HomeMy WebLinkAbout2018-009WORK ORDER NUMBER CCNA2014WO12
Full Cost Accounting and Financial Assurance Reporting
This Work Order Number 12 is entered into as of this _I_E day of ,Ian ary2018, pursuant to that
certain Extension and Amendment of Continuing Contract Agreement for Professional Services entered into as
of this 4" day of November, 2014 (collectively referred to as the "Agreement") and that certain Extension of
Continuing Contract Agreement for Professional Services entered into as of this 24" day of October, 2017
(collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political
subdivision of the State of Florida ("COUNTY") and CDM Smith Inc., (CDM Smith) ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant
will perform the professional services within the timeframe more particularly set forth in Exhibit C
(Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of
the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement
and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as
if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above.
CONSULTANT:
CDM Smith Inc.
By:
Title: PttS�d
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY ,ov��SY '/S
'
Peter D. OV'B, Chairman
Peter
BCC Approved Date: January 16, 2018 •'�� •_.'' l�f>:°
'"-��ouiiTv,El
Attest: Jeffrey R. Smith,�jlerk of Court and Cdtnnptroller
D,ut Clerk
p Y
Approved: ��✓ w-�
Jason E. Arow , County inistrator
Approved as to form and legal sufficiency:
D,II ' • Reingold, County Attorney
EXHIBIT A
AUTHORIZATION FOR PROFESSIONAL SERVICES
INDIAN RIVER COUNTY SOLID WASTE DISPOSAL DISTRICT
ENGINEERING SERVICES FOR
FULL COST ACCOUNTING AND FINANCIAL ASSURANCE REPORTING
CCNA-2014 WO NO. 12
This Authorization, when executed, shall be incorporated in and become part of the Continuing
Contract Agreement for Professional Services between the Indian River County Solid Waste
Disposal District (COUNTY), and CDM Smith Inc. (CONSULTANT), dated December 6, 2011, and the
Extensions and Amendments of Continuing Contract Agreement for Professional Services, dated
November 4, 2014 and October 24, 2017, hereafter referred to as the Contract.
PROTECT UNDERSTANDING
Each year the COUNTY is required to document full cost accounting and financial assurance in
accordance with the Solid Waste Operations Permit. CONSULTANT assists COUNTY with these
submittals to the Florida Department of Environmental Protection (FDEP) each year.
This project is to provide permitting services which are required including:
■ Task 1.0 -Full Cost Accounting Evaluation for Fiscal Year 2016-17
■ Task 2.0 - Financial Assurance
CONSULTANT will coordinate with the COUNTY in order to provide timely execution of each
portion of this project. The Scope of Work is as detailed below.
TASK 1.0 - FULL COST ACCOUNTING EVALUATION FOR FISCAL YEAR 2016-17
Under provisions of Chapter 62-708.300(3), Florida Administrative Code (F.A.C.), the COUNTY is
required to determine and publicly disclose the full cost of solid waste management within its
service area for Fiscal Year 2016-2017.
CONSULTANT will perform an evaluation on the full cost of solid waste management for Fiscal Year
2016-2017 in accordance with the requirements of Chapter 62-708, F.A.C. CONSULTANT will
prepare summary tables and a brief letter presenting the full cost of solid waste management in the
COUNTY for Fiscal Year 2016-2017 and also prepare a draft public notice.
CONSULTANT will provide the draft tables, letter, and public disclosure notice to the COUNTY by
March 15, 2018 assuming receipt of all data required to perform the study are provided by March 1,
2018. After receipt of comments, CONSULTANT will submit the final tables, letter, and public
disclosure notice within 7 calendar days. The COUNTY is required to inform the residential and
nonresidential users of IRC's solid waste management services area of the user's share of the full
cost for solid waste management in accordance with Chapter 403.7049 Florida Statutes.
CDM
Smith A-1 1)2145 WONo. 12,do-
TASK 2.0 - FINANCIAL ASSURANCE
The COUNTY operates Class I and construction and demolition (C&D) debris landfills through a
contract with Republic Services. The COUNTY is required by Chapter 62-701, F.A.C. to provide
financial assurance for each of these facilities annually.
Subtask 2.1 - Recalculation of the Closure Cost Estimates
CONSULTANT will prepare a recalculation of the estimated closing and long-term care costs for the
Class I and C&D debris landfill. CONSULTANT will use the recalculated closing and long-term care
cost estimates to complete the Closure Cost Estimating Form for Solid Waste Facilities for the both
the Class I landfill (includes the waste tire site) and the C&D debris landfill. The forms will be
submitted for review by the COUNTY prior to submittal to FDEP.
Subtask 2.2 - Survey and Airspace Assessment
CONSULTANT will provide surveys and assessments of consumed airspace performed by, a
subconsultant, Masteller, Moler & Taylor, Inc. for the Class I and C&D debris landfills. The
topographic survey will be performed on the entire IRC Landfill site, including the Class I waste
area (Segments I, 11, and III as well as the ditches and roadways surrounding the Class I area), the
C&D debris landfill site (waste area, as well as the fence -line and the surrounding ditches and
berms adjacent to the C&D debris site), expansion areas, stormwater pond, and administrative area.
CONSULTANT will review the volumetric modeling and include a summary of estimated waste
density based on the results of the survey and volumetric modeling.
The deliverable from Masteller, Moler & Taylor, Inc. will consist of a survey identifying the dates the
field survey was completed. Airspace consumed and remaining airspace based on the survey and
the construction and design criteria shall be specifically identified in the financial assurance report.
The survey shall also include the results of the volumetric calculations for the Segments I1 and III
portions of the Class I landfill, as well as the C&D debris landfill. Deliverables accompanying the
survey shall include:
A 1 -inch = 50 feet scale contour map for each site with 1 -foot contour intervals in regular weight
lines, and 5 -foot contour intervals in bold weight lines. Signed and sealed contour maps will be
provided on 24 -inch by 36 -inch paper of each landfill site in 1 -inch = 200 feet scale. A Compact Disc
(CD) with ASCU file of the survey data in AutoCAD 2010 will also be provided.
For the Class I Landfill (Segments 1, II, and 111), the financial assurance report shall include an
evaluation of the compaction of the waste and an analysis as to whether Republic Services is
meeting its contractual compaction requirements. CONSULTANT will include escrow account
balance recommendations for Fiscal Year 2017-2018, as well as escrow account budget
recommendations for Fiscal Year 2018-2019.
Subtask 2.3 - Financial Assurance Report
CONSULTANT will prepare documentation that demonstrates proof of financial assurance for the
cost of closing and providing long-term care for the Class I landfill, the C&D debris landfill, and the
waste tire site. This documentation will be submitted for review by the COUNTY. Two copies of the
final document will be provided to the COUNTY. CONSULTANT will meet with the COUNTY up to
two times to discuss issues and to provide needed coordination. CONSULTANT will also respond to
FDEP correspondence regarding financial assurance.
CDM
Smith A-2 112145 WO No. 12.docx
ASSUMPTIONS
■ Topographic survey of entire IRC Landfill site will be performed.
■ Volumetric calculation will be performed on the currently active Class I and C&D debris cells.
DATA OR ASSISTANCE TO BE PROVIDED BY COUNTY
■ Site access.
■ Escrow account balances.
■ The rates and numbers of dwelling units for each of the transporters
■ Available site surveys.
■ Level of service for each transporter.
■ Monthly fees for both single family residence and multi -family residences collected via non -ad
valorem assessment.
■ Numbers of parcels, equivalent residential units, and waste generation units (WGUs) for Fiscal
Year 2015-16 for each customer.
■ Wastestream monthly totals.
■ Changes to Basis of Allocation.
■ Direct and indirect cost breakdowns.
■ Confirmation of waste generation units.
■ Amount of residential assessment.
PAYMENT AND COMPENSATION
Compensation for the Work Order described herein shall be made on the basis of a lump sum fee.
The lump sum fee for Tasks 1.0 and 2.0, inclusive, is $60,810 as shown in Exhibits B. CONSULTANT
will invoice the COUNTY on a monthly basis based on percent complete of each task. For invoice
purposes only, the value of each task is as shown in the Table 1.
Table 1
TASK VALUE FOR INVOICE PURPOSE
TASK DESCRIPTION VALUE
1.0 Full Cost Accounting Evaluation for Fiscal Year 2016-17 $7,760
2.0 Financial Assurance $53,050
TOTAL WORK ORDER NO. 12 - LUMP SUM $60,810
CDM
Smith A-3 112145 WO No. 12.docx
EXHIBIT B
PROJECT BUDGET
INDIAN RIVER COUNTY SOLID WASTE DISPOSAL DISTRICT
ENGINEERING SERVICES FOR
FULL COST ACCOUNTING AND
FINANCIAL ASSURANCE REPORTING
CCNA-2014 WO NO. 12
PROJECT: Full Cost Accounting and Financial Assurance Reporting
DESCRIPTION: Task 1.0 - Full Cost Accounting Evaluation for Fiscal Year 2016-17
CONTRACT
REFERENCE: Agreement between the Indian River County Board of County Commissioners
and CDM Smith Inc.
Labor CateEOry
Hours
Rate
Total
Sr Officer
2
$220
$440
Principal
14
$200
$2,800
Senior Professional
20
$165
$3,300
Senior Support
4
$120
$480
Project Administration
4
$85
340
Total Hours
44
Total Salary Cost
$7,360
Other Direct Costs
400
TOTAL LUMP SUM FEE
7 760
For the basic services under this Agreement, IRC SWDD agrees to pay the Consultant a lump sum
fee $7,760. CONSULTANT will submit monthly invoices based on the percent complete for the work
performed.
CDM
Smith B-1 112145 WO No 12 docx
EXHIBIT B
PROJECT BUDGET
INDIAN RIVER COUNTY SOLID WASTE DISPOSAL DISTRICT
ENGINEERING SERVICES FOR
FULL COST ACCOUNTING AND
FINANCIAL ASSURANCE REPORTING
CCNA-2014 WO NO. 12
PROJECT: Full Cost Accounting and Financial Assurance Reporting
DESCRIPTION: Subtask 2.1 - Recalculation of the Closure Cost Estimates
Subtask 2.2 - Survey and Airspace Assessment
Subtask 2.3 - Financial Assurance Report
CONTRACT
REFERENCE: Agreement between the Indian River County Board of County
Commissioners and CDM Smith Inc.
Labor Cateeory
Hours
Rate
Total
Sr. Officer
12
$220
$2,640
Principal
40
$200
$8,000
Senior Professional
60
$165
$9,900
Professional 11
74
$130
$9,620
Professional
20
$110
$2,200
Senior Support
8
$120
$960
Staff Support
10
$85
$850
Project Administration
8
$85
680
Total Hours
232
Total Salary Cost
$34,850
Outside Professionals - Masteller, Moler & Taylor, Inc.
$17,000
Other Direct Costs
$1,200
TOTAL LUMP SUM FEE
$53.050
For the basic services under this Agreement, IRC SWDD agrees to pay the Consultant a lump sum
fee of $53,050. CONSULTANT will submit monthly invoices based on the percent complete for the
work performed.
CDM
Smith B-2 112145_W0 No 12 docx
EXHIBIT C
PROJECT SCHEDULE
INDIAN RIVER COUNTY SOLID WASTE DISPOSAL DISTRICT
ENGINEERING SERVICES FOR
FULL COST ACCOUNTING AND
FINANCIAL ASSURANCE REPORTING
CCNA-2014 WO NO. 12
SCHEDULE
Task
1.0 Draft Full Cost Accounting Report
1.0 Final Full Cost Accounting Report
2.1 Recalculation of the Closure Cost Estimates
2.2 Site Survey
2.3 Draft Financial Assurance Report
2.3 Final Financial Assurance Report
Completion Date
March 15, 2018
March 31, 2018
April 1, 2018
February 28, 2018
June 1, 2018
October 1, 2018
CDM
Smith C-1 ;,2145_ WO No 12 docx