Loading...
HomeMy WebLinkAbout2014-206/pig /g,4,tq' AI h.2- 40/111 4p/tr/ Indian River County Emergency Services District Board of Commissioners 4225 43r`' Avenue Vero Beach, Florida 32960 Telephone: (772) 226-3900 FAX: 772-567-9323 Project: Fire Station 1, 1500 Old Dixie Emergency Services District WORK ORDER NO. 1 FOR DESIGN/BUILD AGREEMENT PHASE I WITH Barth Construction, Inc. This Work Order No 1 is in accordance with the existing DESIGN/BUILD AGREEMENT PHASE I dated December 6, 2012 between Barth Construction, Inc (Design/Builder) and Indian River County (County). This Work Order No 1 identifies preconstruction work as follows SECTION I — PROJECT LIMITS This Work Order No. 1 is for the Design/Builder to perform work in connection with the design, programing, construction documents and civil engineering to the proposed Fire Station 1 located at 1500 Old Dixie Highway SECTION II - SCOPE OF SERVICES The services to be provided are attached to this Work Order No 1 and included by reference herein SECTION I11 — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT 1. Project shall be completed as follows: a Time for Completion shall be 120 calendar Days from notice to proceed SECTION IV — COMPENSATION The County agrees to pay, and the Design/Builder agrees to accept, for the above described services rendered a total amount of $58,232.00 Any additional services not described hereon shall be pre -approved by the County All invoicing shall include Work Order No 1 (WO 1), itemized costs and materials expended to complete the Work. Payments shall be in accordance with the original Agreement dated December 6, 2012 1 The AGREEMENT is hereby amended as specifically set forth herein All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein IN WITNESS WHEREOF the parties hereto have executed these presents this 16th day of December 2014 OWNER: BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA DESIGN/BUILDER: BARTH CONSTRUCTION, INC ,. \5$IOPJE s" R «: (Signature) Wesley S Davis Chairman December 16, 2014 Attest: Jeffrey R. Smith Ierk of Circuit Court and C� ptroller Approved as to Form and Leg o: z' ► (Sig lture) •• A.Uw�e`1� � Sufficiency: William K. DeBraal Deputy County Attorney 2 EARTH Construction, Inc. General Contractor CGC007847 November 19, 2014 John King Indian River County Emergency Services 4225 43 rd Avenue Vero Beach, Florida, 32960 Re: Station # I Mr. King, We are pleased to present to you our proposal for the Programming, Design & Preconstruction Services for the Fire Station Building at the IRC Station #1 in the amount of $58,232.00 The scope of this proposal includes the follow; • Programming/scope data and code review. • Schematic, Design Development and Working Drawings — a completed and permitable set of project construction documents including a written specification book. • Project schedule- includes design and construction activities. • Guaranteed Maximum Price — a guaranteed maximum price for the construction of the fire station building based upon the updated Working Drawings that will be provided as part of this proposal. Please refer to the attached for further break down of the costs. Thank you Jason Fykes Barth Construction, Inc. 1717 Indian River Boulevard * Suite 202A * Vero Beach, Florida 32960 Phone: (772) 778-3072 * Fax: (772) 770-3017 E-mail: info@barthconstruction.com * Internett www.barthconstruction.com F:\Projects\IRC Fire Stations 2011\Station #1\Fire Station Building Design & Precon Proposal 11.19.14.doc 1111 BARTN Construction, Inc. PROGRAMMING, BUILDING CODE & DESIGN REVIEW, and PRECONSTRUCTIONS SERVICES Project: Indian River County EMS Fire Station # 1 months 0 wks CODE 'DESCRIPTION Q.TY:'.:. • Labor ITXrr' ".Uniti 'TOTAL LABOR' ` '''MATERIALS: SUB Includes Cost• •Cost'. No' Deisgn Builder Estimator/Project manager ( Jason Fykes 190 Design Build Executive ( Phil Barth 4 il Superintenden 8 Clerical 32 Hrs 150 =600: 0 0: 0 600 firs 100 '19000' 0 0 19000 Hrs 75 600. 0 0 0 firs 45 1,440• 0 0 1'440 Architectural, MEP & Siruct Services Programming/Scope Data 1 LS 2500 Schematic Design Phase 1 LS 12000 ..:1200.0 Design Development Phase 1 LS 15000 15000 1 LS 0 1 LS Civil Design & Permiting 1 LS 0 6450 6450 Landscape & Irrigation Design 1 LS 0 0 0 Surveys -By Owner LS 0 0' 0 Soil Borings/Foundation Report 1 LS 0 0• 0 .::;...0 LS 0 0 0 Forensic Demolition 1 LS 0 0 0 ::0 Document Reproduction/Printing 600 ea 1 0 :642 Shipping is '0. 0 0 Miscellaneous Office Overhead 0 LS 0'. 0 .... 0 Contingency 10% total 0 0 0: Davis Bacon Compliance Tuial:_: reflects the 50% "Re -Use Discount" •21,64 1, AR. CI ifTLCTS rAM • r• NMI- ••aaa, ' 111 r IIR •/11rr w a•11 a ..••S i ■ •.11.011 MN • ON a ••=0 •M . to. t war AIM 11111. c� OEM • • • M=114• a• 111 a •tea. MN a as a �• MI AM •r a �,; A1ES M!0 i"iti�._s_•�a r L� EDLUND • DRITENBAS • BINKLEY ARCHITECTS AND ASSOCIATES, P.A. Members cif the American Institute of Architects AR# AAC000666 16 October 2014 TO: Jason Fykes Barth Construction 1717 Indian River Blvd. Suite 202A Vero Beach, Florida 32960 RE: Proposal for Part 1 Services on the Existing Facility SITE: Station #1, 1500 Old Dixie Highway, Vero Beach, FL 32960 Architect's Project #100114VB Dear Jason, In accordance with the Part 1 Agreement between Indian River County and Barth Construction acting as Design/Builder, and specifically Article 1.3, we are herewith submitting the following request for work authorization to provide Architectural Services to renovate the existing facility. A. Basic Services Our evaluation and documentation shall include the following: 1. Establish Programming and Scope data as necessary to achieve a complete description of work to be performed. See initial Programming/Scope description attached dated 16 October 2014. 2. Visit the project site, take digital photos, actual dimensions, and meet with the end-users to note all concerns regarding the building and site conditions. 3. Research archival and electronic plans available as provided by the Owner and in the absence thereof, field visit the site and document current conditions in AutoCad format. 4. Provide Schematic Design and 100% Design Development Documents to depict and define areas of demolition, renovation, remodeling or new construction for the purposes of quantifying areas, volumes, structural systems, and basic mechanical/electrical infrastructures within the primary building. Provide an Outline Specification. These documents can be utilized by Barth Construction to determine the first estimate of construction costs. Page 1 of 2 85 Royal Palm Pointe, Suite 0, Vero Beach, PL 32860 Vera Beach 772/569.4320 Deerfield Beach 954/429.0995 Fax 772/569-9202 Fax 954/421.5269 5. Provide a review with the Owner and Design/Builder to discuss the functional and organizational relationships, project scope, functional requirements, first estimate of construction and project cost and to confirm the objectives for the project are being met. B. Purpose Jason, these basic Part 1 services are precedent to Working Drawings, Specifications in Book Form and Construction Administration Services which will be considered Part 2 of our services. The Part 2 documents will comply with the requirements of Article 3.2.3 of the Part 2 Agreement between Indian River County and Barth Construction acting as Design/Builder. C. Compensation to the Architect Compensation for the Part 1 Services defined in Article "A" shall be a fixed fee of $27,000.00, including Reimbursable Expenses. D. Invoicing Invoicing shall be every two weeks. The Architect realizes his compensation is contingent upon Barth Construction being in receipt of payment from Indian River County in accordanee with the Master Agreement and the Florida Prompt Payment Act, F.S. 218.70, however, EDB Architects requests that the agreement between Barth Construction and IRC be front loaded to allow compensation for the Design Team work performed in Part 1. PROGRAMMING/SCOPE DATA $ 2,500.00 SCHEMATIC DESIGN PHASE $12,000.00 DESIGN DEVELOPMENT PHASE $15,000.00 REIMBURSABLE EXPENSES Included PART 1 TOTAL FEES E. Schedule $29,500.00 Scheduling and commencement of services shall be immediate due to the pressing needs of the District.Please initiate this copy and return to our office at your earliest convenience. Paul U. Dritenbas, Architect A.I.A. Page 2 of 2 c:1001 14VB.docipaul Barth Construction Agent: Date: �V 1Gr itTEL: I Mr' AMR 1, II•AIM-11— — - • a. 111.1'Mt•• . • NINIi • N ■ —UMW a • — • M N a 1 S— =1111.-7 M 1 r.41=1 err. a 1 IL' - — — • — - • — I. — w I's• _ • - ----- -- r4111M11 r a (:Nt_)/ .CC :RTES EDLUND • DRITENBAS • BINKLEY ARCHITECTS AND ASSOCIATES P.A. Members of the American Institute of Architects AR# AAC000986 16 October 2014 TO: Jason Fykes Barth Construction 1717 Indian River Blvd. Suite 202A Vero Beach, Florida 32960 RE: Proposal for Part 2 Services on the Existing Facility SITE: Station #1, 1500 Old Dixie Highway, Vero Beach, FL 32960 Architect's Project #100114VB Dear Jason, In accordance with the Part 2 Agreement between Indian River County and Barth Construction acting as Design/Builder, and specifically Article 1.3.5 of the Part 1 Agreement and Article 3.2.3 of the Part 2 Agreement, we are herewith submitting the following request for work authorization to provide Architectural Services for the above project: A. Basic Services 1) Provide Construction Documents at 60% and 90% for review and approval by the Owner and construction pricing by Barth Construction. Construction Documents shall include drawings, specifications, and other documents and electronic data setting forth in detail the requirements for construction of the work. These documents will include normal structural, mechanical, and electrical engineering services. All Civil engineering Services for Design and Permitting of the Fire Sprinkler main line and backflow preventer systems will be by others. 2) Provide 100% Construction documents for construction permitting and book form specifications. 3) Provide Construction Administration services for the duration of construction through substantial completion, including inspection reports and digital photos, shop drawings review and response to RFI's by the Contractor. B. Compensation to the Architect Compensation for Phase 2 services shall be based on the Construction Budget of $680,000 established in Part 1 and as applied against the State of Florida, Department Page 1 of 2 65 Royal Palm Pointe, Stine 0, Vero Beech, FL 32860 Vero Beach 772/669-4320 Deerfield Beech 964/429.0995 Fax 772/585-9208 Fax 964/421-8269 of Management Services Division of Building Construction Fee Schedule for Architectural and Engineering Services. (See Attachment "A" for Summary of Fees). Compensation shall be a fixed fee of $33,000, including Reimbursable Expenses. C. Invoicing Invoicing shall be every two weeks. The Architect realizes his compensation is contingent upon Barth Construction being in receipt of payment from Indian River County in accordance with the Master Agreement and the Florida Prompt Payment Act, F.S. 218.70. WORKING DRAWINGS PHASE $24,000.00 CONSTRUCTION ADMINISTRATION PRASE $ 9,000.00 REIMBURSABLE EXPENSES Included PART 2 TOTAL FEES 833,000.00 MODEL ENERGY CODE CALCULATIONS $ 400.00 (If Required) D. Schedule Respe Scheduling and commencement of services shall be immediate due to the pressing needs of the District.Please initiate this copy and return to our office at your earliest convenience. Paul U. Dritenbas, Architect A.I.A. Page 2 of 2 0:1001 I4VB.doc/paul Barth Construction Agent: Date: ATTACHMENT "A" SUMMARY OF FEES FOR STATION #1 RENOVATION 1500 Old Dixie Highway Vero Beach, Florida 32960 PROJECT BUDGET CONSTRUCTION BUDGET FEE STRUCTURE: PART 1 AGREEMENT FEE FOR PROGRAMMING/SCOPE DATA REIMBURSABLE EXPENSES SCHMATIC DESIGN PHASE DESIGN DEVELOPMENT PHASE PART 1 TOTAL FEE STRUCTURE: PART 2 AGREEMENT WORKING DRAWING PHASE CONSTRUCTION ADMINISTRATION PHASE REIMBURSABLE EXPENSES PART 2 TOTAL TOTAL FEES INCLUDING REIMBURSABLE EXPENSES MODEL ENERGY CODE CALCULATIONS (If Required) Page 1 of 1 C:1001 I4VB.doc/paul $750,000.00 $680,000.00 2,500.00 included 12,000.00 15.000.00 $ 29,500.00 24,000.00 9,000.00 included $ 33,000.00 $62,500.00 400.00 EDLUND • DRITENBAS • SINKLEY ARCHITECTS AND ASSOCIATES, P.A. 65 Royal Palrn Pointe, Ste D Vero Beach, FL 32960 Ph: (772) 569-4320 Fac (772) 569-9208 ;RCM Station 4#1 Programming Statement / Scope of Work 16 October 2014 1) Remove all perimeter berms, foundations and infrastructure concealed within elevation of berms. 2) Provide grading of ground for slope to two existing stormwater management areas. Sod as required. 3) All exposed exterior walls, pressure clean old parge coating, lath full wail and provide 3" stucco and Y" ground control joints at 8'-0" o/c Provide a vinyl 1 -bead at bottom of new applied stucco. 4) Repair flat roof and north and south vertical parapets. Provide new flashing. 5) Spray Icynene Insulation to underside of existing plywood roof deck at N & S bays. 6) Remove and replace ductwork at north and south bays. 7) Remove all S.A.T. ceilings and fiberglass batt insulation sitting on top of S.A.T. Replace S.A.T. and T - grid. 8) Remodel kitchen by enlarging to north or west. 9) Alt exterior aluminum soffits to be removed. Provide hi -rib lath and stucco at openings. 10) Insulate exterior block walls with Corefihl 500 Insulation prior to applying new full height stucco overcoat. 11) Remove all interior gypsum walls that show evidence of water or moisture damage. Remove P.T. 1x2 and replace with new Bora' treated P.T. 1x2 @ 16" o/c. 12) Replace particle board parapet walls with structural 5/8" cdx ply. Dry -In and apply %" stucco over new galvanized self -furring wire lath. 13) Replace or repair perimeter gutters and downspouts using .040 commercial grade aluminum. 14) Provide new commercial exhaust hood In kitchen, complete with ansul extinguishing system. 15) Provide 3 new lockable pantry's in kitchen. 16) All tops in kitchen to be roil front protected stainless steel. 17) By way of FBC 2010 code for existing buildings, the scope of work proposed places this project under "Alteration -Level 3" per Section 405. Work area exceeds 50 percent of the aggregate area of the building. Level -3 alterations must comply with the provisions of Chapter 6 and 7, as well as Chapter 8. Section 804.1 calls for Automatic Sprinkler Systems in all areas being "worked" i.e. renovated in accordance with FBC 2010. Because Fire Stations are considered Group R-2 occupancies, Section 903.2.8 FBC calls for automatic sprinkler systems thru-out all buildings with a Group -R fire area, as refined by Section 310.1 Residential R-2. 18) Renovate Men's and Women's toliet/shower rooms to meet ADA or provide one standalone unisex toilet/shower room that complies with FBC accessibility standards. 19) Upgrade fire alarm, pull stations, horns, strobes, and F.A.C.P. along with a new enunciator panel. 20) Provide Fire Fighter Safety Building marking emblem per F.S. 633.027 and NFPA 1, Annex Q. 21) Relocate 2 exterior A/C units sitting on concrete pads to new, lower elevations on concrete pads. Refrigerant lines, thermostat lines and electrical lines from wall mounted disconnects will have to be modified. 22) Provide new hi/low electric water coolers. 23) Note, per FBC and ADA, up to 20% of cost of renovations must be spent bringing this facility into compliance with barrier removal and accessibility. 24) All door hardware must be replaced with lever set units. 25) Provide new 3 compartment sink and disposal in kitchen. 26) Repaint interiors and exterior of building. 27) Repair sloping fiberglass roof areas where leaks are evident. Shingles appear to have remaining useful life. 28) Consider lighting upgrades in offices and kitchen areas. 29) Are the parking and circulation areas for re -cuing the trucks bright enough? Are additional lights required in the parking lot? 30) Can the removed fill dirt at the berms be transported directly west to the COVB soil storage area, in lieu of trucking offsite? 31) Can the station crew remain in the facility during renovations, and reconstruction? 32) We need to revisit Life Safety for safe existing from all areas of the north and south wings, including exit lights and emergency overhead or wall pack lighting. c:\Mary\100114VB\scope.doC: STATE OF FLORIDA, DEPARTMENT OF MANAGEMENT SERVICES AE FEE CA... Page 1 of ' Fee Guide Calculator For Architectural and Engineering Services State or Florida. Department of rdanagement Serv,crs ersion Posted: March 2012 Project Nam: tRFD EMS Station #1 Renovation CONSTRUCTION COST FOR BUILDING (Sitewort Not Included) COMPLEXITY GROUP - PERCENTAGE A B C D E F G 9.62% 8.80% 8.97% 7.99% 7.18% 6.38% 10.09% S 680,000 CALCULATED FEE $65,388 $59,822 $60,996 $54,329 $48,840 $43,415 $68,591 Instructions: Fit in probable construction cost at left and push enter key. GROUP DEFINITIONS: "A" - CONSIDERABLY MORE THAN AVERAGE COMPLF,XITY: Complex Laboratories, Medical Hospitals "B" - MORE THAN AVERAGE COMPLEXITY: Average laboratories, Mental Hospitals, Simple Medical Hospitals, Clinics, Court Houses, Theatres, Complex University Buildings. Special Purpose Classrooms Laboratory Classrooms, Libraries, Auditoriums, Museums, AirTerminals, Food Service Facilities, Specialized Detention Areas, Detention Treatment Areas, Residences, Emergency Management Centers "C" - REPAIRS AND RENOVATIONS: Miscellaneous Repairs and Renovations, Alterations to Office Space or Dormitory Space. Fite Code Corrective Work "D" - AVERAGE COMPLEXITY: General Office Space, General Teaching Space, Gymnasiums, General Detention Living Facilities Factory Buildings "E" - LESS THAN AVERAGE COMPLEXITY: Apartment Buildings, Dormitory Buildings, Service Garages, Stadiums, Repetitive Design Facilities, Office Buildings With Undefined Interior Space (open for later partitioning), Specialized Parking Structures "F"- CONSIDERABLY LESS THAN AVERAGE COMPLEXITY: Warehouses, Parking Garages, Storage Facilities "G" - BUILDING ENGINEERING SERVICES: Mechanical, Electrical and Structural not exceeding $1,000,000 in construction (Not incbuding Site Civil) ADDITIONAL SERVICES & EXPENSES: The following services are considered Additional to Basic Services and are not Included within the basic fee represented by the fee guides: -Feasibility Studies/ Analysis -Facility Programming -Master Planning -Soils Investigations/Reports -Surveys Topographie/Botmdary Vegetation/Improvements/Utilities -Measured Drawings ofExistingFacilities -Existing Facilities Analysis -Toxic Substance Mitigation Surveys and Consultation -Site Environmental Assessments -Site DRI, PUD, Site Plan Review and/or Zoning Modifications Traffic Analysis and Traffic Signal Warrant Studies -Civil Engineering Design including Paving/Grading/Utilities /Drninage/Stonnwater Management/Environmental & All Site Permitting -Existing Site Utility infrastructure Improvements -Site Lighting Design -Landscape Architectural & Irrigation Design -Specialty Consultants Voice/Data Communications; ElectroniclAudio Visual; Food Service Equipment; Hazardous Material; Hospital/Laboratory; interior Design; Indoor Air Quality; Quality Control; Theater/Acoustical; Security -Life Cycle Cost (ROI) and/or Federal DOE Energy Analysis • As defined in the Division of Real Estate Development and Manan -LEED Consultation -Graphic end Signage Design -Special Code Reviews including ACHA -Detailed Cost Estimates - -Documents Prepared For. -Alternate Bids Exceeding Contract Scope -Eseessive Change Orders -Multiple Construction Contracts -Record Dominions/As Buiits -Prolonged Construction Contract Administration Services -Stntcturallhreshold inspections -Project Representation During Construction Beyond Bi -Monthly Administration -Additional Construction Contract Administration Services for Multiple Contracts -Building Commissioning and Training Services -Post Occupancy huts/ Evaluations -Renderings/ Models - Substantive Changes to Scope, Size or Complexity -Owner Requested Changes to Approved Documents -Reimbursable Expenses* Including, but not limited to, reproduction/ printing costs, travel expenses and special mail service expenses ement Form of Agreement Between Owner and Architect - Engineer. LI .. ra .__rr.* so a r•rs--n..: i -r~_: _ 1 ......u.... . CARTER ASSOCIATES, INC. CONSULTING ENGINEERS AND LAND SURVEYORS I7O 21st STREET • VERO BEACH, FLORIDA 32960.3472 •772-562.4191 • 772-562.7180 (RAX) JOHN H. BLUM. P.E.. PRINCIPAL DAVID E. LUEFHJE. P.S.M.. PRINCIPAL GEORGE. A. SIMONS. P.E.. PRINCIPAL PATRICK S. WALTHER, P.E. PRINCIPAL MARVIN E. CARTER. P.S.M., Consultant to the Fkm DEAN F. LUETHJF P.E., MAW) W) Consultant In the Finn November 19, 2014 Mr. Jason Fykes Barth Construction, Inc. 1717 Indian River Blvd Suite 202A Vero Beach, Florida 32960 RE: Civil Engineering Services Agreement IRC Fire Station #1 (Old Dixie Highway) Revised Grading Plan & Proposed Fire Main Dear Jason: FRANK S. CUCCURESE. P.S.M. CLINTON J. RAHJES. P.E. STEVE D. SNOBBRGER. P.E. BENJAMIN D. SPEED. P.E We are pleased to present this proposed agreement to provide civil engineering services relative to the design and permitting for the revised grading plan and proposed fire main at the above referenced project. The following describes our proposed scope of work and terms of agreement between Carter Associates, Inc. (CAI) and Barth Construction, In. (CLIENT).: CAI services will include the following: • Perform a specific purpose survey to locate paving, drainage, and building improvements within limited areas where re -grading is proposed adjacent to existing building. Also locate existing water main and fire hydrant servicing the site. • Prepare a grading and drainage plan to direct stormwater runoff away from the proposed building improvements and into existing stormwater collection areas. • Design and permit with City of Vero Beach Water and Sewer Department a fire line and accessories for future fire protection of the building. • Provide °onsite" project representative for the duration of time required meeting permit conditions and providing routine reporting of substantial construction activities to the Engineer and the City of Vero Beach. Provide certification upon completion of construction. The above referenced tasks can be performed not to exceed the estimated amount of $6,450.00. If additional services are required outside this scope, then separate authorization will be required. N:UHa1PROPOSALWBar6FFiresla6all.dot: Page 1 of 3 02014 by CAI 4Altarinng:tonda Assumptions CAI represents to the CLIENT that in developing this Scope of Work, assumptions have been made, and that deviation from assumptions identified within this proposal may require additional expenditures on behalf of the CLIENT to CAI. Assumptions, not already mentioned herein, are as follows: 1. Engineering proposal is based upon no request for zoning change, land use change, planned development exceptions, or variances. 2. This proposal specifically excludes all application and/or impact fees, which shall be the responsibility of the OWNER 3. It is assumed that site plan approval will not be required from the City of Vero Beach since there is no new impervious area proposed with the plan. 4. Construction staking and as -built surveys are not included with this proposal. General CAI will generally bill the CLIENT monthly on approximately the 10a` day of each month for the previous month's charges. All tasks will be billed on a percentage complete/lump sum basis, plus direct expenses (See attached Rate Schedule). Should additional services be required, a separate written agreement will be prepared and fees shall be negotiated based on the attached Rate Schedule. Should you have any questions regarding our proposal scope of work or terms of agreement, please feel free to call me. If you would like us to proceed with the work described herein, please sign below and return an original signed copy which will serve as our notice to proceed. Sincerely, Agreed to and Accepted:: TER ASSOCIATES, INC. By: kr-\- , Print Name: John H. Blum, P.E. Address: Principal KIHRIPROPOSALIBertli-FireSlationtdoc Page 2 of 3 02014 by CAI servfr g 14oricki Since 01 CARTER ASSOCIATES, INC. NOVEMBER 2014 RATE SCHEDULE Engineer I (Registered - Principal) $150.00/hr Engineer (Registered - Senior Consultant) $140.00/hr. Engineer I (Registered) $140.00/hr. Engineer ll (Registered) $125.00/hr. Engineer III - EIT $100.00/hr. Engineer Technician (Senior) $105.00/hr. Engineer Technician $ 85.00/hr. Surveyor I (Registered - Principal) $150.00/hr. Surveyor (Registered - Senior Consultant) $140.00/hr. Surveyor II (Registered) $125.00/hr. Surveyor III (Registered) $100.00/hr. Survey Crew (4 Men) $143.00/hr. Survey Crew (3 Men) $130.00/hr. Survey Crew (2 Men) $120.00/hr. GPS RTIC Survey Crew (3 Men) $l50.00/hr. GPS RTI( Smvcy Crew (2 Men) $135.00/hr. CADD Technician I $ 80.00/hr. CADD Technician II $ 70.00/hr. Secretary/Word Processor $ 45.00/hr. Inspector $ 62.00/hr. Recording and Permit Fees Cost + 10% Materials Cost Mileage $0.505/mile Sub -consultants Cost + 10% Reimbursable Expenses: Postage, Long Distance Calls, Federal Express, etc. Cost Blueprints $0.25/S.F. Mylar $1.75/S.F. Photocopy (8.5" x 11") $0.15/ea. Photocopy (8.5" x 14") $0.25/ea. Photocopy (11" x 17") $0.35/ea. These fees shall be renegotiated on an annual basis NitHEAPROPOSALWarthflreStationtcloc 02014 by CAI Page 3 of 3 OAIsen'lligFlonda Since 1911