RESOLUTION NO. 91-102
A RESOLUTION OF INDIAN RIVER COUNTY CERTIFYING
"AS -BUILT" COSTS FOR CERTAIN PAVING AND DRAINAGE
IMPROVEMENTS TO 12TH AVENUE BETWEEN 12TH STREET
AND 14TH STREET, DESIGNATED AS PROJECT NO. 8821,
AND OTHER CONSTRUCTION NECESSITATED BY SUCH
PROJECT; PROVIDING FOR FORMAL COMPLETION DATE, AND
DATE FOR PAYMENT WITHOUT PENALTY AND INTEREST.
WHEREAS, the Board of County Commissioners of Indian
River County determined that the improvements described herein
specially benefited the property located within the boundaries as
described in this title, designated as Project No. 8821, are in
the public interest and promote the public welfare of the county;
WHEREAS, on June 5, 1990, the Board held a public
hearing, in the Commission Chambers, at which time the owners of
the property to be assessed were afforded an opportunity to
appear before the Board to be heard as to the propriety and
advisability of making such improvements; and
WHEREAS, after such public hearing was held the County
Commission adopted Resolution No. 90-70 , which confirmed the
special assessment cost of the project to the property specially
benefited by the project in the amounts listed in an attachment
to that resolution; and
WHEREAS, the Director of Public Works has certified the
actual "as -built" cost now that the project has been completed is
$15.66 per front foot, which is less than $16.90 per front foot
in the confirming Resolution No. 90-70,
NON THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that:
1. Resolution No. 90-70 is modified as follows: The
completion date for Project No. 8821 is declared to be August 27,
1991, and the last day that payment may be made avoiding interest
and penalty charges is ninety (90) days after passage of this
resolution.
2. Payments bearing interest at the rate of 12% per
annum may be made in two equal installments, the first to be made
twelve (12) months from the due date and the subsequent payments
L
No. 91-102
to be due yearly from the due date. The due date is ninety (90)
days after the passage of this resolution.
3. The final assessment roll
set forth in attached Exhibit "A".
4. The assessments as shown
for said project listed
in attached Exhibit "A"
stand confirmed and remain legal, valid, and binding first
is as
shall
liens
against the property against which such assessments are made
until paid.
5. The assessments shown in attached Exhibit "A" will be
recorded by the County on the public records of Indian River
County, and the lien shall constitute prima facie evidence of its
validity.
Eggert
This resolution was moved for adoption by Commissioner
, and the motion was seconded by
Commissioner Scurlock and, upon being put
to a vote, the vote was as follows:
Chairman Richard N. Bird
Vice -Chairman Gary C. Wheeler
Commissioner Don C. Scurlock, Jr.
Commissioner Carolyn K. Eggert
Commissioner Margaret C. Bowman
The Chairman thereupon declared
passed and adopted this 3 day of
19•x.
Attest:
Aye
Aye
Aye
Aye
Aye
the resolution duly
September
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY, FLORIDA
By
RICHARD N. BIRD,
Chairman
•JEFFREY K. BARTON,/�
Clerk � ,alfa-ra �.e
•
•
Attachment: Exhibit
12asblt.res
2
•
•
•�
N W N •
�y d o
...< N f6 `' N !' r+ ►11 < ►+ �r �'' !C7
c� c �� c oith
o fin' g c x N
L
(&):fico UP V�� B • $ ''t\)
Pg PC w Ps P P"' w :+ R' .. > tri
N til
N N X N • NR.
1 t( F g!: o g (7)
K § 1 W cnZ
td H
tri 7d
oo :70 Pr bio N Nr t
Ny �� Ny • �g R°0
H LI o
N.N. N Y ,.1
• NRP P E. of N od
0,1
IJ „�,� �O,n N
Hca 8 i�
N z 1. °
M
VI N in N N .-. gi)
A RR:4
2
.-i v..,
mo. .„
0
fie EA EA EA to) EA Vi to to to to to 4 (W 4i — 7
& & & & & .,c^ 41 4 8 g
trl
M g u
fA d! df 69 fA 6A • y N 1 .
gi
,' ' E c4
,- o
Co t.3
1� W
LALAOe 111 CJI VI ( 0% Ch a% GN ON
W O
gW
Q'.
A — N 7d H Pt
P1
4 O /
onto" oo`� pO" x N`
1°� FE, •cog% WI i M6')
, 44 _ � o
B P4 Pgto
N 0 N ? l+1 CO t4PB
ta r H
O
74
aoaIg��'o�° �7�°'^: Aad. �c It
d D ►nCZ qi
i xivv A it tg l' g 3 °, NR,i El N b
$awggilS;1-Vglq% v mn M
[1i4ri..., o:16054eg j'CoO
off' % 'i ' z O
E M
0
0
CA d
A
g•
ISOD 'BUD!
CN
•
•
.
FINAL COST ESTIMATE FOR:
12TH AVENUE BETWEEN 12TH STREET & 14TH STREET
DATE: 7/18/91
PROJECT NO. 8821
FINAL COST
Labor $7,851.01
Equipment $13,903.00
Soil Cement $3,373.05
Asphalt $5,557.29
Sod $3,033.00
Pipe $1,841.67
Limerock $3,295.15
Catch Basins $1,720.00
Curbing $4,648.00
Stakes $13.14
Testing 8300.00
Miscellaneous $165.80
FNOINEERINO
Consulting Engineering
Construction
Stake Out
Administration 2.9773703%
Recording Fee
$45,701.11
8 hrs
75% Property Owner's Assessment
2% Tax Collector's Fee (75% Figure)
$3,716.96
$26.58 $212.64
TOTAL ASSESSMENT
$45,701.11
$3,929.60 $3.929.60
Sub -Total $49,630.71
$1,477.69
$500.00
TOTAL $51,608.40
$38,706.30
$774.13
839,480.43
Assessment = $39,480.43 =
2521.1 F.F.
$15.66