Loading...
HomeMy WebLinkAbout1991-1028/22/91(ENG)RES4.MAG\gfk RESOLUTION NO. 91-102 A RESOLUTION OF INDIAN RIVER COUNTY CERTIFYING "AS -BUILT" COSTS FOR CERTAIN PAVING AND DRAINAGE IMPROVEMENTS TO 12TH AVENUE BETWEEN 12TH STREET AND 14TH STREET, DESIGNATED AS PROJECT NO. 8821, AND OTHER CONSTRUCTION NECESSITATED BY SUCH PROJECT; PROVIDING FOR FORMAL COMPLETION DATE, AND DATE FOR PAYMENT WITHOUT PENALTY AND INTEREST. WHEREAS, the Board of County Commissioners of Indian River County determined that the improvements described herein specially benefited the property located within the boundaries as described in this title, designated as Project No. 8821, are in the public interest and promote the public welfare of the county; WHEREAS, on June 5, 1990, the Board held a public hearing, in the Commission Chambers, at which time the owners of the property to be assessed were afforded an opportunity to appear before the Board to be heard as to the propriety and advisability of making such improvements; and WHEREAS, after such public hearing was held the County Commission adopted Resolution No. 90-70 , which confirmed the special assessment cost of the project to the property specially benefited by the project in the amounts listed in an attachment to that resolution; and WHEREAS, the Director of Public Works has certified the actual "as -built" cost now that the project has been completed is $15.66 per front foot, which is less than $16.90 per front foot in the confirming Resolution No. 90-70, NON THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that: 1. Resolution No. 90-70 is modified as follows: The completion date for Project No. 8821 is declared to be August 27, 1991, and the last day that payment may be made avoiding interest and penalty charges is ninety (90) days after passage of this resolution. 2. Payments bearing interest at the rate of 12% per annum may be made in two equal installments, the first to be made twelve (12) months from the due date and the subsequent payments L No. 91-102 to be due yearly from the due date. The due date is ninety (90) days after the passage of this resolution. 3. The final assessment roll set forth in attached Exhibit "A". 4. The assessments as shown for said project listed in attached Exhibit "A" stand confirmed and remain legal, valid, and binding first is as shall liens against the property against which such assessments are made until paid. 5. The assessments shown in attached Exhibit "A" will be recorded by the County on the public records of Indian River County, and the lien shall constitute prima facie evidence of its validity. Eggert This resolution was moved for adoption by Commissioner , and the motion was seconded by Commissioner Scurlock and, upon being put to a vote, the vote was as follows: Chairman Richard N. Bird Vice -Chairman Gary C. Wheeler Commissioner Don C. Scurlock, Jr. Commissioner Carolyn K. Eggert Commissioner Margaret C. Bowman The Chairman thereupon declared passed and adopted this 3 day of 19•x. Attest: Aye Aye Aye Aye Aye the resolution duly September BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA By RICHARD N. BIRD, Chairman •JEFFREY K. BARTON,/� Clerk � ,alfa-ra �.e • • Attachment: Exhibit 12asblt.res 2 • • •� N W N • �y d o ...< N f6 `' N !' r+ ►11 < ►+ �r �'' !C7 c� c �� c oith o fin' g c x N L (&):fico UP V�� B • $ ''t\) Pg PC w Ps P P"' w :+ R' .. > tri N til N N X N • NR. 1 t( F g!: o g (7) K § 1 W cnZ td H tri 7d oo :70 Pr bio N Nr t Ny �� Ny • �g R°0 H LI o N.N. N Y ,.1 • NRP P E. of N od 0,1 IJ „�,� �O,n N Hca 8 i� N z 1. ° M VI N in N N .-. gi) A RR:4 2 .-i v.., mo. .„ 0 fie EA EA EA to) EA Vi to to to to to 4 (W 4i — 7 & & & & & .,c^ 41 4 8 g trl M g u fA d! df 69 fA 6A • y N 1 . gi ,' ' E c4 ,- o Co t.3 1� W LALAOe 111 CJI VI ( 0% Ch a% GN ON W O gW Q'. A — N 7d H Pt P1 4 O / onto" oo`� pO" x N` 1°� FE, •cog% WI i M6') , 44 _ � o B P4 Pgto N 0 N ? l+1 CO t4PB ta r H O 74 aoaIg��'o�° �7�°'^: Aad. �c It d D ►nCZ qi i xivv A it tg l' g 3 °, NR,i El N b $awggilS;1-Vglq% v mn M [1i4ri..., o:16054eg j'CoO off' % 'i ' z O E M 0 0 CA d A g• ISOD 'BUD! CN • • . FINAL COST ESTIMATE FOR: 12TH AVENUE BETWEEN 12TH STREET & 14TH STREET DATE: 7/18/91 PROJECT NO. 8821 FINAL COST Labor $7,851.01 Equipment $13,903.00 Soil Cement $3,373.05 Asphalt $5,557.29 Sod $3,033.00 Pipe $1,841.67 Limerock $3,295.15 Catch Basins $1,720.00 Curbing $4,648.00 Stakes $13.14 Testing 8300.00 Miscellaneous $165.80 FNOINEERINO Consulting Engineering Construction Stake Out Administration 2.9773703% Recording Fee $45,701.11 8 hrs 75% Property Owner's Assessment 2% Tax Collector's Fee (75% Figure) $3,716.96 $26.58 $212.64 TOTAL ASSESSMENT $45,701.11 $3,929.60 $3.929.60 Sub -Total $49,630.71 $1,477.69 $500.00 TOTAL $51,608.40 $38,706.30 $774.13 839,480.43 Assessment = $39,480.43 = 2521.1 F.F. $15.66