Loading...
HomeMy WebLinkAbout2016-150 INDIAN RIVER COUNTY PUBLIC WORKS DEPARTMENT RENEWAL AND AMENDMENT NO. 1 TO AGREEMENT FOR ANNUAL PROFESSIONAL GEOTECHNICAL ENGINEERING SERVICES BETWEEN GFA INTERNATIONAL, INC. FLORIDA This is a Renewal and Amendment No. 1 to the Agreement for Annual Professional Geotechnical Engineering Services dated September 23, 2014 between GFA International, Inc. (GEOTECHNICAL PROFESSIONAL) and Indian River County, a political subdivision of the State of Florida, 180127 th Street, Vero Beach, Florida, 32967 (COUNTY). WHEREAS, the Parties entered into an Agreement for Annual Professional Geotechnical Engineering Services(Master Agreement) dated September 23, 2014; and WHEREAS, Section III—SCOPE OF SERVICES, Item No. 5 provides for the compensation for basic services to the GEOTECHNICAL PROFESSIONAL; and WHEREAS, Section V111 of the Master Agreement provides for PAYMENTS and the Parties desire to amend the Master Agreement to reflect payments made by the County on a monthly basis; and WHEREAS, Section XIII of the Master Agreement provides for GEOTECHNICAL PROFESSIONAL'S PERSONNEL ASSIGNED TO THE PROJECT and the Parties desire to add to the Master Agreement; and WHEREAS, Section XVII of the Master Agreement provides for the DURATION OF AGREEMENT and the parties desire to renew the Master Agreement for one additional two year term; and WHEREAS, Section XXIV of the Master Agreement provides for PUBLIC RECORDS COMPLIANCE and the Parties desire to amend the Master Agreement; NOW,THEREFORE, in consideration of the following mutual covenants and agreements Indian River County, Florida and GEOTECHNICAL PROFESSIONAL agree as follows: 1.The Agreement for Annual Professional Geotechnical Engineering Services dated September 23, 2014 is amended as follows: Section 111—Scope of Services—Item No. 5 shall read as follows: 5. Compensation to the GEOTECHNICAL PROFESSIONAL for basic services shall be in accordance with each Work Order, as mutually agreed upon by the GEOTECHNICAL PROFESSIONAL and the COUNTY. Current fee schedule is included in "Exhibit A" attached to this Renewal and Amendment No. 1, and will be included as part of each Work Order when approved. F•\Public Works\ENGINEERING DIVISION PROJECTS\1349-RFQ 2014007 Geotechnical Services\Admin\2016-2018 Renewals\Renewal&Amend No. 1 GFA.doc Section VIII—Payments—The following shall be added to the Master Agreement: The GEOTECHNICAL PROFESSIONAL shall submit invoices for periodic progress payments for services performed the preceding calendar month no more than once per month for each COUNTY project for which services are billed. The invoice shall be submitted no later than the fifth business day of the month. Invoices shall identify, at a minimum, the following information: Purchase Order Number (if applicable), Work Order Number (if applicable), COUNTY Project Number, Project Description as set forth in the Contract. Information submitted in support of individual charges shall be provided in the same order as listed on the invoice summary, only information directly related to the invoice shall be included as part of the invoice package. Section XIII —Geotechnical Professional's Personnel Assigned to the Project—The following shall be added to the Master Agreement: All firms providing service under the Master Agreement shall provide resumes for staff that are to be utilized under the Master Agreement for review and approval. Section XVII—Duration of Agreement The Master Agreement is hereby renewed for an additional two year period beginning on September 23, 2016 and ending on September 22, 2018. Section XXIV—Public Records shall read as follows: A. Indian River County is a public agency subject to Chapter 119, Florida Statutes. The GEOTECHNICAL PROFESSIONAL shall comply with Florida's Public Records Law. Specifically, the GEOTECHNICAL PROFESSIONAL shall: (1) Keep and maintain public records that ordinarily and necessarily would be required by the COUNTY in order to perform the service. (2) Provide the public with access to public records on the same terms and conditions that the COUNTY would provide the records and at a cost that does not exceed the cost provided in chapter 119 or as otherwise provided by law. (3) Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law. (4) Meet all requirements for retaining public records and transfer, at no cost, to the COUNTY all public records in possession of the GEOTECHNICAL PROFESSIONAL upon termination of the Agreement and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the COUNTY in a format that is compatible with the information technology systems of the COUNTY. F-Tublic Works\ENGINEERING DIVISION PROJECTSU349-RFQ 2014007 Geotechnical Services\Admin\2016-2018 Renewals\Renewal&Amend No. 1 GFA.doc B. Failure of the GEOTECHNICAL PROFESSIONAL to comply with these requirements shall be a material breach of the Master Agreement. 2. Except as supplemented herein, the terms and conditions of the Master Agreement shall remain in full force and effect. To the extent of any conflict between the terms of this Amendment and the terms of the Master Agreement, the terms of this Amendment shall control. 3.This Amendment No. 1, regardless of where executed, shall be governed by and construed according to the laws of the State of Florida. [THE REMAINDER OF THIS PAGE WAS LEFT BLANK INTENTIONALLY] F•\Public Works\ENGINEERING DIVISION PROJECTS\1349-RFQ 2014007 Geotechnical Services\Admin\2016-2018 Renewals\Renewal&Amend No. 1 GFA.doc IN WITNESS WHEREOF, this Amendment No. 1 to Agreement is executed by the authorized representatives of the parties as of the day and year first above written. BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA COUN ,. Bob Solari, Chairman (Signature) \j (Printed name and title Approved by BCC September 217, 2016 THOMAS MONTANO--�Q� ATTEST: Jeffrey R.Smith,Clerk of Court and Comptroller Witnessed by: l Deputy Clerk (Printed name) DARCEE M PILARSKI Approved as to Form and Legal Su iency: William K. DeBr al, Deputy County Attorney Jason E Br wn, County Administrator FAPublic Works\ENGINEERING DIVISION PROJECTS\1349-RFQ 2014007 Geotechnical Services\Admin\2016-2018 Renewals\Renewal&Amend No. I GFA.doc GFA INTERNATIONAL 521 N.W.ENTERPRISE DRIVE,PORT ST.LUCIE,FLORIDA 34986 (772)924-3575 OFFICE - (772)924-3580 FAX RATESCHEDULE Indian River County Public Works Department—September 23,2016 to September 22,2018(RFQ 2014007) SOIL TESTING Standard or Modified Proctor(sandy soils) ...... .... . .... ................................................. .... . .... ... ........$75.00/ea. Standard or modified Proctor(limerock/shell)... .. . . .... .. .... ......................................... ...... .. . ... . .......90.00/ea. Field Density Test(nuclear method)—Minimum 3 tests per trip ................................................... . . .....20.00/ea. Field Density Test(sand cone method)—Minimum 3 tests per trip . ...... .... ....................................... . . 27.00/ea. Limerock Bearing Ratio(L.B.R.)............................................................................... .. ....... . . .... . ......... 250.00/ea. FloridaBearing Value(F.B.V.)........................ ...... ............................................................................. .. . ..25.00/ea. Sieve Analysis with Hydrometer................................ ......... .............................................................................175.00/ea. Sieve Analysis for Soil(full gradation including No.200 sieve-does not include hydrometer analysis)65.00/ea. Sieve Analysis(material finer than No.200 sieve by washing). ...... .... . ......... .... .... ....... . .. ................. 30.00/ea. Laboratory Permeability Test (sandy soils). ... ........................ .... .................................... .... . .... . .. . ... 85.00/ea. Atterberg Limits(liquid limit and plastic limit) ....................................................................................... ..95.00/ea. Chemical Analysis(carbonates of calcium and magnesium) .....................................................................60.00/ea. MoistureContent.... ..... ........................................................................... .... ................................................25.00/ea. OrganicContent............................................... ... .... . .. .... .. . . .. . .. . . .. ...... . .... .. .... . .. .... .... . .... .... . .30.00/ea. Corrosion Series Tests......... . . .............. ....... . . .........................................................................................150.00/ea. Sampling Trip Charge(if not in conjunction with additional testing)................................................45.00/hr. CONCRETE TESTING Concrete Cylinders: (4"x 8"cylinders) slump test,casting,curing and testing.........................................$70.00/set SlumpTest........ . . . . . . ......................................... .... .... ....... .... . ....................................................... ...... 15.00/hr. AirContent............... . . .................................... . .... . ......... ....... ............................ ...... . . .......... . .. . .......25.00/ea. UnitWeight of Concrete........................... . . . . .... ................................. ........ .. ....... . ... . . ....... ........... . 30.00/ea. Windsor Probe(3 shots per location) ............................ .. . .. . .... . . ... ...................................................150.00/ea. Swiss Hammer Test(minimum of 3) ....................... . .. . .. ....... ........................................ . .. . .. . .... .... ...50.00/ea. Field Coring(minimum of 3) ................................. ...................................... . . .. .. . .. .... .... . .... ......... .... 50.00/ea. Mobilization/Demobilization for Field Coring ... ......................... .. . . . ... .......... ...................75.00/ea. Compression Testing of Field Cores .......... ........ ............................... . . .. ...................................... .. ... ...30.00/ea. Mortar Cubes(set of 6) ......................... . ................. . . . . .. .... .. ................ . ....... . .... . .. . .. . . .. ...... ....70.00/set GroutPrism(set of 3) ................................. ............ .... .... .. . . ..................... ...... .. . ......... .......................75.00/set ASPHALT TESTING Stability Tests(Marshall) ............................. . ..................... .. . . .. . .......................... .. ....... ...... . . . ....$130.00/ea. Bitumen Content(Extraction) .............. . ... .................. . . .... .. . ..................... . .. ......... .... ...................125.00/ea. Sieve Analysis of Extracted Aggregate ......... ............... .. . .. .... ....................... .... . .. .. .... .......................50.00/ea. Asphalt Thickness Determination using 2" or 4" Core Drill(minimum of 3) ........................... . . .. ......30.00/ea. 6"Core Drill(per D.O.T. specs) 1- 10 Cores .................... . . .................................. .... . .............40.00/ea. AdditionalCores .... . .... ..... ............... .... .............. .... . .. .................. .... .... .. . ...........................30.00/ea. Mobilization/Demobilization.... . . ............................. .. .. . .......... .. . . .... .. .............. .. . . .75.00 Specific Gravity of Asphalt Cores for Density Determination .. ............. .... . .... ....................... .. .... . ..25.00/ea. ENGINEERING SERVICES ProjectEngineer...... . ........................ . . . ............ . .. . ............ . .. . .. ................ .... ............................... $125.00/hr. StaffEngineer . ............................................. ... ............. . . ................... .. . .... ........................ .... . . .........85.00/hr. ProjectManager .... ... . .................... . . . . ............ .... ......... .... .... . ..................... . ............................ ..... 80.00/hr. SeniorTechnician................. ...... .................. . ........ .... . ................. . .. .. ................ .. . .... ....................... 50.00/hr. Technician Inspection Services: RegularTime ........ ...... . ................ . .......... .. ................... .. . .............. .. . .. . .. ............... . .... ... 45.00/hr. Overtime(5:00pm—7:00am) . ... ........ . ................... ................... . ...................... .... . ................ 55.00/hr. Overtime(weekends)... .................. ............... ....................................... ....... ....................... . ...... 65.00/hr. Monitoring of Pile Installation: RegularTime ............. ................ . ............. .............. ...... .. ......... . ..... . ................... . .................55.00/hr. Overtime(5:00pm—7:00am)................................... ............................................. .................... ... 65.00/hr. GFA INTERNATIONAL 521 N.W.ENTERPRISE DRIVE,PORT ST.LUCIE,FLORIDA 34986 (772)924-3575 OFFICE - (772)924-3580 FAx RATE SCHEDULE (PAGE 2) Indian River County Public Works Department—September 23,2016 to September 22,2018 (RFQ 2014007) Steel Inspection(Visual Welding Inspection and Bolt Inspection): RegularTime .......... .. .. .......................... . . ............ . ......... ................. ........................................55.00/hr. Overtime ............................ ... .................... ........ ...................... ........ ......................................... 65.00/hr. Clerical Services ............ ........40.00/hr. ......................................................................................................... ............... . Threshold Inspection Services ................................ . ... ..................... .......... .... ..... .....Prices quoted upon request STANDARD PENETRATION TESTING 0-501.................................................................... ........................... .......... ...... ....... ........ ........ .......... .12.00/ft. 50'-75'.. . .. .... .................................................................. ........................................ ......................................15.00/ft. Additional Samples(10'to 25') ............................................................................................................................. 20.00/ea. Additional Samples(25'to 50') ..................... ................ ......... ........ ...... . ....... ........ ....... . ........... ... 25.00/ea. Additional Samples(50'to 75') ......................................... ......... ......... ...... ...... ....... ....... .. .......... ...30.00/ea. Mobilization/Demobilization(25 mile radius)...................................................... ........ . .... ....... .... 150.00 lump sum Groutingof SPT holes ................................ ............... .......... .......... ................................................................ 2.50/ft. For samples placed in jars,the cost of the jars are additional with no markup. DUTCH CONE PENETROMETER(CPT)TESTING 0-50'........................................................................................ ....... .......... ..........................................................9.00/ft. 50'-75'............. .. .. ........................................ ................................................... ..... . ....... ........... .............13.00/ft. 75'+....................................................................................... .. ........................................................... .. ............ 16.00/ft. Mobilization/Demobilization(25 mile radius).................... ......... ................................................................175.00/job HAND CONE PENETROMETER(HCP)TEST 01-61.................................................. . ............................. ....... ....... ....................................... ........ ........10.00/ft. 6'+................................ ................................... .......................... ........ ........................................ ..........12.00/ft. Mobilization/Demobilization(25 mile radius).... ......................... .......... ....... ................................. . ....100.00/job HAND AUGER BORINGS 0-6........................................................ . .. .................. ................................. ..... ........ ......................... ....8.00/ft. 6-10'..................................................... ........................... ........... ............................. ...... . ......................... .......11.00/ft. Mobilization/Demobilization(25 mile radius).......................... ........................... ..... ..............................100.00/job EXFILTRATION TEST FOR STORMWATER MANAGEMENT SFWMDUsual Open Hole Test..................... . ........................................................... ...... ........................... .300.00/ea. ROCK CORING,BORINGS FROM BARGE OR OTHER SPECIALTY DRILLING Prices quoted based on project MONITOR WELLS Prices quoted based on project HAZARDOUS WASTE ASSESSMENT Prices quoted based on project PHASE I ENVIRONMENTAL PROPERTY ASSESSMENT Prices quoted based on project ADDITIONAL TESTING,DRILLING OR ENGINEERING SERVICES Prices quoted based on project Respectfully Submitted, GFA INTERN IONAL,INC. Thomas ontano,Branch Manager