HomeMy WebLinkAbout2017-032 CHANGE ORDER No. 1 PROJECT: Fischer Lake Island Watermain Assessment Proiect DATE OF ISSUANCE February 16,2017 EFFECTIVE DATE March 7, 2017 OWNER Indian River County OWNER's Contract No. 2017-026 Project No. CONTRACTOR Timothy Rose Contracting, Inc. ENGINEER Indian River County You are directed to make the following changes in the Contract Documents: Description: Prior to Contract award,the Contractor has found an error in the unit price. Reason for change order:A deduct in the unit price for 6-inch PVC watermain installed. Attachments: (List documents supporting change) Revised Schedule of Bid Items Dated 2/16/17 CHANGE IN CONTRACT PRICE CHANGE IN CONTRACTTIME Original Contract Price Original Contract Times $ 641,362.93 Substantial Completion: 120 Ready for final payment: 150 Days or dates Net changes from previous Change Orders Net change from previous Change Orders No. to No. No. to No. $ 0.00 0 days Contract Price prior to this Change Order Contract Time prior to this Change Order $ 641,362.93 Substantial Completion: 120 Ready for final payment: 150 Days or dates Net Increase(decrease) in this Change Order Net Increase in this Change Order $ 95,260.00 0 days Contract Price with all approved Change Orders Contract Time with all approved Change Orders $ 546,102.93 Substantial Completion: 120 Ready for final payment: 150 Days or dates RECJee puzed APPROVED: ACCEPTED: By: By: : EngSignature) ner(Authorize4d Signature) ontractor(Authorized Signature) oseph E. Flescher Chairman Date: Mar,h 'Z, 2017 Date: Marek :7, 2017 Date: ATTEST: Jeffrey R. Smith, Clerk of Court and Comptroller RX;y,:, APPROVED AS TO FORM Prepared'by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contrac�r�f& riaE G A L SUI FI�i I E Deputy Clerk BY DYLAN REINGOLD COUNTY ATTORNEY SCHEDULE OF BID ITEMS BID NUMBER 2017-026 PROJECT IDENTIFICATION: Fischer Lake Island Water Assessment Project DATE: 16-Feb-17 1800 27th STREET VERO BEACH, FLORIDA 32960 BY: Timothy Rose Contracting, Inc. Company Name Bid Bid Item Estimated Unit of Unit Bid Price Bid Item Total(in figures) Item No. Description Quantity Measure (in figures) 1 Install 8"PVC Water Main* 7,000 LF $ 30.77 $ 215,390.00 2 Install 6"PVC Water Main* 2,000 LF $ 27.50 $ 55,000.00 3 Install 2"PE Water Main* 120 LF $ 18.60 $ 2,232.00 4 Install 8"HDPE Dir.Drill Water Main 400 LF $ 75.00 $ 30,000.00 5 Install 6"HDPE Dir. Drill Water Main 60 LF $ 78.00 $ 4,680.00 6 Install 4"NRS Resilient Seated Gate Valve and Box 1 EA $ 1,092.00 $ 1,092.00 7 Install 6"NRS Resilient Seated Gate Valve and Box 3 EA $ 1,510.00 $ 4,530.00 i 8 Install 8"NRS Resilient Seated Gate Valve and Box 9 EA $ 1,854.00 $ 16,686.00 9 Install Water Service-Single Short w/Yoke&Box 2 EA $ 1,034.00 $ 2,068.00 10 Install Water Service-Single Long w/Yoke&Box 27 EA $ 1,549.00 $ 41,823.00 11 Install Water Service-Double Long w/Yoke&Box 16 EA $ 2,822.00 $ 45,152.00 12 Install New Fire Hydrant Assembly with 6"Gate 10 EA $ 5,014.00 $ 50,140.00 Valve and Box 13 Public Construction Bond 1 LS $ 5,309.93 $ 5,309.93 14 IMobilization, Demobilization,MOT(Do Not Exceed 1 LS $ 30,000.00 $ 30,000.00 Amount Per Section 01025) 1 SUB-TOTAL $ 504,102.93 FORCE ACCOUNT $ 42,000.00 TOTAL BID AMOUNT $ 546 102.93 exploration/excavation,coordination with any permitting agencies(i.e.,NPDES Permit),storm water permit,audio-visual documentation, land clearing/tree removal necessary for utility installation,trenching,removing,disposing of and replacing unsuitable(i.e.,plastic or organic)material, j dewatering,sheeting/shoring of the excavation,installation of pipe, structures and all appurtenances,trace wires,sleeves,fittings,restrainers, connection requirements including locating,excavating existing pipe,restraining existing pipe and fittings,density testing,filling trench,soil compaction,filling,chlorinating,pressure testing,flushing,density testing,irrigation repair, removal,disposition and replacement of surface over trench to pre-construction conditions,restoration of all pavement,sidewalk,or landscaping or sod damaged or destroyed,removal and resetting or replacing any existing guard rail necessary for utility installation,Trench Safety Act Compliance,bact.sampling&testing,construction staking.The unit price(s)bid will also include restoration of any existing utilities,drainage facilities,signs,mailboxes,driveways,etc.disturbed or damaged by the construction. All materials and installation shall be per Indian River County Utility Standards and Specifications dated January 2015 or latest revision unless otherwise noted in the bid documents.Contractor will be provided with a copy of construction plans in AutoCADD format to use for use in preparing Record Drawings which are also included in the unit price bid for water main installation.The unit price(s)bid will include any and all labor &materials not listed above necessary to furnish the County a complete&working water system as indicated on the construction plans&bid documents.