Loading...
HomeMy WebLinkAbout2017-031 ATTACHMENT 1 -r WORK AUTHORIZATION DIRECTIVE No. 2017-002 St.David's lane at Grand Harbor Water Services Replacement Project BLUE GOOSE CONSTRUCTION DATE OF ISSUANCE: March, 2017 EFFECTIVE DATE: March 7, 2017 OWNER: Indian River County CONTRACTOR: Blue Goose Construction CONTRACT:WATER,SEWER AND RECLAIM WATER LINE REPLACEMENT/EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001,AWARDED September 9, 2014 PROJECT:St.David's Lane at Grand Harbor Water Services Replacement Prosect COUNTY UTILITY PROJECT NO.: UCP#4130 CONTRACTOR'S PROJECT NO.: N/A COUNTY WIP. No. You are directed to proceed promptly with the following work: Description:The project will consist of replacing approximately 42 single and double water services serving the residences at St.David's Lane located in Grand Harbor. Attachments: Attachment 2 Method of determining Contract Price: M Unit Prices: Bid Items as established pursuant to Bid No. 2015001,and awarded by the Board of County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. CO Lump Sum 17 Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below: Labor Cost (rounded)_ $89,255.65 Estimated 90 days from NTP Contract Time: ACCEPT RECOMD: APPROVED: By: � By: B Blue Goose Construction Arjun e , P.E. C N , CHA MAN Labor Contractor Capital rojects Manager oseph E. Flescher G ll Date: � Date: algaln Date: March 7, 2017 .• 1SS10 ••�pb�M... .•,!'✓FqsATTEST: Jeffrev R. Smith, Clerk of CourtAPPROVED AS TO FORM %', • and C troller AND LEGAL SUFFICIENCY Jt t "• $Q. BY be�ui ty C erk D LAN REINGOLD j COUNTY ATTORNEY a i•• •,�$t sej�•• ish taU ocaMicrosoft\Windowffemporaty Intemet Files\Content.Outlook\8BETR4YV\Work Authorization No.2017- UBdVERCO•.. Indian River County Department of Utilities LABOR AND MATERIAL COST Project: GRAND HARBOR-St.David's Lane-WATER SERVICE REPLACEMENT PROJECT Date: January 11,2017 IF MATERIAL COSTS(HD LABOR COSTS Waterworks) Bid Bid Item Estimated Unit of Labor Unit Total Labor Material Unit Total Material Item No. Description Quantity Measure Price Price Price Price 71 Mobilization,Demobilization,MOT 1 10 % $7,376.50 23 Test Holes/Potholes 84 EA. $250.00 $21,000.00 700 LF $4.80 $3,360.00 2.75 $1,925.00 01a Ilnstall 1"or 1-1/2"'pe or PVC Service Line 300 LF $33.35 $10,005.00 2.00 $600.00 07a Install 2-4"HDPE Directional Bore Install Water Service Single Short with 2"Saddle and 6 EA. $300.00 $1,800.00 300.00 $1,800.00 18a Corp Stop at Main Install Water Service Double Short with 2"Saddle and 9 EA. $350.00 $3,150.00 510.00 $4,590.00 18e Corp Stop at Main Install Water Service Single Long with 2"Saddle and Corp 7 EA. $425.00 $2,975.00 310.00 $2,170.00 18g Stop at Main Install Water Service Double Long with 2"Saddle and 20 EA. $425.00 $8,500.00 570.00 $11,400.00 18j Corp Stop at Main 181 Install 2"service casing 25 EA. $400.00 $10,000.00 2.75 $1,925.00 Install Asphalt Cement Replacement over full trench width including Base&Sub-grade Compacted to County 100 TON $45.00 $4,500.00 $75.00 $7,500.00 67a Specifications 86a Lawn Restoration(Topsoil&Sod)up to 12'Wide 100 SY $2.25 $225.00 $2.16 $216.00 Well Point Dewatering,Each Tier depth up to 25' 2 EA. $3,500.00 $7,000.00 66a (Minimum 30'X 30'Work Area) 66b Well Points,Additional Points as Needed 50 EA $25.00 $1,250.00 Subtotal SubtotalWater System Labor $81,141.50 $32,126.00 Contingency 1 % 10% $8,114.15 20% $6,425.20 Subtotal Water System Labor, Mob.,Demob.,MOT, Subtotal Materials, &Permitting $89,255.65 $38,551.20 SubTotal Labor Cost $89,255.65 Materials $38,551.20 TOTAL COST $127,806.85 ATTACHMENT 2 BLUE Blue QUOTATION/ESTIMATE GOOSE 6se Construction Heavy Mill Underground Utilities/Complete Site Development l Marine Project: GRAND HARBOR-St.David's Lane-WATER SERVICE REPLACEMENT PROJECT To: Indian River County Utilities CONTACT: Steve.Bush PHONE: 772-216-1873 Date: January 11,2017 EMAIL LABOR COSTS Bid Bid Item Estimated Unit of Labor Unit Total Labor Item No. Description Quantity Measure Price Price 71 Mobilization,Demobilization,MOT 1 10 % $7,376.50 23 Test Holes/Potholes 84 EA. $250.00 $21,000.00 700 LF $4.80 $3,360.00 01a Install 1"or 1-1/2"'pe or PVC Service Line 300 LF $33.35 $10,005.00 07a Install 2-4"HDPE Directional Bore Install Water Service Single Short with 2"Saddle and 6 EA. $300.00 $1,800.00 18a Corp Stop at Main Install Water Service Double Short with 2"Saddle and 9 EA. $350.00 $3,150.00 18e Corp Stop at Main Install Water Service Single Long with 2"Saddle and Corp 7 EA. $425.00 $2,975.00 18g Stop at Main Install Water Service Double Long with 2"Saddle and 20 EA. $425.00 $8,500.00 18j Corp Stop at Main 181 Install 2"service casing 25 EA. $400.00 $10,000.00 Install Asphalt Cement Replacement over full trench width including Base&Sub-grade Compacted to County 100 TON $45.00 $4,500.00 67a Specifications 86a Lawn Restoration(Topsoil&Sod)up to 12'Wide 100 SY $2.25 $225.00 Well Point Dewatering,Each Tier depth up to 25' 2 EA. $3,500.00 $7,000.00 66a (Minimum 30'X 30'Work Area) 66b Well Points,Additional Points as Needed 50 EA $25.00 $1,250.00 Subtotal SubtotalWater System Labor $81,141.50 Contingency 1 % 10% $8,114.15 Labor Total= $89,255.65 ATTACHMENT 3