Loading...
HomeMy WebLinkAbout2017-064BAGREEMENT THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Costello Brothers Marine Construction. Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1 - WORK 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described in Article 2, below. ARTICLE 2 - THE PROJECT 2.1 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Miscellaneous improvements to a pollution removal facility called PC Main Screening System. Work includes, but is not limited to: saw cut three reinforced concrete channel divider walls and one reinforced concrete inlet throat wall; refurbish Duperon FlexRake No. 1; furnish and install a new davit crane and relocate existing davit crane; and remove mud, silt, debris, etc. from bottom of the treatment facility; all as shown or implied in the Contract Documents. 2.2 Project Name: REINFORCED CONCRETE WALL SAWING AND DUPERON FLEXRAKE REHABILITATION AT PC MAIN SCREENING SYSTEM 2.3 Bid Number: 2017049 2.4 Project Address: 1700 Aviation Boulevard, Vero Beach, FL 32960. ARTICLE 3 — ENGINEER 3.01 The Stormwater Division of the Indian River County Public Works Department is hereinafter called the ENGINEER and will act as OWNER's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4 - CONTRACT TIMES 4.1 Time of the Essence A. All time limits for Milestones, if any, Final Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence to the Contract. 4.2 Days to Achieve Final Completion and Final Payment 00520 - Agreement 00520 - 1 F.\Purchasing \Bids\2016-2017 FY (2017000)\2017049 Concrete Sawing PC Main Rebid\00520 - Agreement.doc Rev. 05/01 A. The Work will be fully completed (Final Completion) and ready for final payment in accordance with paragraph 14.07 of the General Conditions on or before the 45th day from the date the Contract Time commences as set forth in the Notice -to -Proceed (Section 05550). 4.3 Liquidated Damages A. CONTRACTOR and OWNER recognize that time is of the essence for this Agreement and that OWNER will suffer financial loss if the Work is not completed on or before the date specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER $300 for each calendar day that expires after the date specified in paragraph 4.02 for Final Completion, until the Work is finally complete and ready for final payment. ARTICLE 5 - CONTRACT PRICE 5.1 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents, an amount in current funds equal to the sum of the amounts determined pursuant to paragraph 5.01.A and summarized in paragraph 5.01.B, below: A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. B. THE BASE CONTRACT SUM subject to additions and deductions provided in the Contract: Numerical Amount: $ 149.058 Written Amount: One hundred forty-nine thousand. fiftv-eight dollars ARTICLE 6 - PAYMENT PROCEDURES 6.1 Submittal and Processing of Payments A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 6.2 Progress Payments; Retainage A. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment at intervals not less than once each month during performance of the Work as provided in paragraph 6.02.A.1 below. AH such payments will be measured by the schedule of values established in paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements: 00520 - Agreement 00520 - 2 F\Purchasing\Bids\2016-2017 FY (2017000)\2017049 Concrete Sawing PC Main Rebid\00520 - Agreement.doc Rev. 05/01 1. Progress payments will be made in an amount equal to the percentage indicated below, less the aggregate of payments previously made and Tess such amounts as ENGINEER may determine or OWNER may withhold, in accordance with paragraph 14.02 of the General Conditions: a. Ninety percent (90%) of Work completed until the Work is fifty percent (50%) complete, after which payment will be ninety-five percent (95%) of Work completed (with the balance in both instances being retainage). There will be no payment for the cost of materials and equipment not incorporated in the Work but stored on the Project site. 6.3 Final Payment A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.07. ARTICLE 7 - INDEMNIFICATION 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS 8.1 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations: A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work. D. CONTRACTOR has carefully studied all: (1) reports and drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified as provided in paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site which have been identified as provided in paragraph 4.06 of the General Conditions. E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by CONTRACTOR, including applying the specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the Contract Documents to be employed by CONTRACTOR, and safety precautions and programs incident thereto 00520 - Agreement 00520 - 3 F \Purchasing\Bids\2016-2017 FY (2017000)\2017049 Concrete Sawing PC Main Rebid\00520 - Agreement.doc Rev. 05/01 F. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Contract Documents. H. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. ARTICLE 9 - CONTRACT DOCUMENTS 9.1 Contents A. The Contract Documents consist of the following: 1. This Agreement (pages 00520-1 to 00520-7, inclusive); 2. Section 00605 — Public Construction Bond (pages 00605-1 to 00605-3, inclusive); 3. Section 00700 - General Conditions (pages 00700-1 to 00700-51, inclusive); 5. Specifications as listed in the Table of Contents of the Project Manual; 6. Drawings as listed in the Cover Sheet of the CONSTRUCTION DRAWINGS FOR REINFORCED CONCRETE WALL SAWING AND DUPERON FLEXRAKE REHABILITATION AT PC MAIN SCREENING SYSTEM 7. Addenda (numbers to , inclusive); 8. Exhibits to this Agreement (enumerated as follows): a. Section 00310 — Bid Form (CONTRACTOR's Bid) (pages 00310-1 to 00310-7, inclusive); b. Section 00450 — Bidder's Qualifications Form and Questionnaire (page 00456-1 to 00456-7, inclusive plus attached pages); c. Section 00452 - Sworn Statement Under Section 105.08, Indian River County Code, on Disclosure of Relationships (pages 00452-1 to 00452-2, inclusive); d. Section 00458 — List of Subcontractors (page 00458-1); 00520 - Agreement 00520 - 4 F.\Purchasing\Bids\2016-2017 FY (2017000)\2017049 Concrete Sawing PC Main Rebid\00520 - Agreement.doc Rev. 05/01 e. Section 00622 — Contractor's Application for Payment (pages 00622-1 to 00622-6, inclusive); f. Section 00632 — Contractor's Final Certification of the Work (pages 00632-1 to 00632-2, inclusive); g. Documentation submitted by CONTRACTOR prior to Notice of Award (pages to , inclusive); h. Certificates of Insurance as required by the General Conditions. 9. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto: a. Written Amendments; b. Work Change Directives; c. Change Order(s). B. The documents listed in paragraph 9.01.A are attached to this Agreement (except as expressly noted otherwise above). C. There are no Contract Documents other than those listed above in this Article 9. D. The Contract Documents may only be amended, modified, or supplemented as provided in paragraph 3.04 of the General Conditions. ARTICLE 10 - MISCELLANEOUS 10.1 Terms A. Terms used in this Agreement will have the meanings indicated in the General Conditions. 10.2 Assignment of Contract A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 10.3 Successors and Assigns A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 10.4 Severability 00520 - Agreement 00520 - 5 F.\Purchasing\Bids \2016-2017 FY (2017000)\2017049 Concrete Sawing PC Main Rebid\00520 - Agreement.doc Rev. 05/01 A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 10.5 Venue A. This Contract shall be governed by the laws of the State of Florida. Venue for any lawsuit brought by either party against the other party or otherwise arising out of this Contract shall be in Indian River County, Florida, or, in the event of a federal jurisdiction, in the United States District Court for the Southern District of Florida. 10.6 Public Records A. Indian River County is a public agency subject to Chapter 119, Florida Statutes. The Contractor shall comply with Florida's Public Records Law. Specifically, the Contractor shall: 1. Keep and maintain public records required by the County to perform the service. 2. Upon request from the County's Custodian of Public Records, provide the County with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119 or as otherwise provided by law. 3. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the contractor does not transfer the records to the County. 4. Upon completion of the contract, transfer, at no cost, to the County all public records in possession of the Contractor or keep and maintain public records required by the County to perform the service. If the Contractor transfers all public records to the County upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the County, upon request from the Custodian of Public Records, in a format that is compatible with the information technology systems of the County. B. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT: (772) 226-1424 ul_plicrecords irc ov,con Indian River County Office of the County Attorney 1801 27th Street 00520 - Agreement 00520 - 6 F.\Purchasing\Bids\2016-2017 FY (2017000)\2017049 Concrete Sawing PC Main Rebid\00520 - Agreement.doc Rev. 05/01 Vero Beach, FL 32960 C. Failure of the Contractor to comply with these requirements shall be a material breach of this Agreement. IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to OWNER and CONTRACTOR. All portions of the Contract Documents have been signed or identified by OWNER and CONTRACTOR or on their behalf. This Agreement will be effective on May 9 , 2017 (the date the Contract is approved by the Indian River County Board of County Commissioners, which is the Effective Date of the Agreement). OWNER: BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA CONTRACTOR: ••� O�,M1S S I ONFgS �'•. Gi •4. .,* • • (Printed name and title) .ANRIVER k. Jason E. row County Administrator APPROVED AS TO FORM AND LEGAL SUFFI By:/ IE Y: illiam K. DeBraal, ATTEST: eputy County Attorney Jeffrey R. Smith, Clerk of Court and Co ptroller ,411 04/ Depu fr rk Witnessed by: CUU CC --/'(‘Jiaa----(1-:i (Printed name) E3 1c r'C Com- 1"�u t0„iy' * * END OF SECTION * * 00520 - Agreement 00520 - 7 F.\Purchasing \ Bids \2016-2017 FY (2017000)\2017049 Concrete Sawing PC Main Rebid \00520 - Agreement.doc Rev. 05/01