchasing Division on or before the seventh day after it is recorded. The CONTRACTOR shall pay all costs. SC -5.03 Certificates of Insurance SC -5.03 Delete the second sentence of paragraph GC -5.03 in its entirety. SC -5.04 CONTRACTOR's Liability Insurance SC -5.04 Add the following new paragraphs immediately after paragraph GC -5.04.8: C. The limits of liability for the insurance required by paragraph 5.04 of the General Conditions shall provide coverage for not less than the following amounts or greater where required by Laws and Regulations: 00800-3 00800 - Supplementary Conditions 10-12 rev.doc 00800 3F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 09261Admim\Contracl Documents\00800 -Supplementary Conditions 10-12 rev.doc 1. Worker's Compensation: To'meet statutory limits in compliance with the Worker's Compensation Law of Florida. This policy must include Employer Liability with a limit $100,000 for each accident, $500,000 disease (policy limit) and $100,000 disease (each employee). Such policy shall include a waiver of subrogation as against OWNER and ENGINEER on account of injury sustained by an employee(s) of the CONTRACTOR. 2. Commercial General Liability: Coverage shall provide minimum limits of liability of $1,000,000 per occurrence Combined Single Limit for Bodily Injury and Property Damage. This shall include coverage for: a. Premises/Operations b. Products/Completed Operations C. Contractual Liability d. Independent Contractors e. Explosion f. Collapse g. Underground. 3. Business Auto Liability: Coverage shall provide minimum limits of liability of $1,000,000 per occurrence Combined Single Limit for Bodily Injury and Property Damage. This shall include coverage for: a. Owner Autos b. Hired Autos C. Non -Owned Autos. 4. CONTRACTOR's "All Risk" Insurance: CONTRACTOR shall secure Builders' Risk "All Risk" insurance at his expense and provide properly completed and executed "Certificates of Insurance and Insurance Endorsement" forms in the exact wording and format presented in these Contract Documents before starting work. 5. Special Requirements: a. Ten (10) days prior to the commencement of any work under this Contract, certificates of insurance and endorsement forms in the exact wording and format as presented in these Contract Documents will be provided to the OWNER's Risk Manager for review and approval. b. "Indian River County Florida" will be named as "Additional Insured" on both the General Liability, Auto Liability and Builder's Risk "All Risk" Insurance. C. The OWNER will be given thirty (30) days notice prior to cancellation or modification of any stipulated insurance. Such notification will be in writing by registered mail, return receipt requested and addressed to the OWNER's Risk Manager. d. An appropriate "Indemnification" clause shall be made a provision of the Contract (see paragraph 6.20 of the General Conditions). e. It is the responsibility of the CONTRACTOR to insure that all subcontractors comply with all insurance requirements. f. It should be remembered that these are minimum requirements, which are subject to modification in response to high hazard operation. g. Insured must be authorized to do business and have an agent for service of process in Florida and have an AAA policyholder's rating and financial rating of a least Class XI in accordance with the most current Best's Rating. D. Additional Insureds: 00800-4 00800 - Supplementary Conditions 10-12 rev.doc 00800 4F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 092Mdmim\Contract Documents\00800 - Supplementary Conditions 10-12 rev.doc In addition to "Indian River County, entities shall be listed as "additional liability insurance policies: a. City of Sebastian, Florida b. C. SC -5.05 OWNER's Liability Insurance SC -5.05 Delete paragraph GC -5.05.A in its entirety. SC -5.06 Property Insurance Florida," the following individuals or insureds" on the CONTRACTOR's SC -5.06 Delete paragraphs GC -5.06.A, B, and C in their entirety and insert the following paragraphs in their place: A. CONTRACTOR shall purchase and maintain property insurance upon the Work at the Site in the amount of the full replacement cost thereof. This insurance shall: include the interests of OWNER, CONTRACTOR, Subcontractors, ENGINEER, ENGINEER's Consultants and any other individuals or entities identified in the Supplementary Conditions, and the officers, directors, partners, employees, agents and other consultants and subcontractors of any of them each of whom is deemed to have an insurable interest and shall be listed as an insured or additional insured; 2. be written on a Builder's Risk "All Risk" or open peril or special causes of loss policy form that shall at least include insurance for physical loss and damage to the Work, temporary buildings, falsework, and materials and equipment in transit and shall insure against at least the following perils or causes of loss: fire, lightning, extended coverage, theft, vandalism and malicious mischief, earthquake, collapse, debris removal, demolition occasioned by enforcement of Laws and Regulations, water damage, and such other perils or causes of loss as may be specifically required by the Supplementary Conditions. 3. include expenses incurred in the repair or replacement of any insured property (including but not limited to fees and charges of engineers and architects); 4. cover materials and equipment stored at the Site or at another location that was agreed to in writing by OWNER prior to being incorporated in the Work, provided that such materials and equipment have been included in an Application for Payment recommended by ENGINEER; and 5. allow for partial utilization of the Work by OWNER; 6. include testing and startup; and 7. be maintained in effect until final payment is made unless otherwise agreed to in writing by OWNER, CONTRACTOR and ENGINEER with 30 days written notice to each other additional insured to whom a certificate of insurance has been issued. B. CONTRACTOR shall be responsible for any deductible or self-insured retention. C. The policies of insurance required to be purchased and maintained by CONTRACTOR 00800-5 00800 - Supplementary Conditions 10-12 rev.doc 00800 5FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926V\dmim\Contract Documents\00800 - Supplementary Conditions 10-12 rev.doc in accordance with this paragraph SC -5.06 shall comply with the requirements of paragraph 5.06.0 of the General Conditions. SC -5.06.E Delete paragraph GC -5.06.E in its entirety and insert the following in its place: E. Additional Insureds: 1. The following individuals or entities shall be listed as "additional insureds" on the CONTRACTOR's property insurance policies: a. Indian River County, Florida b. City of Sebastian, Florida C. SC -5.07 Waiver of Rights SC -5.07 Delete GC -5.07 (paragraphs A, B, and C) in its entirety. SC -5.08 Receipt and Application of Insurance Proceeds SC -5.08 Delete GC -5.08 (paragraphs A and B) in its entirety. SC -5.09 Delete GC-5.09(paragraph A)in its entirety. SC -6.02 Labor; Working Hours SC -6.02. B. Add the following paragraphs immediately after paragraph GC -6.02. B: 1. Regular working hours are defined as Monday through Friday, excluding Indian River County Holidays, from 7 a.m. to 5 p.m. 2. Indian River County Holidays are: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, Christmas Eve and Christmas Day. Working on these days will not be permitted without prior written permission and approval from the Construction Coordination Manager. 3. The CONTRACTOR shall receive no additional compensation for overtime work, i.e., work in excess of eight hours in any one calendar day or 40 hours in any one calendar week, even though such overtime work may be required under emergency conditions and may be ordered by the ENGINEER in writing. 4. All costs of inspection and testing performed during overtime work by the CONTRACTOR, which is allowed solely for the convenience of the CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to the OWNER to deduct the costs of all such inspection and testing from any payments otherwise due the CONTRACTOR. 5. All costs of OWNER's employees and costs of ENGINEER's Consultant resulting from overtime work by the CONTRACTOR, which is allowed solely for the convenience of the CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to OWNER to deduct all such costs from any payments otherwise due the CONTRACTOR. 6. No work shall commence before 7 a.m. or continue after 5 p.m. except in case of emergency upon specific permission of the ENGINEER. 00800-6 00800 - Supplementary Conditions 10-12 rev.doc 00800 6F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926V\dmim\Contract Documents\00800 - Supplementary Conditions 10-12 rev.doc SC -6.06 Concerning Subcontractors, Suppliers, and Others SC -6.06.C. Add the following sentence at the end of paragraph GC -6.06. C: OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or entity, to the extent practicable, information about amounts paid to CONTRACTOR on account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or other individual or entity. SC -6.08 Permits SC -6.08 Add the following paragraphs immediately after paragraph GC -6.08.A: The OWNER has obtained the following permits (copies of these permits are contained in Appendix "A"): None Required 2. The CONTRACTOR shall obtain and pay for all other required permits and licenses. The CONTRACTOR shall provide copies of the permits to the OWNER and ENGINEER and shall comply with all conditions contained in the permits at no extra cost to the OWNER. 3. The CONTRACTOR shall be familiar with all permit requirements during construction and shall be responsible for complying with these requirements. The cost of this effort shall be included in the pay item in which the work is most closely associated with. SC -11.01 Cost of the Work SC -11.01.A.1. Delete paragraph GC -11.01.A.1 in its entirety, and insert the following sentences in its place: CONTRACTOR will receive payment for actual costs of direct labor and burden (see SC -2.06.13) for the additional or unforeseen work. Labor includes foremen actually engaged in the work; and will not include project supervisory personnel nor necessary on-site clerical staff, except when the additional or unforeseen work is a controlling work item and the performance of such controlling work item actually extends completion of the project due to no fault of the Contractor. Compensation for project supervisory personnel, but in no case higher than a Project Manager's position, shall only be for the pro -rata time such supervisory personnel spent on the contract. In no case shall an officer or director of the Company, nor those persons who own more than 1% of the Company, be considered as project supervisory personnel, direct labor or foremen hereunder. The expenses of performing Work outside of regular working hours, on Saturday, Sunday, or legal holidays, shall be included in the above to the extent authorized by OWNER. - SC -13.03 Test and Inspections SC -13.03.B. Delete paragraph GC -13.03.8 in its entirety, and insert the following sentences in its place: B. OWNER shall employ and pay for the services of an independent testing laboratory to perform all initial inspections, tests, or approvals required by the Contract Documents except those inspections, tests, or approvals listed immediately below. Subsequent inspections, tests, or approvals required after initial failing inspections, tests, or 00800-7 00800 - Supplementary Conditions 10-12 rev.doc 00800 7F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0928V\dmim\Contract Documents\00800 - Supplementary Conditions 10-12 rev.doc approvals shall be paid for by the CONTRACTOR by back charge to subsequent applications for payment. The CONTRACTOR shall arrange, obtain, and pay for the following inspections, tests, or approvals: 1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D below; 2. costs incurred in connection with tests or inspections conducted pursuant to paragraph 13.04.8 shall be paid as provided in said paragraph 13.04.13; 3. tests otherwise specifically provided in the Contract Documents. 13.05 OWNER May Stop the Work SC -13.05.A. Delete paragraph GC -13.05.A in its entirety and insert the following paragraph in its place: A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled workers or ' suitable materials or equipment, or fails to comply with permit requirements, or fails to comply with the technical specifications, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of OWNER to stop the Work shall not give rise to any duty on the part of OWNER to exercise this right for the benefit of CONTRACTOR, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 14.02 Progress Payments SC -14.02.B.5. Delete paragraph GC-14.02.B.5.d in its entirety and insert the following paragraph in its place: d. ENGINEER has actual knowledge of the occurrence of any of the events enumerated in paragraph 15.02.A; or SC -14.02.B.5. Add the following sentences at the end of paragraph GC -14.02.8.5: e. OWNER has been required to pay ENGINEER additional compensation because of CONTRACTOR delays or rejection of defective Work; or OWNER has been required to pay an independent testing laboratory for subsequent inspections, tests, or approvals taken after initial failing inspections, tests, or approvals. SC -14.02.C.1. Delete paragraph GC -14.02.C.1 in its entirety and insert the following paragraph in its place: C. Payment Becomes Due 1. Payment shall be made by OWNER to CONTRACTOR according to the Local Government Prompt Payment Act. F.S. 218.70 et. seq. SC -14.04A. After the third sentence in paragraph GC -14.04A of the General Conditions, delete the remainder of paragraph 14.04A in its entirety and replace with the following: 00800-8 00800 - Supplementary Conditions 10-12 rev.doc 00800 8F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00800 - Supplementary Conditions 10-12 rev.doc "If Engineer considers the Work substantially complete, Engineer will prepare and deliver to Owner a tentative certificate of Substantial Completion that shall fix the date of Substantial Completion. In accordance with the provisions of Florida Statutes section 208.735(7)(a)(2005), upon receipt of the tentative certificate of Substantial Completion from Engineer, the Owner, the Engineer, and the Contractor shall conduct a walk-through inspection of the Project to document a list of any items required to render the Work on the Project complete, satisfactory, and acceptable under this Agreement (herein the "Statutory List"). The Statutory List shall be reduced to writing and circulated among the Owner, the Engineer, and the Contractor by the Owner or the Engineer within 30 calendar days after substantial completion. The Owner and Contractor acknowledge and agree that: 1) the failure to include any corrective work, or pending items that are not yet completed, on the Statutory List does not alter the responsibility of the Contractor to complete all of the Work under this Agreement; 2) upon completion of all items on the Statutory List, the Contractor may submit a pay request for all remaining retainage except as otherwise set forth in this Agreement; and 3) any and all items that require correction under this Agreement and that are identified after the preparation of the Statutory List remain the obligation of the Contractor to complete to the Owner's satisfaction under this Agreement. After receipt of the Statutory List by the Contractor, the Contractor acknowledges and agrees that it will diligently proceed to complete all items on the Statutory List and schedule a final walk-through in anticipation of final completion on the Project." SC -14.04B Add the following new paragraph immediately after paragraph GC 14.048: C. At the time of delivery of the tentative certificate of Substantial Completion, Engineer will deliver to Owner and Contractor a written recommendation as to division of responsibilities pending final payment between Owner and Contractor with respect to security, operation, safety, and protection of the Work, maintenance, heat, utilities, insurance, and warranties and guarantees SC -14.07 Final Payment SC -14.07.C.1.. Delete paragraph GC -14.07. C.1 in its entirety, and insert the following paragraph in its place: C. Payment Becomes Due Payment shall be made by OWNER to CONTRACTOR according to the " Local Government Prompt Payment Act" , Florida Statutes section 218.70, et. seq. SC -15.01 OWNER May Suspend Work SC -15.01.A Delete the last sentence in paragraph GC -15.01.A and insert the following in its place: CONTRACTOR shall be allowed an extension of the Contract Times, directly attributable to any such suspension if CONTRACTOR makes a Claim for an extension as provided in paragraph 10.05. CONTRACTOR shall not be allowed an adjustment of the Contract Price and CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other eco- nomic loss arising out of or resulting from such Work suspension. 00800-9 00800 -Supplementary Conditions 10-12 rev.doc 00800 9F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl -SEE PROJ 0926Wdmim\Contract Documents\00800 - Supplementary Conditions 10-12 rev.doc SC -15.02 OWNER May Terminate For Cause SC -15.02.A.5 and SC -15.02.A.6 Add the following new paragraphs immediately after paragraph GC -15.02.A.4: 5. CONTRACTOR's violation of Section 02225 — "Erosion Control and Treatment of Dewatering Water From the Construction Site." 6. CONTRACTOR's failure to make payment to Subcontractors or Suppliers for materials or labor in accordance with the respective agreements between the CONTRACTOR and the Subcontractors or Suppliers. SC -15.04 CONTRACTOR May Stop Work or Terminate SC -15.04 Delete the following text from the first sentence of paragraph GC -15.04.A: SC -15.04 Delete the following text from the second sentence of paragraph GC -15.04.A: SC -16 DISPUTE RESOLUTION SC -16.02 Mediation SC -16 Add the following new paragraph immediately after paragraph GC -16.01. SCA 6.02 Mediation A. OWNER and CONTRACTOR agree that they shall submit any and all unsettled Claims or counterclaims, disputes, or other matters in question between them arising out of or relating to the Contract Documents or the breach thereof, to mediation by a certified mediator of the 19th Judicial Circuit in Indian River County unless delay in initiating arbitration would irrevocably prejudice one of the parties. The mediator of any dispute submitted to mediation under this agreement shall not serve as arbitrator of such dispute unless otherwise agreed. SC -17 Miscellaneous Add the following new paragraphs immediately after paragraph GC17.05: SC -17.06 Liens A. This project is a "Public Works" under Chapter 255, Florida Statutes. No merchant's liens may be filed against the OWNER. Any claimant may apply to the OWNER for a copy of this Contract. The claimant shall have a right of action against the CONTRACTOR for the amount due him. Such action shall not involve the OWNER in any expense. Claims against the CONTRACTOR are subject to timely prior notice to the CONTRACTOR as specified in Florida Statutes Section 255.05. The CONTRACTOR shall insert the following paragraph in all subcontracts hereunder: 00800-10 00800 - Supplementary Conditions 10-12 rev.doc 00800 10FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Vadmim\Contract Documents\00800 - Supplementary Conditions 10-12 rev.doc "Notice: Claims for labor, materials and supplies are not assessable against Indian River County and are subject to proper prior notice to (CONTRACTOR'S Name) and to (CONTRACTOR Surety Company Name), pursuant to Chapter 255 of the Florida Statutes This paragraph shall be inserted in every sub - subcontract hereunder." The payment due under the Contract shall be paid by the OWNER to the CONTRACTOR only after the CONTRACTOR has furnished the OWNER with an affidavit stating that all persons, firms or corporations who are defined in Section 713.01, Florida Statutes, who have furnished labor or materials, employed directly or indirectly in the Work, have been paid in full. The OWNER may rely on said affidavit at face value. The CONTRACTOR does hereby release, remiss and quit -claim any and all rights he may enjoy perfecting any lien or any other type of statutory common law or equitable lien against the job. ++END OF SUPPLEMENTARY CONDITIONS++ 00800-11 00800 - Supplementary Conditions 10-12 rev.doc 00800 11 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl -SEE PROJ 0926Vadmim\Contract Documents\00800 - Supplementary Conditions 10-12 rev.doc DATE OF ISSUANCE: SECTION 00942 - Change Order Form No. EFFECTIVE DATE: OWNER: Indian River County CONTRACTOR Bid No. 2013006 Project: CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street) OWNER's Project No. 1132 ENGINEER Indian River County You are directed to make the following changes in the Contract Documents: Description: Reason for Change Order: Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: Description Amount Original Contract Price $ Net Increase (Decrease) from $ previous Change Orders No. to Contract Price prior to this $ Change Order: Net increase (decrease) of this $ Change Order: Contract Price with all approved $ Change Orders: ACCEPTED: By: CONTRACTOR (Signature) Date: CHANGE IN CONTRACT TIMES Description Time Original Contract Time: (days or dates) Substantial Completion: Final Completion: Net change from previous Change Orders No. to (days) Substantial Completion: Final Completion: Contract Time prior to this Change Order: (days or dates) Substantial Completion: Final Completion: Net increase (decrease) this Change Order: (days or dates) Substantial Completion: Final Completion: Contract Time with all approved Change Orders: (days or dates) Substantial Completion: Final Completion: RECOMMENDED: By: ENGINEER (Signature) Date: (VAPPROVED: 11 By: OWNER (Signature) Date: 00942 - Change Order Form REV 04-07.doc 00942-1 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy Sl -SEE PROJ 0926V\dmim\Contract Documents\00942 - Change Order Form REV 04-07.doc Rev. 05/01 SECTION 00946 - Field Order Form DATE OF ISSUANCE: Field Change No.: EFFECTIVE DATE: OWNER: Indian River County CONTRACTOR Bid No. 2013006 Project: CR 512 Resurfacing (East Bound Only (Roseland Road to Easy Street) OWNER's Project No. 1132 ENGINEER: Indian River County Field Activity Description: Reason for Change: Recommended Disposition: Field Operations Officer / Engineer (Signature) Date Disposition: Contractor's Onsite Supervisor (Signature) Date Distribution: Field Operations Officer Others as Required: On-site Supervisor Project File * * END OF SECTION * * 00946 - Field Order Form REV 04-07.doc FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\00946 - Field Order Form REV 04-07.doc SECTION 00948 - Work Change Directive EFFECTIVE DATE: DATE OF ISSUANCE: OWNER: Indian River County CONTRACTOR: Bid No. 2013006 Project: CR 512 Resurfacing (East Bound Only) (Roseland Road to Easy Street) OWNER's Project No. 1132 ENGINEER: Indian River County You are directed to proceed promptly with the following changes: Description: Purpose of Work Change Directive: Attachments: (List documents supporting change) If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents. Method of determining change in Contract Prices: j� Unit Prices [j Lump Sum j� Other: II By Change Order: Estimated increase (decrease) in Contract Price If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Method of determining change in Contract Times II Contractor's Records ❑ Engineer's Records R Other: [Z By Change Order: Estimated increase (decrease) in Contract Times: Substantial Completion: days; Ready for Final Completion: days. If the change involves an increase, the estimated time is not to be exceeded without further authorization. * * END OF SECTION * * FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\00948 - Work Change Directive REV 04-07.doc APPROVED: By: ACCEPTED: By: RECOMMENDED: By: CONTRACTOR (Signature) Date: ENGINEER (Signature) Date: OWNER (Signature) Date: * * END OF SECTION * * FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\00948 - Work Change Directive REV 04-07.doc DIVISION 1 GENERAL REQUIREMENTS TITLE SECTION NO. SPECIAL PROVISIONS 01009 FORCE ACCOUNT 01024 FIELD ENGINEERING AND LAYOUT 01050 REFERENCE STANDARDS 01091 GENERAL QUALITY CONTROL 01215 PROGRESS MEETINGS 01220 CONSTRUCTION SCHEDULES 01310 SUBMITTAL OF SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01340 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 01520 PROTECTION OF THE WORK AND PROPERTY 01541 ACCESS ROADS, PARKINGS AREAS AND USE OF PUBLIC STREETS 01550 TRANSPORTATION AND HANDLING OF MATERIALS 01610 AND EQUIPMENT STORAGE OF MATERIAL AND EQUIPMENT 01611 SUBSTITUTIONS 01630 SITE CLEANUP AND RESTORATION 01710 POST FINAL INSPECTION 01820 F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\DIVISION 1 GENERAL REQUIREMENTS.doc SECTION 01009 SPECIAL PROVISIONS 1.1 GENERAL A. Visits to the construction site may be made by representatives of permitting or governing bodies. Submit details of all instructions from the above to the ENGINEER immediately. The Work will not be accepted by the OWNER until final acceptance has been received from the various Regulatory Agencies having jurisdiction. B. Furnish sufficient labor, construction equipment and materials, and work such hours, including night shifts and overtime operations, as may be necessary to insure the prosecution of the work in accordance with the approved progress schedule. If, in the opinion of the ENGINEER, the CONTRACTOR falls behind the progress schedule, take such steps as may be necessary to improve progress, all without additional cost to the OWNER. The ENGINEER shall be compensated for his overtime services in accordance with the Supplementary Conditions, SC -6.02. C. All salvageable material and equipment for which specific use, relocation or other disposal is not specifically noted, shall remain the property of the OWNER and shall be delivered to the OWNER at the following location: 4550 41St Street, at the CONTRACTOR's expense. All material and equipment not in salvageable condition, as determined by the ENGINEER and the OWNER, shall be disposed of by the CONTRACTOR, at the CONTRACTOR's expense. The excess mixed asphalt base, subgrade material shall be the property of the Contractor and must be properly removed and discarded by the Contractor at his expense. D. In addition to these Specifications all work must comply with the requirements of the local governing agency, St. Johns River Water Management District, Department of Environmental Protection, Army Corps of Engineers, Indian River Farms Water Control District, and all other applicable State or Federal agencies' specifications and permits. In the event of a conflict, the more stringent specification or requirement shall govern. E. Before performing any work outside the designated limits of the work site, secure any necessary permits and authorization from the applicable owner, or verify in writing that such has been previously obtained. Follow all requirements of any said permits or authorization. Give the ENGINEER and appropriate owner ten (10) days minimum notice before commencing construction operations outside the designated limits of the work site. 01009-1 01009 -Special Provisions F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01009 - Special Provisions.doc SECTION 01024 FORCE ACCOUNT 1.1 General CONTRACTOR shall furnish all labor, materials, equipment and incidentals necessary to perform additional work not covered on the Contract Drawings. The force Account is intended as a contingency for unforeseen work. 1.1 PAYMENT A. Lump sum amount for force account work is included in the bid schedule. The value of force account work will be determined in accordance with Article 12 of the General Conditions. + + END OF SECTION + + 01024- 1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01024 - Force Account.doc SECTION 01050 FIELD ENGINEERING AND LAYOUT 1.1 GENERAL A. The CONTRACTOR will furnish all construction staking for the project. All staking from control will be under the supervision of a Florida Registered Land Surveyor. B. Develop and make all detail surveys and measurements needed for construction including but not limited to, slope stakes, batter boards, piling layouts and all other working lines, elevations and cut sheets. C. Keep a transit and leveling instrument on the site at all times and a skilled instrument man available whenever necessary for layout of the Work. D. Provide all material required for benchmarks, control points, batter boards, grade stakes, and other items. E. Be solely responsible for all locations, dimensions and levels. No data other than written orders of the ENGINEER shall justify departure from the dimensions and levels required by the Drawings. F. Safeguard all points, stakes, grademarks, monuments and benchmarks made or established on the Work, and reestablish same, if disturbed. Rectify all Work improperly installed because of not maintaining, not protecting or removing without authorization such established points, stakes, marks and monuments. G. When requested by the ENGINEER, provide such facilities and assistance as may be necessary for the ENGINEER to check line and grade points placed by the CONTRACTOR. Do no excavation or embankment work until all cross -sectioning necessary for determining pay quantities has been completed and checked by the ENGINEER. H. The cost of performing engineering and layout work described above shall be included in the contract unit prices for the various items of work to which it is incidental. No separate payment will be made for surveying or engineering. 1.2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR A. Prior to commencing work, the CONTRACTOR shall satisfy himself as to the accuracy of all survey and existing site information as indicated in the Contract Documents. Immediately notify the ENGINEER upon discovery of any errors, inaccuracies or omissions in the survey data. The commencing of any of the work by the CONTRACTOR shall be held as the CONTRACTOR's acceptance that all survey or existing site information is correct and accurate, without any reasonably inferable errors, inaccuracies or omissions. 1050-1 01050 Field Engineering F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01050 - Field Engineering.doc B. The CONTRACTOR shall carefully preserve all control stakes, benchmarks, reference points and property corners and will be responsible for any mistake or loss of time caused by their unnecessary loss or disturbance. If the loss or disturbance of the stakes or marks cause a delay in the Work, the CONTRACTOR shall have no claim for damages or extension of time. Control stakes, benchmarks, reference points and property corners disturbed by the CONTRACTOR's work shall be replaced by a Florida Registered Land Sur- veyor and Mapper, at the CONTRACTOR's expense. In the event the Owner must provide the services of the Florida Registered Surveyor and Mapper to perform this replacement work, the cost of the surveying services will be deducted from any sums due the CONTRACTOR for the work performed under this Contract. C. All survey work shall be performed under the guidance and direction of a Florida Registered Surveyor and Mapper. D. All survey work for Record Drawings shall be performed by a Florida Registered Surveyor and Mapper. 1.3 STATION BOARDS A. CONTRACTOR shall erect and maintain white/black standard FDOT station markers every 100 feet. 1.4 LAYOUT OF STRIPING Establish by instrument, and mark the finished surface, the points necessary for striping finished roadway in conformance with Section 5-7 of FDOT Standard Specifications. + + END OF SECTION + + 1050-2 01050 Field Engineering FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01050 - Field Engineering.doc SECTION 01091 REFERENCE STANDARDS 1.1 GENERAL A. Whenever reference is made to the furnishing of materials or testing thereof to conform to the standards of any technical society, organization or body, it shall be construed to mean the latest standard, code, specification or tentative specification adopted and published at the date of advertisement for bids, unless noted otherwise in the Technical Specifications or on the Drawings. When a reference standard is specified, comply with requirements and recommendations stated in that standard, except when they are modified by the Contract Documents, or when applicable laws, ordinances, rules, regulations or codes establish stricter standards. The list of specifications presented in Paragraph B is hereby made a part of the Contract, the same as if repeated herein in full. B. Reference to a technical society, organization, or body may be made in the Specifications by abbreviations, in accordance with the following list: AASHTO The American Association of State Highway and Transportation Officials ACI American Concrete Institute AGA American Gas Association AISC American Institute of Steel Construction AISI American Iron and Steel Institute ANSI American National Standards Institute ASCE American Society of Civil Engineers ASTM American Society for Testing and Materials AWPA American Wood Preservers Association AWWA American Water Works Association AWS American Welding Society FED.SPEC. Federal Specifications 01091-1 01091 Reference Standards F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD 0926\Admim\Contract Documents\01091 - Reference Standards.doc CRSI Concrete Reinforcing Steel Institute FDEP/DEP Florida Department of Environmental Protection DNR IDepartment of Natural Resources NCPI National Clay Pipe Institute NEMA National Electrical Manufacturers Association NEC National Electric Code NSPE National Society of Professional Engineers OSHA Occupational Safety and Health Administration PCI Prestressed Concrete Institute FDOT/DOT Florida Department of Transportation U. L., Inc. Underwriter's Laboratories, Inc. SSPC Steel Structures Painting Council SJRWMD St. Johns River Water Management District C. When no reference is made to a code, standard or specification, the standard specifications of ASTM, FDOT, or ANSI shall govern. D. In the event of a conflict between the specifications prepared by the ENGINEER and the above referenced specifications and standards, or any other regulatory specification or standard, the more stringent requirement prevails. + + END OF SECTION + + 01091-2 01091 Reference Standards F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01091 - Reference Standards.doc SECTION 01215 GENERAL QUALITY CONTROL 1.1 DESCRIPTION OF REQUIREMENTS A. Definitions: Specific quality control requirements for the work are indicated throughout the Contract Documents. The requirements of this section are primarily related to the performance of the work beyond the furnishing of manufactured products. The term "Quality Control" includes, but is not necessarily limited to, inspection and testing and associated requirements. This section does not specify or modify the OWNER and ENGINEER duties relating to quality review and Contract surveillance. 1.2 RESPONSIBILITY FOR INSPECTIONS AND TESTS A. Residual OWNER Responsibility: The OWNER will employ and pay for the services of independent testing laboratories to perform those required inspections and tests. B. CONTRACTORS General Responsibility: No failure of test agencies, whether engaged by the OWNER or CONTRACTOR, to perform adequate inspections of tests or to properly analyze or report results, shall relieve the CONTRACTOR of responsibility for the fulfillment of the requirements of the Contract Documents. It is recognized that the required inspection and testing program is intended to assist the CONTRACTOR, OWNER, ENGINEER, and governing authorities in the nominal determination of probable compliance with requirements for certain crucial elements of work. The program is not intended to limit the CONTRACTOR in his regular quality control program, as needed for general assurance of compliance. 1.3 QUALITY ASSURANCE A. General Workmanship Standards: It is a requirement that each category of tradesman or installer performing the work be pre -qualified, to the extent of being familiar with the applicable and recognized quality standards for his category of work, and being capable of workmanship complying with those standards. 1.4 PRODUCT DELIVERY -STORAGE -HANDLING Handle, store and protect materials and products, including fabricated components, by methods and means which will prevent damage, deterioration and losses (and resulting delays), thereby ensuring highest quality results as the performance of the work progresses. Control delivery schedules so as to minimize unnecessary long-term storage at the project site prior to installation. 01215-1 01215 General Quality Control FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01215 General Quality.doc 1.5 PROJECT PHOTOGRAPHS/VIDEOS A. The CONTRACTOR shall make provisions, at his expense, for photographs and video tapes of all work areas just prior to construction, and for unusual conditions during construction. The photographs and videos shall show pertinent physical features along the line of construction. The purpose of the videos is to determine any damage to private or public property during construction. B. Pre -Construction Photographs and Video: 1. Contractor shall provide the Owner with photographs and video record and one copy of the existing conditions prior to construction. These photographs and videos shall be a standard DVD format and shall be narrated. 2. The photographs and video shall include, but not be limited to, the following items shown in a clear manner: 1) All existing features within the right-of-way. 2) All existing features within the temporary construction easement. 3) All existing features within permanent easements. 4) All existing features adjacent to any construction. 3. Detail of the photographs and video shall be such that the following examples shall be clear and visible: 1) Cracks in walls. 2) Condition of fencing. 3) Condition of planted areas and types of vegetation. 4) Condition of sodded areas. 5) Conditions of sprinkler systems and associated controls and wiring. 6) Condition of signs. 7) Conditions of lighting and associated wiring. 8) Significant detail of any pre-existing damages physical features shall be shown. The coverage of the photographs and video should include the limits of effects of the use of vibratory rollers. 9) These photographs and video record shall be presented to the Owner within 30 days of the Notice to Proceed. A copy shall be kept in the Contractor's field office. 10)Payment — No additional payment will be made for this work. + + END OF SECTION + + 01215-2 01215 General Quality Control FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\01215 General Quality.doc SECTION 01220 PROGRESS MEETINGS 1.1 SCOPE A. Date and Time: 1. Regular Meetings: As mutually agreed upon by ENGINEER and CONTRACTOR. 2. Other Meetings: On call. B. Place: CONTRACTOR'S office at Project site or other mutually agreed upon location. C. ENGINEER shall prepare agenda, preside at meetings, and prepare and distribute a transcript of proceedings to all parties. D. CONTRACTOR shall provide data required and be prepared to discuss all items on agenda. 1.2 MINIMUM ATTENDANCE A. CONTRACTOR B. SUBCONTRACTOR: When needed for the discussion of a particular agenda item, CONTRACTOR shall require representatives of Subcontractors or suppliers to attend a meeting. C. CONSTRUCTION COORDINATION MANAGER D. OWNER'S representative, if required. E. Utility Representatives F. Others as appropriate. G. Representatives present for each party shall be authorized to act on their behalf. 1.3 AGENDA Agenda will include, but will not necessarily be limited to, the following: 1. Transcript of previous meeting. 2. Progress since last meeting. 3. Planned progress for next period. 4. Problems, conflicts and observations. 5. Change Orders. 6. Status of Shop Drawings. 7. Quality standards and control. 8. Schedules, including off-site fabrication and delivery schedules. Corrective measures, if required. 9. Coordination between parties. 10. Safety concerns. 11. Other business. + + END OF SECTION + + 01220-1 01220 Progress Meetings FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD 09MAdmim\Contract Documents\01220 - Progress Meetings.doc SECTION 01310 CONSTRUCTION SCHEDULES 1.1 GENERAL REQUIREMENTS A. No partial payments shall be approved by the ENGINEER until there is an approved construction progress schedule on hand. B. Designate an authorized representative who shall be responsible for development and maintenance of the schedule and of all progress and payment reports. This representative shall have direct project control and complete authority to act on behalf of the CONTRACTOR in fulfilling the commitments of the CONTRACTOR's schedules. 1.2 REVISIONS TO THE CONSTRUCTION SCHEDULES When the ENGINEER requires the CONTRACTOR to submit revised (updated) progress schedules on a monthly basis the CONTRACTOR shall: A. Indicate the progress of each activity to the date of submission. B. Show changes occurring since the previous submission listing: 1. Major changes in scope. 2. Activities modified since the previous submission. 3. Revised projections of progress and completion. 4. Other identifiable changes. C. Provide a narrative report as needed to define: 1. Problem areas, anticipated delays, and the impact on the schedule. 2. Corrective action recommended and its effect. 3. The effect of changes on schedules of other prime contractors. 1.3 SUBMISSION OF THE CONSTRUCTION SCHEDULES On or before the tenth day after the effective date of the Agreement, submit the initial schedules to the ENGINEER. The ENGINEER will review the schedules and return a review copy to the CONTRACTOR within 21 days after receipt. If required by the ENGINEER, resubmit revised schedules on or before the seventh day after receipt of the review copy. If required by the ENGINEER, submit revised monthly progress schedules with that month's application for payment. 01310-1 01310 Construction Schedule FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01310 - Construction Schedule.doc 1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES A. After receiving approval by the ENGINEER, distribute copies of the approved initial schedule and all reviewed revisions (updated) to: 1. Job site file. 2. Subcontractors. 3. Other concerned parties. 4. OWNER (two copies). 5. ENGINEER B. In the cover letter, instruct recipients to report promptly to the CONTRACTOR, in writing, any problems anticipated by the projections shown in the schedules. + + END OF SECTION + + 01310-2 01310 Construction Schedule FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01310 - Construction Schedule.doc 01340 — Submittal of Shop Drawings 1.1 SCOPE A. Submit shop drawings, product data and samples as required by or inferred by the Drawings and Specifications. Submittals shall conform to the requirements of Article 6.17 of the General Conditions, Section 00700, and as described in this Section. 1.2 SHOP DRAWINGS A. Shop drawings are original drawings, prepared by the CONTRACTOR, a subcontractor, supplier, or distributor, which illustrate some portion of the work; showing fabrication, layout, setting, or erection details. Shop drawings are further defined in Article 6.17, Section 00700. B. Shop drawings shall be prepared by a qualified detailer and shall be identified by reference to sheet and detail numbers on the Contract Drawings. 1.3 PRODUCT DATA A. Product data are manufacturer's standard schematic drawings and manufacturer's catalog sheets, brochures, diagrams, schedules, performance charts, illustrations, and other standard descriptive data. Product data are further defined in Article 6.17, Section 00700. B. Modify standard drawings to delete information which is not applicable to the project and supplement them to provide additional information applicable to the project. C. Clearly mark catalog sheets, brochures, etc., to identify pertinent materials, products, or models. 1.4 SAMPLES Samples are physical examples to illustrate materials, equipment, or workmanship and to establish standards by which work is to be evaluated. Samples are further defined in Article 6.17, Section 00700. 01340 - Submittal of Shop Drawings.doc 01340-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01340 - Submittal of Shop Drawings.doc 01340 — Submittal of Shop Drawings 1.5 CONTRACTOR'S RESPONSIBILITIES FOR SUBMITTAL OF SHOP DRAWINGS, PRODUCT DATA AND SAMPLES A. The CONTRACTOR's responsibilities for submittal of shop drawings, product data, and samples are set forth in paragraph 6.17 of the General Conditions and as further explained herein. B. Prior to submission, thoroughly check shop drawings, product data, and samples for completeness and for compliance with the Contract Documents, verify all dimensions and field conditions, and coordinate the shop drawings with the requirements for other related work. Also review each shop drawing before submitting it to the ENGINEER to determine that it is acceptable in terms of the means, methods, techniques, sequences and operations of construction, safety precautions and programs incidental thereto, all of which are the CONTRACTOR's responsibility. 1. It is CONTRACTOR'S responsibility to review submittals made by his suppliers and Subcontractors before transmitting them to ENGINEER to assure proper coordination of the Work and to determine that each submittal is in accordance with its desires and that there is sufficient information about materials and equipment for ENGINEER to determine compliance with the Contract Documents. 2. Incomplete or inadequate submittals will be returned for revision without review. C. The CONTRACTOR's responsibility for errors and omissions in submittals is not relieved by the ENGINEER's review of submittals. The CONTRACTOR shall approve the shop drawings based on his in -the -field measurements, prior to submittal to the ENGINEER for his review. D. Notify the ENGINEER, in writing at the time of submission, of deviations in submittals from the requirements of the Contract Documents. The CONTRACTOR's responsibility for deviations in submittals from the requirements of the Contract Documents is not relieved by the ENGINEER's review of submittals, unless the ENGINEER gives written acceptance of specific deviations. E. Begin no work, which requires submittals until return of submittals with the ENGINEER's stamp and initials or signature indicating the submittal has been reviewed. 01340 - Submittal of Shop Drawings.doc 01340-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01340 -Submittal of Shop Drawings.doc 01340 — Submittal of Shop Drawings 1.6 SUBMITTAL REQUIREMENTS AND ENGINEER'S REVIEW FOR SHOP DRAWINGS PRODUCT DATA AND SAMPLES A. Submit to: Indian River County Engineering Division 1801 27th Street Vero Beach, FL 32960 B. A letter of transmittal shall accompany each submittal. If data for more than one Section of the Specifications is submitted, a separate transmittal letter shall accompany the data submitted for each Section. C. At the beginning of each letter of transmittal, provide a reference heading indicating the following: 1. OWNER'S Name 2. Project Name 3. Contract Number 4. Transmittal Number 5. Section Number D. All submittals shall have a title block with complete identifying information satisfactory to the ENGINEER. The following is a sample Submittal Form that the CONTRACTOR may use: [The remainder of this page has been left blank intentionally] 01340 - Submittal of Shop Drawings.doc 01340-3 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926V1dmim\Contract Documents\01340 - Submittal of Shop Drawings.doc 01340 s Submittal of Shop Drawings CONTRACTOR SUBMITTALS SUBMITTAL NO. Contractor: Date Sent to County No. Copies Sent to County ❑ Original Submittal ❑ Re -Submittal Project Name: CR 512 RESURFACING (EAST BOUND ONLY) (ROSELAND RD. TO EASY ST.) Project No.: 1132 ❑ Shop Drawing ❑ Cut Sheet ❑ Other Description: Sub -Contractor: Remarks: Reviewing Agency: (As checked below) Date Received Date Returned No. Copies Ret'd ❑ I R C Engineering Div. ❑ I R C Utilities Services Remarks: IRC Engineering Division Date Rec'd from Contractor Date Ret'd to Contractor 1801 27th Street No. Copies Ret'd Vero Beach, FI. 32960 Remarks: Distribution of Copies: IRC Engineering Division Office File Field Office File 01340 - Submittal of Shop Drawings.doc 01340-4 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Hdmim\Contract Documents\01340 - Submittal of Shop Drawings.doc 01340 — Submittal of Shop Drawings E. All submittals shall bear the stamp of approval and signature of CONTRACTOR as evidence that they have been reviewed by CONTRACTOR. Submittals without this stamp of approval will not be reviewed by the ENGINEER and will be returned to CONTRACTOR. F. Assign a number to each submittal starting with No. 1 and thence numbered consecutively. Identify resubmittals by the original submittal number followed by the suffix "A" for the first resubmittal, the suffix "B" for the second resubmittal, etc. G. Initially submit to ENGINEER a minimum of six (6) copies of all submittals that are on 11 -inch by 17 -inch or smaller sheets (no less than 8 1/2 -inch x 11 -inch), and one unfolded sepia and 2 prints made from that sepia for all submittals on sheets larger than 11 -inch by 17 -inch. H. After ENGINEER completes his review, Shop Drawings will be marked with one of the following notations: 1. Approved 2. Approved as Corrected 3. Approved as Corrected - Resubmit 4. Revise and Resubmit 5. Not Approved If a submittal is acceptable, it will be marked "Approved" or "Approved as Corrected". Three (3) prints or copies of the submittal will be returned to CONTRACTOR. J. Upon return of a submittal marked "Approved" or "Approved as Corrected", CONTRACTOR may order, ship or fabricate the materials included on the submittal, provided it is in accordance with the corrections indicated. K. If a Shop Drawing marked "Approved as Corrected" has extensive corrections or corrections affecting other drawings or Work, ENGINEER may require that CONTRACTOR make the corrections indicated thereon and resubmit the Shop Drawings for record purposes. Such drawings will have the notation, "Approved as Corrected - Resubmit." L. If a submittal is unacceptable, three (3) copies will be returned to CONTRACTOR with one of the following notations: 1. "Revise and Resubmit" 2. "Not Approved" 01340 - Submittal of Shop Drawings.doc 01340-5 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01340 - Submittal of Shop Drawings.doc 01340 — Submittal of Shop Drawings M. Upon return of a submittal marked "Revise and Resubmit", make the corrections indicated and repeat the initial approval procedure. The "Not Approved" notation is used to indicate material or equipment that is not acceptable. Upon return of a submittal so marked, repeat the initial approval procedure utilizing acceptable material or equipment. N. Any related Work performed or equipment installed without an "Approved" or "Approved as Corrected" Shop Drawing will be at the sole responsibility of the CONTRACTOR. O. Submit Shop Drawings well in advance of the need for the material or equipment for construction and with ample allowance for the time required to make delivery of material or equipment after data covering such is approved. CONTRACTOR shall assume the risk for all materials or equipment which is fabricated or delivered prior to the approval of Shop Drawings. Materials or equipment will not be included in periodic progress payments until approval thereof has been obtained in the specified manner. P. ENGINEER will review and process all submittals promptly, but a reasonable time should be allowed for this, for the Shop Drawings being revised and resubmitted, and for time required to return the approved Shop Drawings to CONTRACTOR. Q. Furnish required submittals with complete information and accuracy in order to achieve required approval of an item within three submittals. All costs to ENGINEER involved with subsequent submittals of Shop Drawings, Samples or other items requiring approval, will be back -charged to CONTRACTOR in accordance with the General Conditions and the Supplementary Conditions. If the CONTRACTOR requests a substitution for a previously approved item, all of ENGINEER'S costs in the reviewing and approval of the substitution will be back -charged to CONTRACTOR unless the need for such substitution is beyond the control of CONTRACTOR. + + END OF SECTION + + 01340 - Submittal of Shop Drawings.doc 01340-6 F:\PubliGWorks\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01340 -Submittal of Shop Drawings.doc SECTION 01520 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 1.1 SCOPE A. Provide all construction equipment and facilities and temporary controls required to satisfactorily complete the work represented on the Drawings and described in the Specifications. 1.2 RESPONSIBILITY A. All construction facilities and temporary controls remain the property of the Contractor establishing them and shall be maintained in a safe and useful condition until removed from the construction site. B. All false work, scaffolding, ladders, hoistways, braces, pumps, roadways, sheeting, forms, barricades, drains, flumes, and the like, any of which may be needed in construction of any part of the work and which are not herein described or specified in detail, must be furnished, maintained and removed by the CONTRACTOR, who is responsible for the safety and efficiency of such work and for any damage that may result from their failure or from their improper construction, maintenance or operation. C. In accepting the Contract, the CONTRACTOR assumes full responsibility for the sufficiency and safety of all hoists, cranes, temporary structures or work and for any damage which may result from their failure or their improper construction, maintenance or operation and will indemnify and save harmless the OWNER and ENGINEER from all claims, suits or actions and damages or costs of every description arising by reason of failure to comply with the above provision. 1.3 TEMPORARY UTILITIES AND SERVICES A. TEMPORARY WATER 1. Provide a temporary water service as required for all construction purposes and pay for all water used. 2. Furnish potable drinking water in suitable dispensers and with cups for use of all employees at the job. 3. Provide all temporary piping, hoses, etc., required to transport water to the point of usage by all trades. 4. When temporary water service is no longer required, remove all temporary water lines. 01520-1 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01520 - Construction Facilities.doc SECTION 01520 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS B. TEMPORARY SANITARY FACILITIES 1. Provide temporary toilet facilities separate from the job office. Maintain these during the entire period of construction under this Contract for the use of all construction personnel on the job. Provide enough chemical toilets to conveniently serve the needs of all personnel. Properly seclude toilet facilities from public observation. 2. Chemical toilets and their maintenance shall meet the requirements of State and local health regulations and ordinances. Immediately correct any facilities or maintenance methods failing to meet these requirements. Upon completion of work, remove the facilities from the premises. 1.4 SECURITY Full time watchmen will not be specifically required as a part of the Contract, but the CONTRACTOR shall provide inspection of work area daily and shall take whatever measures are necessary to protect the safety of the public, workmen, and materials, and provide for the security of the site, both day and night. 1.5 TEMPORARY CONTROLS Take all necessary precautions to control dust and mud associated with the work of this Contract. In dry weather, spray dusty areas daily with water in order to control dust. Take necessary steps to prevent the tracking of mud onto adjacent streets and highways. 1.6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES Remove the various temporary facilities, services, and controls and legally dispose of them as soon as the work is complete. The areas of the site used for temporary facilities shall be properly reconditioned and restored to a condition acceptable to the OWNER. + + END OF SECTION + + 01520-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01520 -Construction Facilities.doc SECTION 01541 PROTECTION OF THE WORK AND PROPERTY 1.1 GENERAL A. CONTRACTOR shall be responsible for taking all precautions, providing all programs, and taking all actions necessary to protect the Work and all public and private property and facilities from damage as specified in the General Conditions and herein. B. In order to prevent damage, injury or loss, CONTRACTOR'S actions shall include, but not be limited to, the following: 1. Store apparatus, materials, supplies, and equipment in an orderly, safe manner that will not unduly interfere with the progress of the Work or the Work of any other Contractor or utility service company. 2. Provide suitable storage facilities for all materials, which are subject to injury by exposure to weather, theft, breakage, or otherwise. 3. Place upon the Work or any part thereof, only such loads as are consistent with the safety of that portion of the Work. 4. Clean up frequently all refuse, rubbish, scrap materials, and debris caused by construction operations, so that at all times, the site of the Work presents a safe, orderly, and workmanlike appearance. 5. Provide barricades and guard rails around openings, for scaffolding, for temporary stairs and ramps, around excavations, elevated walkways and other hazardous areas. C. Except after written consent from proper parties, do not enter or occupy privately -owned land with men, tools, materials or equipment, except on easements provided herein. D. Assume full responsibility for the preservation of all public and private property or facility on or adjacent to the site. If any direct or indirect damage is done by or on account of any act, omission, neglect or misconduct in the execution of the Work by the CONTRACTOR, it shall be restored by the CONTRACTOR, at its expense, to a condition equal to or better than that existing before the damage was done. 1.2 BARRICADES AND WARNING SIGNALS Where Work is performed on or adjacent to any roadway, right-of-way, or public place, provide barricades, fences, lights, warning signs, danger signals, and watchmen, and take other precautionary measures for the protection of persons or property and of the Work. Paint barricades so they are visible at night. From sunset to sunrise, furnish and maintain at least one light at each barricade. Erect sufficient barricades to keep vehicles from being driven on or into Work under construction. Furnish watchmen in sufficient numbers to protect the Work. CONTRACTOR's responsibility for the maintenance of barricades, signs, lights, and for providing watchmen shall continue until OWNER accepts the Project. 01541-1 F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01541 - Protection of Property.doc SECTION 01541 PROTECTION OF THE WORK AND PROPERTY 1.3 TREE AND PLANT PROTECTION A. Protect existing trees, shrubs and plants on or adjacent to the site that are shown or designated to remain in place against unnecessary cutting, breaking or skinning of trunk, branches, bark or roots. B. Do not store or park materials or equipment within the drip line. C. Install temporary fences or barricades to protect trees and plants in areas subject to traffic. D. Fires shall not be permitted under or adjacent to trees and plants. E. Within the limits of the Work, water trees and plants that are to remain, in order to maintain their health during construction operations. F. Cover all exposed roots with burlap and keep it continuously wet. Cover all exposed roots with earth as soon as possible. Protect root systems from mechanical damage and damage by erosion, flooding, run-off or noxious materials in solution. G. If branches or trunks are damaged, prune branches immediately and protect the cut or damaged areas with emulsified asphalt compounded specifically for horticultural use. H. Remove all damaged trees and plants that die or suffer permanent injury and replace them with a specimen of equal or better quality. Coordinate Work in this Section with requirements of other sections herein. 1.4 PROTECTION OF IRRIGATION The CONTRACTOR shall be responsible for maintaining in good condition all irrigation systems within the right-of-way and easements, which could be damaged by construction activities. The CONTRACTOR shall repair any irrigation systems damaged by construction activities within two (2) days. 1.5 PROTECTION OF EXISTING STRUCTURES A. Underground Structures: 1. Underground structures are defined to include, but not be limited to, all sewer, water, gas, and other piping, and manholes, chambers, electrical conduits, tunnels and other existing subsurface work located within or adja- cent to the limits of the Work. 01541-2 F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01541 - Protection of Property.doc SECTION 01541 PROTECTION OF THE WORK AND PROPERTY 2. All underground structures known to ENGINEER except service connections for water, sewer, electric, and telephone are shown. This information is shown for the assistance of CONTRACTOR in accordance with the best information available, but is not guaranteed to be correct or complete. The existing utilities shown on the Contract Drawings are located according to the information available to the ENGINEER at the time the Drawings were prepared and have not been independently verified by the OWNER or the ENGINEER. Guarantee is not made that all existing underground utilities are shown or that the locations of those shown are accurate. The locations shown are for bidding purposes only. Finding the actual location of any existing utilities is the CONTRACTOR's responsibility and shall be done before it commences any work in the vicinity. Furthermore, the CONTRACTOR shall be fully responsible for any and all damages, which might be occasioned by the CONTRACTOR's failure to exactly locate and preserve any and all underground utilities. The OWNER or ENGINEER will assume no liability for any damages sustained or costs incurred because of the CONTRACTOR's operations in the vicinity of existing utilities or structures, nor for temporary bracing and shoring of same. If it is necessary to shore, brace, or swing a utility, contact the utility company or department affected and obtain their permission regarding the method to use for such work. 3. Contact the various utility companies which may have buried or aerial utilities within or near the construction area before commencing work. Provide 48 hours minimum notice to all utility companies prior to beginning construction. 4. Schedule and execute all work involving existing utilities in order to minimize necessary interruption of services. Whenever such interruption is necessary for completion of the work, notify the ENGINEER and the appropriate utility at least 48 hours in advance. Perform all work to repair/restore utility service to the satisfaction of the appropriate utility. Include all costs related to service maintenance, interruption, and restoration in the appropriate line item in the Contract. 5. Where it is necessary to temporarily interrupt house or business services, the CONTRACTOR shall notify the owner or occupant, both before the interruption (24-hour minimum), and again immediately before service is resumed. Before disconnecting and pipes or cables, the CONTRACTOR shall obtain permission from their owner, or shall make suitable arrangement for their disconnection by their owner. 6. Explore ahead of trenching and excavation work and uncover all obstructing underground structures sufficiently to determine their location, to prevent damage to them and to prevent interruption of the services which such structures provide. If CONTRACTOR damages an underground structure, restore it to original condition at CONTRACTOR's expense. 01541-3 F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01541 - Protection of Property.doc SECTION 01541 PROTECTION OF THE WORK AND PROPERTY 7. Necessary changes in the location of the Work may be made by ENGINEER, to avoid unanticipated underground structures. 8. If permanent relocation of an underground structure or other subsurface facility is required and is not otherwise provided for in the Contract Documents, ENGINEER will direct CONTRACTOR in writing to perform the Work, which shall be paid for under the provisions of Article 11 of the General Conditions. B. Surface Structures: 1. Surface structures are defined as structures or facilities above the ground surface. Included with such structures are their foundations and any extension below the surface. Surface structures include, but are not limited to, buildings, tanks, walls, bridges, roads, dams, channels, open drainage, piping, poles, wires, posts, signs, markers, curbs, walks and all other facil- ities that are visible above the ground surface. C. Protection of Underground and Surface Structures: 1. Sustain in their places and protect from direct or indirect injury, all underground and surface structures located within or adjacent to the limits of the Work. Such sustaining and supporting shall be done carefully, and as required by the party owning or controlling such structure. Before proceeding with the work of sustaining and supporting such structure, satisfy the ENGINEER that the methods and procedures to be used have been approved by the party owning same. 2. Assume all risks attending the presence or proximity of all underground and surface structures within or adjacent to the limits of the Work. CONTRACTOR shall be responsible for all damage and expense for direct or indirect injury caused by its Work to any structure. CONTRACTOR shall repair immediately all damage caused by his work, to the satisfaction of the OWNER of the damaged structure. D. All other existing surface facilities, including but not limited to, guard rails, posts, guard cables, signs, poles, markers, and curbs which are temporarily removed to facilitate installation of the Work shall be replaced and restored to their original condition at CONTRACTOR'S expense. 1.6 DAMAGE TO EXISTING STRUCTURES AND UTILITIES A. The CONTRACTOR shall be responsible for and make good all damage to pavement beyond the limits of this Contract, buildings, telephone or other cables, water pipes, sanitary pipes, or other structures which may be encountered, whether or not shown on the Drawings. B. Information shown on the Drawings as to the location of existing utilities has been prepared from the most reliable data available to the Engineer. This 01541-4 F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01541 - Protection of Property.doc SECTION 01541 PROTECTION OF THE WORK AND PROPERTY information is not guaranteed, however, and it shall be this CONTRACTOR's responsibility to determine the location, character and depth of any existing utilities. He shall assist the utility companies, by every means possible to determine said locations. Extreme caution shall be exercised to eliminate any possibility of any damage to utilities resulting from his activities. 1.7 ADJUSTMENTS OF UTILITY CASTINGS, COVERS AND BOXES A. All existing utility castings, including valve boxes, junction boxes, manholes, pull boxes, inlets and similar structures in the areas of construction that are to remain in service shall be adjusted by the CONTRACTOR to bring them flush with the surface of the finished work. B. The CONTRACTOR shall coordinate the utilities to ensure proper construction sequencing. CONTRACTOR shall make available survey reference markers to the various utility companies. + + END OF SECTION + + 01541-5 F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\01541 - Protection of Property.doc SECTION 01550 ACCESS ROADS, PARKING AREAS AND USE OF PUBLIC STREETS 1.1 GENERAL A. Provide all temporary construction roads, walks and parking areas required during construction and for use of emergency vehicles. Design and maintain temporary roads and parking areas so they are fully usable in all weather conditions. B. Prevent interference with traffic and the OWNER's operations on existing roads. Indemnify and save harmless the OWNER from any expenses caused by CONTRACTOR's operations over these roads. C. Roadways damaged by CONTRACTOR shall be restored to their original condition by the CONTRACTOR subject to approval of the OWNER or ENGINEER. D. Remove temporary roads, walks and parking areas prior to final acceptance and return the ground to its original condition, unless otherwise required by the Contract Documents. 1.2 USE OF PUBLIC STREETS The use of public streets and alleys shall be such as to provide a minimum of inconvenience to the public and to other traffic. Any earth or other excavated material spilled from trucks shall be removed immediately by the CONTRACTOR and the streets cleaned to the satisfaction of the Owner. 1.3 USE OF PUBLIC STREETS FOR HAUL ROADS A. Prior to construction, the CONTRACTOR shall designate all proposed haul roads to be used during the life of the project. Any earth or other materials spilled from trucks shall be removed by the CONTRACTOR and streets cleaned to the satisfaction of the Owner. He further shall be responsible for repairs to any damages caused by his operations, prior to final payment. B. All trucks carrying earth shall be covered while moving with an appropriate tarpaulin. Should trucks hauling earth fail to cover their loads, the CONTRACTOR will be given two (2) written warnings, after which the CONTRACTOR shall pay a fine of $50 per uncovered truck to the Owner when invoked by the Owner to Owner's Engineer. All cleanup shall be the responsibility of the CONTRACTOR. C. All trucks/moving equipment shall have backup warning horns in proper working order while on the job site. + + END OF SECTION + + 01550 Access Roads 01550-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01550 - Access Roads.doc SECTION 01610 TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT 1.1 GENERAL A. Make all arrangements for transportation, delivery and handling of equipment and materials required for prosecution and completion of the Work. B. Shipments of materials to CONTRACTOR or Subcontractors shall be delivered to the site only during regular working hours. Shipments shall be addressed and consigned to the proper party giving name of Project, street number and city. Shipments shall not be delivered to OWNER except where otherwise directed. C. If necessary to move stored materials and equipment during construction, CONTRACTOR shall move or cause to be moved materials and equipment without any additional compensation. 1.2 DELIVERY A. Arrange deliveries of products in accord with construction schedules and in ample time to facilitate inspection prior to installation. B. Coordinate deliveries to avoid conflict with Work and conditions at site and to accommodate the following: 1. Work of other contractors, or OWNER. 2. Limitations of storage space. 3. Availability of equipment and personnel for handling products. 4. OWNER'S use of premises. C. Do not have products delivered to project site until related Shop Drawings have been approved by the ENGINEER. D. Do not have products delivered to site until required storage facilities have been provided. E. Have products delivered to site in manufacturer's original, unopened, labeled containers. Keep ENGINEER informed of delivery of all equipment to be incorporated in the Work. 01610-1 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01610 - Transportation and Handling of Materials and Equipment.doc SECTION 01610 TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT F. Partial deliveries of component parts of equipment shall be clearly marked to identify the equipment, to permit easy accumulation of parts, and to facilitate assembly. G. Immediately on delivery, inspect shipment to assure: 1. Product complies with requirements of Contract Documents and reviewed submittals. 2. Quantities are correct. 3. Containers and packages are intact, labels are legible. 4. Products are properly protected and undamaged. 1.3 PRODUCT HANDLIN A. Provide equipment and personnel necessary to handle products, including those provided by OWNER, by methods to prevent soiling or damage to products or packaging. B. Provide additional protection during handling as necessary to prevent scraping, marring or otherwise damaging products or surrounding surfaces. C. Handle products by methods to prevent bending or overstressing. D. Lift heavy components only at designated lifting points. E. Materials and equipment shall at all times be handled in a safe manner and as recommended by manufacturer or supplier so that no damage will occur to them. Do not drop, roll or skid products off delivery vehicles. Hand carry or use suitable materials handling equipment. + + END OF SECTION + + 01610-2 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\01610 - Transportation and Handling of Materials and Equipment.doc SECTION 01611 STORAGE OF MATERIAL AND EQUIPMENT 1.1 GENERAL A. Store and protect materials and equipment in accordance with manufacturer's recommendations and requirements of Specifications. B. Make all arrangements and provisions necessary for the storage of materials and equipment. Place all excavated materials, construction equipment, and materials and equipment to be incorporated into the Work, so as not to injure any part of the Work or existing facilities, and so that free access can be had at all times to all parts of the Work and to all public utility installations in the vicinity of the Work. Keep materials and equipment neatly and compactly stored in locations that will cause a minimum of inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. Arrange storage in a manner to provide easy access for inspection. C. Areas available on the construction site for storage of material and equipment shall be as shown or approved by the ENGINEER. D. Store materials and equipment which are to become the property of the OWNER to facilitate their inspection and insure preservation of the quality and fitness of the Work, including proper protection against damage by extreme temperatures and moisture. E. Do not use lawns, grass plots or other private property for storage purposes without written permission of the OWNER or other person in possession or control of such premises. F. CONTRACTOR shall be fully responsible for loss or damage to stored materials and equipment. G. Do not open manufacturer's containers until time of installation unless recommended by the manufacturer or otherwise specified. H. When appropriate store materials on wood blocking so there is no contact with the ground. + + END OF SECTION + + 01611-1 01611—Storage of Material F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01611 - Storage of Materials.doc SECTION 01630 SUBSTITUTIONS 1.1 GENERAL A. Requests for review of a substitution shall conform to the requirements of Article 6.05, "Substitutes and Or -Equals," of the General Conditions, and shall contain complete data substantiating compliance of the proposed substitution with the Contract Documents. 1.2 CONTRACTOR'S OPTIONS A. For materials or equipment (hereinafter products) specified only by reference standard, select product meeting that standard by any manufacturer, fabricator, supplier or distributor (hereinafter manufacturer). To the maximum extent possible, provide products of the same generic kind from a single source. B. For products specified by naming several products or manufacturers, select any one of the products or manufacturers named which complies with Specifications. C. For products specified by naming one or more products or manufacturers and stating "or equivalent," submit a request for a substitution for any product or manufacturer which is not specifically named. D. For products specified by naming only one product or manufacturer and followed by words indicating that no substitution is permitted, there is no option and no substitution will be allowed. E. Where more than one choice is available as a CONTRACTOR's option, select product which is compatible with other products already selected or specified. 1.3 SUBSTITUTIONS A. During a period of 15 days after date of commencement of Contract Time, ENGINEER will consider written requests from CONTRACTOR for substitution of products or manufacturers, and construction methods (if specified). 1. After end of specified period, requests will be considered only in case of unavailability of product or other conditions beyond control of CONTRACTOR. B. Submit 5 copies of Request for Substitution. Submit a separate request for each substitution. In addition to requirements set forth in Article 6.05 of General Conditions, include in the request the following: 1. For products or manufacturers: a. Product identification, including manufacturer's name and address. b. Manufacturer's literature with product description, performance and test data, and reference standards. 01630-1 01630 Substitutions FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01630 - Substitutions.doc c. Samples, if appropriate. d. Name and address of similar projects on which product was used, and date of installation. 2. For construction methods (if specified): a. Detailed description of proposed method. b. Drawings illustrating method. 3. Such other data as the ENGINEER may require to establish that the proposed substitution is equal to the product, manufacturer or method specified. C. In making Request for Substitution, CONTRACTOR represents that: 1. CONTRACTOR has investigated proposed substitution, and deter- mined that it is equal to or superior in all respects to the product, manufacturer or method specified. 2. CONTRACTOR will provide the same or better guarantees or warranties for proposed substitution as for product, manufacturer, or method specified. 3. CONTRACTOR waives all claims for additional costs or extension of time related to a proposed substitution that subsequently may become apparent. D. A proposed substitution will not be accepted if: 1. Acceptance will require changes in the design concept or a substantial revision of the Contract Documents. 2. It will delay completion of the Work, or the work of other contractors. 3. It is indicated or implied on a Shop Drawing and is not accompanied by a formal Request for Substitution from CONTRACTOR. E. If the ENGINEER determines that a proposed substitute is not equal to that specified, furnish the product, manufacturer, or method specified at no additional cost to OWNER. F. Approval of a substitution will not relieve CONTRACTOR from the requirement for submission of Shop Drawings as set forth in the Contract Documents. G. The procedure for review by Engineer will include the following: 1. Requests for review of substitute items of material and equipment will not be accepted by Engineer from anyone other than CONTRACTOR. 2. Upon receipt of an application for review of a substitution, Engineer will determine whether the review will be more extensive than a normal shop drawing review for the specified item. 3. If the substitution will not require a more extensive review, Engineer will proceed with the review without additional cost to CONTRACTOR. 01630-2 01630 Substitutions FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Wdmim\Contract Documents\01630 - Substitutions.doc 4. If the substitution requires a more extensive review, Engineer will proceed with the review only after CONTRACTOR has agreed to reimburse Owner for the review cost. 5. Engineer may require CONTRACTOR to furnish at CONTRACTOR's expense additional data about the proposed substitute. H. Any redesign of structural members shall be performed by, and the plans signed and sealed by, a Professional Engineer registered in the State of Florida. The redesign shall be at the CONTRACTOR's expense. Any redesign will require an extensive review by the Engineer. The CONTRACTOR must agree to reimburse the Owner for the review cost prior to the Owner's Engineer proceeding with the design review. The ENGINEER's hourly rate for review is $125 per hour. The ENGINEER's estimated cost of review shall be provided to the CONTRACTOR prior to proceeding with the review to allow the CONTRACTOR the opportunity to rescind the request. Engineer will be allowed a reasonable time within which to evaluate each proposed substitution. Engineer will be the sole judge of acceptability and shall have the right to deny use of any proposed substitution. The CONTRACTOR shall not order, install, or utilize any substitution without either an executed Change Order or Engineer's notation on the reviewed shop drawing. Owner may require CONTRACTOR to furnish at CONTRACTOR's expense a special manufacturer's performance guarantee(s) or other surety with respect to any substitute and an indemnification by the CONTRACTOR. ENGINEER will record time required by Engineer and Engineer's consultants in evaluating substitutions proposed by CONTRACTOR and in making changes in the Contract Documents occasioned thereby. Whether or not a proposed substitute is sued, CONTRACTOR shall reimburse Owner for the charges of Engineer and Engineer's consultants for evaluating each proposed substitute. J. Substitute materials or equipment may be proposed for acceptance in accordance with this Section. In the event that substitute materials or equipment are used and are less costly than the originally specified material or equipment, than the net difference in cost shall benefit the Owner and CONTRACTOR in equal proportions. This cost difference shall not be reduced by any failure of the CONTRACTOR to base his bid on the named materials or equipment. + + END OF SECTION + + 01630-3 01630 Substitutions FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926Mrnim\Contract Documents\01630 - Substitutions.doc SECTION 01710 SITE CLEANUP AND RESTORATION 1.1 SCOPE Furnish all labor, equipment, appliances, and materials required or necessary to clean up and restore the site after the construction is completed. 1.2 REQUIREMENTS A. During the progress of the project, keep the work and the adjacent areas affected thereby in a neat and orderly condition. Remove all rubbish, surplus materials, and unused construction equipment. Repair all damage so that the public and property owners will be inconvenienced as little as possible. B. Provide onsite containers for the collection of waste materials, debris, and rubbish and empty such containers in a legal manner when they become full. C. Where material or debris has been deposited in watercourses, ditches, gutters, drains, or catch -basins as a result of the CONTRACTOR's operations, such material or debris shall be entirely removed and satisfactorily disposed of during the progress of the work, and the ditches, channels, drains, etc., shall be kept clean and open at all times. D. Before the completion of the project, unless otherwise especially directed or permitted in writing: 1. Tear down and remove all temporary buildings and structures; 2. Remove all temporary works, tools, and machinery, or other construction equipment furnished; 3. Remove all rubbish from any grounds occupied; and 4. Leave the roads, all parts of the premises, and adjacent property affected by construction operations, in a neat and satisfactory condition. E. Restore or replace any public or private property damaged by construction work, equipment, or employees, to a condition at least equal to that existing immediately prior to the beginning of the operations. To this end, the CONTRACTOR shall restore all highway, roadside, and landscaping work within any right-of-way, platted or prescriptive. Acceptable materials, equipment,and methods shall be used for such restoration. F. Thoroughly clean all materials and equipment installed and on completion of the work, deliver the facilities undamaged and in fresh and new - appearing condition. 01710-1 01710 Site Cleanup F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01710 - Site Cleanup.doc G. It is the intent of the Specifications to place the responsibility on the CONTRACTOR to restore to their original condition all items disturbed, destroyed, or damaged during construction. Particular attention will be placed on restoration of canals to equal or better condition than prior to construction. H. When finished surfaces require cleaning with cleaning materials, use only those cleaning materials which will not create hazards to health or property and which will not damage the surfaces. Use cleaning materials only on those surfaces recommended by the manufacturer. Follow the manufacturer's directions and recommendations at all times. Keep the amount of dust produced during construction activities to a minimum. At CONTRACTOR's expense, spray water or other dust control agents over the areas, which are producing the dust. Schedule construction operations so that dust and other contaminants will not fall on wet or newly coated surfaces. 1.3 SITE CLEANUP AND RESTORATION Prior to final completion, the OWNER, ENGINEER, INDIAN RIVER FARMS WATER CONTROL DISTRICT, and CONTRACTOR shall review the site with regards to site cleanup and restoration. Clean and/or restore all items determined to be unsatisfactory by the OWNER or ENGINEER, at no additional expense. + + END OF SECTION + + 01710 Site Cleanup 01710-2 FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\01710 - Site Cleanup.doc SECTION 01820 Post Final Inspection 1.1 GENERAL A. Approximately one year after Substantial Completion, the OWNER will make arrangements with the Construction Coordination Manager and the CONTRACTOR for a post final inspection and will send a written notice to said parties to inform them of the date and time of the inspection. B. Corrections of defective work noted by OWNER and Construction Coordination Manager shall comply with the applicable sections of Article 13, General Conditions. C. After the inspection, the OWNER will inform the CONTRACTOR of any corrections required to release the performance and payment bonds. 001820 - Post Final Inspection.doc 001820-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\001820 - Post Final Inspection.doc DIVISION 2 TECHNICAL PROVISIONS SECTION NO. 00001 Technical Specifications SECTION NO. 00004 Scope of Work SECTION NO. 00101 Mobilization SECTION NO. 00102 Maintenance of Traffic SECTION NO. 00104 Erosion and Water Pollution Control SECTION NO. 00283 Reclaimed Asphalt Base Course — Full Depth Reclamation SECTION NO. 00334 Superpave Asphaltic Concrete SECTION NO. 00570 Performance Turf SECTION NO. 00700 Signing and Pavement Markings F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\DIVISION 2 TECHNICAL PROVISIONS Table of Contents REVISED 10-2-08.doc SECTION - 1- Technical Specifications STANDARD SPECIFICATIONS A. All work of this Contract shall conform to the applicable technical specifications of Florida Department of Transportation Standard Specifications for Road and Bridge Construction, 2010, and Supplemental Specification, Special Provisions and addenda thereto, except as modified and supplemented.hereinafter. Reference to Article numbers herein -after apply to the FDOT Standard Specifications, and reference in FDOT Standard Specifications to Department shall be taken as the Owner or its appointed Representative. Wherever the Specifications, Supplementals, etc. may refer to the "Owner", "Department", "State of Florida Department of Transportation", or words relating to offices of State Government, such words shall be taken as meaning Owner or Indian River County, Florida. Wherever the word "Owner's Engineer", "District Engineer", "Engineer", "Project Engineer", etc., appears, it shall be taken to mean the Registered Professional Project Engineer of the Indian River County Public Works Department, Engineering Division acting directly or through duly authorized representatives. Wherever the word "Resident Engineer" appears, it shall be taken to mean an authorized representative of the Owner's Engineer on the Project (Resident Construction Inspector) who will act as an agent for Indian River County, assigned to observe the progress quantity and quality of the work. The work to be performed per sheet Bid item 1643-700 and all other utility work shall conform to the applicable technical specifications of Indian River County Department of Utility Services, Water, Wastewater, Utility Standards Dated September, 2011. The work to be performed per line items 700 through 711 shall conform to the applicable standards of Indian River County Typical Drawings for Pavement Markings, Signing & Geometrics Dated July, 2011. SECTION - 4- SCOPE OF WORK Section 4-3.9 Value Engineering Incentive is deleted in its entirety. SECTION - 101- MOBILIZATION The work specified in this section shall conform to Section 101 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction. (2010 Edition) Contractor shall include the Public Construction Bond and Survey Control (install/re- establish) in the unit price for Mobilization. 01025-1 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ SURVEY CONTROL 1. Install/re-establish: It shall be the contractor's responsibility to hire a Professional Surveyor and Mapper as defined per Chapter 472, Florida Statutes, to replace any horizontal and vertical control shown on the engineering plans that was destroyed during construction. 2. New roadway alignment control points (Survey Baseline or controlling line and all points as indicated on the plans or control sheet) upon final roadway completion. Include all intersections and side streets. State Plane Coordinates and elevations for all control points. 3. Either if shown on plans or not: Any Public Land Corner or Governmental Survey Control point(s),vertical control (bench marks), property corners destroyed and/or disturbed during the scope of the project shall be properly re-established as per standards as set forth within Florida Statutes, Administrative code and Minimum Technical Standards for that type of survey. All said surveying mentioned above shall be performed under the direct supervision of a registered Professional Surveyor and Mapper in the state of Florida and certified accordingly. Said Governmental agency(s) shall be notified in writing of disturbance and re -establishments. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 101-1 - Mobilization - Lump Sum SECTION - 102 - MAINTENANCE OF TRAFFIC The work specified in this item shall conform to Section 102 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction (2010 Edition), except as modified herein. A. GENERAL PROVISIONS -DESCRIPTION: The work specified in this Section consists of maintaining traffic within the limits of the project for the duration of the construction period, including any temporary suspensions of the work. It shall include the construction and maintenance of any necessary detour facilities; the providing of necessary facilities for access to residences, businesses, etc., along the project; the furnishing, installing and maintaining of traffic control and safety devices during construction, the control of dust through the use of calcium chloride if necessary, and any other special requirements for safe and expeditious movement of traffic as may be called for on the plans. The term, Maintenance of Traffic, as used herein, shall include all of such facilities, devices and operations as are required for the safety and convenience of the public as well as for minimizing public nuisance; all as specified in this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions Section. B. BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall present his Maintenance of Traffic Plan at the pre -construction conference. The 01025-2 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ Maintenance of Traffic Plan shall indicate the type and location of all signs, lights, barricades, striping and barriers to be used for the safe passage of pedestrians and vehicular traffic through the project and for the protection of the workmen. The plan will indicate conditions and setups for each phase of the Contractor's activities. When the project plans include or specify a specific Maintenance of Traffic Plan, alternate proposals will be considered when they are found to be equal to or better than the plan specified. In no case may the Contractor begin work until the Maintenance of Traffic Plan has been approved in writing by the Engineer. Modifications to the Maintenance of Traffic Plan that become necessary shall also be approved in writing. Except in an emergency, no changes to the approved plan will be allowed until approval to change such plan has been received. The cost of all work included in the Maintenance of Traffic Plan shall be included in the pay item for Maintenance of Traffic. The Contractor shall be responsible for performing daily inspections, including weekends and holidays, with some inspections at nighttime, of the installations on the project and replace all equipment and devices not conforming with the approved standards during that inspection. The project personnel will be advised of the schedule of these inspections and be given the opportunity to join in the inspection as is deemed necessary. C. TRAFFIC CONTROL - STANDARDS: The FDOT Design Standards For Design, Construction Maintenance and Utility Operations On The State Highway System, Edition as dated on the plans set forth the basic principles and prescribes minimum standards to be followed in the design, application, installation, maintenance and removal of all traffic control devices and all warning devices and barriers which are necessary to protect the public and workmen from hazards within the project limits. The standards established in the aforementioned manual constitute the minimum requirements for normal conditions, and additional traffic control devices warning devices, barriers or other safety devices will be required where unusual, complex or particularly hazardous conditions exist. The above referenced standards were developed using F.H.W.A., U.S.D.O.T. Manual on Uniform Traffic Control Devices (MUTCD). D. TRAFFIC CONTROL DEVICES WARNING DEVICES AND BARRIERS - INSTALLATION: The responsibility for installation and maintenance of adequate traffic control devices, warning devices and barriers, for the protection of the travel in public and workmen, as well as to safeguard the work area in general shall rest with the Contractor. Consideration shall be given to recommendations of the Engineer. The required traffic control devices, warning devices and barriers shall be erected by the Contractor prior to creation of any hazardous condition and in conjunction with any necessary re-routing of traffic. The Contractor shall immediately remove, turn or cover any devices or barriers which do not apply to existing conditions. All traffic control devices shall conform to MUTCD standards and shall be clean and relatively undamaged. Damaged devices diminishing legibility and recognition, during either night or day conditions, are not acceptable for use. 01025-3 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ nnnr_n,a..., 1...I'`....trnnV hnnu mon+c\Tcnhnirol Cnarifiro4innc rinn E. NO WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a manner that no undue hazard will result due to the requirements of this article, and the procedures and policies described therein shall in no way act as a waiver of any of the terms of the liability of the Contractor or his surety. F. Contractor's Maintenance of Traffic Plan shall maintain continuous vehicular traffic on CR 512 at all times. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 102-1 - Maintenance of Traffic - Lump Sum SECTION — 104 - EROSION CONTROL AND TREATMENT OF DEWATERING WATER AND STORMWATER FROM THE CONSTRUCTION SITE PART 1 —GENERAL 1.1 SCOPE A. This Section covers erosion control and the treatment of dewatering water and stormwater runoff from the construction site and work area. The pollution control measures shall prevent turbid or otherwise polluted waters from being discharged from the construction site or work area, to undeveloped portions of the site or off-site. B. The OWNER considers pollution from dewatering water and stormwater runoff from a construction site or work area to be a very serious offense. The CONTRACTOR is solely responsible for preventing pollution caused by dewatering water and stormwater runoff from the construction site or work area. C. The pollution control measures specified herein represent minimum standards to be adhered to by the CONTRACTOR throughout the Project's construction. The OWNER reserves the right to require the CONTRACTOR to employ additional pollution control measures, when in the sole opinion of the OWNER, they are warranted. If site specific conditions require additional erosion and stormwater pollution control measures during any phase of construction or operation to prevent erosion or to control sediment or other pollution, beyond those specified in the Drawings or herein, implement additional best management practices as necessary, in accordance with Chapter 4, "Best Management Practices for Erosion and Sedimentation Control" of the Florida Erosion and Sediment Control Inspector's Manual, and other references as may be required by regulatory permits. (http://www.dep.state.fl.us./water/nonpoint/docs/erosion/erosion-inspectors- manual.pdf) D. The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this Section. Alternatively, the OWNER may halt the CONTRACTOR's operations until the CONTRACTOR is in full compliance with this Section. If the OWNER halts the CONTRACTOR's work as a result of its failure to comply with this Section, the Construction Contract time clock will continue to run. 01025-4 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ ---- n n.....i.v fen To hnin [ Q-1ifi—fil—'I" E. In addition to these Specifications, comply with Chapter 4 - "Best Management Practices for Erosion and Sedimentation Control" and Chapter 5 — "Best Management Practices for Dewatering" of the Florida Erosion and Sediment Control Inspector's Manual. In the event of a conflict between the referenced Chapters and these Specifications, the more stringent requirement shall prevail. 1.2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR A. The OWNER has obtained certain permits for this project and they are listed in paragraph SC -6.08 of the Supplementary Conditions. Per paragraph SC -6.08.0 of the Supplementary Conditions, the CONTRACTOR shall apply for, obtain, and pay for all other required permits, licenses, sampling, and tests. Permits the CONTRACTOR may need to secure may include but not be limited to: 1. Long-term and/or short-term dewatering permit as required by the St. Johns River Water Management District (SJRWMD). Generally, only the short-term permit is required. Contact SJRWMD at (321) 984-4940 to determine which permit is required and the associated statutory requirements; 2. SJRWMD RDS -50 Permit (required); 3. The State of Florida Generic Permit for Stormwater Discharge From Large and Small Construction Activities (required). Contact the Florida Department of Environmental Protection (FDEP) at (866) 336-6312 (toll free) or (850) 245-7522 or www.dep.state.fl.us/water/stormwater/npdes/ 4. FDEP's Uncontaminated Groundwater Release Permit (required if dewatering occurs). This permit requires water quality testing by a State certified laboratory. B. Provide copies of all permits to the OWNER and ENGINEER and comply with all conditions contained in all permits at no extra cost to the OWNER. If there is a conflict between any permit requirement and these Specifications, the more stringent specification or requirement shall govern. C. In addition to paying for all permit fees, CONTRACTOR shall also pay for all water quality sampling and laboratory tests required by any permit. 1.3 GENERAL A. Do not begin any other construction work until the pollution control and treatment system has been constructed in accordance with approved plans and permits and approved for use by the OWNER and applicable permitting authorities. B. From time to time, the OWNER or ENGINEER will inspect the pollution control and treatment system and may take effluent samples for analysis by a testing laboratory selected and paid for by the OWNER. If at any time, the OWNER or ENGINEER determines that the pollution control and treatment system is not in compliance with the approved system, the OWNER or ENGINEER will shut the portion of the project down that is not in compliance, and it shall remain shut -down until the pollution control and treatment system is properly constructed or repaired, and complies with the approved pollution control and treatment system plans and specifications. 01025-5 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD nn�cn,-b.,..,,\I'.,r,+ronl Ilnrumon4c\TcrF+nirol Cnc�ifiro4innc rl..r C. Schedule construction to minimize erosion and stormwater runoff from the construction site. Implement erosion control measures on disturbed areas as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than 7 days after the construction activity in that portion of the site has temporarily or permanently ceased. In addition to other temporary erosion control measures that may be implemented, application of polyacrylamide is required on all such disturbed areas within 7 days after the construction activity in that portion of the site has temporarily or permanently ceased, unless final landscaping has been installed. Polyacrylamide application shall be as specified herein. D. Inspect each pollution control system at least once per day and after each rainfall event. Clean and maintain each pollution control system as required by its manufacturer or the OWNER, until the system is no longer needed. If a water quality violation occurs, immediately cease all work contributing to the water quality violation and correct the problem. E. Discharge shall not violate State or local water quality standards in the receiving waters, nor cause injury to the public health or to public or private property, nor to the Work completed or in progress. The receiving point for water from construction operations shall be approved by the applicable owner, regulatory agency, and the ENGINEER. F. Promptly repair all damage at no cost to the OWNER. 1.4 SUBMITTALS A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment systems in accordance with Section 1340. B. Stormwater Pollution Prevention Plan. 1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS REQUIRED FOR INSTALLATION AND MAINTENANCE A. State Certified Erosion Control Specialty Subcontractor is Required for Installation and Maintenance: Installation and maintenance of all erosion and stormwater pollution control devices, shall be by a State Certified erosion control subcontractor who specializes in the installation and maintenance of such devices. After installation, this specialty subcontractor shall maintain the erosion and stormwater pollution control devices until in the ENGINEER's sole opinion, the devices are no longer necessary (such time not to extend past the date the OWNER formally accepts the project as complete). Before beginning construction, submit to Indian River County for review and approval, a Stormwater Pollution Prevention Plan (SWPPP), prepared by the certified erosion control subcontractor. Construction shall not begin until the SWPPP has been approved by Indian River County. Submit the approved SWPPP to the ENGINEER before beginning construction. Include in the SWPPP, the "Contractor's Affidavit Regarding Erosion Control and Treatment of 01025-6 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD nn�cna.,-. .,,\!`,.,+ror+ Iln�nmo..fc\To�hni�ol Cr,anifi�o H.,nc L,� Dewatering Water and Stormwater From the Construction Site" (located at the end of this Section). 1.6 "POLLUTION" AND CERTAIN UNCONTESTABLE POLLUTION EVENTS DEFINED A. With respect to this Section and as may be further defined in paragraphs 1.6.13, 1.6.C, and 1.6.D, "pollution" is the presence in off-site waters of any substances, contaminants, or manmade or human -induced impairment of off-site waters or alteration of the chemical, physical, biological, or radiological integrity of off-site water in quantities or at levels which are or may be potentially harmful or injurious to human health or welfare, animal or plant life, or property. Pollutants to be removed include but are not limited to, sediment and suspended solids, solid and sanitary wastes, phosphorus, nitrogen, pesticides, oil and grease, concrete truck washout, stucco mixer washout, curb machine washout, washout from other construction equipment, construction chemicals, and construction debris. B. When the Discharge is Directly Into an Existing Water Body, Pollution Occurs When. An existing water body (including ditches and canals) Is defined to be polluted by the CONTRACTOR's operations when at any time, the turbidity of the water immediately downstream of the CONTRACTOR's discharge point(s) is at least 29 nephelometric turbidity units (NTUs) higher than the turbidity of the background water upstream of the discharge point(s). [See Fla. Administrative Code 62-302.530] Exception: When the discharge is directly into or through an outfall discharging into "Outstanding Florida Waters," designated by Florida Statute 403.061(27), the turbidity of the discharged water cannot exceed the turbidity of the immediate receiving water. The ENGINEER or OWNER shall determine the locations where the turbidity is measured. C. When the Discharge is not Directly Into an Existing Water Body, Pollution Occurs When ... In some instances, dewatering water or stormwater runoff from the construction site or work area may reach a water body indirectly, such as after traveling through pipes or by overland flow. Before construction commences, the Contractor will measure background levels of total suspended solids (TSS) and turbidity, in the immediate vicinity of the discharge water's ultimate discharge point into the receiving water body. If the discharge water's TSS and turbidity measurements exceed these pre -construction background values by 20 percent for TSS and 29 NTUs for turbidity, then the discharge from the CONTRACTOR's operations is defined to be polluted. D. Pollution Always Occurs When ... The discharge from a construction site or work area is defined to be polluted whenever the pH of the discharge is less than 6.5 or greater than 8.5, or whenever any of the following is present in the discharge water: (1) Hazardous waste or hazardous materials in any quantity, (2) Any petroleum product or by-product in any quantity, (3) Any chemical in any quantity, or (4) Concentrated pollutants. E. Above paragraphs 1.6.13, 1.6.C, and 1.6.D do not in any way, limit the types of conditions in which pollution may be determined to occur. 01025-7 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 1.7 PENALTIES FOR NONCOMPLIANCE WITH THIS SECTION A. In addition to the OWNER's specific remedies, if erosion or pollution is caused by dewatering water or stormwater runoff from the construction site, the OWNER will immediately report the violations to the Indian River County Code Enforcement Board, SJRWMD, FDEP, Indian River Farms Water Control District (or other F. S. Chapter 298 Drainage District, as appropriate), and other pertinent regulatory or enforcement agencies. PART 2 - MATERIALS AND INSTALLATION 2.1 GENERAL A. Polyacrylamide: As required in Paragraph 1.3.C, place polyacrylamide (PAM) on bare ground to reduce the potential for erosion. PAM may also be used in water bodies to remove turbidity. Use the anionic form of polyacrylamide that does not stick to fish gills. For PAM information and its proper application, contact Applied Polymer Systems, Inc., (678) 494-5998, www.siltstop.com. B. Staked Silt Fences: 1. General: Use silt fences to control runoff from the construction site where the soil has been disturbed. 2. Installation: Install per the manufacture's recommendations and as specified herein. In general, install the silt fence in a manner that allows it to stop the water long enough for the sediment to settle while the water passes through the silt fence fabric. All supporting posts shall be on the down-slope side of the fencing. Place the bottom of the fabric 6 -inches minimum, under compacted soil to prevent the flow of sediment underneath the fence. Place silt fences away from the toe of slopes. Otherwise, install in accordance with FDOT Index No. 102. 3. Product: All material shall be new and unused. Use FDOT Types II through IV silt fences where large sediment loads are anticipated, where slopes are 1:2 (vertical: horizontal) or steeper, or as directed by the ENGINEER; otherwise use FDOT Type III silt fence. (a) For FDOT Type III Silt Fence -ACF Environmental, Catalog No. 360800000, Florida DOT Silt Fence. U.S. Sieve = 30, tensile strength = 120 pounds. The heavy-duty filter fabric shall be pre -attached to 48 -inch long stakes on 6 -foot centers. (1-800-448-3636). (b) For FDOT Type IV Silt Fence, modify the above Catalog No. 360800000 to comply with FDOT Index No. 102. (c) Or equivalent. C. Turbidity Barriers: 1. General: Use turbidity barriers to control sediment contamination of rivers, lakes, ponds, canals, etc. 2. Installation: Install per the manufacturer's recommendations and per FDOT Index No. 103 unless directed otherwise by the ENGINEER. 3. Product: All material shall be new and unused. The turbidity barrier shall be a pervious barrier and the fabric color shall be yellow. a. Parker Systems, Inc. (1-866-472-7537),model Type II or Type I b. Or equivalent. 01025-8 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ D. Sedimentation Control From Dewatering or Pumping Operations Using Filter Bags: 1. Remove silt, sediment, and other particles from dewatering or pumping applications using a filter bag. The bag shall be manufactured using a polypropylene non -woven geotextile and sewn by a double -needle machine, using a high strength nylon thread. The bag shall have a. fill spout large enough to accommodate a 4 -inch pump discharge hose. Straps shall be attached to the bag to secure the hose and prevent pumped water from escaping without being filtered. 2. Installation: Install in accordance with the manufacturer's specifications. Use as many filter bags as required, at no additional cost to the OWNER. Legally dispose of the bags offsite, at no cost to the OWNER. If the bags are placed on aggregate to facilitate filtration efficiency, do not use limerock aggregate. 3. Product: The filter bag shall be supplied with lifting straps. a. "DIRTBAG 53 or 55 as applicable," supplied by ACF Environmental, Inc. (1-800-448-3636). b. "DANDY DEWATERING BAG" supplied by Dandy Products, fc (1-800-591-2284). C. Or equivalent. E. Curb Inlet Protection: 1. Filter stormwater before it enters curb inlets. 2. Installation: Install in accordance with the manufacturer's specifications. Use as many of the specified filtration devices as required, at no additional cost to the OWNER. 3. Product: All materials shall be new and unused. The length of the curb inlet filtration device shall be at least 2 -feet longer than the curb inlet opening. a. "GUTTERBUDDY," supplied by ACF Environmental, Inc. (1-800-448- 3636). b. Or equivalent. F. Catch Basin Protection: 1. Filter stormwater before it enters catch basins (drop inlets). The filter "sack" shall be manufactured from woven polypropylene geotextile and sewn by a double -needle machine, using a high strength nylon thread. The sack shall be manufactured to fit the opening of the catch basin or drop inlet and it shall have the following features: two dump straps attached at the bottom to facilitate emptying; lifting loops as an integral part of the system to be used to lift the sack from the basin; and a colored restraint chord approximately halfway up the sack to keep the sides away from the catch basin walls. The colored restraint chord shall also serve as a visual means of indicating when the sack should be emptied. 2. Installation: Install in each catch basin in accordance with the manufacturer's specifications. Use as many of the specified filtration devices as required, at no additional cost to the OWNER. 3. Product: All materials shall be new and unused. a. "SILTSACK" (regular flow), supplied by ACF Environmental, Inc. (1- 800-448-3636). b. "FloGuard+PLUS," supplied by Kristar Enterprises, Inc. (1-800-579- 8819). C. Or equivalent. 01025-9 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ nooa�e fn,tn �r nf���+ n^-. nfc\ro..hm;; 1 Qmo f;. fin 1 14— G. Construction Site Egress Driveways: Minimize the transport of sediment and soil from the construction site or work area by vehicle wheels. Construct a crushed rock driving surface at the vehicle exit point(s). Provide an area large enough to remove the sediment and soil from vehicle wheels before the vehicle leaves the construction site or work area. Provide wash -down stations as required to wash vehicle tires and retain all washwater on-site. Do not use limerock. H. Rock and Stone for Erosion Control and Pollution Control and Treatment: 1. Crushed Limerock: Crushed limerock shall not be used under any circumstance. 2. Acceptable Material: FDOT #4 non -calcareous aggregate (usually granite), washed and meeting the requirements of FDOT Standard Specifications for Road and Bridge Construction, Section 901. Hay Bales: Hay bales shall not be used. PART 3 - EXECUTION A. Design, construct, and maintain the pollution control and treatment system to minimize erosion and capture and remove pollutants from the construction site and from all other areas disturbed by construction activities. B. Apply polyacrylamide only as directed by the polyacrylamide manufacturer/supplier. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 104-1 — Erosion & Water Pollution Control - Lump Sum [The remainder of this page was left blank intentionally] 01025-10 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROD c ...ifi—fi— 1— CONTRACTOR'S AFFIDAVIT REGARDING POLLUTION This sworn statement is submitted to Indian River County Project No. 1132 for CR 512 REHABILITATION (EAST BOUND ONLY) (ROSELAND ROAD TO EASY STREET) STATE OF COUNTY OF Personally before me the undersigned authority, appeared administered, stated as follows: 1. This sworn statement is submitted by the CONTRACTOR whose business address is and (if applicable) its Federal Identification No.(FEIN) is 2. My name is who upon oath duly and my relationship to the entity named above is (If signing as Owners Agent, attach Letter of Authorization to Sign from Owner) 3. 1 understand and agrees that in addition to complying with the terms and conditions of the Stormwater Management System Permit issued by Indian River County, Contractor is responsible for complying with the terms and conditions of the following as applicable to the site: (a) State of Florida Generic Permit for Stormwater Discharge From Large and Small Construction Activities (for projects one acre or larger), (b) Stormwater Pollution Prevention Plan (regardless of project size), (c) St. Johns River Water Management District permit(s) (regardless of project size), (d) Florida Department of Environmental Protection permit(s) (regardless of project size), (e) All other permits required for this project not specifically listed herein, and (f) All Codes and Ordinances of Indian River County. . 4. 1 understand and agrees that "pollution" as defined by Florida Statutes Chapter 403.031(7) includes: "... the presence in the outdoor atmosphere or waters of the state of any substances, contaminants, noise, or manmade or human -induced impairment of air or waters or alteration of the chemical, physical, biological, or radiological integrity of air or water in quantities or at levels which are or may be potentially harmful or injurious to human health or welfare, animal or plant life, or property or which unreasonably interfere with the enjoyment of life or property, including outdoor recreation unless authorized by applicable law." 01025-11 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 5. 1 understand and agrees that in addition to the definition set forth in Item 4 above, "pollution" is also defined by Florida Administrative Code 62-302.530 and as may be further defined in the Indian River County permit(s). 6. 1 understand that Indian River County requires the design, installation, and maintenance of proper erosion control measures at all times during construction until complete stabilization is achieved at the project site. Contractor understands that this requirement is for this project regardless of the project size. 7. 1 understand that there are civil and criminal penalties for pollution listed in Florida Statutes Ch. 403.141 and Ch. 403.161 and that there are other penalties listed in Indian River County's permits, including but not limited to, Indian River County issuing a Cease and Desist Order for the project. Contractor understands that it may be liable for these and other penalties if offsite pollution occurs as a result of activities associated with the Project. 8. Transfer of Ownership or County Issued Permits: (a) Transfer of Interest in Real Property: Within twenty-one (21) days of any transfer of ownership or control of the real property at which the permitted activity, facility, or system is located or authorized, the Contractor shall notify in writing, both the Indian River County Engineering Division and the Indian River County Stormwater Division of the transfer. Contractor shall provide the name, mailing address, and telephone number of the transferee and a copy of the instrument effectuating the transfer. Said notification is in addition to notifying the County Attorney's Office as required by County Code. (b) Transfer of a County Permit. To transfer a County issued permit, Contractor must provide (1) the information required in Item 8(a); (2) a written statement from the proposed transferee that it will be bound by all terms and conditions of the permit; and (3) a new Contractors Affidavit form properly executed by the transferee. Upon proper receipt of these items the County shall transfer the permit to the transferee. (c) Contractor is encouraged to request a permit transfer prior to the sale or legal transfer of the real property at which a permitted facility, system, or activity is located or authorized. However, the transfer shall not be effective prior to the sale or legal transfer. (d) An "Illicit Discharge Sign" must be present at the site at the time of transfer. Replacement or additional signs may be obtained from the Indian River County Public Works Department at a cost of $30.00 per sign. 01025-12 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ nnncn.�...,:...�r....a..,..f flnrnmon4c\Torhnirol Cncnifiro4innc rinr Under penalty of perjury, Contractor declares that it has read the foregoing affidavit and the facts stated in it are true. Contractor: Authorized Signature: Printed Name: Date: FURTHER AFFIANT SAYETH NAUGHT (If signing as Owners Agent, attach Letter of Authorization to Sign from Owner) The foregoing instrument was subscribed and sworn to before me this , 20_ by who is personally known to me or has produced identification and who did take oath. My Commission expires: day of Notary Public State of Florida at Large + + END OF SECTION + + 01025-13 Technical Specifications F:\Public Works\ENGINEER] NG DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ nn�cna.., o..,�r,,..+..,..f n„�.,,on+�\Torhnirol Cncrifirotinnc .-7nn as SECTION - 283 - RECLAIMED ASPHALT BASE COURSE — FULL DEPTH RECLAMATION DESCRIPTION - This work is the in-place construction of a Reclaimed Asphalt Base Course, using either reclaimed asphalt pavement (RAP) material and/or reclaimed aggregate material (RAM), and existing road base material combined with virgin aggregates and/or bituminous material. It is the intent of this contract to recycle 100% of the existing asphalt pavement and part or all of the existing base course to ensure that the completed reclaimed base course will be of a consistent material and thickness throughout. This will include, but is not limited to, all existing asphalt pavement adjacent to all concrete curbing, storm sewer inlets, manholes, sanitary sewer manholes, and all utility valve boxes. CONTRACTOR QUALIFICATIONS - Bidders shall have a minimum of three years of experience in the construction of reclaimed asphalt base course. Bidders shall provide a list of five successfully completed full depth reclamation projects within the State of Florida along with contact information for the Owners of those projects, and the completion date for each project. Bidders shall also provide a list of the major equipment that will be used on this project. SUBMITTALS — Submit Mix Designs for Reclaimed Asphalt Base Course and detailed Traffic Control Plan to the County for approval prior to the start of construction. Submittals must be transmitted to the County a minimum of 3 working days prior to the start of construction. BASE COURSE DESIGN - The Contractor shall review the core data provided for the existing roadway and shall perform testing and/or coring prior to submitting a Bid to verify that the Cold Recycled Bituminous Base Course Mix Design or the Reclaimed Asphalt Base Course Mix Design, as applicable, has a minimum Structural Number (SN) of 1.8 for the total thickness of the finished/completed base course. The Contractor shall be responsible for preparing Mix Designs for the Cold Recycled Bituminous Base Course Mix Design or the Reclaimed Asphalt Base Course Mix Design, as applicable, prior to the start of construction. The Contractor will also be required to test the completed base course and provide test results that verify that the completed base course meets the specified Structural Number. In the event that the completed reclaimed asphalt base does not meet the minimum Structural Number specified, the County may require corrective work on the base course or the placement of additional asphalt surface course. All Mix Design testing/preparation and testing for verification of the Structural Number shall be performed by an independent testing laboratory and all costs associated with the Mix Design preparation and SN verification testing shall be the responsibility of the Contractor. The Testing Laboratory performing Cold Recycled Bituminous Base Course Mix Designs or the Reclaimed Asphalt Base Course Mix Designs and SN verification testing shall be an accredited laboratory that is regularly engaged in asphalt testing including the preparation of Mix Designs for Cold Recycled Bituminous Base Course or Reclaimed Asphalt Base Course, and testing to establish and verify Structural Number for asphalt base course layers. The Contractor shall provide information for proposed testing laboratories and mix designs shall be subject to the approval of the County. 1. Reclaiming The work item for Reclaimed Asphalt Base Course shall consist of pulverizing an existing bituminous pavement and its base course and mixing them together, adding water and new 01025-14 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ cr 1;fi+;1, a„n base material, injecting the specified stabilizing agent directly into the mixing chamber of the reclaiming machine and uniformly mixing it with the pulverized material at the rate and depth specified; and watering, shaping, grading, and compacting the blended material to produce a stabilized base course, true to the established line and grade of the road. The Contractor will be required to perform reclaiming work while traffic is maintained in another lane or lanes of the road. The work item for Reclaimed Asphalt Base Course shall include all necessary traffic control services provided during the reclaiming operation which are not covered under other work items in the Contract. All traffic control and maintenance of traffic is to be performed in conformity with Agency standards with Roadway and Traffic Design Standards, published by the Florida DOT, and with the Manual for Traffic Control Devices, published by the U.S. Department of Transportation. 2. Materials a. References: the abbreviated title, "FDOT Specifications," used herein refers to the Standard Specifications for Road and Bridge Construction 2010, of the Florida Department of Transportation. b. Stabilizing Agent: Stabilizing agent shall consist of emulsified asphalt, type CSS - 1h, meeting the requirements of ASTM D2397-98 and shall be injected in the base material. c. Asphalt Emulsion mix design: Asphalt emulsion is to be used as the stabilizing agent. The Contractor shall obtain a mix design study based on the material in the existing layers. Prior to scheduling the work, the Contractor shall obtain the services of an independent laboratory which shall sample the pavement, base, subgrade and shall perform a modified Marshall Stability Test and a recommendation as the depth of mixing and the rate and depth of emulsion treatment. The Reclaimed Asphalt Base Course shall have a minimum Structural Number (SN) of 1.8 for the total thickness of the finished/completed base course. The Contractor shall be responsible for preparing Mix Designs for the Reclaimed Asphalt Base Course prior to the start of construction. The Contractor will also be required to test the completed base course and provide test results that verify that the completed base course meets the specified Structural Number. All Mix Design testing/preparation and testing for verification of the Structural Number shall be performed by an independent testing laboratory and all costs associated with the Mix Design preparation and SN verification testing shall be the responsibility of the Contractor. The assumed Project Mix Design is based on a mixture of 9" of reclaimed asphalt and limerock or cemented coquina base and 2.75 gallons/SY of CSS -1 H Emulsified Asphalt. The target Mix Design shall have a minimum Asphalt Structural Number (SN) of 0.20 per inch. The Mixture used in the work shall be as determined by the project specific Mix Design Testing. The Testing Laboratory preparing the Reclaimed Asphalt Base Course Mix Designs and SN verification testing shall be an accredited laboratory that is regularly engaged in asphalt testing including the preparation of Mix Designs for Cold Recycled Bituminous Base Course or Reclaimed Asphalt Base Course, and testing to establish and verify Structural Number for asphalt base course layers. The Contractor shall provide information for proposed testing laboratories and mix designs shall be subject to the approval of the County. The Mix Design study and recommendations shall be forwarded to the County at least five work days prior to starting operation. d. Granular base material: Granular base material to be added to the reclaimed layers shall consist of limerock meeting the requirements for Limerock Stabilized 01025-15 Technical Specifications FAPublic Works\ENGINEER] NG DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ f1�9R\4flmiml(`nnfror} flnnnmen4c\Terhnirel Cnerifirofinne Anr Base of the FDOT Specifications, Section 911. Further, it shall have a minimum LBR value of 100. 3. Equipment a. General: The Contractor shall accomplish the work utilizing a road reclaimer, a motor grader, a vibratory roller or three -wheeled roller, a water truck with spray bar and such additional equipment as may be necessary to the operation. The required equipment shall be subject to the County's approval, and the County may, at any time during the work, disapprove the use of a particular machine for unsafe, erratic, or inadequate performance. Utilization of a proper road reclaimer and compaction equipment as specified herein is essential to this work, and substitution of other equipment or a different technique shall not be acceptable. b. Reclaimer: The work shall be performed utilizing a road reclaimer machine originally designed for pavement reclaiming. The road reclaimer shall be a CAT 350, larger or a comparable model of equal or greater horsepower and rotor size, produced by another manufacturer. The reclaimer shall be capable of pulverizing and mixing pavement, base materials, and subgrade soil to depth of 16 inches. It shall be capable of injecting asphalt emulsion into the rotor chamber at an accurately controlled rate and of doing so in confined areas inaccessible to a tanker truck. c. Compacting equipment: The Contractor shall compact the reclaimed base material with a vibratory roller weighing not less than 13,000 lbs. or by a three wheeled roller weighing not less than 11 tons. The vibrator must be fully operable at maximum amplitude throughout the compacting process. 4. Construction Procedure a. General: When the work is to be performed under traffic, each lane shall be completed in segments, the lengths and limits of which shall be approved by the County. The County may limit the length of the work zone to avoid causing a traffic hazard or undue delay. Before commencing the reclaiming operations, the Contractor shall set alignment stakes (laths) at intervals of 200 feet or less on both sides of the road, offset at least 4 feet from the proposed edge of pavement for use in preparing the base and placing the new pavement. The setting of laths shall be in addition to any other markers or reference points required under the Contract, and the placing of surveying markers or other references elsewhere shall not substitute for the required laths along the existing pavement. Prior to beginning work, the Contractor shall relocate all mailboxes, newspaper boxes, signs, and other appurtenances which are located within such proximity to the roadway as to risk damage or to interfere with the work. Before this work may begin, residents and businesses shall be notified of the impending work by means of printed flyers. After all other work items are complete, the removed items shall be replaced in their original locations, except that the distance from the proposed edge of pavement shall be as prescribed by County requirements or guidelines. b. Reclaiming: The Contractor shall pulverize the existing pavement in multiple passes of the reclaimer, applying sufficient mechanical effort to reduce the fragments to a maximum size of 3 inches. In this process the pulverized material shall be combined uniformly with the base and subgrade to a depth specified in the Contractor's Mix Design. Following the reclaimer, a roller shall be applied to compact the blended material sufficiently to support traffic temporarily. The County requires removal of approximately 2-1/2 in of pulverized material prior to addition of the stabilizing agent. When the pulverizing and mixing step is complete, the material shall be graded, watered, remixed, shaped, and compacted as necessary to 01025-16 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ establish proper grade and uniform thickness and to support traffic temporarily. Water shall be applied if necessary to obtain uniform moisture content as required by the Contractor's Mix Design, The Contractor shall apply additional water at frequent intervals as needed to suppress dust, preserve the surface, and maintain the specified moisture content. The stabilizing agent shall then be applied and mixed to the depth specified by the County, and grading and compaction of the combined base material shall proceed immediately behind the mixing of the stabilizing agent. Before final grading and the addition of the emulsion, the Contractor shall adjust the cross -slope, super elevation, and profile grade by adding granular base material as required to provide the required grade and cross slope for the road, or removing material. c. Compaction: The Contractor may employ other compaction equipment and methods in addition to the vibratory roller to accomplish the final grading and to compact and finish the surface. Transverse joints shall be compacted by crossrolling parallel to the joint. After the material has been compacted to load-bearing strength, the Contractor shall proof -roll the prepared base in the presence of the Inspector. The County may, as it deems necessary, direct the Contractor to correct areas of weakness and excess moisture in the base by scarifying, aerating, and reworking shore sessions to the full depth of the layer. If, after an area has been reworked and recompacted, it remains soft or does not attain the required density, the County may direct the Contractor to remove the material and replace it with Granular Base Material meeting the requirements of these specifications. 5. Basis of Payment a. Mobilization for reclaiming: No payment for mobilization shall be due for returning the equipment to the site when it has been removed and returned for the Contractor's own purposes or because of breakdowns and repairs, weather delays, labor problems, accidents, or the like, or when work has been resumed after being stopped by the County because of unsatisfactory materials, equipment, or performance. Payment for Mobilization shall be Lump Sum for the project. b. Reclaimed Asphalt Base, in place and accepted, shall be paid for at the contract unit price per square meter or square yard, as indicated in the Bid Sheet. The area of work for the purpose of payment shall be the overall length of each reclaimed lane times the specified total base width for the lane. The total base width shall include the widening width, if any, in which the reclaimer is to be used to blend new base material with the pulverized layers. Payment under this item shall be full compensation for all work included in or incidental to the reclaiming operation, for the grading, shaping, and compacting of the Reclaimed Asphalt Base, for the mix design study, for furnishing, delivering, and applying water, for applying and mixing and furnishing asphalt emulsion or other stabilizing agent as specified, and for all other work and material incidental to the reclaiming operation. Completed Base Course Testing — The Contractor shall perform a minimum of 8 tests of the completed base course to verify that the completed base course meets the specified minimum Structural Number of 1.8. Test locations shall be determined by the County. In the event that the minimum Structural Number is not achieved, the County may require corrective action, including the placement of additional asphalt structural course at the expense of the Contractor. c. Payment for Granular base material is included in the cost of the Reclaimed Asphalt Base. The Contractor shall determine how much if any granular base is 01025-17 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ no0a1e.4., i-Xrr.,.,1. # enenffi—fi— A— required and shall include the cost for granular base in the cost of the Reclaimed asphalt base. d. Asphalt Emulsion type CSS -1 h shall be uniformly incorporated in the layer at the rate specified by the Mix Design. Payment is in gallons of Asphalt Emulsion Type CSS -1 h. e. Manholes: Each manhole shall be protected during the reclamation process. After final pass of reclaimer and final compaction, manholes shall be adjusted to the appropriate height to accommodate the asphalt overlay finish grade. f. Water Shutoffs: Water shutoffs and other valves or shutoffs shall be protected during the reclamation process. After final pass of reclaimer and final compaction, water shutoffs and other valves and shutoffs shall be adjusted to the appropriate height to accommodate the asphalt overlay finish grade. g. Material/Removal: Material shall be removed from the roadway area in order to prepare for a desired final grade or removal of unsuitable material. Approximately 2- 1/2" removal shall be required off the top after initial pulverization. There is no additional payment for removal of material. Items of Payment Payment for the work specified in this item shall be made under: Bid Item No. 285-7 — Optional Base Course — Per Square Yard Bid Item No. 300-1 — Asphalt Emulsion type CSS -1 h — Per Gallon SECTION — 334 - SUPERPAVE ASPHALTIC PAVEMENT The work specified in this item shall conform to Section 334 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction (2010). Sub article 334-8.1 through 334-8.3 — Basis of Payment shall be deleted in its entirety. Sub article 334-8.4 — Payment shall be amended as follows: Item No. 334-1-13A — Superpave Asphaltic Concrete —1" SP 9.5 — Per Square Yard. Item No. 334-1-13B — Superpave Asphaltic Concrete — 1 Y" SP 12.5 — Per Square Yard. SECTION — 570 — PERFORMANCE TURF The work specified in this item shall conform to Section 570 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction (2010). A. Description: Sod for the project shall be of the variety that is common to the area and of a variety approved by the Engineer. This work shall also include mowing in accordance with Section 104-7.2, to be mowed at 6" height with a mulching mower. B. Work Included: Scope of Work: The work specified in this section consists of the establishing of a stand of grass, within the project, right-of-way, easements, and 01025-18 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ no')RXA,A„ im%r'^.,rr—f r)—l—fo\T-11ni—I c o�ta �+ rl— other areas indicated on the Drawings, by furnishing and placing grass sod. Also included are fertilizing, watering and maintenance as required to assure a healthy stand of grass. Two applications of fertilizer will be required with the initial application being fertilizer and the second application being "weed and feed". C. Guarantee: All sodded areas shall be guaranteed for three months after date of final acceptance. Replacement of Defective Sod: Any dead sod or sod showing (less than 95% of a square) indication of probable non survival or lack of health and vigor, or which do not exhibit the characteristics to meet specifications, shall be replaced within two weeks of notice from Owner or Engineer. All replacement sod shall be furnished/installed at no additional cost to the Owner and shall be guaranteed for three months. All replacement shall meet original specifications. The Contractor shall notify the Owner and Engineer ten days prior to the end of the guarantee period and such guarantee shall be extended until notification is received. At the end of the guarantee period, all sod that is dead or in unsatisfactory growth shall be replaced within two weeks. D. Fertilizer: Commercial fertilizers shall comply with the state fertilizer laws. The numerical designations for fertilizer indicate the minimum percentages (respectively) of (1) total nitrogen, (2) available phosphoric acid and (3) water-soluble potash contained in the fertilizer. The chemical designation of the fertilizer shall be 16-4-8. Fertilizer shall include iron, minor nutrients and trace elements. At least 50 percent of the nitrogen shall be derived from organic sources. At least 50 percent of the phosphoric acid shall be from normal super phosphate or an equivalent source which will provide a minimum of two units of sulfur. The amount of sulfur shall be indicated on the quantitative analysis card attached to each bag or other container. Contractor shall ensure 1 pound of nitrogen per 1,000 square feet. E. Water for Grassing: Contractor shall provide the water used in the sodding operations as necessary to meet the requirements of Article 570-5 and 2.34.B. F. Preparation of Ground: The area over which the sod is to be placed shall be scarified or loosened to a depth and then raked smooth and free from debris. Where the soil is sufficiently loose and clean, the Owner, at his discretion, may authorize the elimination of ground preparation. G. Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a range of 6.0 - 7.0. Contractor shall apply two (2) applications. The initial shall be fertilizer and the second application shall be "weed and feed". The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds per acre, or 10 pounds per 1,000 square feet, by a spreading device capable of uniformly distributing the material at the specified rate. Contractor shall apply applications as per manufacturer's specification. All tickets from bags shall be handed over to the County Inspector. On steep slopes, where the use of a machine for spreading or mixing is not practicable, the fertilizer shall be spread by hand and raked in and thoroughly mixed 01025-19 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ c—M—+l— A- with the soil to a depth of approximately 2 inches. H. Placing Sod: The sod shall be placed on the prepared surface, with edges in close contact and shall be firmly and smoothly embedded by light tamping with appropriate tools. Where sodding is used in drainage ditches, the setting of the pieces shall be staggered so as to avoid a continuous seam along the line of flow. Along the edges of such staggered areas, the offsets of individual strips shall not exceed 6 inches. In order to prevent erosion caused by vertical edges at the outer limits, the outer pieces of sod shall be tamped so as to produce a featheredge effect. Where sodding is placed abutting paved shoulder, the contractor is to ensure that the finished sod elevation is 1 %2" below paved shoulder. On slopes greater than 3:1, the Contractor shall prevent the sod from sliding by means of wooden pegs driven through the sod blocks into firm earth, at suitable intervals. Sodding shall not be performed when weather and soil conditions are, in the Engineer's opinion, unsuitable for proper results. Sod shall be placed around all structures, equipment pads, etc. I. Watering: The areas on which the sod is to be placed shall contain sufficient moisture, as determined by the Engineer, for optimum results. After being placed, the sod shall be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks. Thereafter, the Contractor shall apply water as needed until the sod roots and starts to grow for a minimum of 60 days (or until final acceptance, whichever is latest). J. Maintenance: The Contractor shall, at his expense, maintain the sodded areas in a satisfactory condition until final acceptance of the project. Such maintenance shall include repairing of any damaged areas and replacing areas in which the establishment of the grass stand does not appear to be developing satisfactorily. Replanting or repair necessary due to the Contractor's negligence, carelessness or failure to provide routine maintenance shall be at the Contractor's expense. The Contractor shall maintain the sodded area up to the final acceptance date as directed by the Engineer. Grass height shall not exceed 6" without mowing. Clippings shall be removed from sidewalk. K. Article 570-9. The first two paragraphs under this Article are deleted and the following substituted: The contract unit price for sodding shall include the costs of sod, fertilizer (2 applications), sidewalk sweeping after mowing, mowing, pegging disposal of clippings, water, tools, equipment, labor and all other incidentals necessary. Item of Payment Payment shall be made under: Bid Item No. 570-1-2A — Performance Turf (Sod) (Bahia) - Per Square Yard Bid Item No. 570-1-213 — Performance Turf (Sod) (St. Augustine, Floritam or match existing) - Per Square Yard 01025-20 Technical Specifications FAPublic Works\ENGINEER] NG DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ r)nl)a\A.1n..-.. -- I T__ -__i'.__ --- _.. _._ SECTION - 00700 SIGNING AND PAVEMENT MARKINGS A. Signing and pavement marking for traffic control shall conform to the requirements of the Standard Specifications (2010), Manual on Uniform Traffic Control Devices, Supplemental Specifications, Roadway and Traffic Design Standards, manufacturer's specifications. B. Traffic Signs: All existing signs which are the property of the Owner shall be transported to the Indian River County Road and Bridge Maintenance Yard by the Contractor during construction if they are within the construction limits. Care shall be exercised by the Contractor during removal, storage and relocation so as not to damage the signs. If any damage occurs, as determined by the Owner's Engineer or Resident Construction Inspector, the sign shall be replaced by the Contractor with no compensation. C. All reflective pavement markers shall be 4" x 4". Item of Payment Payment shall be made under: Bid Item No. 663-74-15 — Econolite Vehicle Detector Assembly — Per Each Bid Item No. 700-20-11A — Sign Single Post (W4 -2R MERGE) - Per Assembly Bid Item No. 700-20-11 B — Sign Single Post (R3 -7R RT LANE MUST TURN RT) - Per Assembly Bid Item No. 706-3 — Retro -reflective Pavement Markers White/Red — Per Each Bid Item No. 706-3A—Retro-reflective Pavement Markers Amber/Mono — Per Each Bid Item No. 706-313 — Retro -reflective Pavement Markers White/Red — Per Each Bid Item No. 711-11-121 — Traffic Stripe (Solid) (Thermoplastic)(White)(6") — Per Linear Foot Bid Item No. 711-11-123 — Traffic Stripe (Solid) (Thermoplastic)(White)(12") — Per Linear Foot Bid Item No. 711-11-125 — Traffic Stripe (Solid) (Thermoplastic)(White)(24") — Per Linear Foot Bid Item No. 711-11-141A — Traffic Stripe (Skip) (10'-30') (Thermoplastic) (White) — Per Linear Foot Bid Item No. 711-11-141 B — Traffic Stripe (Skip) (6-10') (Thermoplastic) (White) — Per Linear Foot Bid Item No. 711-11-160A — Pavement Messages (Thermoplastic) (MERGE) — Per Each Bid Item No. 711-11-160B — Pavement Messages (Thermoplastic) (ONLY) — Per Each Bid Item No. 711-11-170 — Turn Arrows (Thermoplastic) — Per Each Bid Item No. 711-11-221 — Traffic Stripe (Solid) (Thermoplastic) (Yellow) (6") — Per Linear Foot + + END OF SECTION + + 01025-21 Technical Specifications FAPublic Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ APPENDIX `A' GEOTECHNICAL REPORTS Appendix A -Permits F;\Public Works\ENGINEERING DIVISION PROJECTS\1132-CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\Contract Documents\APPENDIX A - Geotech.doc DUNRChBERGER engineering & testing, inc. www.dunkelborger-ongineoring.com • Fort Lauderdale • Lakeland • Port Saint Lucie • Sarasota • West Palm Beach Indian River County April 19, 2012 1801 27`h Street Project No. PSL -093054 (10.6) Vero Beach, Florida 32960 Attention: Mr. Michael D, Nixon, RE....Wa e -mall (tnnixon@ircgov.corn) Subject: Engineering Services - Pavement Coring Services CR512 from Roseland Road to Easy Street Indian River County, Florida Dear Mr. Nixon: Dunkelberger Engineering & Testing, Inc. (Dunkelberger) has performed Pavement Coring Services for the eastbound lanes of CR512 that are located between Roseland Road and Easy Street in Indian River County, Florida. The subject roadway section incorporates approximately 1.9 miles of two-lane flexible pavement that was rehabilitated in the 1990s with an asphalt pavement overlay and addition of turn lanes. Base on our meeting with your office on March 1, 2012, we understand that the County is planning to rehabilitate the subject roadway section. The overall objective of this work is to provide the County with feasible economic rehabilitation alternatives, which would allow your office to select the optimum rehabilitation strategy. The approach consisted of collecting and analyzing the relevant project data, including (1) the extent and depth of distresses; (2) the composition of the existing pavement including the subgrade and embankment; and (3) project constraints and special considerations. Based on the evaluation results, we have provided rehabilitation alternatives which can repair the distresses and also are able to prevent the rapid recurrence. DATA COLLECTION Dunkelberger performed pavement coring at select locations within the project limits as well as an existing pavement condition survey. The purpose of the coring work was to determine the composition of the existing pavement and the depth of its distress while the primary objective of the condition survey was to identify the types and extent of the distresses. Pavement Distresses: Types and Extent The results of our site visit on March 1 and April 12, 2012 indicated that more than 80% of the existing pavement was distressed, The dominant types of distress are the longitudinal and block cracking, while moderate raveling and potholes in some isolated locations were also observed in the existing roadway. The longitudinal cracking was located in wheel paths as well as along the construction joints between paved driving lanes. State of Florida Board of Professional Engineers Authorization No. 6870 877,64.3.6832 C512 Roadway Coring Project No. PSL-lQ-3054 (BG.6) Coring Woi-hand 'Ffiidings Page 2 On April 02, 2012, 6 total of seven (7) 4 -inch. diameter pavement cores were out at the select .locations. as sho' Nrn on the attached Sh6.et 1. At each core location, a hand auger was used to drill. Jot the under .9 h lying base and subgrade materials, which were sampled. approximateY. I it thQ middle of each layer.. Along with. the asphalt pavpnipat cores,. I .he representatiyp ba'ge * Rod gi sub Me, soil materials. were sampled and transported lack to our laboratory for. Visuals -manual 'e-kaiiiiiWi6n and claoificatl6n, The; tlTIc*kndss measiuielnofits: and thedes.cf1ptions of the base and Embgrad�o-oigtorlah*.are summ-orized inAp ix ... f- . and ptoontt d:.gophically it -Figure I below. 0 5 X0 Core Number C -I -64 C•S C-4 C-5 C-6 4 1. :0 Asphalt M Concrete n Base. 14'Subgrade Figure 1. Subsurface Pro.fi.16 Reference: to this information shows: (1*)* TSe- typiqql - thic.kaess!of the asphalt p-a-vernentl cored with -In the proj-pet- li ranged frons 3'Xi- -Indifi'to 4/4 niches with an aveiage of.. 3-7/9- inches. The twooutliers are: i0-4'*hioh has a MJ11aft Asphalt po-em6nt'o-vev-,M.4 tI-h&e�-- of :and 0-7.4t.1he.- takii.-lane 'Which has (2) Visual evaluation iodicafes that pll of these pavement, 00TO-S . consist. of it lifts with an average thickness:-ofthet top. li*R- of % inch, and that all cracking ,at the select core locations extend through the. entire-.t&616iesses. C512 Roadway Coring Project No. PSL -10-3054 (BG 6) Page 3 (3) The base course has an average thickness of 83/4 inches, and was mainly constructed with limerock or cemented coquina at the selected core locations. (4) Underneath the base course appeared to be natural sandy materials with no sign of stabilization. Hardpan soils were encountered underneath the subgrade at two core locations: C-1 and C-2. Hardpan is a dark, organically stained, weakly cemented fine sand material which is firm and dense when undisturbed, and most notably is low in permeability. (5) At the time of our field work, the groundwater table was about 4 feet below the road surface. Project Constraints and Special Considerations There are side streets and driveways to the businesses. Most of the driveways are sloping down to the roadway with the edge flush or higher than the edge of the asphalt pavement. DATA ANALYSIS Possible Causes of Distresses Considering the service life and service conditions of the subject pavement, our opinion is the following factors have been the major contributors to the observed pavement distress. 1. Ageing of the asphalt binder: asphalt binder is flexible when it is new, and becomes stiff and brittle when it is aged. The aged asphalt pavement tends to crack under traffic loads as well as from thermal cyclic loads, and shrinkage due to a loss of the lighter (more volatile) hydrocarbons (oils). 2. Fatigue of the existing pavement: Increase in loading from higher volumes and heavier vehicles than anticipated in the original design. Under heavy loads, the aged pavement cracks as one or more longitudinal cracks. After repeated loading, the longitudinal cracks connect forming many-sided sharp -angled pieces that develop into block cracking. 3. Poor quality of Initial Construction: The longitudinal cracking between paving lanes most likely resulted from weak joints that lacked sufficient compaction during initial construction, which became more vulnerable to attacks from weathering conditions; 4. Lack of timely maintenance -- The existing pavement most likely experienced severe cracking before maintenance rehabilitations were performed in the past. Without timely repairs, the pavement is exposed to more severe service conditions due to (1) the stress concentration under traffic; and (2) water damages and accelerated ageing process. 5. Ineffectiveness of the rehabilitations: The multi -lifts of the asphalt pavement section indicated that the existing pavement was overlaid at a later time after its initial construction, The top lift appeared to consist of Superpave 12.5 or Type S-1 asphalt mix, which requires a minimum of 1.5 -inch thickness for a proper compaction. The 3/ -inch asphalt pavement at the top lift makes it very difficult to achieve the required compaction. Insufficient compaction and low pavement density makes the pavement more vulnerable to damages caused by environmental attacks and traffic loading. This condition would also shorten the time for reflective cracking to appear in the overlay. ®ur�lcelllber�er 0512 Roadway Coring 10,3054 Project No. PSI(BG 6) Pavement Section -Page 4 In, our Opinion, the thicknesses of pavement components are 60ni. 0 typical. es I fol _parable t the typi 1. (1 ig.1 f typ this of roadway. However, the aged and distressed asphalt 'PAV611let 11as_ compromised its 0 ... structural capacity to meet the current traffic loading conditio*hs. -8a ed urrent on its. fair to poor coridilioij, the f6lloving- table. pi ovides an estimated Structural N pnibor ($N) of the existing pavement section. The'de8ign. SN of the, sarne pavement -structure would be -J, . 33, REHABILITATION ALTEc-RNA-T .14 s-Unlroary, the existing pavement. exhjbjU -e Xtensive - -dist g pa resses, as a. re�iilt, the P si. n ve-ment- 8fruc mal capacity is -sig fjeatjq- T.ed - h 0 with an Wi -acc.eloraod dpte rate:. With continuous ipete. as.qjn the traffic loading, the ppvemoAt jjeedsjo be repaired . to mfti the N16WIng-driteria, (1) All distresses are repaired and.flie rootca*-Lises -OfIlie ;_distresses:a TQW.U�ThO-9trilctbraleVaeltY of lire restored to currently as well as thr. .. .00ghotlt its. m'vicee life with nojilial i-naintonance, (3.) The, :repalk*--Om -'sh Id be economically viable jnx.049,11-to the -.expected servicelife.; and -(4) Meet atlWstraintg r4 #Opiaj . project' nd/or requirenients.. Based on the af6mmentioned considerations and: requirerneAt.*8,-t h,efi'oQv -.vjig ll j .. ,. are the keOrnmi n6.d rehabilitative alternatives in an order of cost. I of he: and a predetermined portion of the underlying base, pr su . bgra de is UnifUmly. pulverized and blended to produce an upgraded,. horfiogefie6us m atei-jal, Sometimes this, bl.6!4 sufficiently strong to serve -as the'boe %t:a t*,w- pa_,vdtjjbjjt. u & 6:f stabilizers, -can is . e result ..In. greatly increased strengths in addition to linpmving `04stahP01o A 0 - *1' " OD gj,*rin ra t ois. tire damage"it is imperative that representative- samples be taken ffo-M. OW layor to; 0 - dl; preferably iri shliffu' gradations As would be produced by the. recycling p'ropess, in order to evaluate stabilizer'type and contentji " the :lab. After the recy6libg. is: c . OMPI-00, tho'.:ftiat,:should . be: allow -ed' to ;et jre°.-(dq out), and their be surfaced with -ain lifin-Lim of 'l V2 ill B fni` x, L B-6ftefit' 13Y.FDR process, pavement cracks are totally eliminated :and O s rue. -ira t. t lissues can. be addtWed. -FDR_ also. allows the: structural. capacity of .the roadway to be increased b deepehi.qg,the. depffi. f I-Coyc ujg- AnY A0justn!b))T9 of cross slope can-be:achieved easily as vVellI ; 2. Cost Typically $'6 per square- yard to construct a FDR base course wjfh a reolarndti*01i Opal, of niches, and 110.50 per SY f6r a 2.5 -inch* Superpa-ve asphalt P'qvomeht ovbJAY.. ib"'inkeibeti6eii ri. C512 Roadway Coring Project No. PSL -10-3054 (BG 6) Page 5 3. The expected life of FDR with this overlay is 1020 years is the same life as a total reconstruction project. Partial milling with ARMI: Cracks left in the underlying layers will reflect up through overlays due to the stress concentrations at the cracks from temperature movements and load deflections. This movement causes overlays to deteriorate faster than would be indicated strictly by the structural number calculations. The ARMI layer will reduce the stress concentration by providing a reflective cracking proof layer while the overlay thickness' would reduce the load deflection and help insulate the cracked pavement from temperature movements. A 1 %Z to 2 inch asphalt structure coarse layer is required to be placed over the ARMI Iayer to provide the heat to develop bonding between the layers and provide a smooth surface. 1- Benefit: This repair takes less time compared to other alternatives, 2. Cost: $2 per SY for 3.5 -inch milling, $4,14 per SY for ARMI layer and $10.50 per SY for 2.5 -inch overlay. 3. The expected life of CIR with this overlay is 6-10 years. Cold In- lace Reesrclin>: ((,IR): In the cold in-place recyclingCIR existing asphalt pavement is cold milled, crushed, and mixd with a small amount ofeas htalt emulsion, and then placed and compacted without any heat, After the recyclihe ng is complete, the mat should be allowed to cure (dry out), and then be surfaced with a minimum of 1 2 inches Superpave hot mix asphalt. The best candidates for the CIR process are roadways which are cracked while remaining structurally sound and having a well -drained base. I . The main benefit of CIR is that pavement cracks are eliminated and the structural value of the roadway is restored and/or increased, thus extending the service life. 2. Cost: Typically $8.5 per SY for CIR and $10.5 per SY for a 2.5 -inch Superpave asphalt Pavement overlay. 3. The expected life of CIR with overlay is 10-20 years; which is the sante life as a total reconstruction proj eel. Total Reconstruction of the Pavement Section: This alternative involves removal of the existing asphalt pavement in its entirety and replacing with a total of 4.5 inches of hot mix asphalt (HMA) pavement, which consists of two lifts of 1.5 -inch structural course asphalt followed by a 1.5 -inch frication course layer at the surface. The HMA requirements are Superpave 12.5 Traffic Level (TL) C for the structural course and FC 12.5 TL C for the friction course. 4. Benefit: Pavement cracks are totally eliminated and the structural capacity is restored. 5. Cost: $12.13 per SY for 3 -inch Superpave structural course, $6.50 for 1.5 -inch friction course with polymer modified binder, $2 for removal of the existing asphalt pavement. 6. The expected life of CIR with this overlay is 1020 years; which is the same life as a total reconstruction project. It is critical that each of the rehabilitation options provided above are carefully designed and Properly constructed to achieve the full potential that each alternative offers. Additionally, economic restraints must be considered during the selection of the alternatives to County's resource allocations. As a matter of interest, most prices stated above are FDOT wide meet the averages for 2011 calendar year. K)Unkellberaer C512.Roadway Coring Pxojciat No. PSL -10-3054 (BG 6) 000 - Page 6 We trust that this information is Clibar and understandab-16., Please f6el free t Claifflchtioft reg4rdffig this .0 00 if you heed -any matter,. or if you DeeO any additional information, Shicerely, UUNKELBERGtiR-L,NOINF ERIN Be.TCSII IG, INC,. 0(Sue * ya"i ) Z Idog, ph -D., P.E. FL Registration No..6833,0... 87AM.0 I Mobael J. olconhor, p,*E,. ExePlItive Vice President PL Regis t . tra ion No.. -44092. Attachnjentsc Sheet I —Pavement Core o Lo.c.ati :1 -n-plall Appendix. -1 — Summary of PaVel"ent cokeMOa810omeirtts and. Desoript.joil$. U"Jakelberger