HomeMy WebLinkAbout2014-106Board of County Commissioners
Administration - Building A (South)
1801 27th Street
Vero Beach, Florida 32960
Telephone: (772) 567-8000 FAX: 772-778-9391
Project:
OSLO BOAT RAMP — IRC PROJECT NO. 0381
AMENDMENT NO. 6
TO
WORK ORDER NO.1 (Engineering)
FOR
PROFESSIONAL SERVICES AGREEMENT
WITH
G.K. ENVIRONMENTAL, INC.
This is an amendment to the existing Work Order No.1 dated September 8, 2009, including AMENDMENTS
NUMBER 1 through 5, in accordance with the PROFESSIONAL SERVICES AGREEMENT dated October 8, 2013
between G.K. ENVIRONMENTAL, INC. (CONSULTANT) and INDIAN RIVER COUNTY (COUNTY). The proposed
scope of work includes additional services required to assist the County with the preparation and participation
in the Administrative Hearing for the Oslo Boat Ramp Improvement Project by providing attendance to
meetings with County and legal staff, depositions, hearings, design changes, meetings with regulatory
agencies, and subsequent agency requests for design and mitigation plan revisions and additional information
from State, Federal permitting agencies and their commenting agencies and other required additional
environmental assistance to the County. All provisions of Work Order No. 1, including Amendment Nos. 1
through 5, shall remain in full force and effect, unless otherwise specifically modified. This amendment
addresses changes in "SCOPE OF SERVICES", "COMPENSATION" and "TIME OF COMPLETION" of Work Order
No. 1 as follows:
SCOPE OF SERVICES
TASK I
($6,554.00)
CONSULTANT will assist Indian River County Engineering and Legal Departments as required in preparation and
participation in the Administrative Hearing for the Oslo Boat Ramp Improvement Project. This additional work
will include: onsite and offsite meetings, depositions, potentially additional onsite sampling with data analysis,
and research of published scientific data, as it relates to the administrative hearing.
The above work will be completed on an hourly basis as outlined in the recently approved CONSULTANT rate
schedules (copy attached). CONSULTANT fees for this task will not exceed $6,554.00 without further County
approval.
TASK II
($3,446.00)
CONSULTANT will assist Indian River County Engineering and Legal Departments as required to address the
results of the project hearing and assist in obtaining the ACOE permit.
The above work will be completed on an hourly basis as outlined in the recently approved CONSULTANT rate
schedules (copy attached). CONSULTANT fees for this task will not exceed $3,446.00 without further County
approval.
GK Environmental,
Oslo Road BoaRamp
Amendment No 6 to Work Order No 1
August 19, 2014
Page uofz
COMPENSATION
The section of Work Order No. 1 entitled COMPENSATION shall be revised in response to the estimated Scope
modifications (Task | and Task 2) set out herein. The charges will be invoiced on a not -to -exceed hourly basis
per Exhibit A, G. K. Environmental Fee Schedule.
Fees for Environmental Services:
TASK 1 and TASK 11
TIME OF COMPLETION
Not -to -exceed $10'000.00
G.K. Environmental, Inc. shall proceed in a reasonable time upon receipt of notice to proceed to complete the
additional design services, as determined as necessary by the COUNTY, of this Amendment No. 6. Services to
run concurrently with the Permitting and Administrative Hearing process for the Oslo Boat Ramp
Improvements.
Work Order No. 1 is hereby amended as specifically set forth herein. All remaining sections of Work Order No.
1 shall remain in full force and effect, and are incorporated herein.
In WITNESS whereof the parties have executed Amendment No. 6 this 19 t h Day of
August , 2014.
G. K. NVlR0NMENTA,AN
Witnessed by:
ylan Reingold, County Attorney
Approved as to Form and Legal Sufficiency
IN N RIVER COUNTY, FLORIDA
44, (-;-618
Peter D. O'Bryan, Chairman
Board of County Commissioners
ApprovedbyBCC Angoat lg, 2014
Attest:
Jeffrey R. Smith, Clerk of Court and Comp o e
eputy Clerk
aird, County Administra or
Macintosh eoUsers peorgekw=,u"Library Mail Downloads oxAmendment w^6,mm+/*"
G. K. ENVIRONMENTAL, INC.
Environmental Consulting
GEORGE R. KULCZYCKI, CEC, CES, CEI
155 McKee Lane
Vero Beach, FL 32960
Phone 772-567-9129
Fax 772-567-6245
Email gkea,me.com
EXHIBIT A
G. K. Environmental, Inc. Fee Schedule & GKE Subcontractor Fee Schedule
10/1/13-9/30/15
G. K. Environmental, Inc. Fee Schedule
President, Principal Ecologist $120.00 / hour (or lump
sum)
Administrative Assistance $ 45.00 / hour (or lump
sum)
GKE boat / fuel / associated sampling equipment $ 65.00 / hour (or lump
sum)
Phase I Audits / Environmental Site Assessments GKE Standard Fee:
(includes historic aerial site reviews / onsite inspections, $2,975.00 (<5.0 acre site)
and evaluations of: hazardous waste, preliminary endangered &
threatened species, and approximate wetland locations)
GKE reimbursement expenses
$0.45;
invoice
photo b/w copies $0.15;
photo color copies
postage: per postage
G. K. Environmental, Inc. Subcontractor Coordination and Supervision Services Fee Schedule
Landscape & Maintenance Service per bid / event
Archaeological Service per bid / event
CAD Operator $ 70.00 per hour
Field Assistant I. $ 40.00 per hour
Field Assistant II Biologist / Chemist $ 75.00 per hour
Ge4-rgei R. Ku1c-izeyck& September 20, 2013
George R. Kulczycki, President, Principal Ecologist Date