HomeMy WebLinkAbout2017-066 ATTACHMENT 3
WORK AUTHORIZATION DIRECTIVE
No. 2017-004
Heron Cay Mobile Home Park: Longpointe Court Water Main Replacement Project
BLUE GOOSE CONSTRUCTION
DATE OF ISSUANCE:April 21, 2017 EFFECTIVE DATE: May 9, 2017
OWNER: Indian River County
CONTRACTOR: Blue Goose Construction
CONTRACT:WATER,SEWER AND RECLAIM WATER LINE REPLACEMENT/EXTENSIONS
AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001,AWARDED September 9, 2014
PROJECT.:Longpointe Court Water Main Replacement +'
COUNTY UTILITY PROJECT NO.: UCP#N/A CONTRACTOR'S PROJECT NO.: N/A U
COUNTY WIP. No. 471-169000-17518
You are directed to proceed promptly with the following work: +,
Description: Construct new water main to serve existing homes along Longpointe Court in Heron Cay v
MHP and abandon the existing water main. Project includes the construction of new water services and 4-4
o
connection of existing homes to new system. x
a�
Attachments:Attachment 3
U
Method of determining Contract Price:
IN Unit Prices: Bid Items as established pursuant to Bid No. 2015001,and awarded by the Board of
County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. a
Ed Lump Sum
0 Cost of the Work
a� >1
The Cost of Labor, Contingency and Contract Time is summarized below: h a
H
Labor Cost (rounded)= $59,334.17 Estimated90 days from NTP w
Contract Time: y;
.V,��c�.M/S�•se
ACCEP RECOMM LADED: APPROVED:
•�:
?V1
BY: BY. � — 60sephE, FleschE!!r�
Blue Goose Construction John M. Bo r, P.E. N Y,CHAIRMAIjI.
Labor Contractor Utilities En ineer :?.--..
Date: 4 ` Date: 3 Date: May 9, 2017
APPROVED AS TO FORM
AND LEGAL SUFFICjEj: jCy
BY
F•\Utilities\UTILITY-Engineering\Projects-Utility Construction Permits\[RC-Heron Cay-Longpointe WM8W1 Aft*W1,L"k
Authorization No 2017-004.doe COUNTY ATT0 P i%,;U Y