HomeMy WebLinkAbout2014-1359/013 (cop/
cr. ' 3
et)/1 — /L3
INDIAN RIVER COUNTY
PUBLIC WORKS DEPARTMENT
PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT
FOR ANNUAL PROFESSIONAL GEOTECHNICAL ENGINEERING
SERVICES - RFQ 2014007
THIS AGREEMENT, entered into this 23 day of SPptembPr , 2014 by
and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida,
hereinafter referred to as the "COUNTY", and ARDAMAN & ASSOCIATES, INC
hereinafter referred to as the "GEOTECHNICAL PROFESSIONAL."
WITNESSETH
That the COUNTY and the GEOTECHNICAL PROFESSIONAL, in consideration
of their mutual covenants, herein agree with respect to the performance of professional
geotechnical and testing services by the GEOTECHNICAL PROFESSIONAL, and the
payment for those services by the COUNTY, as set forth below and in individual Work
Orders. This agreement shall be referred to as the "MASTER AGREEMENT" under
which future Work Orders will apply
The GEOTECHNICAL PROFESSIONAL shall provide the COUNTY with
professional geotechnical and testing services and such other related services as
defined in specific Work Orders, in all phases of each project. The GEOTECHNICAL
PROFESSIONAL shall serve as the COUNTY's professional representative for the
project as set forth in each Work Order, and shall give professional geotechnical advice
to the COUNTY during the performance of the services to be rendered.
SECTION I — PROJECT LIMITS
Project limits shall be identified in individual Work Orders prepared by the
COUNTY and approved by the GEOTECHNICAL PROFESSIONAL. Each Work Order
will be sequentially numbered and formally approved by the COUNTY prior to a Notice -
to -Proceed being issued. Purchase Orders may be issued by the COUNTY and
approved through the MONIS system for proposed services that total less than
$15,000.00. For proposed services $15,000.00 and over, Work Orders shall be issued
and approved by the Indian River County Board of County Commissioners.
Basic services required of the GEOTECHNICAL PROFESSIONAL for the project
will be described in other appropriate sections of this Agreement and in individual Work
Orders.
SECTION II -- COUNTY OBLIGATIONS
The COUNTY agrees to provide the following material, data, or services as
required in connection with the work to be performed under this Agreement:
A. Provide the GEOTECHNICAL PROFESSIONAL with a copy of any
pertinent preliminary data or reports available to the COUNTY
F \Public Works\ENGINEERING DIVISION PROJECTS \1349-RFQ 2014007 Geotechnical Services \Admin\Agreements 2014-201542014-2016
AGREEMENT ARDAMAN.doc
B. Provide the GEOTECHNICAL PROFESSIONAL with all reasonably
available drawings, surveys, right-of-way maps, and other documents in
the possession of the COUNTY that are pertinent to the project.
C. The COUNTY shall be responsible for obtaining only those permits
required to perform the work to complete the project, if such permit
requirements are made into law and established by regulatory agencies
after the effective date of the Work Order.
D. The COUNTY shall make all provisions for the GEOTECHNICAL
PROFESSIONAL to enter upon public or private property as reasonably
required for the GEOTECHNICAL PROFESSIONAL to perform his
services.
E The COUNTY shall supply the GEOTECHNICAL PROFESSIONAL with
copies of all applicable local codes and regulations.
SECTION III — SCOPE OF SERVICES
The GEOTECHNICAL PROFESSIONAL agrees to perform all necessary
professional geotechnical and testing services and other pertinent services in
connection with the assigned project as required and as set forth in the following:
A. General
1. The GEOTECHNICAL PROFESSIONAL will endeavor not to
duplicate any previous work done on any project. Before issuance
of a Work Order and written authorization to proceed, the
GEOTECHNICAL PROFESSIONAL shall consult with the COUNTY
to clarify and define the COUNTY's requirements for the project
and review all available data.
2. The GEOTECHNICAL PROFESSIONAL shall attend conferences
with the COUNTY and its representatives, upon request.
3 In order to accomplish the work described under this Agreement
under the time frames and conditions set forth in this Agreement,
the GEOTECHNICAL PROFESSIONAL shall:
a. Complete work on the project within the time allowed by
maintaining an adequate staff of registered professional
geotechnical engineers and technicians and other
employees on the work at all times.
b. Comply with all federal, state, and local laws applicable to
this project(s). The GEOTECHNICAL PROFESSIONAL
work product shall conform with all applicable federal, state
and local laws applicable to this project(s)
c The GEOTECHNICAL PROFESSIONAL shall cooperate
fully with the COUNTY in order that all phases of the work
may be properly scheduled and coordinated.
4. All original documents (copy of), survey notes, tracings, and the
like, including all items furnished to the GEOTECHNICAL
PROFESSIONAL by the COUNTY pursuant to this Agreement, are
and shall remain the property of the COUNTY, and shall be
delivered to the COUNTY upon completion of the work.
F 1Public WorksIENGINEERING DIVISION PROJECTS11349-RFQ 2014007 Geotechnical Servlces\Admin\Agreements 2014-2015\2014-2016
AGREEMENT ARDAMAN.doc
5. Compensation to the GEOTECHNICAL PROFESSIONAL for basic
services shall be in accordance with each Work Order, as mutually
agreed upon by the GEOTECHNICAL PROFESSIONAL and the
COUNTY. Current fee schedule is included in "Exhibit A" attached,
and will be included as part of each Work Order when approved.
SECTION IV — TIME FOR COMPLETION
The time for completion of each project shall be defined in the Work Order.
SECTION V — COMPENSATION
The COUNTY agrees to pay, and the GEOTECHNICAL PROFESSIONAL
agrees to accept, for services rendered pursuant to this Agreement, fees in accordance
with the following:
A. Professional Services Fee - The basic compensation shall be mutually
agreed upon by the GEOTECHNICAL PROFESSIONAL and the COUNTY
prior to issuance of each Work Order, and the amount shall be included in
the Work Order to be formally approved by the Board of County
Commissioners.
B Direct Payment for Certain Services - The COUNTY will not pay for
services or goods provided by others working in conjunction with the
GEOTECHNICAL PROFESSIONAL.
SECTION VI — ADDITIONAL SERVICE WORK
Additional service work occurs when the COUNTY requests changes after it has
formally approved this Agreement. Additional service work shall not commence until a
Work Order for the additional work has been formally issued by the County Engineer or
his designee, and formally approved by the Board of County Commissioners, or the
County Administrator and the additional service work shall be performed in accordance
with the fee schedule set forth in that Work Order.
SECTION VII — CHANGE IN THE PROJECT SCOPE AFTER A WORK ORDER HAS
BEEN EXECUTED
If the project scope is changed after a Work Order has been executed, such work
shall be the subject of a Supplemental Work Order formally approved by the Board of
County Commissioners or the County Administrator pursuant to his delegated authority.
SECTION VIII — PAYMENTS
The COUNTY shall make progress payments to the GEOTECHNICAL
PROFESSIONAL on the basis of the approved partial payment request as
recommended by COUNTY in accordance with the provisions of the Local Government
Prompt Payment Act, Florida Statutes section 218 70 et. seq.
Unless otherwise stated in the Work Order, the GEOTECHNICAL
PROFESSIONAL shall submit duly certified invoices in duplicate to the County
Engineer
3
F'\Public Works\ENGINEERING DIVISION PROJECTS11349-RFQ 2014007 Geotechnical Services1Admin\Agreements 2014-201512014-2016
AGREEMENT ARDAMAN.doc
The Agreement shall be divided into units of deliverables, which shall include, but
not be limited to, reports, findings, recommendations, and test results, that must be
received and accepted in writing by the County Engineer, prior to payment
SECTION IX — RIGHT OF DECISIONS
All services shall be performed by the GEOTECHNICAL PROFESSIONAL to the
satisfaction of the County Engineer who shall decide all questions, difficulties, and
disputes of whatever nature that may arise under or by reason of this Agreement,
according to the prosecution and fulfillment of the service hereunder, and the character,
quality, amount and value thereof. The COUNTY's decision upon all claims, questions,
and disputes shall be final, conclusive, and binding upon the parties hereto, unless such
determination is clearly arbitrary or unreasonable.
Adjustments of compensation and contract time because of any major changes
in the work that might become necessary or be deemed desirable as the work
progresses shall be reviewed by the County Engineer If the GEOTECHNICAL
PROFESSIONAL does not concur in the judgment of the County Engineer as to any
decisions made by him or her, it shall present its written objections to the County
Administrator of Indian River County, who shall make a decision, and the
GEOTECHNICAL PROFESSIONAL shall abide by the County Administrator's decision,
unless the decision is clearly arbitrary or unreasonable.
SECTION X — OWNERSHIP AND REUSE OF DOCUMENTS
A. Ownership and Copyright: Ownership and copyright of all reports, test
results, and other data developed by the GEOTECHNICAL
PROFESSIONAL pursuant to this Agreement, shall be vested in the
COUNTY Said materials shall be made available to the COUNTY by the
GEOTECHNICAL PROFESSIONAL at any time upon request of the
COUNTY. On or before the tenth day after all work contemplated under
this Agreement is complete, all of the above materials shall be delivered to
the County Engineer.
B Reuse of Documents: All documents, including but not limited to reports
and tests, prepared or performed by the GEOTECHNICAL
PROFESSIONAL pursuant to this Agreement, are related exclusively to
the services described herein. They are not intended or represented to be
suitable for reuse by the COUNTY or others on extensions of this project
or on any other project. The COUNTY's reuse of any document shall be
at the COUNTY's own risk. The COUNTY shall not hold the
GEOTECHNICAL PROFESSIONAL liable for any misuse by others.
SECTION XI — NOTICES
Any notices, reports or other written communications from the GEOTECHNICAL
PROFESSIONAL to the COUNTY shall be considered delivered when posted by
certified mail or delivered in person to the County Engineer. Any notices, reports or
other communications from the COUNTY to the GEOTECHNICAL PROFESSIONAL,
shall be considered delivered when posted by certified mail to the GEOTECHNICAL
PROFESSIONAL at the last address left on file with the COUNTY or delivered in-person
to said GEOTECHNICAL PROFESSIONAL or its authorized representative
4
F \Public Works\ENGINEERING DIVISION PROJECTS11349-RFQ 2014007 Geotechnical ServicesWdminlAgreemen,ts 2014-201512014-2016
AGREEMENT ARDAMAN.doc
SECTION XII — TERMINATION
Either party may terminate this Agreement upon seven (7) days written notice to
the other party, except if the GEOTECHNICAL PROFESSIONAL terminates this
Agreement, such termination shall not be effective, absent the COUNTY's consent, until
the GEOTECHNICAL PROFESSIONAL'S completion to the COUNTY's satisfaction, of
any pending Work Order.
SECTION XIII — GEOTECHNICAL PROFESSIONAL'S PERSONNEL ASSIGNED TO
THE PROJECT
The COUNTY shall have the right of approval of all GEOTECHNICAL
PROFESSIONAL's personnel assigned to any COUNTY project. Therefore, any
subsequent changing of assigned personnel to any COUNTY project shall also be
subject to COUNTY approval. Failure to adhere to this policy shall be considered a
cause for contract termination
SECTION XIV — AUDIT RIGHTS
The COUNTY reserves the right to audit the records of the GEOTECHNICAL
PROFESSIONAL related to this Agreement at any time during the prosecution of the
work included herein and for a period of three years after final payment is made
SECTION XV — SUBLETTING
The GEOTECHNICAL PROFESSIONAL shall not sublet, assign, or transfer any
work under this Agreement without the written consent of the COUNTY. When
applicable and upon receipt of such consent in writing, the GEOTECHNICAL
PROFESSIONAL shall cause the names of the engineering and geotechnical firms
responsible for the major portions of each separate specialty of the work to be inserted
on the reports or other data
SECTION XVI — WARRANTY
The GEOTECHNICAL PROFESSIONAL warrants that it has not employed or
retained any company or person other than a bona fide employee working solely for the
GEOTECHNICAL PROFESSIONAL, to solicit or secure this Agreement, and that it has
not paid or agreed to pay any company or person other than a bona fide employee
working solely for the GEOTECHNICAL PROFESSIONAL any fee, commission,
percentage fee, gifts or any other considerations, contingent upon or resulting from the
award or making of this Agreement. For the GEOTECHNICAL PROFESSIONAL
breach of violation of this warranty, the COUNTY shall have the right to annul this
Agreement without liability.
SECTION XVII — DURATION OF AGREEMENT
This Agreement shall remain in full force and effect for a period of two years after
the date of execution thereof, or until completion of all project phases as defined by the
County Engineer, whichever occurs first, or unless otherwise terminated by mutual
consent of the parties hereto, or terminated pursuant to Section XII — "Termination."
This Agreement may be extended for one additional two year increment at the
discretion of the COUNTY.
5
F \Public Works\ENGINEERING DIVISION PROJECTS11349-RFQ 2014007 Geotechnical Services \Admin'Agreements 2014-201512014-2016
AGREEMENT ARDAMAN.doc
SECTION XVIII — INSURANCE
During the performance of the work covered by this Agreement, the
GEOTECHNICAL PROFESSIONAL shall provide the COUNTY with evidence that the
GEOTECHNICAL PROFESSIONAL has obtained and maintains the insurance listed in
the Agreement.
1 GEOTECHNICAL PROFESSIONAL shall procure and maintain for the
duration of the Agreement, insurance against claims for injuries to persons
or damages to property which may arise from or in connection with the
performance of the work hereunder by the GEOTECHNICAL
PROFESSIONAL, its agents, representatives, employees or
subcontractors. The cost of such insurance shall be included in the
GEOTECHNICAL PROFESSIONAL's fees.
2 Minimum Scope of Insurance (for fees less than $500,000):
A. Worker's Compensation as required by the State of
Florida. Employers Liability of $100,000 each accident,
$500,000 disease policy limit, and $100,000 disease each
employee.
B General Liability $1,000,000 combined single limit per
accident for bodily injury and property damage. Coverage
shall include premises/operations, products/completed
operations, contractual liability, and independent
contractors. COUNTY shall be named an "Additional
Insured" on the certificate of insurance.
C. Auto Liability $500,000 combined single limit per accident
for bodily injury and property damage Coverage shall
include owned vehicles, hired vehicles, and non -owned
vehicles. COUNTY shall be named an "Additional Insured"
on the certificate of insurance
D Professional Liability Insurance providing coverage for
negligent acts, errors, or omissions committed by
GEOTECHNICAL PROFESSIONAL with a $1,000,000 per
claim/annual aggregate. This insurance shall extend
coverage to loss of interest, earning, profit, use and
business interruption, cost of replacement power, and
other special, indirect, and consequential damages.
3 GEOTECHNICAL PROFESSIONAL's insurance coverage shall be
primary.
4. All above insurance policies shall be placed with insurers with a Best's
rating of no less that A -VII. The insurer chosen shall also be licensed to
do business in Florida.
5 The insurance policies procured, other than professional liability, shall be
occurrence forms, not claims made policies. Professional liability shall be
on a claims -made basis.
6 The insurance companies chosen shall provide certificates of insurance
prior to signing of contracts, to the Indian River County Risk Management
Department.
6
E \Public Works\ENGINEERING DIVISION PROJECTS\1349-RFQ 2014007 Geotechnical ServicesWdmin\Agreements 2014-2015\2014-2016
AGREEMENT ARDAMAN.doc
7. Each insurance company shall provide the Indian River County Risk
Management Department with a certificate of insurance that states that
the insurance company will provide 30 days notice to the Risk
Management Department, of its intent to modify or cancel said policies of
insurance. Such notice shall be in writing by registered mail, return receipt
requested, and addressed to the Risk Manager of the Risk Management
Department.
8 The GEOTECHNICAL PROFESSIONAL shall include all sub -contractors
as insured under its policies or shall furnish separate certificates and
endorsements for each subcontractor. All coverages for subcontractors
shall be subject to all of the requirements stated herein.
9. Any deductibles or self-insured retentions greater than $5,000 must be
approved by the Risk Manager for Indian River County with the ultimate
responsibility for same going to the GEOTECHNICAL PROFESSIONAL
SECTION XIX - INDEMNIFICATION
GEOTECHNICAL PROFESSIONAL hereby agrees to indemnify, and hold
harmless, the COUNTY, and the COUNTY's officers, employees and agents, from and
against any and all claims from liabilities, damages, losses, costs, third party claims,
judgments, and expense to persons or property, including reasonable attorneys' fees, to
the extent caused by the negligence, recklessness, or intentionally wrongful conduct of
GEOTECHNICAL PROFESSIONAL, or of GEOTECHNICAL PROFESSIONAL's
officers, employees, or agents, and GEOTECHNICAL PROFESSIONAL shall indemnify
the COUNTY against any such claims and any judgments that may be entered in
connection therewith, including reasonable attorneys' fees.
SECTION XX — SAFETY
The GEOTECHNICAL PROFESSIONAL is solely responsible for any job site
safety. However, in accordance with generally accepted practices, the
GEOTECHNICAL PROFESSIONAL may report any observed job site safety violations
by others to the COUNTY.
SECTION XXI — CHOICE OF LAW AND VENUE
This Agreement shall be governed by the laws of the State of Florida Venue for any
lawsuit brought by either party against the other party or otherwise arising out of this
Contract shall be in Indian River County, Florida, or in the event of a federal jurisdiction, in
the United States District Court for the Southern District of Florida.
SECTION XXII — ENTIRETY OF AGREEMENT
This writing embodies the entire Agreement and understanding between the
parties hereto, and there are no other Agreements and understandings, oral or written,
with reference to the subject matter hereof that are not merged herein and superseded
hereby. No alteration, change, or modification of the terms of this Agreement shall be
valid unless made in writing and signed by both parties hereto.
7
F -\Public Works\ENGINEERING DIVISION PROJECTS\1349-RFQ 2014007 Geotechnical Services1Admin\Agreements 2014-201512014-2016
AGREEMENT ARDAMAN.doc
SECTION XXIII - SEVERABILITY
If any provision, section, or paragraph of this agreement is determined by a court
of competent jurisdiction to be void, illegal, or unenforceable, the remaining portions not
found to be void, illegal, or unenforceable, shall remain in full force and effect.
SECTION XXIV — PUBLIC RECORDS COMPLIANCE
A. Indian River County is a public agency subject to Chapter 119, Florida
Statutes. The SURVEYOR shall comply with Florida's Public Records Law
Specifically, the SURVEYOR shall:
(1) Keep and maintain public records that ordinarily and necessarily would be
required by the COUNTY in order to perform the service.
(2) Provide the public with access to public records on the same terms and
conditions that the COUNTY would provide the records and at a cost that
does not exceed the cost provided in chapter 119 or as otherwise provided
by law
(3) Ensure that public records that are exempt or confidential and exempt from
public records disclosure requirements are not disclosed except as
authorized by law.
(4) Meet all requirements for retaining public records and transfer, at no cost, to
the COUNTY all public records in possession of the SURVEYOR upon
termination of the Agreement and destroy any duplicate public records that
are exempt or confidential and exempt from public records disclosure
requirements All records stored electronically must be provided to the
COUNTY in a format that is compatible with the information technology
systems of the COUNTY.
B. Failure of the SURVEYOR to comply with these requirements shall be a
material breach of this Agreement.
[The remainder of page intentionally left blank.]
8
F\Public Works\ENGINEERING DIVISION PROJECTS11349-RFQ 2014007 Geotechnical ServicesWdminNAgreements 2014-2015\2014-2016
AGREEMENT ARDAMAN .doc
IN WITNESS WHEREOF the parties hereto have executed these presents this
23 day of September , 2014.
OWNER
BOARD OF COUNTY COMMISSIONERS
INDIAN RIVER COUNTY, FLORIDA
(J)3-1
-713eQ) Peter D. O'Bryan, Chairma
Approved by BCC September 23, 2014
ATTEST:
Jeffrey K. Smith, Clerk of Circuit Court
and
Comptroller
1r O-
DepUt
y lerk
Approved as to Form
Sufficiency:
ylan Rein I of , r
ARDAMAN & ASSOCIATES, INC.
D J. Zralla , P.E.
sistant Vic President/Branch
M n.•-
roeo°�'/" '•ss' Witnessed by:
r(Signature)
%yp'•' 1 •'Q�°,' Ardaman & Associates, Inc.
and Legal
NTY Attorney
osep
A. Baird, COUNTY Administrator
(Printed name)
9
F \Public Works\ENGINEERING DIVISION PROJECTS11349-RFQ 2014007 Geotechnical Services\Admin\Agreements 2014-2015'2014-2016
AGREEMENT ARDAMAN.doc
Ardaman & Associates, Inc.
Geotechnical Environmental and
Materials Consultants
460 NW Concourse Place, Unit 1
Port St. Lucie, Florida 34986
772-878-0072 (office)
772-878-0097 (fax)
www.ardaman com
EXHIBIT "A"
ARDAMAN & ASSOCIATES, INC.
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1, 2014 through September 30, 2016)
SITE PREPARATION PROCEDURES INSPECTION, SAMPLING AND TESTING SERVICES
Monitoring of the removal of deleterious soils or materials
Inspection of placement and compaction of fill material
Penetrometer tests. Sampling of natural or fill material
Inspection of borrow areas.
Engineering technician
Senior engineering technician
Density Tests:
In-situ density tests, nuclear or drive sleeve method
(minimum of four per trip)
Sampling of natural or fill material for
laboratory testing; Engineering technician
ASPHALT: FIELD INSPECTION, SAMPLING AND LABORATORY TESTING
Engineering technician time for field sampling
Coring.
Mobilization of coring equipment:
With power supplied
Without power supplied
Certified engineering technician to inspect
preparation of base course/surface installation or plant control
Asphalt mix designs
Marshall Stability and Flow Test (Includes pill densities)
Extraction and gradation tests (sampled hot)
Extraction and gradation tests (sampled from pavement)
Density tests
Depth measurements
STRUCTURAL STEEL:
Field inspection for visual examination of welds, ultrasonic
testing, dye penetrant, magnetic particle, etc.
Metals technician
(Equipment and minimum charges determined by project)
OVERTIME AND HOLIDAY
Charges will be increased 50% for work performed during weekends and official holidays.
SUB -CONTRACTING SERVICES
Cost Plus 12%
$45 00/hour
$50 00/hour
$20 00/test
$45 00/hour
$45 00/hour
$150 00/trip
$100 00/trip
$65 00/hour
$750 00/design
$105 00/test
$125 00/test
$165 00/test
$22.00/test
$8 00/test
$65 00/hour
460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page 1 of 8
Ardaman & Associates, Inc.
=hiGeotechnical, Environmental and
Materials Consultants
EXHIBIT "A"
ARDAMAN & ASSOCIATES, INC.
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1, 2014 through September 30, 2016)
CONCRETE SAMPLING AND TESTING
Cylinder samples (up to 4 cylinders per set) molding
curing, and strength testing (ASTM C-31 and C-39).
Cylinders shall be left in a place provided by the
Contractor, covered with plastic caps and attempts
made to provide shade thereon. If temperature of
the air is critical to first 24 hours (during field curing),
equipment to maintain such controls shall be provided
by others.
Additional cylinders
Engineering technician time due to construction delays and time
transporting cylinders from site to office
if no other work is required
Curing and strength testing samples delivered to our
laboratory (ASTM C-39)
Continuous monitoring of concrete placement and/or
extra slump and temperature tests, engineering technician time
Slump tests (ASTM C-143)
Air Entrainment (ASTM C-173)
Unit weight
Yield tests
Verification of mix design
Fineness modules
Plant control
Concrete blocks. Strength tests (determined by gross area)
Concrete blocks Absorption and strength tests (net area)
Block Prism Assembly
Flexural Strength Beams (up to 3 beams) $30 00 each additional beam
Test beams made by others
Grout Prisms 3/set (blocks supplied by others)
Marsh Funnel Viscosity
SAMPLING AND TESTING OF IN-PLACE CONCRETE/SOIL CEMENT
Coring and testing of cored samples:
Engineering technician time (two technicians may be required)
Mobilization of coring equipment
With power supplied
Without power supplied
Trimming, capping and strength test (ASTM C-42)
Depth measurement
Swiss Hammer
Mobilization of equipment
Technician time
$80 00/set
$15 00/cylinder
$45 00/hour
$15 00/cylinder
$45 00/hour
$15 00/test
$30 00/test
$35 00/test
$35 00/test
$225 00/each
$44 00/each
$65 00/hour
$30 00/block
$125 00/set of 3
$220 00/set of 3
$150 00/set of 3
$50 00/each
$80 00/set
$35 00/test
$45 00/hour
$150 00/trip
$100 00/trip
$30 00/core
$15 00/core
$50 00/trip
$52 00/hour
460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page 2 of 8
Ardaman & Associates, Inc.
..016 Geotechnical, Environmental and
Materials Consultants
EXHIBIT "A"
ARDAMAN & ASSOCIATES, INC.
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1, 2014 through September 30, 2016)
ENGINEERING
Data Evaluation, Engineering Analysis,
Design, Inspections, Field Monitoring, etc.
Senior Project Engineer (P E. / Branch Manager)
Project Engineer
Staff Engineer
CONSTRUCTION MONITORING
AND FIELD TESTING
Senior Field Technician
Field Technician
SUPPORT PERSONNEL
Senior Technical Draftsman
Technical Draftsman I
Technical Secretary
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
$115 00
$95 00
$85 00
$50 00
$45 00
$55 00
$50 00
$45 00
460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page 3 of 8
Ardaman & Associates, Inc.
=AiGeotechnical, Environmental and
Materials Consultants
EXHIBIT "A"
ARDAMAN & ASSOCIATES, INC.
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1, 2014 through September 30, 2016)
CLASSIFICATION TESTS
Moisture Content (ASTM D-2216) Each $15 00
Organic Content
Loss on Ignition (ASTM D-2974) Each $30 00
Wet Combustion (AASHTO T-194) Each $95 00
Unit Weight/Classification (Undisturbed Sample) Each $48 00
Grain Size Distribution
Sieve Analysis (ASTM D-421, D-422) Each $65 00
Percent Fines (ASTM 0-1140) Each $35 00
Hydrometer Analysis (ASTM D-422) Each $85 00
Atterberg Limits (ASTM D-4318)
Plasticity Index Less than 150% Per Set $105 00
Plasticity Index Greater than 150% Add'I Per Set $80 00
Shrinkage Limit (ASTM D-4943) Each $75 00
Specific Gravity (ASTM D-854) Each $65 00
Los Angeles Abrasion Each $350 00
COMPACTION TESTS
Standard (ASTM D-698) or Modified Proctor (ASTM D-1557)
Maximum -Minimum Density (ASTM D-4253, D-4254)
Limerock Bearing Ratio (3 points)
Per Test
Per Set
Per Test
$85 00
$105 00
$275 00
CONSOLIDATION TESTS
Incremental Consolidation Test (ASTM D-2435)
Up to Ten Load -Unload Increments Per Test $460 00
More than Ten Load -Unload Increments Per Add'I Increment $50 00
Constant Rate of Strain Consolidation Test (ASTM D-4186) Each $560 00
PERMEABILITY TESTS
Permeability Test on Sand Each $135 00
Permeability Test on Fine Grained Soil
k >10-8cm/sec Each $225 00
k <10"8cm/sec Each $350 00
Test Duration Greater than 7 days Per Add'I Increment $20 00
Permeation with Fluids Other Than Water Add'I Per Test $115 00
STRENGTH TESTS
Strength Index Tests (Torvane, Penetrometer, etc.) Each $12.00
Vane Shear Test Each $22.00
Unconfined Compression Test (ASTM D-2166)
Strength Only Each $50 00
With Stress -Strain Curve Each $85 00
Triaxial Tests:
Unconsolidated -Undrained (ASTM D-2850) Each $185 00
Unconsolidated -Undrained (with pore pressure response) Each $420 00
Consolidated -Undrained (with pore pressure measurement) Each $420 00
Consolidated -Drained on Sands Each $320 00
Consolidated -Drained on Fine Grained Soils Each $480 00
Use of Fluids Other Than Water Add'I Per Test $145 00
Direct Shear Tests (Coarse Grained Soils)
Conventional 2.3" Box Shear Per Normal Load $230 00
With Stress Reversals Per Normal Load $340 00
460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page 4 of 8
'iifhI[k' Ardaman & Associates, Inc.
Geotechnical, Environmental and
Materials Consultants
EXHIBIT "A"
ARDAMAN & ASSOCIATES, INC.
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1, 2014 through September 30, 2016)
CHEMICAL TESTS
pH Each $15 00
Specific Conductance Each $12 00
Fluoride Each $22 00
Sulfate Each $42 00
Chloride Each $42.00
Soil pH Each $25 00
Soil Specific Conductance Each $42.00
Soil Resistivity (ASTM G-57) Each $42.00
Carbonate Content Each $65 00
Corrosion Series (pH, sulfate, chloride and resistivity) Each $155 00
CHEMICAL LABORATORY SUBCONSULTANT SERVICES
Laboratory Analytical Testing
GEOSYNTHETICS
Geomembrane Thickness (ASTM D-1593)
Geomembrane Density (ASTM D-792)
Geomembrane Tensile Strength (ASTM D-638), Machine and
Transverse Direction
Geomembrane Tear Resistance (ASTM D-1004), Machine and
Transverse Direction
Weld Peel and Shear (ASTM D-413, D-882)
Geotextile Tensile Strength (ASTM D-4632)
Geotextile Trapezoidal Tear (ASTM D-4533)
Per Sample
Per Sample
Per Set
Per Set
Per Set
Per Set
Per Set
Cost + 12%
$30 00
$46 00
$110 00
$75 00
$82.00
$110 00
$130 00
SAMPLE PREPARATION AND SPECIAL TESTS
Preparation of Samples for Testing (e.g., crushing for carbonate content determination, filtering of clayey soil for
chemical tests) will be charged at $25 00 per sample. Prices for other tests on geomembranes and geotextiles will be
determined per project based upon technician man-hours and other considerations
460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page 5 of 8
Ardaman & Associates, Inc.
iiihiGeotechnical, Environmental and
Materials Consultants
EXHIBIT "A"
ARDAMAN & ASSOCIATES, INC.
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1, 2014 through September 30, 2016)
MOBILIZATION AND DEMOBILIZATION
Men and Equipment $250 00
Portable Barge Per Job $5,000 00 Minimum
STANDARD DRILLING
All Terrain Vehicle
Auger Borings (4 -inch)
Wash Borings - Cuttings Only (up to 3 inch)
Soil drilling
Rock drilling
Standard Penetration Test (SPT) Borings
(ASTM D-1586) in soil (N -values <50)
from surface to 25 feet
from 25 feet to 50 feet
from 50 feet to 100 feet
from 100 feet to 125 feet
from 125 feet to 150 feet
Standard Penetration Test (SPT) Borings in
high resistance soil/rock (N -values >50)
Furnish, Install, and Remove Casing (up to 4 -inch)
from surface to 50 feet
from 50 feet to 100 feet
from 100 feet to 150 feet
Drilling (Time Basis)/2 man -crew
Drilling (Time Basis)/3 man -crew
Support Water Truck (Time Basis)
Rock Coring (N or H size)
from surface to 50 feet
from 50 feet to 100 feet
from 100 feet to 150 feet
Field Permeability
SAMPLING
Additional SPT Sampling:
from 10 feet to 25 feet
from 26 feet to 50 feet
from 51 feet to 100 feet
from 101 feet to 125 feet
from 126 feet to 150 feet
Undisturbed Samples:
Shelby Tube
Fixed -Piston Shelby, Osterberg, Pitcher
SOUNDINGS
Electric Dutch Cone Soundings
Piezocone Soundings
Muck Probing/Clay Sampling
Cone/Piezoprobe Soundings (Time Basis)
Piezoprobe Dissipation Monitoring
Add'I Price Per LF $2.50
Per Lineal Foot $9 50
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Add'I Price Per LF
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Crew -Hour
Per Crew -Hour
Per Day
Per Lineal Foot
Per Lineal Foot
Per Lineal Foot
Per Test
Per Additional Sample
Per Additional Sample
Per Additional Sample
Per Additional Sample
Per Additional Sample
Per Sample
Per Sample
Per Lineal Foot
Per Lineal Foot
Per Crew Hour
Per Crew Hour
Per Crew Hour
$8 00
$12.00
$13 50
$14 50
$15 00
$18 00
$22 00
$3 50
$8 50
$10 00
$12.50
$185 00
$200 00
$150 00
$26 00
$28 00
$32.00
$350 00
$23 00
$26 00
$29 00
$34 00
$39 00
$125 00
$150 00
$11 50
$12.00
$120 00
$185 00
$145 00
460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page 6 of 8
Ardaman & Associates, Inc.
=AiGeotechnical, Environmental and
Materials Consultants
EXHIBIT "A"
ARDAMAN & ASSOCIATES, INC.
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1, 2014 through September 30, 2016)
OTHER CHARGES
Clearing Difficult Access, Hole Location and Set -Up
Standby Time
Piezometer and Well Installation (plus materials)
Bore Hole Grouting and Sealing (plus materials)
Well Clearing/Sensitivity/Water Level
Air Boat Use
Instrumentation Unit Use
Materials
Barge Borings
ATV Borings
Per Crew -Hour
Per Crew -Hour
Per Crew -Hour
Per Crew -Hour
Per Crew -Hour
Per Day
Per Day
Per Job
ENVIRONMENTAL SITE ASSESSMENTS
Phase I Environmental Site Assessments
Tracts 50 acres or less (contiguous properties or per individual tract)
Tracts between 51 and 500 acres (contiguous properties)
Tracts greater than 500 acres
Phase II Environmental Site Assessments
Analytical Laboratory testing for hazardous or petroleum contamination
(soil, sediment and groundwater)
OTHER RELATED ENVIROMENTAL DRILLING CHARGES
Support Water Truck
Drumming Contaminated Soil/Drilling Fluids
In 55 gallon drums (Disposal not Included)
Drum Disposal
Visqueen (100 feet by 20 feet)
MONITORING WELL INSTALLATION
Temporary 2 -inch PVC Wellpoint (Piezometer))
2 -inch PVC
NOTE. Double cased deep monitoring well (above cost x 2)
VAULT/PAD INTALLATION — MONITORING WELLS
Well Size
2"
4"
2" or 4"
DIRECT PUSH GROUNDWATER SAMPLING
Direct Push Sampler (minimum 1 day)
ENVIRONMENTAL FIELD TESTING SERVICES
Slug Injection/Withdrawal Permeability Test
Double Ring Infiltrometer Test (ASTM D-3385-75)
Per Day
Per Drum
Per Drum
Per Roll
Per Foot
Per Foot
Vault Size
8" w/pad
12" w/pad
Above ground riser w/pad
Per Day
Each
Each
$150 00
$150 00
$165 00
$165 00
$150 00
$500 00
$150 00
At Cost + 12%
Normal drilling rates times 1.5
Normal drilling rates times 1 5
$1,800.00 Minimum
$2,100 00 Minimum
varies
varies
cost + 15%
$150 00
$150 00
Varies
$85 00
$18 00
$35 00
$275 00
$380 00
$275 00
$1,500 00
$250.00+$80.00ihour
$500 00
460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page 7 of 8
Ardaman & Associates, Inc.
=AIGeotechnical, Environmental and
Materials Consultants
EXHIBIT "A"
ARDAMAN & ASSOCIATES, INC.
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1, 2014 through September 30, 2016)
SPECIAL DRILLING/SOUNDING
Prices for special drilling (barge drilling, air boat sampling, amphibious drilling, NQ wire line coring, large diameter
borings; drilling in corrosive, contaminated or hazardous materials; drilling at great depths; installing large diameter
temporary casing; etc.) field vane testing, and other specialized sampling or field tests will be determined per project.
INSTRUMENTATION
Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field permeability
and packer tests will be determined per project.
GENERAL FIELD EQUIPMENT:
Generator Per Day $95 00
Steam Cleaner Per Day $100 00
Surveying Equipment (Water Table Elevations) Per Day $55 00
Peristaltic Purging Pump Per Day $40 00
pH/Conductivity Meter Per Day $25 00
Turbidity Meter Per Day $55 00
Water Level Indicator Per Day $20 00
EXPENDABLE SUPPLIES:
High Capacity (0 45 micron) Filter Each $22.00
Disposable Teflon Bailer Each $18 00
Disposable Polyethylene Bailer Each $13 00
Isopropyl Alcohol (decontamination) Per Gallon $15 00
Deionized Water (decontamination) Per Five Gallon $14 00
16 oz. Soil Jars (soil headspace analysis) Per Box of 12 $10 00
Tygon Tubing Per Foot $2.50
Polyethylene Tubing Per Foot $ 60
55 -gallon Drum Each $65 00
HEAVY EQUIPMENT:
Vacuum Truck, Dump Truck, Crane, Excavator,
Trackhoe, Backhoe, etc. Per Job Cost + 15%
REMEDIATION EQUIPMENT:
Cost is based on type of equipment and duration of project. Cost to be determined on project by project basis
Please call if you have any questions or require additional information
Sincerely,
ARDAMAN & ASSOCIATES, INC.
Dan J. rail
ranch M
ck, P.E
ager
Date 9/10/2014
460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page 8 of 8