HomeMy WebLinkAbout2018-064SECTION 00942 - Change Order Form
No. 1
DATE OF ISSUANCE: March 20, 2018 EFFECTIVE DATE: March 20, 2018
OWNER: Indian River County
CONTRACTOR Blue Goose Construction.
Project: 424 22nd Street SE Sewer Lateral Replacement
OWNER'S Bid No. WA 2018-002
You are directed to make the following changes in the Contract Documents:
Description: Deduct watermain relocation from contract.
Reason for Change Order: It was anticipated that a 4 -inch watermain may need to be relocated
in order to replace the sewer lateral. The relocation of the watermain was not necessary.
Attachments: See itemized schedule
CHANGE IN CONTRACT
PRICE:
Time
Description
Amount
Original Contract Price
$15,000.56
Net Increase (Decrease)
$0.00
from previous Change
Orders No. :
(days)
Contract Price prior to this
$15,000.56
Change Order:
Net increase (decrease) of
($6,809.31)
this Change Order:
(days or dates)
Contract Price with all
$8,191.25
approved Change Orders:
CONTRACTOR (Signature)
Date: 3 /,;-,10,120/A
CHANGE IN CONTRACT TIMES
Description
Time
Original Contract Time:
(days or dates)
Substantial Completion:
Final Completion:
Net change from previous Change
Orders No.:
(days)
Substantial Completion:
Final Completion:
Contract Time prior to this Change
Order:
(days or dates)
Substantial Completion:
Final Completion:
Net increase (decrease) this
Change Order:
(days or dates)
Substantial Completion:
Final Completion:
Contract Time with all approved
Change Orders:
(days or dates)
Substantial Completion:
Final Completion:
RECOMMENDED:
By: 44w
EN NEER (Signa ure
Date: 312G120/9
APPROVED .AS TCm*.
AN LEGAL, SUFFICI
FAUtilities\UTILITY- Engineering\Projects -Capital Projects\18-0213 424 22nd St SW\00942 -Change Order Form .docx
00942-1
a)
0
oU
ro
0
U
u-4
0
a)
U
E
m
D LAN REIT GOLD
OOUNTY ATTORNEY
00942 - Change Order Form
Contractor's Application for Payment
424 22nd Stree SE Sewer Lateral Replacement
To:
Indian River County Utilities
From:
Blue Goose Construction
PO No.
WA 2018-002
Project No.:
BG 1325
1 Original Contract Price:
2 Net change by Change Orders and Written Amendments (+ or
3 Current Contract Price (1 plus 2):
4 Total completed and stored to date:
5 Retainage (per Agreement):
0% of completed Work:
0 % of retainage:
6 Total completed and stored to date less retainage (4 minus 5):
7 Less previous Application for Payments:
8 DUE THIS APPLICATION (6 MINUS 7):
Application for Payment No. 1 - FINAL
For Work Accomplished through the period of 03/16/18
15,000.56
(6,809.31
$ 8.191.25
191.25
Total Retainage: $ -
$ 8,191.25
$ 8,191.25
UNDER PENALTY OF PERJURY, the undersigned CONTRACTOR certifies that (1) the labor and materials listed on this request for
payment have been used in the construction of this Work; (2) payment received from the last pay request has been used to make
payments to all subcontractors, laborers, materialmen and suppliers except as listed on Attachment A, below; (3) title of all Work,
materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER
at time of payment free and clear of all Liens, security interests and encumbrances (except such as are covered by a Bond acceptable to
OWNER indemnifying OWNER against any such Lien, security interest or encumbrance); (4) all Work covered by this Application for
Payment is in accordance with the Contract Documents and not defective; and (5) If this Periodic Estimate is for a Final Payment to
project or improvement, I further certify that all persons doing work upon or furnishing materials or supplies for this project or
improvement under this foregoing contract have been paid in full, and that all taxes imposed by Chapter 212 Florida Statutes, (Sales and
Use Tax Act, as Amended) have been paid and discharged, and that I have no claims against the OWNER.
Dated I ` L By' antfm
(CONTRACTO — must b gned by
an Officer of the Corporation)
Greg Hampton - Controller
Print Name and Title
STATE OF FLORIDA
COUNTY OF ST LUCIE
1
Before me, a Notary Public, duly commissioned, qualified, and acting, per1sppnally appeared, who being
by me first duly sworn upon oath, says that he/she is the C6Y�--Wt LR -r- of the CONTRA OR mentione above and that
he/she has been duly authorized to act on behalf of it, and that he/she executed the above Contractor's Application for Payment and
Contractor's Certification statement on behalf of said CONTRACTOR;1statements containpd herein are true, correct,
and complete. Subscribed and swom to before me this 0— day of Y ` 20 L
1
Y bh is personally known to me or has produced 4 as identification.
NOTARY PUBLIC:
Printed name: 7ERESAGORMAN
#FF 945828
Commission No.:d g* EXPIRES: December 22, 2019
r 'Bon ru egry public Underwriters
Commission Expiration: qh°O
Page 1 Pay Application 1
Indian River County Utilities
424 22nd Stree SE Sewer Lateral Replacement
t
WORK COMPLETED
Item No.
Description
Qt
Unit
Unit Price
Scheduled Value Previous Application
Amount Quantity Total
This Period
Quantity
Total
Total Com feted
Quantity Total
40.00
220.00)
9
Install Mechanical Restrained Joint Ductile Iron Fitting
-0.25
Ton
$4,100.00
$
1,025.00
0.25
1,025.00
Olb
Install 4" PVC Water Main
40.00
LF
$5.50
$
220.00
40.00
220.00
40.00
220.00
9
Install Mechanical Restrained Joint Ductile Iron Fitting
0.25
Ton
$4,100.00
$
1,025.00
0.25
1,025.00
0.25
1,025.00
10a
Install Mechanical Restrained Joints on Existing Main, 3" through
6.00
EA
$60.00
$
360.00
6.00
360.00
6.00
360.00
Ila
Lower/Offset Pipe by Excavation After Restraining Joints, 3"
40.00
LF
$6.00
$
240.00
40.00
240.00
40.00
240.00
13a
Grout Pipe Abandoned and Left in Place, 3" through 8"
100.00
LF
$12.00
$
1,200.00
100.00
1,200.00
100.00
1,200.00
23
Test Holes / Potholes
8.00
EA
$250.00
$
2,000.00
8.00
2,000.00
8.00
2,000.00
55c
Install 6" Sewer Service Lateral -Single (> 7') SDR 26
100.00
LF
$15.00
$
1,500.00
100.00
1,500.00
100.00
1,500.00
58
Gravity Sewer Tap- Single Residential Service -4"-8"includes
1.00
EA
$500.00
$
500.00
1.00
500.00
1.00
500.00
65
Saw Cut, Remove and Dispose of Asphalt
10.00
Ton
$30.00
$
300.00
10.00
300.00
10.00
300.00
66a
Install Asphalt Cement Overlay -Type SP -9.5 A.C. over Existing
10.00
Ton
$60.00
$
600.00
10.00
600.00
10.00 1
600.00
67b
Remove, Dispose of and/or Replace Rock Base Course, Compacted
20.00
Ton
$20.00
$
400.00
20.00
400.00
20.00
400.00
67c
Remove, Dispose of and/or Replace Stabilized Sub- Grade Course,
20.00
Ton
$14.00
$
280.00
20.00
280.00
20.00
280.00
86a
Lawn Restoration (Topsoil & Sod) Includes Watering
50.00
SY
$2.25
$
112.50
50.00
112.50
50.00
112.50
85a
Remove and Properly Dispose of Asbestos Concrete Pipe or
1.00
Ton
$750.00
$
750.00
1.00
750.00
1.00
750.00
88a
Well Point Dewatering Set Up, Tier Depth up to 25', (Minimum 30'
1.00
LS
$3,500.00
$
3,500.00 -
1.00
3,500.00
1.00
3,500.00
91
Mobilization, Demobilization, MOT (based on SO% Labor Cost):
1.00
LS
$1,298.75
$
1,298.75 -
1.00
1,298.75
1.00 1
1,298.75
Contingency
11.00
1 LS
714.31
$
714.31
1.00
714.31
1.00 1
714.31
$ 15,000.56
Work Deleted
Olb
Install 4" PVC Water Main
-40.00
LF
$5.50
$
220.00
40.00
220.00
40.00
220.00)
9
Install Mechanical Restrained Joint Ductile Iron Fitting
-0.25
Ton
$4,100.00
$
1,025.00
0.25
1,025.00
0.25
1,025.00
10a
Install Mechanical Restrained Joints on Existing Main, 3" through
-6.00
EA
$60.00
$
360.00
6.00
360.00
6.00
360.00
Ila
Lower/Offset Pipe by Excavation After Restraining Joints, 3"
-40.00
LF
$6.00
$
240.00
40.00
240.00
40.00
240.00
85a
Remove and Properly Dispose of Asbestos Concrete Pipe or
-1.00
Ton
$750.00
$
750.00
1.00
750.00
1.00
750.00
88a
Well Point Dewatering Set Up, Tier Depth up to 25', (Minimum 30'
-1.00
LS
$3,500.00
$
3,500.00
1.00
3,500.00
1.00
3,500.00
Contingency
-1.00
1 LS
714.31
$
714.31
1.00
714.31
1.00
714.31
424 22nd St Sewer Lateral
$ 6,809.31 .
Total $ 8,191.25 $ $ 8,191.25 $ 8,191.25
Confidential
Amount Completed to Date $ 8,191
Retainage @ 0%
Total Completed & Stored Less Retainage $ 8,191
Less Previous Payment
Amount Due Contractor
8,191
' ✓ YL
7-'-1A -
3-1A
Page 1