HomeMy WebLinkAbout2014-206/pig /g,4,tq'
AI h.2-
40/111 4p/tr/
Indian River County
Emergency Services District Board of Commissioners
4225 43r`' Avenue
Vero Beach, Florida 32960
Telephone: (772) 226-3900 FAX: 772-567-9323
Project:
Fire Station 1, 1500 Old Dixie
Emergency Services District
WORK ORDER NO. 1
FOR
DESIGN/BUILD AGREEMENT
PHASE I
WITH
Barth Construction, Inc.
This Work Order No 1 is in accordance with the existing DESIGN/BUILD AGREEMENT
PHASE I dated December 6, 2012 between Barth Construction, Inc (Design/Builder) and Indian
River County (County). This Work Order No 1 identifies preconstruction work as follows
SECTION I — PROJECT LIMITS
This Work Order No. 1 is for the Design/Builder to perform work in connection with the design,
programing, construction documents and civil engineering to the proposed Fire Station 1 located
at 1500 Old Dixie Highway
SECTION II - SCOPE OF SERVICES
The services to be provided are attached to this Work Order No 1 and included by reference
herein
SECTION I11 — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT
1. Project shall be completed as follows:
a Time for Completion shall be 120 calendar Days from notice to proceed
SECTION IV — COMPENSATION
The County agrees to pay, and the Design/Builder agrees to accept, for the above described
services rendered a total amount of $58,232.00
Any additional services not described hereon shall be pre -approved by the County
All invoicing shall include Work Order No 1 (WO 1), itemized costs and materials expended to
complete the Work. Payments shall be in accordance with the original Agreement dated
December 6, 2012
1
The AGREEMENT is hereby amended as specifically set forth herein All remaining sections of
the AGREEMENT shall remain in full force and effect, and are incorporated herein
IN WITNESS WHEREOF the parties hereto have executed these presents this 16th day of
December 2014
OWNER:
BOARD OF COUNTY COMMISSIONERS
INDIAN RIVER COUNTY, FLORIDA
DESIGN/BUILDER:
BARTH CONSTRUCTION, INC
,. \5$IOPJE s"
R
«:
(Signature)
Wesley S Davis
Chairman
December 16, 2014
Attest: Jeffrey R. Smith Ierk of
Circuit Court and C� ptroller
Approved as to Form and Leg
o: z' ► (Sig lture)
•• A.Uw�e`1� �
Sufficiency:
William K. DeBraal
Deputy County Attorney
2
EARTH
Construction, Inc.
General Contractor CGC007847
November 19, 2014
John King
Indian River County Emergency Services
4225 43 rd Avenue
Vero Beach, Florida, 32960
Re: Station # I
Mr. King,
We are pleased to present to you our proposal for the Programming, Design & Preconstruction Services for the Fire Station
Building at the IRC Station #1 in the amount of $58,232.00
The scope of this proposal includes the follow;
• Programming/scope data and code review.
• Schematic, Design Development and Working Drawings — a completed and permitable set of project
construction documents including a written specification book.
• Project schedule- includes design and construction activities.
• Guaranteed Maximum Price — a guaranteed maximum price for the construction of the fire station
building based upon the updated Working Drawings that will be provided as part of this proposal.
Please refer to the attached for further break down of the costs.
Thank you
Jason Fykes
Barth Construction, Inc.
1717 Indian River Boulevard * Suite 202A * Vero Beach, Florida 32960
Phone: (772) 778-3072 * Fax: (772) 770-3017
E-mail: info@barthconstruction.com * Internett www.barthconstruction.com
F:\Projects\IRC Fire Stations 2011\Station #1\Fire Station Building Design & Precon Proposal 11.19.14.doc
1111 BARTN
Construction, Inc.
PROGRAMMING, BUILDING CODE & DESIGN REVIEW, and PRECONSTRUCTIONS SERVICES
Project: Indian River County EMS Fire Station # 1 months
0 wks
CODE
'DESCRIPTION
Q.TY:'.:.
• Labor
ITXrr' ".Uniti
'TOTAL
LABOR' `
'''MATERIALS:
SUB
Includes
Cost•
•Cost'.
No'
Deisgn Builder
Estimator/Project manager ( Jason Fykes 190
Design Build Executive ( Phil Barth 4
il
Superintenden 8
Clerical 32
Hrs
150
=600:
0
0:
0
600
firs
100
'19000'
0
0
19000
Hrs
75
600.
0
0
0
firs
45
1,440•
0
0
1'440
Architectural, MEP & Siruct Services
Programming/Scope Data
1
LS
2500
Schematic Design Phase
1
LS
12000
..:1200.0
Design Development Phase
1
LS
15000
15000
1
LS
0
1
LS
Civil Design & Permiting
1
LS
0
6450
6450
Landscape & Irrigation Design
1
LS
0
0
0
Surveys -By Owner
LS
0
0'
0
Soil Borings/Foundation Report
1
LS
0
0•
0
.::;...0
LS
0
0
0
Forensic Demolition
1
LS
0
0
0
::0
Document Reproduction/Printing
600
ea
1
0
:642
Shipping
is
'0.
0
0
Miscellaneous
Office Overhead
0
LS
0'.
0
.... 0
Contingency
10%
total
0
0
0:
Davis Bacon Compliance
Tuial:_:
reflects the 50% "Re -Use Discount"
•21,64 1,
AR. CI ifTLCTS
rAM • r• NMI-
••aaa, ' 111 r IIR
•/11rr w a•11
a ..••S i ■
•.11.011 MN • ON a
••=0 •M . to. t
war AIM 11111. c�
OEM
• •
• M=114• a• 111
a •tea. MN a as
a �• MI AM •r a
�,; A1ES
M!0 i"iti�._s_•�a r L�
EDLUND • DRITENBAS • BINKLEY
ARCHITECTS AND ASSOCIATES, P.A.
Members cif the American Institute of Architects
AR# AAC000666
16 October 2014
TO: Jason Fykes
Barth Construction
1717 Indian River Blvd.
Suite 202A
Vero Beach, Florida 32960
RE: Proposal for Part 1 Services on the Existing Facility
SITE: Station #1, 1500 Old Dixie Highway, Vero Beach, FL 32960
Architect's Project #100114VB
Dear Jason,
In accordance with the Part 1 Agreement between Indian River County and Barth
Construction acting as Design/Builder, and specifically Article 1.3, we are herewith
submitting the following request for work authorization to provide Architectural Services to
renovate the existing facility.
A. Basic Services
Our evaluation and documentation shall include the following:
1. Establish Programming and Scope data as necessary to achieve
a complete description of work to be performed. See initial
Programming/Scope description attached dated 16 October 2014.
2. Visit the project site, take digital photos, actual dimensions, and meet with the
end-users to note all concerns regarding the building and site conditions.
3. Research archival and electronic plans available as provided by the Owner
and in the absence thereof, field visit the site and document current conditions
in AutoCad format.
4. Provide Schematic Design and 100% Design Development Documents to
depict and define areas of demolition, renovation, remodeling or new
construction for the purposes of quantifying areas, volumes, structural
systems, and basic mechanical/electrical infrastructures within the primary
building. Provide an Outline Specification. These documents can be utilized
by Barth Construction to determine the first estimate of construction costs.
Page 1 of 2
85 Royal Palm Pointe, Suite 0, Vero Beach, PL 32860
Vera Beach 772/569.4320 Deerfield Beach 954/429.0995
Fax 772/569-9202 Fax 954/421.5269
5. Provide a review with the Owner and Design/Builder to discuss the functional
and organizational relationships, project scope, functional requirements, first
estimate of construction and project cost and to confirm the objectives for the
project are being met.
B. Purpose
Jason, these basic Part 1 services are precedent to Working Drawings, Specifications
in Book Form and Construction Administration Services which will be considered
Part 2 of our services. The Part 2 documents will comply with the requirements of
Article 3.2.3 of the Part 2 Agreement between Indian River County and Barth
Construction acting as Design/Builder.
C. Compensation to the Architect
Compensation for the Part 1 Services defined in Article "A" shall be a fixed fee of
$27,000.00, including Reimbursable Expenses.
D. Invoicing
Invoicing shall be every two weeks. The Architect realizes his compensation is
contingent upon Barth Construction being in receipt of payment from Indian River
County in accordanee with the Master Agreement and the Florida Prompt Payment
Act, F.S. 218.70, however, EDB Architects requests that the agreement between
Barth Construction and IRC be front loaded to allow compensation for the Design
Team work performed in Part 1.
PROGRAMMING/SCOPE DATA $ 2,500.00
SCHEMATIC DESIGN PHASE $12,000.00
DESIGN DEVELOPMENT PHASE $15,000.00
REIMBURSABLE EXPENSES Included
PART 1 TOTAL FEES
E. Schedule
$29,500.00
Scheduling and commencement of services shall be immediate due to the pressing
needs of the District.Please initiate this copy and return to our office at your earliest
convenience.
Paul U. Dritenbas, Architect A.I.A.
Page 2 of 2
c:1001 14VB.docipaul
Barth Construction Agent:
Date:
�V 1Gr itTEL: I
Mr' AMR 1,
II•AIM-11— — -
• a. 111.1'Mt•• .
• NINIi • N ■
—UMW a • — •
M N a 1 S—
=1111.-7 M 1 r.41=1
err. a 1 IL'
- — — • — -
• — I. — w
I's• _ •
- -----
-- r4111M11 r a
(:Nt_)/ .CC :RTES
EDLUND • DRITENBAS • BINKLEY
ARCHITECTS AND ASSOCIATES P.A.
Members of the American Institute of Architects
AR# AAC000986
16 October 2014
TO: Jason Fykes
Barth Construction
1717 Indian River Blvd.
Suite 202A
Vero Beach, Florida 32960
RE: Proposal for Part 2 Services on the Existing Facility
SITE: Station #1, 1500 Old Dixie Highway, Vero Beach, FL 32960
Architect's Project #100114VB
Dear Jason,
In accordance with the Part 2 Agreement between Indian River County and Barth
Construction acting as Design/Builder, and specifically Article 1.3.5 of the Part 1 Agreement
and Article 3.2.3 of the Part 2 Agreement, we are herewith submitting the following request
for work authorization to provide Architectural Services for the above project:
A. Basic Services
1) Provide Construction Documents at 60% and 90% for review and approval by
the Owner and construction pricing by Barth Construction. Construction
Documents shall include drawings, specifications, and other documents
and electronic data setting forth in detail the requirements for construction of
the work. These documents will include normal structural, mechanical, and
electrical engineering services. All Civil engineering Services for Design and
Permitting of the Fire Sprinkler main line and backflow preventer systems
will be by others.
2) Provide 100% Construction documents for construction permitting and book
form specifications.
3) Provide Construction Administration services for the duration of construction
through substantial completion, including inspection reports and digital
photos, shop drawings review and response to RFI's by the Contractor.
B. Compensation to the Architect
Compensation for Phase 2 services shall be based on the Construction Budget of
$680,000 established in Part 1 and as applied against the State of Florida, Department
Page 1 of 2 65 Royal Palm Pointe, Stine 0, Vero Beech, FL 32860
Vero Beach 772/669-4320 Deerfield Beech 964/429.0995
Fax 772/585-9208 Fax 964/421-8269
of Management Services Division of Building Construction Fee Schedule for
Architectural and Engineering Services. (See Attachment "A" for Summary of Fees).
Compensation shall be a fixed fee of $33,000, including Reimbursable Expenses.
C. Invoicing
Invoicing shall be every two weeks. The Architect realizes his compensation is
contingent upon Barth Construction being in receipt of payment from Indian River
County in accordance with the Master Agreement and the Florida Prompt Payment
Act, F.S. 218.70.
WORKING DRAWINGS PHASE $24,000.00
CONSTRUCTION ADMINISTRATION PRASE $ 9,000.00
REIMBURSABLE EXPENSES Included
PART 2 TOTAL FEES 833,000.00
MODEL ENERGY CODE CALCULATIONS $ 400.00 (If Required)
D. Schedule
Respe
Scheduling and commencement of services shall be immediate due to the pressing
needs of the District.Please initiate this copy and return to our office at your earliest
convenience.
Paul U. Dritenbas, Architect A.I.A.
Page 2 of 2
0:1001 I4VB.doc/paul
Barth Construction Agent:
Date:
ATTACHMENT "A"
SUMMARY OF FEES FOR STATION #1 RENOVATION
1500 Old Dixie Highway Vero Beach, Florida 32960
PROJECT BUDGET
CONSTRUCTION BUDGET
FEE STRUCTURE: PART 1 AGREEMENT
FEE FOR PROGRAMMING/SCOPE DATA
REIMBURSABLE EXPENSES
SCHMATIC DESIGN PHASE
DESIGN DEVELOPMENT PHASE
PART 1 TOTAL
FEE STRUCTURE: PART 2 AGREEMENT
WORKING DRAWING PHASE
CONSTRUCTION ADMINISTRATION PHASE
REIMBURSABLE EXPENSES
PART 2 TOTAL
TOTAL FEES INCLUDING REIMBURSABLE EXPENSES
MODEL ENERGY CODE CALCULATIONS (If Required)
Page 1 of 1
C:1001 I4VB.doc/paul
$750,000.00
$680,000.00
2,500.00
included
12,000.00
15.000.00
$ 29,500.00
24,000.00
9,000.00
included
$ 33,000.00
$62,500.00
400.00
EDLUND • DRITENBAS • SINKLEY
ARCHITECTS AND ASSOCIATES, P.A.
65 Royal Palrn Pointe, Ste D
Vero Beach, FL 32960
Ph: (772) 569-4320 Fac (772) 569-9208
;RCM Station 4#1
Programming Statement / Scope of Work
16 October 2014
1) Remove all perimeter berms, foundations and infrastructure concealed within elevation of berms.
2) Provide grading of ground for slope to two existing stormwater management areas. Sod as required.
3) All exposed exterior walls, pressure clean old parge coating, lath full wail and provide 3" stucco and
Y" ground control joints at 8'-0" o/c Provide a vinyl 1 -bead at bottom of new applied stucco.
4) Repair flat roof and north and south vertical parapets. Provide new flashing.
5) Spray Icynene Insulation to underside of existing plywood roof deck at N & S bays.
6) Remove and replace ductwork at north and south bays.
7) Remove all S.A.T. ceilings and fiberglass batt insulation sitting on top of S.A.T. Replace S.A.T. and T -
grid.
8) Remodel kitchen by enlarging to north or west.
9) Alt exterior aluminum soffits to be removed. Provide hi -rib lath and stucco at openings.
10) Insulate exterior block walls with Corefihl 500 Insulation prior to applying new full height stucco
overcoat.
11) Remove all interior gypsum walls that show evidence of water or moisture damage. Remove P.T. 1x2
and replace with new Bora' treated P.T. 1x2 @ 16" o/c.
12) Replace particle board parapet walls with structural 5/8" cdx ply. Dry -In and apply %" stucco over
new galvanized self -furring wire lath.
13) Replace or repair perimeter gutters and downspouts using .040 commercial grade aluminum.
14) Provide new commercial exhaust hood In kitchen, complete with ansul extinguishing system.
15) Provide 3 new lockable pantry's in kitchen.
16) All tops in kitchen to be roil front protected stainless steel.
17) By way of FBC 2010 code for existing buildings, the scope of work proposed places this project under
"Alteration -Level 3" per Section 405. Work area exceeds 50 percent of the aggregate area of the
building. Level -3 alterations must comply with the provisions of Chapter 6 and 7, as well as Chapter
8. Section 804.1 calls for Automatic Sprinkler Systems in all areas being "worked" i.e. renovated in
accordance with FBC 2010. Because Fire Stations are considered Group R-2 occupancies, Section
903.2.8 FBC calls for automatic sprinkler systems thru-out all buildings with a Group -R fire area, as
refined by Section 310.1 Residential R-2.
18) Renovate Men's and Women's toliet/shower rooms to meet ADA or provide one standalone unisex
toilet/shower room that complies with FBC accessibility standards.
19) Upgrade fire alarm, pull stations, horns, strobes, and F.A.C.P. along with a new enunciator panel.
20) Provide Fire Fighter Safety Building marking emblem per F.S. 633.027 and NFPA 1, Annex Q.
21) Relocate 2 exterior A/C units sitting on concrete pads to new, lower elevations on concrete pads.
Refrigerant lines, thermostat lines and electrical lines from wall mounted disconnects will have to be
modified.
22) Provide new hi/low electric water coolers.
23) Note, per FBC and ADA, up to 20% of cost of renovations must be spent bringing this facility into
compliance with barrier removal and accessibility.
24) All door hardware must be replaced with lever set units.
25) Provide new 3 compartment sink and disposal in kitchen.
26) Repaint interiors and exterior of building.
27) Repair sloping fiberglass roof areas where leaks are evident. Shingles appear to have remaining
useful life.
28) Consider lighting upgrades in offices and kitchen areas.
29) Are the parking and circulation areas for re -cuing the trucks bright enough? Are additional lights
required in the parking lot?
30) Can the removed fill dirt at the berms be transported directly west to the COVB soil storage area, in
lieu of trucking offsite?
31) Can the station crew remain in the facility during renovations, and reconstruction?
32) We need to revisit Life Safety for safe existing from all areas of the north and south wings, including
exit lights and emergency overhead or wall pack lighting.
c:\Mary\100114VB\scope.doC:
STATE OF FLORIDA, DEPARTMENT OF MANAGEMENT SERVICES AE FEE CA... Page 1 of '
Fee Guide Calculator
For Architectural and Engineering Services
State or Florida. Department of rdanagement Serv,crs
ersion Posted: March 2012
Project Nam:
tRFD EMS Station #1 Renovation
CONSTRUCTION
COST FOR
BUILDING (Sitewort
Not Included)
COMPLEXITY GROUP - PERCENTAGE
A
B
C
D
E
F
G
9.62%
8.80%
8.97%
7.99%
7.18%
6.38%
10.09%
S 680,000
CALCULATED FEE
$65,388
$59,822
$60,996
$54,329
$48,840
$43,415
$68,591
Instructions: Fit in probable construction cost at left and push enter key.
GROUP DEFINITIONS:
"A" - CONSIDERABLY MORE THAN AVERAGE COMPLF,XITY: Complex Laboratories, Medical Hospitals
"B" - MORE THAN AVERAGE COMPLEXITY: Average laboratories, Mental Hospitals, Simple Medical Hospitals, Clinics, Court
Houses, Theatres, Complex University Buildings. Special Purpose Classrooms Laboratory Classrooms, Libraries, Auditoriums,
Museums, AirTerminals, Food Service Facilities, Specialized Detention Areas, Detention Treatment Areas, Residences, Emergency
Management Centers
"C" - REPAIRS AND RENOVATIONS: Miscellaneous Repairs and Renovations, Alterations to Office Space or Dormitory Space.
Fite Code Corrective Work
"D" - AVERAGE COMPLEXITY: General Office Space, General Teaching Space, Gymnasiums, General Detention Living Facilities
Factory Buildings
"E" - LESS THAN AVERAGE COMPLEXITY: Apartment Buildings, Dormitory Buildings, Service Garages, Stadiums, Repetitive
Design Facilities, Office Buildings With Undefined Interior Space (open for later partitioning), Specialized Parking Structures
"F"- CONSIDERABLY LESS THAN AVERAGE COMPLEXITY: Warehouses, Parking Garages, Storage Facilities
"G" - BUILDING ENGINEERING SERVICES: Mechanical, Electrical and Structural not exceeding $1,000,000 in construction (Not
incbuding Site Civil)
ADDITIONAL SERVICES & EXPENSES:
The following services are considered Additional to Basic Services and are not Included within the
basic fee represented by the fee guides:
-Feasibility Studies/ Analysis
-Facility Programming
-Master Planning
-Soils Investigations/Reports
-Surveys Topographie/Botmdary
Vegetation/Improvements/Utilities
-Measured Drawings ofExistingFacilities
-Existing Facilities Analysis
-Toxic Substance Mitigation Surveys and Consultation
-Site Environmental Assessments
-Site DRI, PUD, Site Plan Review and/or Zoning Modifications
Traffic Analysis and Traffic Signal Warrant Studies
-Civil Engineering Design including
Paving/Grading/Utilities
/Drninage/Stonnwater Management/Environmental & All Site
Permitting
-Existing Site Utility infrastructure Improvements
-Site Lighting Design
-Landscape Architectural & Irrigation Design
-Specialty Consultants
Voice/Data Communications; ElectroniclAudio
Visual; Food Service Equipment; Hazardous
Material; Hospital/Laboratory; interior Design;
Indoor Air Quality; Quality Control;
Theater/Acoustical; Security
-Life Cycle Cost (ROI) and/or Federal DOE Energy Analysis
• As defined in the Division of Real Estate Development and Manan
-LEED Consultation
-Graphic end Signage Design
-Special Code Reviews including ACHA
-Detailed Cost Estimates -
-Documents Prepared For.
-Alternate Bids Exceeding Contract Scope
-Eseessive Change Orders
-Multiple Construction Contracts
-Record Dominions/As Buiits
-Prolonged Construction Contract Administration Services
-Stntcturallhreshold inspections
-Project Representation During
Construction Beyond Bi -Monthly Administration
-Additional Construction Contract
Administration Services for Multiple Contracts
-Building Commissioning and Training Services
-Post Occupancy huts/ Evaluations
-Renderings/ Models
- Substantive Changes to Scope, Size or Complexity
-Owner Requested Changes to Approved Documents
-Reimbursable Expenses*
Including, but not limited to, reproduction/ printing
costs,
travel expenses and special mail service expenses
ement Form of Agreement Between Owner and Architect -
Engineer.
LI .. ra .__rr.* so a r•rs--n..: i -r~_: _ 1
......u.... .
CARTER ASSOCIATES, INC.
CONSULTING ENGINEERS AND LAND SURVEYORS
I7O 21st STREET • VERO BEACH, FLORIDA 32960.3472 •772-562.4191 • 772-562.7180 (RAX)
JOHN H. BLUM. P.E.. PRINCIPAL
DAVID E. LUEFHJE. P.S.M.. PRINCIPAL
GEORGE. A. SIMONS. P.E.. PRINCIPAL
PATRICK S. WALTHER, P.E. PRINCIPAL
MARVIN E. CARTER. P.S.M., Consultant to the Fkm
DEAN F. LUETHJF P.E., MAW) W) Consultant In the Finn
November 19, 2014
Mr. Jason Fykes
Barth Construction, Inc.
1717 Indian River Blvd
Suite 202A
Vero Beach, Florida 32960
RE: Civil Engineering Services Agreement
IRC Fire Station #1 (Old Dixie Highway)
Revised Grading Plan & Proposed Fire Main
Dear Jason:
FRANK S. CUCCURESE. P.S.M.
CLINTON J. RAHJES. P.E.
STEVE D. SNOBBRGER. P.E.
BENJAMIN D. SPEED. P.E
We are pleased to present this proposed agreement to provide civil engineering services relative
to the design and permitting for the revised grading plan and proposed fire main at the above
referenced project. The following describes our proposed scope of work and terms of agreement
between Carter Associates, Inc. (CAI) and Barth Construction, In. (CLIENT).:
CAI services will include the following:
• Perform a specific purpose survey to locate paving, drainage, and building improvements
within limited areas where re -grading is proposed adjacent to existing building. Also
locate existing water main and fire hydrant servicing the site.
• Prepare a grading and drainage plan to direct stormwater runoff away from the proposed
building improvements and into existing stormwater collection areas.
• Design and permit with City of Vero Beach Water and Sewer Department a fire line and
accessories for future fire protection of the building.
• Provide °onsite" project representative for the duration of time required meeting permit
conditions and providing routine reporting of substantial construction activities to the
Engineer and the City of Vero Beach. Provide certification upon completion of
construction.
The above referenced tasks can be performed not to exceed the estimated amount of
$6,450.00. If additional services are required outside this scope, then separate
authorization will be required.
N:UHa1PROPOSALWBar6FFiresla6all.dot: Page 1 of 3
02014 by CAI
4Altarinng:tonda
Assumptions
CAI represents to the CLIENT that in developing this Scope of Work, assumptions have been
made, and that deviation from assumptions identified within this proposal may require additional
expenditures on behalf of the CLIENT to CAI. Assumptions, not already mentioned herein, are
as follows:
1. Engineering proposal is based upon no request for zoning change, land use change, planned
development exceptions, or variances.
2. This proposal specifically excludes all application and/or impact fees, which shall be the
responsibility of the OWNER
3. It is assumed that site plan approval will not be required from the City of Vero Beach since
there is no new impervious area proposed with the plan.
4. Construction staking and as -built surveys are not included with this proposal.
General
CAI will generally bill the CLIENT monthly on approximately the 10a` day of each month for the
previous month's charges. All tasks will be billed on a percentage complete/lump sum basis, plus
direct expenses (See attached Rate Schedule). Should additional services be required, a separate
written agreement will be prepared and fees shall be negotiated based on the attached Rate
Schedule.
Should you have any questions regarding our proposal scope of work or terms of agreement,
please feel free to call me. If you would like us to proceed with the work described herein, please
sign below and return an original signed copy which will serve as our notice to proceed.
Sincerely, Agreed to and Accepted::
TER ASSOCIATES, INC. By:
kr-\- , Print Name:
John H. Blum, P.E. Address:
Principal
KIHRIPROPOSALIBertli-FireSlationtdoc Page 2 of 3
02014 by CAI
servfr g 14oricki
Since 01
CARTER ASSOCIATES, INC.
NOVEMBER 2014
RATE SCHEDULE
Engineer I (Registered - Principal) $150.00/hr
Engineer (Registered - Senior Consultant) $140.00/hr.
Engineer I (Registered) $140.00/hr.
Engineer ll (Registered) $125.00/hr.
Engineer III - EIT $100.00/hr.
Engineer Technician (Senior) $105.00/hr.
Engineer Technician $ 85.00/hr.
Surveyor I (Registered - Principal) $150.00/hr.
Surveyor (Registered - Senior Consultant) $140.00/hr.
Surveyor II (Registered) $125.00/hr.
Surveyor III (Registered) $100.00/hr.
Survey Crew (4 Men) $143.00/hr.
Survey Crew (3 Men) $130.00/hr.
Survey Crew (2 Men) $120.00/hr.
GPS RTIC Survey Crew (3 Men) $l50.00/hr.
GPS RTI( Smvcy Crew (2 Men) $135.00/hr.
CADD Technician I $ 80.00/hr.
CADD Technician II $ 70.00/hr.
Secretary/Word Processor $ 45.00/hr.
Inspector $ 62.00/hr.
Recording and Permit Fees Cost + 10%
Materials Cost
Mileage $0.505/mile
Sub -consultants Cost + 10%
Reimbursable Expenses:
Postage, Long Distance Calls,
Federal Express, etc. Cost
Blueprints $0.25/S.F.
Mylar $1.75/S.F.
Photocopy (8.5" x 11") $0.15/ea.
Photocopy (8.5" x 14") $0.25/ea.
Photocopy (11" x 17") $0.35/ea.
These fees shall be renegotiated on an annual basis
NitHEAPROPOSALWarthflreStationtcloc
02014 by CAI
Page 3 of 3
OAIsen'lligFlonda
Since 1911