HomeMy WebLinkAbout2018-102SECTION 00942 - Change Order Form
No. 1
DATE OF ISSUANCE: May 10, 2018 EFFECTIVE DATE: May 10, 2018
OWNER: Indian River County
CONTRACTOR Blue Goose Construction.
Project: Forest Park Water Main Ext.
OWNER'S Bid No. WA 2017-008
You are directed to make the following changes in the Contract Documents:
Description: Add/Deduct line items/quantities from contract.
Reason for Change Order: Final Pay Application: Adjust contract amount to reflect actual
constructed material and quantities, and delete contingency.
Attachments: See itemized schedule
CHANGE IN CONTRACT
y�OhtiMISS/p..
PRICE:
Time
Description
Amount
Original Contract Price
$74,920.78
Net Increase (Decrease)
$0.00
from previous Change
.oQi
Orders No.
(days)
Contract Price prior to this
$74,920.78
Change Order:
Net increase (decrease) of
($14,532.38)
this Change Order:
(days or dates)
Contract Price with all
$60,388.40
approved Change Orders:
ACCEPTED:
By:
CONTRACTOR (Signature)
Date: �� f
CHANGE IN CONTRACT TIMES
y�OhtiMISS/p..
Description
Time
Original Contract Time:
(days or dates)
Substantial Completion:
s*
Final Completion:
Net change from previous Change
.oQi
Orders No.:
(days)
Substantial Completion:
Final Completion:
Contract Time prior to this Change
Order:
(days or dates)
Substantial Completion:
Final Completion:
Net increase (decrease) this
Change Order:
(days or dates)
Substantial Completion:
Final Completion:
Contract Time with all approved
Change Orders:
(days or dates)
Substantial Completion:
Final Completion:
RECOMMENDED:
By:
,a, J, / /7: ?? ,
?16 [NEER (Signat e)
Date: 4/�/ 20/
APPROVED:
OWNER (Signature)
Bob Solari, Vice Chairmar
Date: June 5, 2018
APPROVED AS TO FORM
y�OhtiMISS/p..
AND LEGAL SUFFICIENCY
,���'�' • �F�'�
-
BY
s*
DNrL. AN RE1NG0L0
COUNTY ATTORNEY
.oQi
C:\Users\tgormanlAppData\Local\Microsoft\Windows\INetCache\Content.Outlook\7DX40179\CO-1 WA2017-008.docx
00942-1
o=
y ->.w 8•'�:
•'•._ R/lir : �e1� .•'
0
P
U
b
0
U
-H
E
APPLICATION FOR PAYMENT NO.2 - FINAL
To:
Indian River County Utilities
From:
Blue Goose Growers, LLC (CONTRACTOR)
Contract:
1290
PO #:
Project:
Forest Park 6" WM Extension
For Work completed through the date of 04/17/18
1 Original Contract Price:
2 Net change by Change Orders and Written Amendments (+ or
3 Current Contract Price (1 plus 2)
Contractor Purchased Material
4 Total completed and stored to date:
5 Retainage (per Agreement)
of completed work
of stored material $ -
Total Retainage:
6 Total complete and stored to date less retainage (4 minus 5)
7 Less previous Application for Payments
8 DUE THIS APPLICATION (6 MINUS 7)
Accompanying Documentation:
$ 74,920.78
(14,532.38)=
60,388.40
3,827.06
64,215.46
64,215.46
59,046.05
$ 5,169.41
CONTRACTOR'S Certification:
The undersigned CONTRACTOR certifies that (1) all previous progress payments received from OWNER on
account of Work done under the Contract referred to above have been applied on account to discharge
CONTRACTOR's legitimate obligations incurred in connection with Work covered by prior Applications for
Payment numbered 1 through 1 inclusive; (2) title of all Work, materials and equipment incorporated in
said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of
payment free and clear of all Liens, security interests and encumbrances (except such as are covered by a Bond
acceptable to OWNER indemnifying OWNER against any such Lien, security interest or encumbrance); and (3)
all Work covered by this Application for Payment is in accordance with the Contract Documents and not
defective.
Dated: 5 1 oil
State of Florida
County of St Lucie
Blue Goose Growers, LLC
CONTRACTOR
By:
-A�4,o,,�—
Greg Hampto Control r
Subscrib d and sworn to before me this 0 day of l 2018
Notary Public TERESAGORMAN
aR1�Y'y'�� = MY COMMISSION t: FF 945828
My Commission expires: :+= ber 22, 2019
��ms
BondedftuNotaryPublio UnderwritersPayment of the above AMOUNT DUE THIS recommended.
Dated:
Min/11.
L
Indian River County Utilities
Forest Park 6" Water Main Extension
Pay Application 2 - 04/17/18
ITEM NO
'
ITEM DESCRIPTION
CONTRACT
QUANTITIES
UNIT
UNIT PRICE TOTAL AMOUNT
PREVIOUS PERIOD
QUANTITY VALUE
INSTALLED
THIS PERIOD
QUANTITY VALUE
INSTALLED
TOTAL TO DATE
QUANTITY VALUE
INSTALLED
216.1290
PERCENT % COMPLETE
COMPLETE
01c
Install 6" PVC Water Main
695.00
LF
$6.00
$4,170.00
695.00
$4,170.00
$0.00
695.00
$4,170.00
100.00%
100.00%
07b
Install 6" HDPE Horizontal Directional Drill (SDR -11)
including fusion of MJ adaptors
530.00
LF
$38.85
$20,590.50
530.00
$20,590.50
$0.00
530.00
$20,590.50
100.00%
100.00%
16a
Install 6x6" Wet Tap with 6" Gale Valve
1.00
Ea
$900.00
$900.00
1.00
$900.00
$0.00
1.00
$900.00
100.00%
100.00%
16a
Install 44" Wet Tap with 4" Gate Valve
1.00
EaM$250.00
$900.00
1.00
$900.00
$0.00
1.00
$900.00
100.00%
100.00
9
Install MJ Fittin s
0.75
ton
S3.075.00
0.75
$3,075.00
$0.00
0.75
$3,076.00
100.00%
100.00
23
Test Holes / Potholes
35.00
Fla
$8 750.00
35.00
$8 750.00
$0.00
35.00
$8 750.00
100.00%
100.00%
28
Install Tem ora Jum er
1.00
EA
$500.00
1.00
$500.00
$0.00
1.00
$500.00
100.00%
100.00%
29b
Fill Pressure Test Chlorinate&FlushWM
1280.00
LF
$1920.00
1280.00
$1920.00
$0.00
1280.00
$1920.00
100.00%
100.00%
30b
Install & Remove Sam le Paint
3.00
EA
$825.00
3.00
$825.00
$0.00
3.00
$825.00
100.00%
100.00%
30c
Take &Test Bacterialo ical Sam le
6.00
EA
$900.00
0.00
$0.00
$0.00
0.00
$0.00
0.00%
0.00%
65
Saw Cut Remove and Dis ose of As halt
50.00
Ton
$1,500.00
0.00
$0.00
8.25
$247.50
8.25
$247.50
16.50%
16.50%
67a
Install Asphalt Cement Pavement Replacement over
full trench width including Base and Sub -Grade
Compacted
50.00
Ton
$45.001
$2,250.00
0.00
$0.00
1 8.25
$371.25
1 8.25
$371.25
16.50%
16.50%
82
Clear and Grub
1600.00
SY
$5.00
$8,000.00
1600.00
$8,000.00
$0.00
1600.00
S8,000.00
100.00%
100.00%
84
Load and Haul Debris to Landfill
20.00
ton
$25.00
$500.00
20.00
$500.00
$0.00
20.00
$500.00
100.00%
100.00%
86a
Lawn Restoration (Topsoil & Sod) Includes Watering 150.00
SY
$2.25
$337.50
150.00
$337.50
$0.00
150.00
$337.50
100.00%
100.00
86b
Lawn Restoration (Seed and Mulch) Includes
Watering
1600.00
SY
$0.50
$800.00
1600.00
$800.00
$0.00
1600.00
$800.00
100.00%
100.00%
88a
Well Point Dewatering Set Up, Tier Depth up to 25',
Minimum 30'X 30' Work Area
1.00
LS
$3,500.00
$3,500.00
0.00
$0.00
$0.00
0.00
$0.00
0.00%
0.00%
88b
Well Point Dewatering, Additional Points Needed for
Lar er Area or Linear Work
100.00
EA
$25.00
$2,500.00
0.00
$0.00
$0.00
0.00
$0.00
0.00%
0.00%
91
Mobilization, Demobilization, MOT (based on 10%
Labor Cost):
1.00
LS
$6.191.80
$6.191.80
1.00
S6,191.80
$0.00
1.00
$6,191.80
100.00%
100.00%
Contingency
1.00
LS
$6,810.98
$6,810.98
0.00
$0.00
$0.00
0.00
$0.00
0.00%
0.00%
Original Contract Price
$74,920.78
$67,459.80
$618.75
$58,078.55
DELETED WORK
30C
Take & Test Bacterialo ical Sample
-6.00
EA
$150.00
-$900.00
$0.00
0.00
$0.00
0.00%
0.00%
65
Saw Cut Remove and Dispose of Asphalt
-41.75
Ton
$30.00
-$1,252.50
0.00
$0.00
$0.00
0.00
$0.00
0.00%
0.00%
67a
Install Asphalt Cement Pavement Replacement over
full trench width including Base and Sub -Grade
Compacted
-41.75
Ton
$45.00
-$1,878.75
0.00
$0.00
$0.00
0.00
$0.00
0.00%
0.00%
88a
Well Point Dewatering Set Up, Tier Depth up to 25',
Minimum 30'X 30' Work Area
-1.00
LS
S3 500.00
-S3 500.00
$0.00
0.00
$0.00
0.00%
0.00%
88b
Well Point Dewatering, Additional Points Needed for
Larger Area or Linear Work
-100.00
FA
$25.00
-$2,500.00
$0.00
0.00
$0.00
0.00%
0.00%
Contingency
-1.00
LS
1 $6,810.98
-$6810.98
0.00
$0.00
$0.00
0.00
$0.00
0.00%
0.00%
ADDITIONAL WORK
86A
Lawn Restoration (Topsoil & Sod) Includes Watering
872.00
SY
$2.25
$1962.00
705.00
$1586.25
167.00
$375.75
872.00
$1962.00
100.00%
100.00%
79C
Removal of Concrete
12.84
SY
$10.00
$128.40
$0.00
12.84
$128.40
12.84
$128.40
100.00%
100.00%
80
Install Concrete sidewalk
115.50
SY
$1.90
$219.45
50.00
115.50
$219.45
115.50
5219.45
100.00%
100.00%
-$14,632.38
$1,586.25
$723.60
$2,309.85
Material - Concrete
1.00
LS
$656.23
$656.23
$0.00
$0.00
0.00
$0.00
0.00%
0.00%
Material Asphalt
1.00LS
$623.83
$623.83
$0.00
$0.00
0.00
$0.00
0.00%
0.00%
Material Sad
1.00
LS
$2 568.00
$2,547.00
$0.00
$0.00
0.00
$0.00
0.00%
0.00%
$3,827.06
$60,388.40
$69,046.06
$1,342.35
$60,388.40
Amount Completed to Date
$ 60,388.40
Contractor purchased material
$ 3,827.06
Total Completed & Stored Less Retainage
$64,215.46
Less Previous Payment
$ 59,046.05
Amount Due Contractor
$ 5,169.41
K\1-Projects\7- Projects Amrded\INDIAN RIVER UTILITIES LABOR CONTRACT\Billing\1290 Forest Park\1290 IRCU Forest Park -Pay application 2 FINAL 2017.04.17
1 of 2 SOV
NAIL FARMS, INC. Invoice 26963
PO BOX 360054
MELBOURNE, FL 32936
(321)254-6746 APPROVED
thesodfather@aol.com
By Bryan Crain at 7:45 am,, Nov 29, 2097
BILLTO _.._ _ ...
Blue Goose Growers
PLEASE PAY
1900 Old Dixie Highway DATE
Fort Pierce, FL 34946 .11/15/2017
JOB DESCRIPTION
N' .0f
ACTIVITY
OTY RATE AMOUNT
Bahia Pallet 6960 9 100.00 900.00T
Floratam Pallet 6961 8 150.00 1,200.00T
Thank you for your business! SUBTOTAL 2,100.00
TAX (7%) 147.00
TOTAL 2,247.00
216202.6315 A2161290 H 6960.-
$963.00 TOTAL DUE
216202.6315 A2161290 H 6961 - $2,247.��
$1,284.00 THANK Y .
NAIL FARMS, INC.
PO BOX 360054
MELBOURNE, FL 32936
(321)254-6746
thesodfather@aol.com
BILL TO
Blue Goose Growers
1900 Old Dixie Highway
Fort Pierce, FL 34946
JOB DESCRIPTION
Vero
Invoice 26992
APPROVED
By Bryan Crain at 4:16 pm, Nov 20, 20,17
DATE .
11/16/2017
ACTIVITY
OTY
RATE AMOUNT
—__....... _.._ _.__... _.__.� _._...._.. _ ._._. �_. __.._......-
Floratam Pallet 1250!6961
.._..-.
-- ......_....__.
y2-1'
._...._...__ _...._... _.._._.._
1X.A� 1,8
Bahia Pallet
3
100.00 300.00T
Thank you for your business!
SUBTOTAL
- ev
TAX (7%)
TOTAL
216202.6315 A2161250 H 6961- $1926.00
_ ........ __..�_..._
216202.6315 A2161290 H 6960 - $321.00
TOTAL'DUE
$ 2^7.x- Z�e�
THANKYOU l�
r
HANGER CONSTRUCTION INDUSTRIES, INC.
P.O. Box 15065
est PaImBeach, FL 33416
.61) 793-9400
Plant: FT Pierce
106128
Blue Goose Growers, LLC
1900 Old Dixie Highway
Ft. Pierce FL 34946
INVOICE
DATE- j NQM13ER I PAGh
03/02/18 1 1371022 1 11
IWAW
AFAV
e$ ! Iax CEMEX
CEMEX Construction Materials Florida, LLC
CEMEX One
Bay Crete
Kennedy Concrete
-11+t�11�t1�1[[rlrlr11111Jill
11�1[�rr[r[�nut'1',Ili[u�l[[
INV2INS.A000379
BLUE GOOSE CONSTRUCTION
PO BOX 14709
FORT PIERCE FL 34979-4709
N
INVOICE
Date:
031,0112018
Invoice No:
9437245034
Terms:
Net 15th
Payment Due On:
04115/2018
Territory Manager:
-HAGENS, CURTIS
Job No:
14554530
Legal Address:
400 WOODLAND DR.
Customer Job No.
1290
Account N0:
3172586
Account Name:
BLUE GOOSE CONSTRUCTION
For All inquiries Call:
833-675-7375
Remit To:
CEMEX I PO Box 7301971 Dallas, TX 75373-0197
PAGE 1 OF 7
PO Number: 1290 DELIVERY ADDRESS: 400 WOODLAND DR., VERO BEACH, FL, 32961
Ship Date Dellvary Ref # Product Code 1 Description Qty UOM Net Price By UOM Units Amount Freight FTX
03101@018 8078504689 36555793 1202749 ENVIRONMENTAL CHARGE 1,000 EA $20.00 1 PC 1.000 $20.00 $0.00 T
031016018 8078504689 35555793 1247818 FUEL SURCHARGE 1,000 EA $17.50 1 PC 1.000 $17.50 $0.00 T
03101!1018 8078504688 35555793 1557665 2500 REG 3.500 YD3 $99.50 1 YD3 3.500 $34825 $0.00 T
0310112018 8078504688 35555793 1571252 SERV,PAYLOAD,CHARGEOVER3-8,CUBICYA 1.000 PC $200.00 1 PC 1.000 $200.00 $0.00 T
03!016018 8078504688 35555793 1586055 SERV,CONCRETE HANDUNG FEE PER LOAD 1.000 EA $10.00 1 EA 1.000 $10.00 $0.00 T
03/016018 8078504688 35555793 1589831 MONOFIUUAENT2IBER 2.630 LB $6.67 1 LB 2.630 $17.54 $0.00 T
PO Subtotal 340 Yards 0.00 Tons $613.29 Material $0.00 Freight 1 $0.00 Other $4294 TaX • $656.23 Total
APPROVED 1290/6921 �
By Bryan Crain at 9:08 arra, Mar 26, 2018 ,�01
.•Hartir>trararcrrrerarar>trararar>tr�ra,g ✓��
«216202.6315 A 2161290 H 6921
rtrar>arar�rarar�rerar a uNrarar>trrrei
3.50 Yards 000 Tons $0.00 Freight $0.00 Other $42-94 Tax 5058.231nvolce Total 1
rw nivotss tncoWratea hareinby wfinw aBinap,wwA*UL,ainwue CraMArp1k&%M BAM. sa-- Stw mm 7erma erbcamiu e.smrs owownerdSsOers Oreucoo'a=#= pCV&M mass sod»sncns"iaa)as tukfsatfa@,eaets
invoke rAmermon awe, meas aeat, w*wahm Wss,nted hww tarpmeons sMpene were deivefed ssm3co:ed wW further ex M5* egM to PaY taacowaa, rad, this Aveemnt Uftmsf s1wBaw eaeY.e Paymnu.