HomeMy WebLinkAbout2018-116WORK AUTHORIZATION DIRECTIVE
No. 2018-003
615` Drive Water Main Replacement
BLUE GOOSE CONSTRUCTION
DATE OF ISSUANCE: June 11, 2018
ATTACHMENT 2
EFFECTIVE DATE: June 19, 2018
OWNER: Indian River County
CONTRACTOR: Blue Goose Construction
CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS
AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001, AWARDED September 9, 2014
PROJECT: 61" Drive Water Main Replacement
COUNTY UTILITY PROJECT NO.: UCP N/A CONTRACTOR'S PROJECT NO.: N/A
COUNTY WIP. No. 47123536-044699-1852
You are directed to proceed promptly with the following work:
Description: Install 6" directional bore to replace failed existing water main along 61" Drive.
Method of determining Contract Price:
M Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of
County Commissioners on September 9, 2014 to Blue Goose Construction, Inc.
M Lump Sum
0 Cost of the Work
The Cost of Labor, Contingency and Contract Time is summarized below:
Labor Cost =
$27,775.00
Estimated
90 days from NTP
Contract Time:
ACCEPTED:
By: J
Blue Goose Construction
Labor Contractor
G
Date: //f Zit
RECOM �EDQ:
By:
John M. Boyer, P. .
Utilities Engineer
Date:
APPROVED:
By: /
Tndian Ri-,Te-r
Peter D. O'Bryan, C
O
91
U
7:1
t~
ro
0
U
4A
O
x
Q)
U
2
44
Date: June 19, 218
nn��``��RCOU����"
APPROVED AS TO Folk 4R .._-�.,.w
AND LEGAL SUFFICIENO
BY
L')YLANI I EiI,!t ��LCJ
COUNTY ATTORNEY
F:\Utilities\UTILITY - Engineering\Projects - Capital Projects\18-0516 61stDR WaterRep\Agenda Item\18-0619 WA Approval\Work
Authorization No. 2018-003.doc
Indian River County Department of Utilities
CONSTRUCTION BUDGET - Labor Contract & Direct Purchase
Project: 61st Drive Water Main Replacement Attachment 1
By: John M. Boyer, P.E.
Date: May 30, 2018
LABOR COSTS
MATERIAL COSTS
(IRC Direct Purchase)
Bid
Bid Item
Estimated
Unit of
Labor Unit
Total Labor
Material Unit
Total Material
Item No.
Description
Quantity
Measure
Price
Price
Price
Price
01c
Install 6" PVC Water Main
40
LF
$6.00
$240.00
$4.80
$192.00
07b
Install 6" HDPE Horizontal Directional Drill (SDR -11)
200
LF
$38.85
$7,770.00
$6.00
$1,200.00
including fusion of MJ adaptors
9
Install Mechanical Restrained Joint Ductile Iron Fitting
0.25
Ton
$4,100.00
$1,025.00
$4,100.00
$1,025.00
10a
Install Mechanical Restrained Joints on Existing Main, 3"
12
EA
$60.00
$720.00
$70.00
$840.00
through 8"
13a
Grout Pipe Abandoned and Left in Place, 3" through 8"
220
LF
$12.00
$2,640.00
$12.00
$2,640.00
23
Test Holes / Potholes
4
EA
$250.00
$1,000.00
$0.00
$0.00
28
Install Temporary Jumper and Remove after FDEP
1
EA
$500.00
$500.00
$0.00
$0.00
Clearance
29a
Fill, pressure test, chlorinate, and flush water main, 4"
240
LF
$1.50
$360.00
$0.00
$0.00
through 8"
30b
Install Sample Point per County Detail, Remove after
2
EA
$275.00
$550.00
$0.00
$0.00
FDEP Clearance
67b
Remove, Dispose of and/or Replace Rock Base Course,
5
Ton
$20.00
$100.00
$50.00
$250.00
Compacted to County Specifications
67c
Remove, Dispose of and/or Replace Stabilized Sub-
5
Ton
$14.00
$70.00
$50.00
$250.00
Grade Course, Compacted to County Specifications
86a
Lawn Restoration (Topsoil & Sod) Includes Watering
100
SY
$2.25
$225.00
$2.75
$275.00
88a
Well Point Dewatering Set Up, Tier Depth up to 25',
2
LS
$3,500.00
$7,000.00
$0.00
$0.00
(Minimum 30'X 30' Work Area)
88b
Well Point Dewatering, Additional Paints Needed for
30
EA
$25.00
$750.00
$0.00
$0.00
Larger Area or Linear Work
91
Mobilization, Demobilization, MOT (based on 30% Labor
1
LS
$2,300.00
$2,300.00
$0.00
$0.00
Cost):
Subtotals:
Labor:
$25,250.00
Material:
$6,672.00
Contingency:
10%
$2,525.00
30%
$667.20
Labor:
$27,775.00
Material:
$7,339.20
TOTAL CONSTRUCTION COST:
$35,114.20
FDEP PERMIT FEE:
n/r
Eng. Design (by Staff):
$0.00
Geotechnical Testing:
$0.00
Stake -Out & As -Built Survey (by Staff):
$0.00
TOTAL PROJECT BUDGET:
$35,114.20
F:\Utilities\UTILITY-Engineering\Projects Capita l Projects\ 18-0516 61stDR WaterRep\Cost Estimate- 61stDr Water. As,