Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2016-147
INDIAN RIVER COUNTY PUBLIC WORKS DEPARTMENT RENEWAL AND AMENDMENT NO. 1 TO AGREEMENT FOR ANNUAL PROFESSIONAL GEOTECHNICAL ENGINEERING SERVICES BETWEEN ANDERSEN ANDRE CONSULTING ENGINEERS, INC. AND INDIAN RIVER COUNTY, FLORIDA This is a Renewal and Amendment No. 1 to the Agreement for Annual Professional Geotechnical Engineering Services dated September 23, 2014 between Andersen Andre Consulting Engineers, Inc. (GEOTECHNICAL PROFESSIONAL) and Indian River County, a political subdivision of the State of Florida, 180127 th Street, Vero Beach, Florida, 32967 (COUNTY). - WHEREAS, the Parties entered into an Agreement for Annual Professional Geotechnical Engineering Services(Master Agreement) dated September 23, 2014; and WHEREAS, Section III—SCOPE OF SERVICES, Item No. 5 provides for the compensation for basic services to the GEOTECHNICAL PROFESSIONAL; and WHEREAS, Section VIII of the Master Agreement provides for PAYMENTS and the Parties desire to amend the Master Agreement to reflect payments made by the County on a monthly basis; and WHEREAS, Section XIII of the Master Agreement provides for GEOTECHNICAL PROFESSIONAL'S PERSONNEL ASSIGNED TO THE PROJECT and the Parties desire to add to the Master Agreement; and WHEREAS, Section XVII of the Master Agreement provides for the DURATION OF AGREEMENT and the parties desire to renew the Master Agreement for one additional two year term; and WHEREAS, Section XXIV of the Master Agreement provides for PUBLIC RECORDS COMPLIANCE and the Parties desire to amend the Master Agreement; NOW,THEREFORE, in consideration of the following mutual covenants and agreements Indian River County, Florida and GEOTECHNICAL PROFESSIONAL agree as follows: 1. The Agreement for Annual Professional Geotechnical Engineering Services dated September 23, 2014 is amended as follows: Section III—Scope of Services— Item No. 5 shall read as follows: 5. Compensation to the GEOTECHNICAL PROFESSIONAL for basic services shall be in accordance with each Work Order, as mutually agreed upon by the GEOTECHNICAL PROFESSIONAL and the COUNTY. Current fee schedule is included in "Exhibit A" attached to this Renewal and Amendment No. 1, and will be included as part of each Work Order when approved. F-\Public Works ENGINEERING DIVISION PROJECTS\1349-RFQ 2014007 Geotechnical Services\Admin\2016-2018 Renewals\Renewal&Amend No.1 Andersen Andre.doc Section VIII— Payments—The following shall be added to the Master Agreement: The GEOTECHNICAL PROFESSIONAL shall submit invoices for periodic progress payments for services performed the preceding calendar month no more than once per month for each COUNTY project for which services are billed. The invoice shall be submitted no later than the fifth business day of the month. Invoices shall identify, at a minimum, the following information: Purchase Order Number (if applicable), Work Order Number (if applicable), COUNTY Project Number, Project Description as set forth in the Contract. Information submitted in support of individual charges shall be provided in the same order as listed on the invoice summary, only information directly related to the invoice shall be included as part of the invoice package. Section XIII —Geotechnical Professional's Personnel Assigned to the Project—The following shall be added to the Master Agreement: All firms providing service under the Master Agreement shall provide resumes for staff that are to be utilized under the Master Agreement for review and approval. Section XVII — Duration of Agreement The Master Agreement is hereby renewed for an additional two year period beginning on September 23, 2016 and ending on September 22, 2018. Section XXIV— Public Records shall read as follows: A. Indian River County is a public agency subject to Chapter 119, Florida Statutes. The GEOTECHNICAL PROFESSIONAL shall comply with Florida's Public Records Law. Specifically, the GEOTECHNICAL PROFESSIONAL shall: (1) Keep and maintain public records that ordinarily and necessarily would be required by the COUNTY in order to perform the service. (2) Provide the public with access to public records on the same terms and conditions that the COUNTY would provide the records and at a cost that does not exceed the cost provided in chapter 119 or as otherwise provided by law. (3) Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law. (4) Meet all requirements for retaining public records and transfer, at no cost, to the COUNTY all public records in possession of the GEOTECHNICAL PROFESSIONAL upon termination of the Agreement and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the COUNTY in a format that is compatible with the information technology systems of the COUNTY. F-Tubfic Works\ENGINEERING DMSION PROJECMS 1349-RFQ 2014007 Geotechnical Services\Admin\2016-2018 RenewalARenewal&Amend No. Andersen Andre.doc B. Failure of the GEOTECHNICAL PROFESSIONAL to comply with these requirements shall be a material breach of the Master Agreement. 2. Except as supplemented herein, the terms and conditions of the Master Agreement shall remain in full force and effect. To the extent of any conflict between the terms of this Amendment and the terms of the Master Agreement, the terms of this Amendment shall control. 3. This Amendment No. 1, regardless of where executed, shall be governed by and construed according to the laws of the State of Florida. [THE REMAINDER OF THIS PAGE WAS LEFT BLANK INTENTIONALLY] F-\Public Works\ENG1NEERING DIVISION PROJECTS\1344-RFQ 2014007 Geotechnical Services\Admin\2016-2018 Renewals\Renewal&Amend No.1 Andersen Andre.doc IN WITNESS WHEREOF, this Amendment No. 1 to Agreement is executed by the authorized representatives of the parties as of the day and year first above written. BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA Bob Solari, Chairman (Signature) David P.Andre, P.E., Principal (Printed name and title) Approved by BCC September 20. 2016 ATTEST: Jeffrey R. Smith,Clerk of Court and Comptroller Witnessed by: De Clerk (Printed name) Peter G. Andersen, RE Approved as to Form an egal S iency: William K. DeBraal, Deputy County Attorney Jason E,Brown, County Administrator J`��y'C 0 AtM/SS/o ••'9��FR COUNT��. F•\Public Works\ENGINEERING DIVISION PROJECTS\1349-RFQ 2014007 Geotechnical Services\Admin\2016-2013 Ratewals\Renewal&Amend No. Andersen Andre.doc ANDERSEN ANDRE CONSULTING ENGINEERS, INC. Geotechnical Engineering Construction Materials Testing LYX� Environmental Consulting PH. (772) 807-9191 Contact: David Andre, P.E. dandre@aaceinc.com ANDERSEN ANDRE CONSULTING ENGINEERS, INC, 2016-2018 FEE SCHEDULE • CONSTRUCTION MATERIALS TESTING SERVICES • SOIL TESTING—FIELD Field Density Tests - mimmum of four per trip (Nuclear Method—ASTM-D-2922) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $23.00/test Engineering Technician Time Penetrometer Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $55.00/hr. Standby Time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $55.00/hr. Inspection and Monitoring Fill Placement . . . . . . . . . . . . . . . . . . . . . . . . . . . $55.00/hr. Monitoring Muck Excavation &Backfill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $55.00/hr. SOIL TESTING—LABORATORY Modified Proctor —ASTM D-1557 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $85.00/ea. Standard Proctor —ASTIv1 D-698 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $85 00/ea. Florida Bearing Value (FB_V) —FM-5-517 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $60.00/ea. Linerock Bearing Ratio (LBR) —FM-5-515 . . . . . . . . . . . . . . . . . . . . . . . . . . . . $295 00/ea. Proctor/LBR/FBV Sample Pickup (If Not Scheduled With Other Work) . . $55.00/hr Moisture Content —ASTM D-2216 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $20 00/ea. Organic Content — ASTM D-2974 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35 00/ea. Carbonate Content—FM-5-514 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $65.00/ea. Soil Particle Size Analysis (ASTM D-422) Dry Sieve Analysis—1 inch to No. 200 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $65.00/ea. Washed Sieve Analysis — 1 inch to No. 200 . . . . . . . . . . . . . . . . . . . . . . . . . . . . $95.00/ea. Washed Sieve Analysis —No 200 only . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50.00/ea. Hydrometer Analysis —Passing No. 200 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $165.00/ea. Road Base Particle Size Analysis Sample Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00/ea. Washed sieve analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $95.00/ea. Laboratory Permeability Testing of Soil (ASTM D-2434) Constant Head or Falling Head . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $175.00/test Specific Gravity of Rock/Cores (ASTM D-854) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $125.00/test L.A.Abrasion of Rock/Aggregate (ASTM C535) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $275.00/test Andersen Andre Consulting Engineers,Inc.a 834 W Swan Avenue,Port St.Lucie,Fl,34983• Ph.(772)807-9191•www.aaceinc.com *Contact: David Andre,P.E.dandrepaaceinc.com Page 1 of 5 _RACE 2016-2018 Fee Schedule CONCRETE SAMPLING AND TESTING(Indian River County) Compressive Strength Samples of normal weight concrete (ASTM C-31) . . . . . . . . . . . . $85.00/set Includes: sampling(ASTM C-172), Slump (ASTM C-143) Temperature (ASTM C-1064),Molding (ASTM C-31) Curing &Testing(ASTM C-39) for 1 Set of Four Test Cylinders Additional cylinders (more than 4 per set) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $15.00/cyl. Additional slump tests (more than 1 per set) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $10 00/ea. Compressive strength of CMU grout Samples (ASTM C-1019): . . . . . . . . . . . . . . . . . . . . . $85.00/set Includes, Slump if requested,Temperature and Molding 1 Set of Four Grout Prisms Technician Standby time due to construction delays in excess of 1.0 hour per set of cylinders/prisms . . . . . . . . . . . . . . . . . . . . . . . . . . . . $55.00/hr. Sample pick-up if not scheduled with other work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50.00/set Curing and strength testing of concrete samples F.O.B.our laboratory (ASTM C-39): . . $15.00/cyl. Continuous monitoring of concrete placement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $55.00/hr. Air Content by Volumetnc Method (ASTM C-173) . . . . . . . . . . . . . . . . . . . . . . . . . . $35 00/test Air Content by Pressure Method (ASTM C-231) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $45.00/test Unit Weight and Yield (ASTM C-138) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $45.00/ea. Fineness Modulus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $55 00/ea. Concrete blocks (ASTM C-140) Strength tests (gross area basis 45.00/block Strength tests (net area basis) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75.00/block Absorption . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $30.00/block Masonry Mortar—2" a 2" cubes molded at site (3 per set) . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00/set SAMPLING AND TESTING OF IN-PLACE CONCRETE Core samples Mobilization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00/day Technician time (2 man crew) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $55.00/man-hr. Core machine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150.00/day Generator (if required) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50.00/day Diamond bit wear - per inch diameter per inch length . . . . . . . . . . . . . . . . . . . . . . . $0.35/in/un Sample preparation (Measuring,Trimming&Capping) . . . . . . . . . . . . . . $ 35.00/core Compressive Strength tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $15.00/core Andersen Andre Consulting Engineers,Inc. •834 SW Swan Avenue,Port St.Lucie,FL 34983• Ph.(772)807-91910 www.aaceinc.com OContact: David Andre,P.E.dandreOaaceinc.com Page 2 of 5 RACE 2016-2018 Fee Schedule Swiss Hammer: Equipment Fee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50.00/day Senior Technician time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $63.00/hr. Windsor probe: Equipment Fee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $133.00/day Charges per set of 3 shots . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $73.00/set Staff Engineer/ Senior Technician Field time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $73.00/hr. Rebar Location R-Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $73.00/dap Technician time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $63.00/hr. ASPHALT FIELD INSPECTION, SAMPLING AND LABORATORY TESTING Pavement Cores for thickness verification, base thickness &subbase description Mobilization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00/day Core Machine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $130.00/day Generator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $30.00/day Techmcian time (2 man crew) . . . . . . . . . . . . $35.00/man-hr. . . . . . . . . . . . . . . . . . . . . . . Diamond bit wear- per inch diameter per inch of depth . . . . . . . . . . . . . . . . . . . $0.35/in/in Flag men and barricades if needed for safety and M.O.T. . . . . . . . . . . . . . . . $45 00/hr./man Laboratory Testing Services Unit weight ofcores . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35 00/core Marshall Stability&Flow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Upon Request Extraction and gradation tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Upon Request STRUCTURAL STEEL Bolted connections Torque Wrench . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00/day Project Engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $95.00/hr. Sr. Engineering Technician . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $65.00/hr. Field inspection of steel reinforcement placement Senior Project Engineer (P.E.) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $110.00/hr. Project Engineer(P.E.) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $95.00/hr Staff Engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75.00/hr. Senior Engineering Technician . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $55.00/hr. Engineering Technician . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . $48 00/hr. TRAVEL CHARGES Charges to be determined per job—most Jobs are billed portal to portal SUBCONTRACTING SERVICES Cost plus 15% Andersen Andre Consulting Engineers,Inc. • 834 SW Swan Avenue,Port St.Lucie,FL 34983• Ph.(772)807-9191•www.aaceinc.com •Contact: David Andre,P.E.dandreoaaceinc.com Page 3 of 5 RACE 2016-2018 Fee Schedule OVERTIME AND HOLIDAY Overtime rates will apply to all work scheduled or completed on weekends and holidays and prior to 7:00 AM and after 5:00 PM on weekdays. Weekdays prior to or after normal working hours . . . . . . . . . . . . . . . . . . . . 1.50 x normal rate Weekends . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.50 x normal rate Holidays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.00 x normal rate All invoices are due and payable upon receipt unless other arrangements have been made previously. • SUBSURFACE EXPLORATION SERVICES • Mobilization &demobilization of drilling crew and equip . . . . . Vanes ($250.00 for Indian River Crnty.) Layout of boring locations, and coordination of underground utility locating . . . . . . . . . . $75.00/hr Standard Penetration Test (SPT) borings (ASTM D-15861 in soil (N-values less than 50) From surface to depths of 25 feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $13.00/foot From 26 to 50 feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $14 00/foot From 51 to 75 feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $15.00/foot From 76 to 100 feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $17.00/foot Additional charge for SPT in high resistance soil/rock (N-values greater than 50) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5.00/foot Continuous SPT testing and sampling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $22.00/sample Other subsurface sampling and testing methods: Auger borings (ASTM D-1452) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9 50/foot Muck probings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500.00/technician/day Wash bormQs(cuttmg only). Soil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59.00/foot Rock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $12.00/foot Undisturbed samphng: Shelby tube . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $125.00/sample Fixed piston . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $135.00/sample Dutch Cone Soundings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . varies Piezocone Soundings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . varies Andersen Andre Consulting Engineers,Inc.• 834 SW Swan Avenue,Port St.Lucie,FL 34983• Ph. (772)807-9191 0 www.aaceinc.com *Contact: David Andre,P.E.d-andre(@,aacemc.com Page 4 of 5 VACE 2016-2018 Fee Schedule Other Charges: Standby time (per crew hour) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $125.00/hour Borehole grouting and sealing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $125 00/hour plus materials Furnish,install and remove casing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $10.00/foot Lodging and per diem (crew-man/day) . . . . . . . . . . . . . . . . . g g P . . . . . . . . . . . . . . $130.00/da}, Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . cost + 20% Special Drilling_ Barge driUmg . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . varies NQ wireline coring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vanes Drilling at depths in excess of 100 feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . varies Large diameter boreholes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vanes Groundwater Sampling: Installation of piezometers and observation wells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . varies Special piezometer of polluted soil and groundwater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vanes Subsurface Permeabihty Tests: SFW[MD Etfiltration test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350.00/test Borehole Permeability test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $330 00/test Double Rung Infiltrometer test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $300.00/test • ENGINEERING SERVICES • Inspection of construction procedures, data evaluation, engineering analyses, and report preparation Principal Engineer (P.E.) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $125.00/hr. Senior Project Engineer (P.E.) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $110.00/hr. Project Engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $95.00/hr. Staff Engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75.00/hr. Senior Engineering Technician . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $55 00/hr. Engineering Technician . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $48.00/hr. CAD Draftsman Technical Secretary . . . . . 45.00/hr. *Note: Fees listed herein are valid for the period of September 23, 2016 through September 22, 2018. David P. Andre, P.E. Principal Engineer Andersen Andre Consulting Engineers,Inc. • 834 SW Swan Avenue,Port St.Lucie,Fl,34983• Ph.(772)807-9191•-.vww.aaceinc.com *Contact: David Andre,P.E.dandre naaceinc.com Page 5 of 5