Loading...
HomeMy WebLinkAbout2016-079 WORK ORDER NUMBER 6 Oslo Road (91h St. SW) and 66th Avenue Intersection Improvement IRC Project No. 1203 This Work Order Number 6 is entered into as of this 24 day of May 2016, pursuant to that certain Continuing Contract Agreement for Professional Services, dated November 15, 2011 and that certain Extension and Amendment of Continuing Contract Agreement for Professional Services entered into as of the 4"day of November,2014(collectively referred to as the"Agreement'), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Kimley-Horn & Associates, Inc.("Consultant"). EXHIBIT A SCOPE OF WORK The COUNTY desires to prepare traffic signalization plans associated with the Oslo Road/ 661h Avenue Intersection Improvement Project. It is understood that the proposed signalization improvements will consist of a box span-wire traffic signal assembly at the subject intersection which will be designed to meet current IRC and FDOT standards. It is understood that the proposed signalization design will be performed based upon the proposed IRC roadway geometry. The plans will include the design and layout of proposed signal poles, signal heads, loops, conduit, and pull boxes. The plans will include all call outs, loop detector chart, controller timing chart, signal head details, sign details,controller notes,signal operating plan,overhead street name sign design details, pole schedules, tabulation of quantities. The set of plans will include the following sheets: key sheet; tabulation of quantities; general notes; plan sheet; sign work sheets (if necessary) and strain pole schedule. The COUNTY will provide geotechnical data necessary to support the strain pole selection. The County agrees to provide (in a timely manner) the following material, data, or services as required in connection with the work to be performed under this Agreement; all of which information the CONSULTANT may use and reasonably rely upon: A. Provide the CONSULTANT with a geotechnical investigations, traffic counts, preliminary data or reports available,existing location surveys,topographic surveys,and related documents required to complete the construction documents. B.! Provide the CONSULTANT with all available drawings, right-of-way maps, and other documents in the possession of the County pertinent to the project. C. The County shall make provisions for the CONSULTANT to enter upon public and private property as required for the CONSULTANT to perform his services. D. The County will promptly execute all permit applications and provide application and review fees necessary to expedite the acquisition of any local, state or federal permits made necessary by the project. I I E. The County will pay for all permit fees. A. Traffic Signalization Plans: Roadway set of plans shall consist of the following: 60% 90% 100% Cover Sheet C C F Summary of Pay Items P C F Summary of Quantities& General Notes P C F Signalization Plans P C F Construction Cost Estimate and Quantities C C F Notes: P—Preliminary, C—Complete, but subject to change, F- Final The plans will be prepared based upon English units. Final digital design documents will be provided to the County in AutoCAD format. The following additional data shall be utilized for development of the plans: 1I. The roadway plans sheets will be drawn at a scale of 1" =40' prepared on 11" x 17" sheets. 2. Plan sheets shall depict existing right-of-way, section lines, property lines, temporary construction easements, and centerline of construction. Horizontal control points with state plane coordinates for all PC's, PT's,curve radius,curve length and horizontal Pi's shall be included on the Plan or summarized in an alignment table. 3] Plans shall include spot grades adequate to describe any proposed grading. 4. Match lines shall not be located within the limits of an intersection. 5. If applicable,soil boring information shall be plotted on cross sections with soil classification and high season water table. 6. All quantities shall reference FDOT Pay Item Numbers. 7. All details shall reference FDOT Index Numbers. 8. All specifications shall reference to County and/ or FDOT Specifications for Road and Bridge Construction. Any deviations are special specifications not included in FDOT Specifications are required in the Technical Specifications. 91 60%, 90%abd 100% Plan Submittals shall include the following: i. Three (3) Sets of Signed and Sealed Plans. ii. One (1) Opinion of Probable Construction Cost iii. One (1) CD with drawings in PDF format,final submittal shall include .dwg files. iv. The CONSULTANT will provide construction documents and calculations in sufficient quantity as required by the various reviewing agencies. i B. Utility Coordination: The CONSULTANT will coordinate with franchise utility operators in the vicinity of the project such that the proposed construction activities can be developed to minimize impacts to existing utilities located withinithe project limits. Any utility permitting and relocation design required to accommodate the proposed improvements will be addressed as an additional service relative to this scope of work. FEE SCHEDULE Thi i COUNTY agrees to pay and the Consultant agrees to accept for services rendered pursuant to this Agreement fees inclusive of expenses in accordance with the following: i A. Professional Services Fee The basic compensation mutually agreed upon by the Consultant and the COUNTY is as follows: I Lump Sum Components Task Labor Fee Traffic Signalization Plans $ 20,360 i Utility Coordination $ 2,780 i Project Total $ 23,140 TIME SCHEDULE Upon authorization to proceed by the COUNTY, final design documents are expected to take approximately three (3) months from the Notice to Proceed (NTP). NTP Upon BOCC Approval Phase I Submittal (60% Design Plans) 1 months following NTP Phase II Submittal (90% Design Plans) 2 months following NTP Phase III Submittal (Final Design Plans) 3 months following NTP Thl COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A (Scope of Work), part of this Work Order and made part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit A (Fee Schedule), part of this Work Order and made a part hereof by this reference. The Consultant will perform the professional services within the,timeframe more particularly set forth in Exhibit A (Time Schedule), part of this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. INIWITNESS WHEREOF,the parties hereto have executed this Work Order as of the date first written above. CONSULTANT: BOARD OF COUNTY COMMISSIONERS KIMLEY HORN &jg §CJCIATES, INC. OF INDIAN RIVER COUNTY By: By:TU Bob Solari, Chairman Title: BCC Approved Date: May 24, 2016 COAtry�s.o Attest:Jeffrey R. Smith, Clerk of Court and Comptroller By: CY4-t� Deputy Clerk 'FROOUNN�%'� ,.�•• Approved: Joseph . Bai d, County Administrator i Approved as to form and legal sufficiency: Dylan T. Reingold,County Attorney