Loading...
HomeMy WebLinkAbout2000-127/o -/6-6'O As -Built (Fourth Reso.) 3/25/97(ENG)RES4.MAG\gk RESOLUTION NO. 2000- 127 A RESOLUTION OF INDIAN RIVER COUNTY CERTIFYING "AS -BUILT" COSTS FOR CERTAIN PAVING AND DRAINAGE IMPROVEMENTS TO 18Tn AVENUE BETWEEN 1ST PLACE AND 2ND STREET, DESIGNATED AS PROJECT NO. 9606, AND OTHER CONSTRUCTION NECESSITATED BY SUCH PROJECT; PROVIDING FOR FORMAL COMPLETION DATE, AND DATE FOR PAYMENT WITHOUT PENALTY AND INTEREST. WHEREAS, the Board of County Commissioners of Indian River County determined that the improvements described herein specially benefitted the property located within the boundaries as described in this title, designated as Project No. 9606, are in the public interest and promote the public welfare of the county; and WHEREAS, on April 6, 1999, the Board held a public hearing in the Commission Chambers at which time the owners of the property to be assessed were afforded an opportunity to appear before the Board to be heard as to the propriety and advisability of making such improvements; and WHEREAS, after such public hearing was held the County Commission adopted Resolution No. 99-33, which confirmed the special assessment cost of the project to the property specially benefitted by the project in the amounts listed in an attachment to that resolution; and WHEREAS, the Director of Public Works has certified the actual "as -built" cost now that the project has been completed is $19.77 per front foot, which is less than $20.19 per front foot in the confirming Resolution No. 99-33. LC) AirOcin 1 a. RESOLUTION NO. 2000-127 NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that: I. Resolution No. 99-33 is modified as follows: The completion date for Project No. 9606 is declared to be August 30, 2000, and the last day that payment may be made avoiding interest and penalty charges is ninety (90) days after passage of this resolution. 2. Payments bearing interest at the rate of 8.5% per annum may be made in two equal installments, the first to be made twelve (12) months from the due date and the subsequent payments to be due yearly from the due date. The due date is ninety (90) days after the passage of this resolution. 3. The assessment roll for said project listed in Resolution No. 99-33 shall be as set forth in attached Exhibit "A" to this resolution. 4. The assessments as shown in attached Exhibit "A" shall stand confirmed and remain legal, valid, and binding first liens against the property against which such assessments are made until paid. 5. The assessments shown in Exhibit "A", attached to Resolution No.99-33 were recorded by the County on the public records of Indian River County, and the lien shall constitute prima facie evidence of its validity. 2 RESOLUTION NO. 2000- 127 This resolution was moved for adoption by Commissioner Ginn , and the motion was seconded by Commissioner Stanbridge and, upon being put to a vote, the vote was as follows: Chairman Fran B. Adams Vice -Chairman Caroline D. Ginn Commissioner Kenneth R. Macht Commissioner Ruth Stanbridge Commissioner John W. Tippin Aye Aye Aye Aye Aye The Chairman thereupon declared the resolution duly passed and adopted this 10th day of October ,2000, 9606 Resolution As-Built-mag.wpd BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA B„ c5D)am, K7 Oid6ist,c) Fran B. Adams, Chairman Indian River County Administration Budget t✓ Legal Risk Management I Public Works Engineering 3 Aonroved Date 10 /0 3 00 d, FINAL COST FOR: 18TH AVENUE BETWEEN 1ST PLACE AND 2ND STREET DATE: August 15, 2000 TOTAL F.F. PROJECT NO. 9606 TOTAL L.F. FINAL COST 846.00 432.13 CONSTRUCTION I Labor $7,060.23 �j Outside Labor $133.04 Equipment $5,311.03 ,I Equipment Rental $75.87 Asphalt $2,269.12 Concrete $85.96 Sod $2,098.80 Pipe/Culverts $923.66 Stabilizer& Limerock $1,649.53 Engineering Tests $56.55 Miscellaneous $6.50 TOTAL CONSTRUCTION COSTS: $19,670.29 $19,670.29 PERMIT FEES $350.00 $350.00 TITLE SEARCH FEES ($2.59/L.F.) $2.59x432.13 $1,119.21 $1,119.21 Sub -Total $21,139.50 Administration 3.005227% $635.29 Recording Fees $88.50 TOTAL $21,863.29 25% County's Cost 75% Property Owner's Assessment 2% Collection Fee (75% Figure) TOTAL COST TO PROPERTY OWNERS: Assessment = $16,725.42 846 FF $5,465.82 $16,397.47 $327.95 $16,725.42 $19.77 $16,725.42 9606FCST.WK4 09/29/2000 P FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE IMPROVEMENTS TO: 18TH AVENUE FROM 1ST PLACE TO 2ND STREET PROJECT NO. 9606 NAME & ADDRESS William C. Ware 166 18th Avenue Vero Beach, Florida 32962 * 2. Harold D. & Wilma Lee Ballard 176 18th Avenue Vero Beach, Florida 32962 * 3. Grace L. Miller 186 18th Avenue Vero Beach, Florida TOTAL FRONT FEET 846 COST TO PROPERTY OWNERS. $16,725.42 COST PER FRONT FOOT$19.77 FRONT LEGAL DESCRIPTION FOOTAGE COST/F.F. TOTAL COST 14-33-39-00017-0001-00008.0 Lot 8, Block A, Moreland S/D PBI 4-12 14-33-39-00017-0001-00009.0 Lot 9, Block A, Moreland S/D PBI 4-12 14-33-39-00017-0001-00010.0 Lot 10, Block A, Moreland S/D 32962 PBI4-12 * 4. George A. & Patricia DeForest, III 196 18th Avenue Vero Beach, Florida 32962 * 5 Roman J. & Virginia J. Walewski 1805 2nd Street Vero Beach, Florida 32962 9606FIN.WK4 14-33-39-00017-0001-00011.0 Lot 11, Block A, Moreland S/D PBI 4-12 14-33-39-00017-0002-00001.0 Lot 1, Block B, Moreland S/D PBI 4-12, OR Book 444, PP 594 1 106.30 $19.77 $2,101.55 105.50 $19.77 $2,085.74 105.00 $19.77 $2,075.85 106.20 $19.77 $2,099.57 106.3 $19.77 $2,101.55 'A" 09/25/2000 FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE IMPROVEMENTS TO: 18TH AVENUE FROM 1ST PLACE TO 2ND STREET PROJECT NO. 9606 NAME & ADDRESS 6. George F. & Beveraly Jean Evans 27920 Knickerbocker Bay Village, OH 44140 • 7. Daniel L. & Rose B. Schmitz 175 18th Avenue Vero Beach, Florida 32962 • 8. Neil R. & Linda Manning 1820 1st Place Vero Beach, Florida 32962 * = SIGNED PETITION 9606F1N.WK4 TOTAL FRONT FEET COST TO PROPERTY OWNERS. COST PER FRONT FOOT 846 $16,725.42 $19.77 FRONT LEGAL DESCRIPTION FOOTAGE COST/F.F. TOTAL COST 14-33-39-00017-0002-00002.0 Lot 2, Block B, Moreland S/D PBI 4-12, OR Book 459, PP 791 14-33-39-00017-0002-00003.0 Lot 3, Block B, Moreland S/D PBI 4-12 14-33-39-00017-0002-00004.0 Lot 4, Block B, Moreland S/D PBI 4-12 2 105 $19.77 $2,075.85 105.5 $19.77 $2,085.74 106.2 $19.77 $2,099.57 846.00 $19.77 $16,725.42 TOTAL FRONT COST PER F.F. iAL ASSESSMENT FOOTAGE EXffl"rr ' 09/25/2000