HomeMy WebLinkAbout2018-092CCNA2018 WORK ORDER 1
SOUTH GIFFORD ROAD LANDFILL
This Work Order Number 1 is entered into as of this 8thday of May , 201 8,
pursuant to that certain Continuing Consulting Engineering Services Agreement for Professional Services
entered into as of this 17th day of April, 2018 (collectively referred to as the "Agreement"), by and between
INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and
Geosyntec Consultants, Inc. ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit A
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The
Consultant will perform the professional services within the timeframe more particularly set forth in
Exhibit A (Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of
the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement
and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as
if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above.
..........
CONSULTANT: BOARD OF COUNTY COMMISSIONERS. - E6r;M ss�o.
OF INDIAN RIVER COUNTY oJ�?�••'�''F�
By: By:
Peter D. O' Bryan , Chun
Print Na
e: ° .n .
Jill Joh on •.9y•. �;._
••A
GOU
Title: Principal BCC Approved Date: May 8, 2018
Attest: Jeffrey R. S
By:
De ui
Approved:
Jason
Approved as to form and legal sufficiency:
of
County Administrator
T. Reingold, County Attorney
EXHIBIT A
PROFESSIONAL SERVICES
engineers I scientists I innovators
Geosyntec
consultants
Mr. Himanshu H. Mehta, P.E.
Managing Director
Solid Waste Disposal District
Indian River County
132574 1h Avenue SW
Vero Beach, Florida 32968
6770 South Washington Avenue, Suite 3
Titusville, Florida 32780
PH 321.269.5880
FAX 321.269.5813
www.geosyntec.com
30 April 2018
Subject: Proposal to Provide One Year of Groundwater Monitoring/Reporting and
Related Consulting Services
Former South Gifford Road Landfill
Vero Beach, Indian River County, Florida
Dear Mr. Mehta:
Geosyntec Consultants (Geosyntec) is pleased to submit this letter proposal to the Indian River
County (IRC) Solid Waste Disposal District (SWDD) to provide professional services for Florida
Department of Environmental Protection (FDEP)-required activities associated with continued
implementation of the groundwater monitoring for the chlorinated volatile organic compound
(CVOC) plume at the Former South Gifford Road Landfill located in Vero Beach, Indian River
County, Florida (Site). This fee proposal is based on correspondence with the FDEP and
discussions with IRC. As requested by IRC, this fee proposal includes budget to complete two
semi-annual monitoring and reporting events for the plume monitoring well network, monitoring
well maintenance and brush clearing, as well as related consulting services to prepare an annual
pollution liabilities evaluation report for identified IRC -owned environmental liabilities and
represent IRC during interactions with regulatory agencies. Geosyntec has prepared this proposal
(professional services as Exhibit A) as Work Order No. CCNA2018 WO No. 1 for the Continuing
Contract Agreement for Professional Services between IRC SWDD and Geosyntec. The remainder
of this letter provides an overview of the project background, a description of the proposed scope
of work, a budget estimate, and a discussion of the schedule for accomplishment of the work
described herein.
PROJECT BACKGROUND
As part of the long-term monitoring activities for the identified CVOC plume associated with the
South Gifford Road Landfill, a network of monitoring wells will require sampling on an annual or
semi-annual basis to: (i) confirm that the CVOC plume is not migrating by monitoring the lateral
and vertical extent; (ii).evaluate the impact of source and dissolved plume bioremediation to assess
FR0766\XR18011
engineers I scientists I innovators
Mr. Himanshu H. Mehta, P.E.
30 April 2018
Page 2
Geosyntec
consultants
CVOC plume centerline concentrations over time; and (iii) assess the impact of biological and
physical natural attenuation processes on CVOC plume degradation.
In consideration of the ongoing natural attenuation processes occurring at the site, the enhancement
of these biological processes via the injection of an electron donor was proposed and agreed to in
concept by the FDEP in correspondence dated 2 August 2006. In response to FDEP's request and
supported by groundwater monitoring results, Geosyntec conducted an injection event in 2017
[Remedial Action Plan Modification Addendum No. 3 (RAPM3)] to remediate recalcitrant CVOC
groundwater impacts in the former source area. Semi-annual performance monitoring associated
with bioremediation implementation is ongoing at monitoring well GR-MW37B and conducted
concurrently groundwater monitoring of the plume monitoring well network.
PROPOSED SCOPE OF WORK
The proposed scope of work consists of semi-annual groundwater monitoring and reporting and
related activities to be performed on behalf of IRC SWDD at the Former South Gifford Road
Landfill. For the purpose of budgeting, the scope of work has been divided into the following
tasks:
• Task 1 — Project Management;
• Task 2 — Meetings/Regulatory Interaction;
• Task 3 — Annual Pollution Remediation Liabilities Evaluation;
• Task 4 — Semi -Annual Sampling Activities;
• Task 5 — Monitoring Well Maintenance;
• Task 6 — Brush Clearing Activities; and
0 Task 7 — Data Evaluation and Semi -Annual Reporting.
The remainder of this section presents a general description of the activities to be performed in
each task.
Task 1 — Proiect Manaeement: Under this task, Geosyntec will perform project planning and
management responsibilities, such as correspondence with IRC SWDD and FDEP, invoice review,
project coordination, and project administration. The budget includes ten hours per
sampling/reporting event for the project manager, two hours for the principal -in -charge, and two
hours for the administrative assistant.
FR0766\XR 18011
engiI7eers I scientists I innovators
Mr. Himanshu H. Mehta, P.E.
30 April 2018
Page 3
Geosynteccl
consultants
Task 2 — Meetings/Regulatory Interaction: Under this task, Geosyntec will prepare for and
attend up to two meetings, with IRC SWDD, FDEP, and/or IRC Board of County Commission, as
necessary. It has been assumed that one of these meetings will be in person and one meeting will
be by conference call. Also, under this task, six hours has been included for the principal -in -charge
to provide ongoing support to IRC SWDD related to interaction and negotiation with FDEP.
Task 3 — Annual Pollution Remediation Liabilities Evaluation: As requested by IRC SWDD,
under this task, Geosyntec will prepare the annual environmental liability evaluation. This
document is prepared annually in response to Governmental Accounting Standards Board
Statement No. 49 (GASB No. 49), Accounting and Financial Reporting for Pollution Remediation
Obligations, which requires the inclusion and calculation of pollution remediation obligations. The
objective of GASB No. 49 is to enhance the usefulness and comparability of pollution remediation
obligation information reported by state and local governments. It has been assumed that the report
will include evaluation of two sites, including South Gifford Road Closed Landfill (4701 41"
Street) and Old Administration Building (1840 25th Street). In addition, two hours have been
included for a Florida registered professional engineer to conduct an independent review of the
liability evaluation.
Task 4 — Semi -Annual Sampling Activities: Under this task, Geosyntec will perform 2018 field
activities related to the performance monitoring and plume groundwater monitoring. The semi-
annual activities will include field preparation, groundwater sampling, and water level
measurements. Field preparation activities will include scheduling and staffing, subcontracting,
coordination with the analytical laboratory, field equipment preparation, procurement of Passive
Diffusion Bag (PDB) samplers, and notifying FDEP and Vero Beach Municipal Airport of the
field schedule. Performance monitoring well MW -37B associated with the RAPM3
implementation is included in the semi-annual sampling plan for analysis of bioremediation
performance parameters, including dissolved gasses, total organic carbon, and dechlorinating
microbial concentration.
Geosyntec will perform the groundwater sampling activities associated with the CVOC plume
monitoring well network. Sampling activities will be completed with a combination of PDB
samplers and traditional low -flow sampling techniques. PDBs are anticipated to be purchased from
EON Products, one of the few suppliers of this type of passive sampling device. Two PDB
harnesses will be purchased from EON Products for monitoring wells GR-MW02C and GR-
MW22CCR. Groundwater sampling activities will be executed using a two -person sampling crew
and will be performed in general accordance with the FDEP Standard Operating Procedures
(SOPS). The proposed summer 2018 field event (tentatively scheduled for June) will include
sampling of nine monitoring wells (three wells using PDBs and six wells with traditional sampling
techniques). The summer 2018 field event is budgeted to include one day for groundwater
sampling activities and one day for PDB deployment for the next sampling event (total of two field
days each with two persons). The proposed winter 2018 field event (tentatively scheduled for
FR0766\XR18011
engineers I scientists I innovators
Mr. Himanshu H. Mehta, P.E.
30 April 2018
Page 4
Geosyntec
consultants
December) will include sampling of 47 monitoring wells (37 wells using PDBs and ten wells with
traditional sampling techniques). The winter 2018 field event is budgeted to include a total of three
days (with two persons) for groundwater sampling activities and PDB deployment for the summer
2019 sampling event. Consistent field documentation and field protocols will be utilized to develop
reliable data to support the natural attenuation evaluation for the groundwater plume. The
groundwater samples will be analyzed in accordance with the sampling plan summarized in the
2017 Annual Groundwater Monitoring Report. Quality control samples are proposed to be
collected at a rate of 5% of total samples as required by the most recent FDEP SOPs.
Geosyntec will conduct a complete round of groundwater level measurements coincident with each
semi-annual groundwater sampling event (budgeted for one day with two -person field team for
each event). Depth to groundwater measurements will be recorded to the nearest 0.01 -ft in each
monitoring well, including existing monitoring wells and applicable City of Vero Beach wells
(assumed up to 90 wells per event).
It is anticipated that purge water (investigation -derived waste [IDW]) will be containerized in 55 -
gallon polyethylene drums and temporarily staged on Site for characterization prior to removal
and disposal. Costs are included herein for two 55 -gallon polyethylene drums and oversight of
drum disposal concurrent with one of the sampling events.
Overall, budget has been included for six field days with a two -person team (i.e., 12 man days)
and associated field expenses for sampling.
Task 5 — Monitoring Well Maintenance: A monitoring well inventory was conducted by
Geosyntec personnel in December 2017 to document maintenance needs, including top of casings
that had shifted above well completions, new well plugs, and/or new manhole lids. Based on
observations, maintenance activities are necessary, as discussed with IRC, to repair well pads at
three cluster locations, GR-MW13, GR-MW27, GR-MW32. Geosyntec will provide oversight for
a subcontractor to repair tops of casings and replace well pads. A Florida -licensed surveyor will
survey the repaired monitoring wells and performance monitoring well GR-MW37B to identify
the location and relevant elevation information (e.g., top of casing, ground surface). Monitoring
well maintenance will be performed prior to the summer 2018 semi-annual groundwater
monitoring event.
Task 6 — Brush Clearing Activities: During the monitoring well inventory conducted by
Geosyntec personnel in December 2017, approximately 20 well clusters were noted to be
overgrown by brush or tall grass impeding access for sample collection. Geosyntec will provide
oversight for a contractor to clear brush and mow undergrowth in an approximate 6 feet radius
around select well clusters. Brush clearing activities will be performed prior to the summer 2018
semi-annual groundwater monitoring event.
FR0766\XR18011
engineers I scientists I innovators
Mr. Himanshu H. Mehta, P.E.
30 April 2018
Page 5
Geosynte&
considtants
Task 7 — Data Evaluation and Semi -Annual Reporting: Under this task, Geosyntec will perform
data evaluation activities and reporting. The reporting includes preparation of one summer 2018
report (simplified format) and one winter 2018 report for submittal to FDEP.
The summer 2018 report will be a letter report with attachments, including a monitoring well
location map and tables of the field and laboratory results. Data evaluation activities for the
summer 2018 report will include database management, screening results against applicable
regulatory criteria, and summary data table preparation. This report will be prepared following the
June groundwater sampling event.
The winter 2018 report will be consistent with the groundwater monitoring reports historically
submitted to FDEP for this Site and the data evaluation activities will include database
management, screening results against applicable regulatory criteria, GIS figure preparation, time
trend analyses, and/or statistical data analyses. The winter 2018 annual report will be supported by
attachments containing Chain -of -Custody sheets, field notes and observations, water sampling
logs, maps, graphs, analytical results, and any other applicable materials.
In addition to the information outlined above (which has been provided historically in groundwater
monitoring reports for the Site), this report will include a more rigorous quantitative statistical
evaluation of the CVOC results to support the"possible reduction in the quantity and frequency of
the sampling activities. As part of the statistical analysis, trend analysis graphs showing temporal
concentrations of constituents and a summary of the Mann -Kendall statistics will be included to
identify increasing, decreasing, or no trends in groundwater constituent concentrations. Historical
data summaries will be included for monitoring wells recommended for removal from the
monitoring plan. This report will be prepared following the December groundwater sampling
event.
The draft summer and winter 2018 reports will be submitted to IRC SWDD for review prior to
submittal to FDEP. Each final report will be signed and sealed by a Florida registered professional
engineer or geologist.
SCHEDULE
The semi-annual groundwater monitoring events will be tentatively conducted in June and
December 2018 as described herein. Reports will be submitted to FDEP to meet required
deadlines.
BUDGET ESTIMATE
A budget estimate for the scope of work outlined in Tasks 1 through 7 of this proposal is
summarized in the following table, and a detailed budget estimate is provided as Attachment A.
The budget estimate presented in this proposal is based on Geosyntec's understanding of the
FR0766\XR18011
engineers I scientists I innovators
Mr. Himanshu H. Mehta, P.E.
30 April 2018
Page 6
Geosyntec°
consiiltants
project requirements, our experience gained from executing similar tasks for SWDD since 2002 at
the Site, and experience with groundwater monitoring and reporting activities at similar facilities.
Geosyntec will not exceed the budget estimate without prior approval and written authorization
from IRC SWDD.
Task 1 —
Project Management
$5,222
Task 2 —
Meetings/Regulatory Interaction
$5,686
Task 3 —
Annual Pollution Remediation Liabilities Evaluation
$2,613
Task 4 —
Semi -Annual Sampling Activities
$45,964
Task 5 —
Monitoring Well Maintenance
$6,308
Task 6 —
Brush Clearing Activities
$9,801
Task 7 —
Data Evaluation and Semi -Annual Reporting
$17,204
TOTAL
$92,798
CLOSUREI
Geosyntec appreciates this opportunity to offer our services. If this proposal is acceptable, please
indicate your agreement by signing the attached work authorization, which references this
proposal. Please return one signed work authorization to Ms. Johnson's attention. Please call either
of the undersigned with questions you may have as you review this proposal.
Sincerely,
J
Crystal Towns, P.G.
Hydrogeologi(st
{— W ' ice- rio"
Jill W. Johnson, P.G.
Principal Hydrogeologist
Attachments
FR0766\XR18011
engineers I scientists I innovators
ATTACHMENT A
BUDGET ESTIMATE
engineers I scientists I innovators
Table 1
APRIL 2018 BUDGET ESTIMATE
SOUTH GIFFORD ROAD LANDFILL
TASK 1: Proiect Management
ITEM
XR18011
BASIS RATE QUANTITY
ESTIMATED
BUDGET
A, '"Professional Services.
Principal
hr $225 2
$450
Professional
hr $160 24
$3,840
Subtotal Professional Services
$4,290
. Technical/Administrative, Services ,
,
Project Administrator
lu
$65
12
$780
Subtotal Technical/Administrative Services
$780
C. Reimbursables .' "
Communications Fee
3% labor
0.03
5,070
$152
Subtotal Reimbursables
$152
'TOTAL ESTIMATED BUDGET : TASK 1.
:$5,222;
55,222-
XR18011 Geosyntec Consultants
Table 2
APRIL 2018 BUDGET ESTIMATE
SOUTH GIFFORD ROAD LANDFILL
TASK 2: Meetines/ReLyulatory Interaction
ITEM
BASIS RATE QUANTITY
ESTIMATED
BUDGET
A. Professional Services
Principal
hr $225 16
$3,600
Professional
hr $160 12
$1,920
Subtotal Professional Services
$5,520
C. ,Iteimbnrsab[es .,
.
Communications Fee
3% labor
0.03
5,520
$166
Subtotal Reimbursables
$166
TOTAL.ESTIMATED BUDGET 5 TASK 2
,' . $5,686• • . ,
XR18011 Geosyntee Consultants
Table 3
APRIL 2018 BUDGET ESTIMATE
SOUTH GIFFORD ROAD LANDFILL
TASK 3: Annual Pollution Remediation Liabilities Evaluation
ITEM
BASIS
RATE QUANTITY
ESTIMATED
BUDGET
A.'Professi6nal•S6rvic6
Senior Principal
hr
$240 1
$240
Principal
hr
$225 1
$225
Senior Professional
hr
$205 2
$410
Professional
hr
$160 2
$320
Staff Professional
hr
$120 10
$1,200
Subtotal Professional Services
$2,395
B..Technical/Adinirt6trative Services
Project Administrator
hr
$65
2
$130
Subtotal Technical/Administrative Services
$130
C. Reimbuirsables. 4'
Communications Fee
3% labor
0.03 2,525
$76
8.5"x11" Photocopies
each
$0.12 100
$12
Subtotal Reimbursables
$88
''TOTAL ESTIMATED BUDGET : TASK
XR18011 Geosyntec Consultants
Table 4
APRIL 2018 BUDGET ESTIMATE
SOUTH GIFFORD ROAD LANDFILL
TASK 4: Semi -Annual Samnline Activities
ITEM
BASIS
RATE
QUANTITY
ESTIMATED
BUDGET
A:" Professional Services
Principal
hr
$225
4
$900
Professional
hr
$160
12
$1,920
Senior Staff Professional
hr
$140
100
$14,000
Subtotal Professional Services
$16,820
B:"TechuicuUAdministrative, Services,
Construction Manager II
hr
$120
100
$12,000
Project Administrator
hr
$65
2
$130
Subtotal Technical/Administrative Services
$12,130
C. Sabcoii&r ctor"s '
Laboratory Analysis for VOCs
each
$62
59
$3,630
Laboratory Analysis for TOC
each
$29
7
$206
Laboratory Analysis for Dissolved Gases
each
$83
7
$580
Laboratory Analysis for Dhc
each
$305
4
$ I,220
Laboratory Analysis for vcrA
each
$90
4
$360
Subtotal Subcontractor Services
$5,996
D. Reimbursablei"
Miscellaneous Supplies
day
$50
14
$700
PDBs for Summer event
quote
$32
3
$97
PDBs for Winter event
quote
$32
37
$1,196
PDB Harnesses
quote
$55
2
$110
Drums
each
$50
2
$100
Drum Transport
each
$262
2
$524
Lodging
day
$152
14
$2,128
Per Diem
day
$51
14
$714
Communications Fee
3% labor
0.03
$28,950
$869
Field Vehicle
day
$80
14
$1,120
8.5"x11" Photocopies
each
$0.12
160
$19
Overnight Cooler -Test America
each
$95
4
$380
Overnight Cooler-SIREM
each
$95
2
$190
Groundwater Sampling Kit (per sampler)
day
$300
8
$2,400
Water Level Measurement Kit (2 person team)
day
$55
2
$110
PDB Deployment Kit
day
$100
2
$200
Equipment Shipping
each
$54
3
$162
Subtotal Reimbursables
$11,019
TOTAL ESTIMATED BUDGET': TASK'4
$45;964
Notes:
1. Lodging and per diem rates were taken from the GSA website for the Vero Beach area (www.gsa.gov).
2. Groundwater Sampling Kit includes two sets o£the following: water level indicator, peristaltic pump, water quality meter (pH,
temperature, conductivity, dissolved oxygen, and oxidation reduction potential), turbidity meter, tubing, and miscellaneous field supplies.
3. Water Level Measurement Kit includes: water level indicator and miscellaneous field supplies.
4. PDB Deployment Kit includes: miscellaneous field supplies necessary to suspend and deploy PDBs.
XRI8011 Geosyntec Consultants
Table 5
APRIL 2018 BUDGET ESTIMATE
SOUTH GIFFORD ROAD LANDFILL
TASK 5: Monitoring Well Maintenance
ITEM
BASIS RATE QUANTITY
ESTIMATED
BUDGET
A.- Prufessional,Services
'
Principal
hr $225 0
$0
Professional
hr $160 4
$640
Senior Staff Professional
hr $140 14
$1,960
Subtotal Professional Services
$2,600
C., Subcontract ors:
Environmental Drilling Service
lump sum $2,461 1
$2,461
KugelmannLand'Surveying
lump sum $1,038 1
$1,038
Subtotal Subcontractor Services
$3,499
D: Reimbursable's
Miscellaneous Supplies
day $50 1
$50
Per Diem
day $51 1
$51
Communications Fee
3% labor 0.03 $2,600
$78
Field Vehicle
day $80 1
$80
Subtotal Reimbursables
$209
.TOTAL EMMATED,BUDGET :,TASK 5
$6,308
Notes:
1. Per diem rates were taken from the GSA website for the Vero Beach area (www.gsa.gov).
XR18011 Geosyntec Consultants
Table 6
APRIL 2018 BUDGET ESTIMATE
SOUTH GIFFORD ROAD LANDFILL
TASI{ 6: Brush Clearing Activities
ITEM
BASIS
RATE QUANTITY
ESTIMATED
BUDGET
A." Professional Services .
Principal
hr
$225 0
$0
Professional
hr
$160 4
$640
Senior Staff Professional
hr
$140 26
$3,640
Subtotal Professional Services
$4,280
C: Subcontractors
Santa Cruz Construction
lump sum
1 $4,869
1
$4,869
Subtotal Subcontractor Services
$4,869
D. Reimbursables
Miscellaneous Supplies
day
$50 2
$100
Lodging
day
$131 2
$262
Per Diem
day
$51 2
$102
Communications Fee
3% labor
0.03 $4,280
$128
Field Vehicle
day
$80 2
$160
Subtotal Reimbursables
$652
TOTAL ESTIMATED BUDGET: TASI{ 6 .:
$9,801 .
Notes:
1. Lodging and per diem rates were taken from the GSA website for the Vero Beach area (www.gsa.gov).
XR18011 Geosyntec Consultants
Table 7
APRIL 2018 BUDGET ESTIMATE
SOUTH GIFFORD ROAD LANDFILL
TASK 7: Data Evaluation and Semi -Annual RenortinLy
ITEM
BASIS
RATE QUANTITY
ESTIMATED
BUDGET
A. Professional Services,
Senior Principal
hr
$240 4
$960
Principal
hr
$225 12
$2,700
Professional
hr
$160 30
$4,800
Staff Professional
hr
$120 40
$4,800
Subtotal Professional Services
$13,260
B:'Teehriical%Admtiistra"five Services .
Designer
hr
$130 18
$2,340
Project Administrator
hr
$65 8
$520
Subtotal Technical/Administrative Services
$2,860
C: Reimbutsables.; .,
Communications Fee
3% labor
0.03 $16,120
$484
Specialized Computer Applications
hr
$15 36
$540
8.5"x11" Photocopies
each
$0.12 500
$60
Subtotal Reimbursables
$1,084
TOTAL -ESTIMATED BUDGET : TASK 7