Loading...
HomeMy WebLinkAbout2016-103 EXHIBIT A W. O. NO. 1 BRICK MANHOLE REHABILITATION PROJECT PURPOSE The purpose of this Task Order is to describe the Scope of Services for the Brick Manhole Rehabilitation Project. The overall goal of the project is successfully rehabilitate brick manholes using a structural epoxy coating system as an alternative to installation of a FRP liner system. An FRP liner system requires that the cone section be removed and replaced causing significant public disruption and added expense to the OWNER. The OWNER has selected six (6) of their worst brick manholes for this project located within the Ixora Park Subdivision. This task order includes the development of performance specifications, application services/inspection/quality control testing of the rehabilitated manholes, and a brief summary technical memorandum. ENGINEER'S SERVICES ENGINEER's services include the following three tasks to complete this assignment. These tasks are discussed in detail below. • Task 1 - Performance Specification Development • Task 2 - Application Services/Inspection/Quality Control Testing • Task 3 - Technical Memorandum TASK 1. PERFORMANCE SPECIFICATION DEVELOPMENT ENGINEER will develop a performance_specification to cover the brick manhole rehabilitation utilizing a structural epoxy coating system. Deliverables by ENGINEER for OWNER review and input: • Performance specification TASK 2. APPLICATION SERVICES/INSPECTION/QUALITY CONTROL Subtask 2.1. Application Services ENGINEER has selected the application of the structural epoxy coating system based on prior successful experience rehabilitating brick manholes. ENGINEER will coordinate the application services to perform the rehabilitation of the six (6) brick 48-inch diameter manholes. The manhole locations and depth are listed below: 2534 2nd Street 10'-5" Lift Station 100 12' 2464 1st Place 9' 2184 1st Place 7' _ H-\Client\Indian River County\Contract\IRC 2016-TO2_doc 1 2413 2nd Street SW 8' 2413 2nd PI SW 6' Owner will be responsible for any permits and debris removal that may be required No permits are anticipated, since all work will be performed through the open manhole lid Subtask 2.2. Inspection i ENGINEER will perform limited on-site field inspection and train County inspectors on the steps involved with the successful rehabilitation of brick manholes Assume three days Subtask 2.3. Quality Control ENGINEER will observe two quality control tests during subtask 2.2 The first is a spark testing of the finished surface of each manhole to ensure that no pinholes exist. The second is adhesion tests of two of the six manholes to ensure that the minimum adhesion test requirement has been achieved. The test will be extended to failure to access the maximum adhesion that was achieved. Costs associated with this task are included in subtask 2.2 TASK 3. TECHNICAL MEMORANDUM Subtask 3.1. Draft Technical Memorandum At the completion of the manhole rehabilitation (Tasks 1 and 2), ENGINEER will produce a brief draft technical memorandum (TM) summarizing the results of the project and distribute the TM to OWNER for review and approval Subtask 3.3. Final Technical Memorandum The ENGINEER will revise the draft TM as appropriate based on the OWNER's comments received, and submit a Final TM. Task 3 Deliverables: Draft brief TM (PDF) Final TM (PDF) TIME OF PERFORMANCE Completion of the services outlined above will be provided over the course of three months after notice to proceed. PAYMENT OWNER shall pay ENGINEER for ENGINEER's Services, as delineated above, rendered under a lump sum fee of $47,200 (Task 1- $3,125, Task 2.1- $32,175, Task 2.2- $9,260, Task 3- $2,640). HAClient\Indian River County\Contract\IRC 2016-TO2_doc 2 IN WITNESS WHEREOF, duly authorized representatives of the OWNER and of the ENGINEER have executed this Work Order No 1 evidencing its issuance by OWNER and acceptance by ENGINEER. CAROLLO ENGINEERS, INC BOARD OF COUNTY COMMISSIONERS OF i INDIAN RIVER COUNTY Accepted this 12th day of July, 2016 By- By- Robert S Cushing, PhD, PE, DEE Bob Solari Chairman Attest* Jeffrey R. Smith, Clerk of Coil QoQ. By- e' Comptroller .9i�• �'rho, Michael A. Fleury. P.E.,IBICEE •couN V By: put le c Approv Jason E. Bro n, County Administrator Approved as to form and leg I sufficiency: Dylan . Reingold, County Attorney MClient\Indian River County\Contract\IRC 2016-W01_doc 3 I i -