HomeMy WebLinkAbout2018-117WORK AUTHORIZATION DIRECTIVE
No. 2018-004
12th Street SW Water Service Replacement
BLUE GOOSE CONSTRUCTION
DATE OF ISSUANCE: May 30, 2018
ATTACHMENT 1
EFFECTIVE DATE: June 19, 2018
OWNER: Indian River County
$2,113.13
CONTRACTOR: Blue Goose Construction
k
a)
CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS
p
AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001, AWARDED September 9, 2014
4-1
PROJECT: 12th Street SW Water Service Replacement
U
COUNTY UTILITY PROJECT NO.: UCP N/A CONTRACTOR'S PROJECT NO.: N/A
0
COUNTY WIP. No. N/A
You are directed to proceed promptly with the following work:
-J
0
Description: Replace existing double water service.
U
4-10
Method of determining Contract Price:
EN Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of
County Commissioners on September 9, 2014 to Blue Goose Construction, Inc.
0 Lump Sum
M Cost of the Work
The Cost of Labor, Contingency and Contract Time is summarized below:
Labor Cost =
$2,113.13
Estimated
90 days from NTP
Contract Time:
ACCEPTE
By: /�� /rf!Ef,
Blue Goose Construction
Labor Contractor
Date:
RECOM ESDEEDD:
By: P'`• ��
John M. Boyer, .E.
Utilities Engineer
Date:
APPROVED:
1�
to
w
M
By:
Indian River C, t o��F9s
Peter D. O'Bryan, Ch
Date: June 19, 201$
Qi
APPROVED AS TO FORM •Rj�ERco� .
AND LEGAL SUFFICIENCY
BY �..r...,_
DYLAN RElNGOLD
COUNTY ATTORNEY
F:\Utilities\UTILITY - Engineering\Projects - Capital Projects\18-0521 2325 12th St SW\Work Authorization No. 2018-004.doc
Indian River County Department of Utilities
CONSTRUCTION BUDGET - Labor Contract & Direct Purchase
Project: 12th Street SW Water Service Replacement
(Vero Highlands)
By: John M. Boyer, P.E.
Date: June 11, 2018
Attachment 2
LABOR COSTS
MATERIAL COSTS
(IRC Direct Purchase)
Bid
Item No.
Bid Item
Description
Estimated
Quantity
Unit of
Measure
Labor Unit
Price
Total Labor
Price
Material Unit
Price
Total Material
Price
18k
Install Water Service -Double Long with 1" meter and
box (more than 50 ft)
1
EA
$450.00
$450.00
$1,169.70
$1,169.70
181
Install 2" PVC Service Casing
1
EA
$400.00
$400.00
$25.00
$25.00
181
Install Water Service Double Long with 2" Saddle and
Corp Stop at Main (Abandon Existing Service)
1
EA.
$600.00
$600.00
$26.00
$26.00
26b
Install or Replace Existing Service Meters (Connect
Customer -Side Plumbing)
1
EA
$250.00
$250.00
$100.00
$100.00
86a
Lawn Restoration (Topsoil & Sod) Includes Watering
50
SY
$2.25
$112.50
$2.75
$137.50
91
Mobilization, Demobilization, MOT (based on 10% Labor
Cost):
1
LS
$200.00
$200.00
$0.00
$0.00
Subtotals:
Labor:
$2,012.50
Material:
$1,458.20
Contingency:
5%
$100.63
5%
$72.91
Labor:
$2,113.13
Material:
$1,531.11
TOTAL CONSTRUCTION COST:
$3,644.24
FDEP PERMIT FEE:
n/r
Eng. Design (by Staff):
n/r
Geotechnical Testing:
n/r
Stake -Out & As -Built Survey (by Staff):
n/r
TOTAL PROJECT BUDGET:
$3,644.24
F:\Utilities\UTILITY- Engineering\Projects -Capital Projects\18-0521 232512th St SW\Cost Estimate - 12th Street SW.xlsx