HomeMy WebLinkAbout2014-139Change Order Form T) A3 arti /31 No 1 DATE OF ISSUANCE EFFECTIVE DATE OWNER. Indian River County CONTRACTOR Duininck, Inc. Project. Dunes Golf Course Irrigation System Project OWNER's Project No 148060 You are directed to make the following changes in the Contract Documents Description Additional Part and Full Circle Sprinklers per Contract and Pump Station Zee Pipe Connection Reason for Change Order The original design of the irrigation system had 993 valve -in -head sprinklers for the entire property During installation, there are adjustments that need to be made in order to have proper coverage of water These additional 23 heads, basically one per hole, will enhance the golf course in certain areas where we didn't have water before In lieu of coming back later and paying triple the price, it is best to install them now than later because of cost The connection we were to use was an old metal corroded pipe and the pipe outlet was reduced to a smaller size than what we were hqoking up to so it made sense to do this work now rather than later and have a nice, clean connection with the correctly sized outlet. The specification did not specify to connect to existing pump above or below ground We are building a new Z so we will not have to rely on trying to connect to existing old and corroded metal pipe Much of the connection price is to change out an existing bottleneck reducer that was installed when the new pump station was purchased years ago The existing pump header is 10 inches in diameter and the Z pipe is 12 inches in diameter yet the pump goes from 10 inch to 8 inch then 8 inch to 12 inch with a bottleneck in the middle We also need to include a saddle on the new the pipe to accommodate their flow meter This way the system is complete and new and HDPE all the way above ground and will eliminate the very old existing bare metal pipe that is in the ground currently and below or in the existing water table Attachments (List documents supporting change) Work Order Proposal from Duininck, Inc Change Order - 1 CHANGE IN CONTRACT PRICE Description Amount Original Contract Price $1,168,000 9/30/14 Net Increase (Decrease) from previous Change Orders No to $0 Substantial Completion Final Completion Contract Price prior to this Change Order $1,168,000 (days or dates) 9/19/14 Net increase (decrease) of this Change Order $12,080 Contract Price with all approved Change Orders $1,180,080 (days or dates) 9/19/14 ACCEPTED CONTRACTOR (Signature) Date. %'�; ' f DUININCK, INC. P.O. BOX 208 PRINSBURG, MN 56281 CHANGE IN CONTRACT TIMES Description Time Original Contract Time Substantial Completion Final Completion (days or dates) 9/19/14 9/30/14 Net change from previous Change Orders No to (days) 9/19/14 Substantial Completion Final Completion 9/30/14 Contract Time prior to this Change Order Substantial Completion Final Completion (days or dates) 9/19/14 9/30/14 Net increase (decrease) this Change Order Substantial Completion Final Completion (days or dates) 0 0 Contract Time with all approved Change Orders Substantial Completion Final Completion (days or dates) 9/19/14 9/30/14 RECOMMENDED By' ENGINEER (Signature) Date APP OVED B ,�,IL.t� OWNER (Signature) Chairman, Peter D.O'B Date: 09-23-2014 ........ ..' ` 4, '• , • "�ouu 'ROVED AS TO FORM ••••AND LEGAL SUFFICIENCY Change Order - 2 BY DYLAN REINGOLD COUNTY ATTORNEY