HomeMy WebLinkAbout2016-123 Board of County Commissioners '-, _-P , ,; �:,I
180127th Street
Vero Beach, Florida 32960 AUG j 201.6
Telephone: (772) 567-8000 FAX: (772)-778-9391 FAC ITIDs Mi NIAGEEME T
Professional Design Services
For
Indian River County Health Department Roof Replacement
WORK ORDER NO. 3 (Facilities Management Division)
FOR
AMENDMENT TO CONTINUING CONTRACT AGREEMENT
FOR PROFESSIONAL SERVICES, APRIL 18, 2014
WITH
REI ENGINEERS, INC.
All services performed under this contract shall be supervised and certified by a licensed Professional
Engineer(PE) licensed with the State of Florida and staff employed directly with your firm.
Scope of Services
Indian River County is requesting that REI Engineers, Inc., prepare construction drawings consisting of
roof plans and details; which depict the Scope of Work, assist in the bidding phase, and provide
construction administration services for the replacement of the roof at the Indian River County
Health Department, 1900 27`h Street, Vero Beach Fl. The design shall also include repairs to the
widow/glazing and stucco walls as outlined in "Envelope Condition Assessment" prepared by REI
Engineers, Inc., on August 28, 2015.
All work shall be performed in accordance with the attached Proposal dated August 2, 2016 (Exhibit A)
and shall comply with Standards enumerated in the Continuing Contract Agreement for Professional
Services, dated April 18, 2014.
COMPENSATION.
The COUNTY agrees to pay, and REI Engineers, Inc., agrees to accept, $28,400.00 for services rendered
according to the Proposal dated August 2, 2016, identified in the attached EXHIBIT A, incorporated by
reference herein.
t
Work Order No.3
Indian River County Health Department—Roof Replacement
August 8,2016
IN WITNESS HEREOF the parties hereto have executed these presents
This nth day of August 12016.
OWNER REI ENGINEERS, INC.
BOARD OF COUNTY COMMISSIONERS
INDIAN RIVER COUNTY,FLORIDA
Qtit.
Bob Solari,Chairman Scott inesley,President
Approved by BCC August 16, 2016
Witnessed by:d1l
ATTEST:
Jeffrey R.Smith,Clerk of Court and
Comptroller
-60M
Deputy Clerk (Printed na )
Approved as to Form and Legal
Sufficiency:
William K. DeBraal, Deputy County
Attorney
Jason .Bro n,County Administrator •'+r ,y `���:
9
:?,P•• . t ;Vie;:
••�'GFROOUNTY.�:��'�:
C:�Users�rszpyrl:a\Desktop)FacilitiatAcrnda ltems�Health Departm®t Roof Desicn\Work Order x3 for
REl.doc
- i
REI ENGINEERS
10150 HIGHLAi-1D MANOR DRIVE, SUITE 200, TAMPA, FL 33610
PHONE 813.944.2137 FAx 813.314.2196
August 2, 2016 Exhibit
Indian River County
4305A 43'd Avenue,
Vero Beach,FL 32967
Attention: Chris Burr
Facilities Manager
Reference: Proposal for Engineering Services
Contract Documents and Construction Administration
Health Department Roof Replacements
REI Proposal No.P 16TPA-011
Dear Mr.Burr:
In response to our recent discussions and emails, we are pleased to submit this proposal for your
consideration. The roof areas outlined in this proposal include Areas A, B, C, D, E, F, G, H, I, J, and K
(totaling approximately 25,000 square feet) of the facility located at 1900 27`h Street, Vero Beach,Florida.
The following is an outline of the proposed services for Contract Documents and Construction
Administration:
I. CONTRACT DOCUMENTS
A. Conduct the site visit(s) to develop detailed Contract Documents for the subject building.
B. Extract roof samples to identify roof system composition and condition. Submit samples
of the roof for testing, as necessary. Results of any testing will be included in the contract
documents. Cored locations to be repaired with compatible materials.
C. Perform the following engineering design calculations for all roof areas which will be
sealed by a Licensed Engineer:
1. Determine design wind loads in accordance with ASCE 7 as required by the current
edition of the State Building Code.
2. Primary and secondary(overflow)drainage for compliance with the current edition
of the State Plumbing Code.
3. Existing and proposed roof system R-Value for compliance with the current edition
of the State Energy Conservation Code.
4. Estimate existing and proposed roof system dead load unit weights to determine
load change and the need for a structural analysis. If a structural analysis is
required,REI will coordinate applicable work with a licensed Structural Engineer.
The cost for the structural analysis(if necessary) is not included in this proposal.
D. Prepare comprehensive scaled drawings for conditions present to ensure competitive bids
are received. All plans and details to be developed on Computer Aided Drafting
(AutoCAD).
E. Prepare technical specifications for the removal of the existing roofing systems and
installation of the insulation, new roof systems, and sheet metal for the facility. Wall and
ROOFING,WATERPROOFING AND BUILDING ENVELOPE ENGINEERS AND CONSULTANTS
www.re ie ng inee rs.c o m
AN EMPLOYEE-OWNED COMPANY
I
REI Proposal-No.P16TPA-011
August 2,2016
Page 2
window repairs outlined in the document"Envelope Condition Assessment for IRC Health
Department", dated August 28, 2015, will be included in the technical specifications.
F. Issue preliminary Contract Documents for Owner review. Upon acceptance,final Contract
Documents will be prepared and submitted.
G. Provide advertisement for bids to Owner for use in advertising in accordance with
applicable laws and/or submit names of three or more qualified Contractors to bid the
Contract Documents.
H. Hold one Pre-Bid Meeting for potential contractors to review the Contract Documents and
resolve any questions that may arise during the bid stage of the project.
I. Bids shall be analyzed and a recommendation made based on low bid, alternates,
contractor's past performance and Owner's budget restrictions. Submit a certified Bid
Tabulation and recommendation for award.
II. CONSTRUCTION ADMINISTRATION
A. Complete Owner's recommended Form of Agreement between Owner and Contractor and
submit to Owner and Contractor for acceptance.
B. Issue "Notice to Proceed" with Date of Commencement and construction period
established.
C. Review and accept, as appropriate, shop drawings and submittals as required by the
Contract Documents. Return unacceptable submittals to contractor as required until
compliance with specifications is realized.
D. Hold a pre-construction meeting with the successful contractor to ensure a clear
understanding of the plans and specifications.
E. Perform quality assurance site visit once every five working days,Monday through Friday,
to verify work is in compliance with the Contract Documents. Photographs will be taken
as deemed necessary for documentation. REI cannot comment on work that takes place
and covered while REI is not onsite.
F. Prepare and submit reports from each quality assurance site visit relaying information
pertaining to weather, area worked, application methods, material types installed during
the site visit, and listing of non-conforming items requiring Contractor's correction.
G. Certify Contractor's monthly invoicing based on status of work performed as determined
from project site visits.
H. Route any change orders developed to address changes to the contract requirements.
I. Upon notification by the contractor that the job is substantially complete, a substantial
completion inspection will be conducted with REI, Owner, Contractor and Manufacturer
personnel. A punch list will be prepared to list any minor items that require further
treatment.
REI Proposal'No.P16TPA-011
August 2,2016
Page 3
J. Upon notification by the contractor that the job is fully complete,a final inspection will be
conducted with REI, contractor and Owner personnel. A final inspection report will be
submitted upon verifying completion or if necessary, an additional punch list will be
prepared.
K. Upon completion of work,verify compliance of warranties,close out documents,and final
billing,before forwarding to the Owner.
M. PROPOSED SCOPE OF WORK
A. Remove existing roof system down to the existing steel (Sectors D &H) and lightweight
insulating concrete deck and provide new roof system along with sheet metal flashing and
accessories to provide a complete, watertight, 20-year warrantable roof assembly. Roof
system selected will be submitted to Owner for approval.
B. Perform window/glazing and stucco wall repairs as outlined in REI's Report "Envelope
Condition Assessment for IRC Health Department"dated August 28, 2015.
IV. ENGINEERING FEES
A. Based on the anticipated scope of work for this project,the proposed engineering fees are:
Contract Review Documents........................................................................$8,950
Contract Final Documents............................................................................$6,350
BiddingPhase...............................................................................................$1,500
Construction Administration.......................................................................$10,100
Closeout........................................................................................................$1,500
TotalEngineering Budget.....................................................................................$28,400
V. PROJECT SCHEDULE
A. Preliminary Contract Documents shall be completed within 60 days of Notice to Proceed.
Final Contract Documents shall be completed and sealed within 10 days of receipt of
comments.
B. Construction Administration shall be performed during the estimated construction duration
and the project closeout process. This work is expected to take 75 calendar days.
If this proposal meets with your approval,please notify us in writing. This proposal will remain firm for a
period of thirty (30) days. After that time, we reserve the right to review scheduled commitments and
prices.
If you have any questions regarding this matter,please do not hesitate to call.
Respectfully submitted,
REIEngineers
Randy Moore Jr., EI Kenneth Tyner,PE,RRC