RESOLUTION NO. 91-100
A RESOLUTION OF INDIAN RIVER COUNTY CERTIFYING
"AS -BUILT" COSTS FOR CERTAIN PAVING AND DRAINAGE
IMPROVEMENTS TO 2ND STREET BETWEEN 24TH AVENUE AND
23RD AVENUE, DESIGNATED AS PROJECT NO. 8847, AND
OTHER CONSTRUCTION NECESSITATED BY SUCH PROJECT;
PROVIDING FOR FORMAL COMPLETION DATE, AND DATE FOR
PAYMENT WITHOUT PENALTY AND INTEREST.
WIENERS, the Board of County Commissioners of Indian
River County determined that the improvements described herein
specially benefited the property located within the boundaries as
described in this title, designated as Project No. 8847, are in
the public interest and promote the public welfare of the county;
and
WEEREAB, on October 23, 1990 , the Board held a public
hearing, in the Commission Chambers, at which time the owners of
the property to be assessed were afforded the opportunity to
appear before the Board to be heard as to the propriety and
advisability of making such improvements; and
WIENERS, after such public hearing was held the County
Commission adopted Resolution No. 90-164, which confirmed the
special assessment cost of the project to the property specially
benefited by the project in the amounts listed in an attachment
to that resolution; and
WHEREAS, the Director of Public Works has certified the
actual "as -built" cost now that the project has been completed is
$11.20 per front foot, which is less than $17.12 per front foot
in the confirming Resolution No. 90-164,
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that:
1. Resolution No. 90-164 is modified as follows: The
completion date for Project No. 8847 is declared to be August 27,
1991, and the last day that payment may be made avoiding interest
and penalty charges is ninety (90) days after passage of this
resolution.
2. Payments bearing interest at the rate of 12% per
annum may be made in two equal installments, the first to be
made twelve (12) months from the due date and the subsequent
1
No. 91- 100
payments to be due yearly from the due date. The due date is
ninety (90) days after the passage of this resolution.
3. The final assessment roll for said project is as set
forth in attached Exhibit "A".
4. The assessments as shown in attached Exhibit "A" shall
stand confirmed and remain legal, valid, and binding first liens
against the property against which such assessments are made
until paid.
5. The assessments shown in attached Exhibit "A" will be
recorded by the County on the public records of Indian River
County, and the lien shall constitute prima facie evidence of its
validity.
Eggert
This resolution was moved for adoption by Commissioner
, and the motion was seconded by
Commissioner Scurlock and, upon being put
to a vote, the vote was as follows:
Chairman Richard N. Bird
Vice -Chairman Gary C. Wheeler
Commissioner Don C. Scurlock, Jr.
Commissioner Carolyn K. Eggert
Commissioner Margaret C. Bowman
The Chairman thereupon declared
passed and adopted this 3 day of
19_11
Attest
Aye
Aye
Aye
Aye
Aye
the resolution duly
September
BOARD OF COUNTY COMMISSIONERS
OF INDIAN IVER COUNTY, FLORIDA
By //14,/
RIC r • D N. BIRD,
Chairman
. . JEFFREl4'. K: TON,
Clerk weacee
/97/
Admin
Attachment: Exhibit "A"
2stasblt.res
2
I1
A w qi
to •`- b O
yd
o
„„ re. 3›
7<P 7=g) t3 41 P
to ' to " SPa
" R. 2 tin
CZ
• H
D y k' t 1 g !..
y ^ g
F. &' '71Z
E.
ca
co
to40
mmg
r
pr.. v1 V1 Ch IR' V1 C� C;) y
56 011 OFr CA G• ; A•ti
N O• N g• o L• O �.qn 5 Ll}Jl
t/� t7 u Ll 00 O 00 O (]
.g C C Q
g i44
., 40
x y O
,s.)
8
z d
O ›
4
11 8 tri
C;Ili F-) 8tri
a.
oo g g g to
O OOwiH
Wo; 0
„ 0 g4. - t.,
S.i4
O O O O 4140 Ft
o0 y
L
P: W
✓ Cw
lit p p o0
pW N J J y Pa
O g O O A
N
FINAL COST ESTIMATE FOR:
2ND STREET BETWEEN 24TH AVENUE AND 23RD AVENUE
INDIAN RIVER HEIGHTS SUBDIVISION
DATE: 7/30/91
PROJECT 8847
FINAL COST
Labor $998.96
Equipment $1,120.00
Asphalt $1,085.46
Sod $864.00
Pipe $133.17
Limerock $1,985.13
Stakes $4.50
Testing $160.00
$6,351.22
$6,351.22
ENGINEERING
Consulting Engineering
Construction
Stake Out
$953.I1
$26.58 $212.64
Administration 2.9841411 %
Recording Fee
75% Property Owner's Assessment
2% Tax Collector's Fee (75% Figure)
TOTAL ASSESSMENT
Assessment
$5,979,46 =
533.88 F.F.
51,165.75 $1.165.75
Sub -Total $7,516.97
5224.32
$75.00
TOTAL $7,816.29
55,862.22
5117.24
$5,979.46
$11.20