HomeMy WebLinkAbout2014-139Change Order Form
T) A3 arti
/31
No 1
DATE OF ISSUANCE EFFECTIVE DATE
OWNER. Indian River County
CONTRACTOR Duininck, Inc.
Project. Dunes Golf Course Irrigation System Project
OWNER's Project No 148060
You are directed to make the following changes in the Contract Documents
Description
Additional Part and Full Circle Sprinklers per Contract and Pump Station Zee Pipe
Connection
Reason for Change Order
The original design of the irrigation system had 993 valve -in -head sprinklers for the entire
property During installation, there are adjustments that need to be made in order to have
proper coverage of water These additional 23 heads, basically one per hole, will enhance
the golf course in certain areas where we didn't have water before In lieu of coming back
later and paying triple the price, it is best to install them now than later because of cost
The connection we were to use was an old metal corroded pipe and the pipe outlet was
reduced to a smaller size than what we were hqoking up to so it made sense to do this work
now rather than later and have a nice, clean connection with the correctly sized outlet.
The specification did not specify to connect to existing pump above or below ground We
are building a new Z so we will not have to rely on trying to connect to existing old and
corroded metal pipe
Much of the connection price is to change out an existing bottleneck reducer that was
installed when the new pump station was purchased years ago The existing pump header
is 10 inches in diameter and the Z pipe is 12 inches in diameter yet the pump goes from 10
inch to 8 inch then 8 inch to 12 inch with a bottleneck in the middle We also need to
include a saddle on the new the pipe to accommodate their flow meter
This way the system is complete and new and HDPE all the way above ground and will
eliminate the very old existing bare metal pipe that is in the ground currently and below or in
the existing water table
Attachments (List documents supporting change)
Work Order Proposal from Duininck, Inc
Change Order - 1
CHANGE IN CONTRACT
PRICE
Description
Amount
Original Contract Price
$1,168,000
9/30/14
Net Increase (Decrease) from
previous Change Orders No
to
$0
Substantial Completion
Final Completion
Contract Price prior to this
Change Order
$1,168,000
(days or dates)
9/19/14
Net increase (decrease) of this
Change Order
$12,080
Contract Price with all approved
Change Orders
$1,180,080
(days or dates)
9/19/14
ACCEPTED
CONTRACTOR (Signature)
Date. %'�; ' f
DUININCK, INC.
P.O. BOX 208
PRINSBURG, MN 56281
CHANGE IN CONTRACT TIMES
Description
Time
Original Contract Time
Substantial Completion
Final Completion
(days or dates)
9/19/14
9/30/14
Net change from previous Change
Orders No to
(days)
9/19/14
Substantial Completion
Final Completion
9/30/14
Contract Time prior to this Change
Order
Substantial Completion
Final Completion
(days or dates)
9/19/14
9/30/14
Net increase (decrease) this
Change Order
Substantial Completion
Final Completion
(days or dates)
0
0
Contract Time with all approved
Change Orders
Substantial Completion
Final Completion
(days or dates)
9/19/14
9/30/14
RECOMMENDED
By'
ENGINEER (Signature)
Date
APP OVED
B ,�,IL.t�
OWNER (Signature)
Chairman, Peter D.O'B
Date: 09-23-2014
........
..' `
4,
'•
,
• "�ouu 'ROVED AS TO FORM
••••AND LEGAL SUFFICIENCY
Change Order - 2
BY
DYLAN REINGOLD
COUNTY ATTORNEY