HomeMy WebLinkAbout2014-174EXTENSION AND AMENDMENT OF
CONTINUING CONTRACT AGREEMENT
for
PROFESSIONAL SERVICES
1/10'ga/oil/
121.6 .
A014- 17q
THIS EXTENSION AND AMENDMENT to CONTINUING CONTRACT AGREEMENT for PROFESSIONAL
SERVICES ("Amendment") is entered into as of this 4 day of November, 2014, by and between
INDIAN RIVER COUNTY, a political subdivision of the State of Florida, ("COUNTY"), and SCS Engineers,
("Consultant").
BACKGROUND RECITALS
A. In accordance with the Consultants' Competitive Negotiation Act, Section 287.055, Florida
Statutes, on November 15, 2011, the COUNTY and Consultant entered into a Continuing
Contract Agreement for Professional Services to provide certain professional services
relating to Public Works, Solid Waste Disposal District (SWDD) Utilities -Major and Utilities -
Minor systems (the "Agreement").
B. Per section 4.1 of the Agreement, the initial term of the Agreement was three years.
C. Per section 4.1 of the Agreement, COUNTY had the option to extend the Agreement for a
maximum of three years.
D. Per section 10.2 of the Agreement, the terms of the Agreement may be modified if made in
writing and signed by the Consultant and COUNTY; and
E. Both the COUNTY and Consultant wish to both extend the Agreement and modify the billing
rates and the insurance requirements set forth in the Agreement.
NOW THEREFORE, in accordance with the mutual covenants herein contained and other good
valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the
parties agree as follows:
1. The above background recitals are true and correct and are incorporated herein.
2. EXTENSION TERM. The County hereby extends the Initial Term set forth in section 4.1 of
the Agreement until November 16th, 2017.
3. HOURLY BILLING RATES. Section 1.5 of the Agreement is hereby amended to incorporate
a Revised Exhibit 2, attached to this Amendment, describing the schedule of current hourly
billing rates.
4. INSURANCE. Section 7.2 of the Agreement is hereby amended as follows:
a. 7.2.2. General Liability: commercial general liability coverage, including contractual
liability and independent contractor, with a minimum combined single limit of $4007000
$300,000 per occurrence • - - - - - - - _ - "'
b. 7.2.3. Business Automobile Liability: owned, hired, and non -owned vehicles at a
minimum combined single limit of $199,000 $300,000 per occurrence a+ ersonal
owned .chicles
c. 7.4. All required insurance policies shall be placed with insurers licensed to do
business in Florida and with a Best's rating of A: VII or better.
5. All other provisions of the Agreement shall remain in full force and effect.
IN WITNESS WHEREOF the parties hereto have executed this Agreement as of the date
first written above.
Consultant: (SCS Engineers) INDIAN RIVER COUNTY
By its Board of County Commissioners
By
C .lam Zs
Printed name: C. Ed Hilton, Jr. PE
Title: Vice President
Date 10/20/14
By -2,t)
Attest:Jeffr-; R. Smith, Clerk o �'and
Co ,f• troller
eputy Clerk
Approved:
seph A.aird
ounty Administrator
Approved as to form and legal
sufficiency:
an Reingold
County Attorney
SCS ENGINEERS FEE SCHEDULE
(Effective October 1, 2014 through November 16, 2017)
Rate/Hour ($)
Principal/Office Director 240
Project Director 210
Senior Project Advisor 190
Senior Project Manager 170
Project Manager 150
Senior Project Professional 135
Project Professional 120
Designer 110
Construction Superintendent 105
Staff Professional 100
Designer/Drafter 95
Senior Technician 90
Associate Staff Professional 85
Technician 62
Office Services Manager/Project Administrator 75
Secretarial/Clerical 70
1. The hourly rates are effective October 1, 2014.
2. The above rates include salary, overhead, administration, and profit. Other direct expenses,
such as analyses of air, water and soil samples, reproduction, travel, subsistence,
subcontractors, computers, and other reimbursable fees, are billed in accordance with the
attached reimbursable fee schedule or at cost, plus 15 percent for administration.
3. For special situations, such as expert court testimony, hourly rates for principals of the firm
will be on an individually -negotiated basis.
SCS ENGINEERS
FEE SCHEDULE (Continued)
(Effective October 1, 2014 through November 16, 2017)
Page 2 i
SCS ENGINEERS
REIMBURSABLES FEE SCHEDULE
(Effective October 1, 2014 through November 16, 2017)
ADMINISTRATION/MILEAGE
Unit Cost
(S)
Unit
Reimbursable
Vehicle Mileage 0.56 mile
Truck Usage $75 day
Reproduction — Black and White Copies 0.10 each
Reproduction - Color Copies 0.75 each
CAD Usage 5 hour
EQUIPMENT/FIELD SUPPLIES
Sampling Trailer, Field Equipped
Rate ($)
250
Unit
Day
Field -equipped sampling trailer includes equipment and supplies for soil and groundwater
sampling, decontamination, health and safety, logs, packing and shipping, and
miscellaneous uses.
Calibration:
Conductivity Standards * 1 Ounce
Isobutylene * 1 Liter
Methane in Air OVA Calibration Gas * 1 Liter
Pentane in Air * 1 Liter
pH Buffer Solutions (4,7,10) * 1 Ounce
Decontamination Equipment:
Brushes * 5 Day
Distilled/Deionized Water * 1 Gallon
Isopropyl Alcohol * 1 Ounce
Liquinox Soap Concentrate * 1 Ounce
Plastic Buckets * 5 Day
SCS ENGINEERS
FEE SCHEDULE (Continued)
(Effective October 1, 2014 through November 16, 2017)
Page 3
EQUIPMENT/FIELD SUPPLIES Rate ($) Unit
Poly Sheeting * 1 Square Foot 1
Health and Safety Equipment:
Altair 4 Monitor 10/100 Day/Month
Half-face/Full-face Respirators 20 Day
Personal H2S Monitor 5/50 Day/Month
Respirator Cartridges 10 Each
Tyvec Coveralls 5 Each
Nuclear Gauge 50/250 Day/Week
Hydrogeology Pumps:
Centrifugal Trash Pump * 15 Day
Grundfos Submersible Pump 25 Day
Peristaltic Pump * 15 Day
Whale Pump* 15 Day
Indoor Air Quality Equipment:
Bore scope 50 Day
DryCalc DC -Lite Calibrator 25 Day
Moisture Encounter ME -1 40 Day
Protimeter Mini Moisture Meter 35 Day
SKC Air Sampling Pump and Calibrator 15 Day
TSI IAQ Calc Air Quality Meter 50 Day
Zefon International Bio -Sampler Pump 50 Day
Industrial Hygiene Equipment:
CrowCon Gasman Meter — HF 25 Day
CrowCon Gasman Meter — H2S 25 Day
CrowCon Gasman Meter — SO2 25 Day
CrowCon Gasman Meter — NH3 25 Day
CrowCon Gasman Meter — CO 25 Day
DC-10 Noise Calibrator 25 Day
NoisePro DL 25 Day
TES1350 Sound Level Meter 25 Day
TSI VelociCalc/Micro Velometer 50 Day
Walchek II Air Screening System 50 Day
SCS ENGINEERS
FEE SCHEDULE (Continued)
(Effective October 1, 2014 through November 16, 2017)
Page 4
EQUIPMENT/FIELD SUPPLIES
Landfill Gas Field Equipment
Wellhead
Blower on Skid
Rate ($) Unit
15
45
Day
Day
Media Measurement Equipment:
Conductivity Meter * 15 Day
Draeger Air Screening System * 20 Day
DO Meter* 15 Day
GasTech Gas Meter 50 Day
GEM Soil Gas Meter 125 Day
Heath Porta FID II OVA * 50 Day
Horiba U-10 Water Quality Meter 60 Day
Oil/Water Interface Probe 25 Day
pH Meter * 15 Day
Temperature Meter * 15 Day
Tier 2 Gauge 50 Day
Turbidity Meter * 15 Day
Water Level Indicator * 15 Day
YSI Cond/Temp/Salinity Meter * 50 Day
Miscellaneous Equipment:
Absorbent Material 15 Cubic Foot
Air Compressor 60 Day
Camera 10 Day
Cordless Saw 20 Day
Generator 60 Day
Global Positioning System (GPS) 45 Day
Hammer Drill 15 Day
Laser Level Surveying Package 75 Day
Power Inverter 10 Day
Regent Lighting* 5 Day
Ryobi Drill 7 Day
Silicon Tubing * 2 Foot
Teflon Tubing * 4 Foot
SCS ENGINEERS
FEE SCHEDULE (Continued)
(Effective October 1, 2014 through November 16, 2017)
Page 5
EQUIPMENT/FIELD SUPPLIES Rate ($) Unit
Traffic Control Cones * 5 Day
Transit Level Surveying Package 50 Day
Tygon Tubing * 2 Foot
Video Camera 50 Day
Walky Talkys* 10 Day
Soil Sampling Equipment:
Hand Drill Auger System 25 Day
Sampling Tube - Acrylic, SS 5 Day
Slide Hammer * 10 Day
Bar Punch 10 Day
SS Bowls, Spoons, Scoops, etc. * 5 Day
SS Hand Auger - Bucket, Dutch * 10 Day
Water Sampling Equipment:
QED Micropurge w/Flow Cell*
Reusable Teflon Bailer/Lanyard *
* = Included in standard sampling trailer
rental.
200
5
Day
Day