Park Place Mobile Home Park Water Services Replacement Project j
BLUE GOOSE CONSTRUCTION
i
DATE OF ISSUANCE: March 22,2017 EFFECTIVE DATE:April 18, 2017
OWNER: Indian River County
CONTRACTOR: Blue Goose Construction
CONTRACT: WATER,SEWER AND RECLAIM WATER LINE REPLACEMENT/EXTENSIONS
AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001 AWARDED September 9, 2014
PROJECT: Park Place Water Services Replacement Prosect
ani
COUNTY UTILITY PROJECT NO.: UCP#4133 CONTRACTOR'S PROJECT NO.: N/A o
COUNTY WIP. No.
You are directed to proceed promptly with the following work: ;
U
Description:The project will consist of replacing approximately 102 single and double water services
serving the residences at Park Place Mobile Home Park located on Barber Street west of the FEC rail ro
road tracks.
I
Attachments:Attachment 3 U
Method of determining Contract Price:
0 Unit Prices: Bid Items as established pursuant to Bid No.2015001,and awarded by the Board of U
County Commissioners on September 9,2014 to Blue Goose Construction, Inc.
0 Lump Sum H
0 Cost of the Work
U
The Cost of Labor,Contingency and Contract Time is summarized below: \
Labor Cost(rounded)_ $76,234.54 Estimated 90 days from NTP 4-4
Contract Time: °)....
SI0ij—e s.,.
ACCEPT RECOMD APPROVED: :.�,�• E .`'-
W
By. By: By o
Blue Goose Construction Arjun a , P.E. Y,CHA MA��c. o-'
Labor C ntract r Capital Projects Manageroseph E. Flescher
�'�'�:q�RIVERG����V•i
Date: t! Date: �� 1 Date: May 16, 2017 j
APPROVED ,AG TO FORM
AND LEGA►L. SUFFICIENCY i
y
BY i
DYLAN REINGOL D
F1UUlities\UTILITY-EngineeringTrojects-Utility Construction PermltAIRC-Park Place-4133\Work Aud1QQklKTV T0RNEY
W7,
QUOTATION/ESTIMATE
Blue
Goose
construction
Heavy Civil;Underground Utilities!Complete Site Oevolopment+Marine
Project: PARK PLACE-WATER SERVICE REPLACEMENT PROJECT
To: Indian River County Utilities
CONTACT: Steve.Bush
PHONE: 772-216-1873
Date: February 11,2017 EMAIL :
LABOR COSTS
Bid Bid Item Estimated Unit of Labor Unit Total Labor
Item NO. Description Quantity Measure Price Price
71 Mobilization,Demobilization,MOT 1 10 % $6,300.38
23 Test Holes/Potholes 30 EA. $250.00 $7,500.00
Ola Install 1"or 1-1/2"'pe or PVC Service Line 350 LF $4.80 $1,680.00
07a Install 2-4"HDPE Directional Bore 600 LF $33.35 $20,010.00
Install Water Service Single Short with 2"Saddle and
18a 4 EA. $300.00 $1,200.00
Corp Stop at Main
18e Install Water Service Double Short with 2"Saddle and 24 EA. $350.00 $8,400.00
Corp Stop at Main
Install Water Service Single Long with 2"Saddle and Corp
18g 5 EA. $425.00 $2,125.00
Stop at Main
Install Water Service Double Long with 2"Saddle and
18j 23 EA. $425.00 $9,775.00
Corp Stop at Main
181 Install 2"service casing 18 EA. $400.00 $7,200.00
Install Asphalt Cement Replacement over full trench
67a width including Base&Sub-grade Compacted to County 25 TON $45.00 $1,125.00
Specifications
79c Remove Concrete Driveway 115 SY $10.00 $1,150.00
79d Insatll Conceret Driveway 115 SY $19.50 $2,242.50
86a Lawn Restoration(Topsoil&Sod)up to 12'Wide 265 SY $2.25 $596.25
Subtotal SubtotalWater System Labor $69,304.13
Contingency 1 % 10% $6,930.41
Labor Total= $76,234.54