Loading...
HomeMy WebLinkAbout1991-031 (3)RESOLUTION NO. 91- 31 A RESOLUTION OF INDIAN RIVER COUNTY, FLORIDA, ADOPTING RATES, FEES, AND CHARGES FOR THE DEPARTMENT OF UTILITY SERVICES, PURSUANT TO THE AUTHORITY OF ORDINANCE NO. 91-9 WHEREAS, Indian River County operates a Department of Utility Services, which is funded without contribution from the ad valorem tax fund of the County and is required to support itself from rates, fees, and charges paid by the customers of the utility system, and WHEREAS, Ordinance No. 91-9 authorizes the imposition by the Department of Utility Services of certain rates, fees, and charges to support the operation of the Department in a fair and equitable manner. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that the following schedule of rates, fees, and charges is hereby adopted by use by the Department of Utility Services effective April 1, 1991. Rates, fees, and charges shown for 1992 will become effective October 1, 1991. Rates, fees, and charges shown for 1993 will become effective October 1, 1992. The resolution was moved for adoption by Commissioner S c u r l o c k and the motion was seconded by Commissioner Eggert , and, upon being put to a vote, the vote was as follows: Chairman Richard N. Bird Ay e Vice Chairman Gary C. Wheeler Absent Commissioner Don C. Scurlock, Jr. Aye Commissioner Margaret C. Bowman Aye Commissioner Carolyn K. Eggert A y e The Chairman thereupon declared the resolution duly passed and adopted this 12 day of Morch , 1991. Jeffrey K. 13arton r dbt075/046.51 BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA By: Richard N. Bird Chairman . .: Urvs.r Ca 4proved Dale__ 1 Admin. Vr(11 13 `42/--9 Legal .� Budget • SCHEDULE OF WATER AND SEWER RATES. FEES. AND CHARGES 1991. 1992, AND 1993 1991 RATES Water Billing Charge - Per Account 5200 Base Facilities Charge Where Lines Ars Available - Per ERU $6.20 Base Facilities Charge Where Capacity is Reserved But Lines Are Not Available - Per ERU Volume Charge 0 to 3,000 Gallons Per Month Per ERU Except Irrigation Only - Per 1,000 Gallons Per Month 3.001 to 7.000 Gallons Per Month Per ERU and Irrigation Only 0 - 7.000 Gallons Per Month - Per 1.000 Gallons Over 7,000 Gallons Per Month Per ERU - Per 1,000 Gallons Excess Volume Surcharge For Use Greater than 13,000 Gallons Per Month Per ERU - Per 1,000 Gallons Sewer Billing Charge - Per Account Base Facilities Charge Where Lines Are Available - Per ERU Base Facilities Charge Where Capacity Is Reserved But Lines Are Not Avallable - Per ERU dbt075/047.wk1 $3.10 1992 1993 $2.00 $8.70 $200 $9.20 $4.35 $4.60 $1.75 $1.75 $1.75 $2.15 $2.15 $2.15 $2.55 $2.55 $2.55 $1.95 $2.10 $2.30 $2.00 $2.00 $2.00 $7.60 $13.00 $13.50 $3.80 $6.50 $6.75 SCHEDULE OF WATER ANO SEWER RATES, FEES. AND CHARGES 1991, 1992, AND 1993 Volume Charge - Calculated as 85 Percent of Water Use - Per 1,000 Gallons -10,000 Gallon Per Month Maximum for Residential Customers Excess Volume Surcharge For Use Greater than 11,000 Gallons Per Month Per ERU - Per 1.000 Gallons Excess Sewage Strength Charge Excess Sewage Strength Charge Applicable to Customers Required to Use Greasetraps But Who Have Obtained a Variance Due to Hardship or Financial Unfeasibility Septage Charge per 1,000 Gallons IMPACT FEES Water - Per ERU Water Treatment and Storage Water Transmission Total Sewer - Per ERU Wastewater Treatment and Sludge Disposal Effluent Disposal Wastewater Transmission Total dbt0751047.wk1 1991 $3.35 $3.70 Sewage Charge • Ratio of Total Dissolved Solids or Biochemical Oxygen Demand in milligrams per liter / 250 50 Percent Excess Sewage Strength Charge $95.00 $818.00 $502.00 $1,320.00 $979.00 $604.00 $580.00 $2,163.00 1992 $3.35 $4.05 Sewage Charge • Ratio of Total Dissolved Solids or Biochemical Oxygen Demand In milligrams per liter / 250 $100.00 $893.00 $548.00 $1,441.00 $1,048.00 $647.00 $626.00 $2,321.00 1993 $3.35 $4.45 Sewage Charge ' Ratio of Total Dissolved Solids or Biochemical Oxygen Demand in milligrams per liter / 250 $105.00 $973.00 $597.00 $1,570.00 $1,159.00 $716.00 $676.00 $2,551.00 SCHEDULE OF WATER AND SEWER RATES, FEES, AND CHARGES 1991. 1992. AND 1993 1991 1992 1993 Impact Fees for 1994 and subsequent years will be Increased in proportion to the Engineering New Record construction cost index applicable to Indian River County OTHER CHARGES Deposits Required Upon Opening, Transferring, or Reconnecting Service Residential and Commercial - Per ERU $50.00 $50.00 $50.00 Hydrant Meter $345.00 $345.00 $345.00 Interest Rate Paid on Deposits 0.5 % Per Month 0.5 % Per Month 0.5 % Per Month Charge for Returned Check $12.00 $12.00 $12.00 Issuance of Duplicate Bill $1.50 $1.50 $1.50 Sewer Tap Cost Plus Overhead Cost Plus Overhead Cost Plus Overhead Meter Replacement 5/8 Inch $100.00 $100.00 $100.00 1 Inch $125.00 $125.00 $125.00 1 1/2 Inch $300.00 $300.00 $300.00 2 Inch and Larger Cost Plus Overhead Cost Plus Overhead Cost Plus Overhead Meter Removal 5/8 Inch $30.00 $30.00 $30.00 1 Inch $30.00 $30.00 $30.00 1 1/2 Inch amd Larger $40.00 $40.00 $40.00 dbt075/047.wk1 SCHEDULE OF WATER AND SEWER RATES, FEES, AND CHARGES 1991, 1992, AND 1993 EJlarvice Connection dh Meter h Meter Ifich Meter er than 1 1/2 Inch Meter ' Service Connection iltntial rruarcial and Other Iaload Cuts L9cking and Boring Flestoration u r zed Use of Fire Hydrants Ind Extraordinary Ott nstaliation rrib Meter IMeter rich Meter Meter Meter and Larger Idrant Meter isrvice Reconnection Working Hours ticking Hours ►.wk1 1991 1992 $400.00 $460.00 $810.00 Cost Plus Overhead $500.00 Cost Plus Overhead Cost Plus Overhead $200 Minimum Cost Plus Overhead Cost Plus Overhead $115.00 Cost Plus Overhead $130.00 $200.00 $500.00 $630.00 Cost Plus Overhead $25.00 $18.00 $400.00 $460.00 $810.00 Cost Plus Overhead $500.00 Cost Plus Overhead Cost Plus Overhead $200 Minimum Cost Plus Overhead Cost Plus Overhead $115.00 1993 $400.00 $460.00 $810.00 Cost Plus Overhead $500.00 Cost Plus Overhead Cost Plus Overhead $200 Minimum Cost Plus Overhead Cost Plus Overhead $115.00 Cost Plus Overhead Cost Plus Overhead $130.00 $200.00 $500.00 $630.00 Cost Plus Overhead $25.00 $18.00 $130.00 $200.00 $500.00 $630.00 Cost Pius Overhead $25.00 $18.00 $25.00 $25.00 $25.00