Loading...
HomeMy WebLinkAbout2018-117WORK AUTHORIZATION DIRECTIVE No. 2018-004 12th Street SW Water Service Replacement BLUE GOOSE CONSTRUCTION DATE OF ISSUANCE: May 30, 2018 ATTACHMENT 1 EFFECTIVE DATE: June 19, 2018 OWNER: Indian River County $2,113.13 CONTRACTOR: Blue Goose Construction k a) CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS p AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001, AWARDED September 9, 2014 4-1 PROJECT: 12th Street SW Water Service Replacement U COUNTY UTILITY PROJECT NO.: UCP N/A CONTRACTOR'S PROJECT NO.: N/A 0 COUNTY WIP. No. N/A You are directed to proceed promptly with the following work: -J 0 Description: Replace existing double water service. U 4-10 Method of determining Contract Price: EN Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. 0 Lump Sum M Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below: Labor Cost = $2,113.13 Estimated 90 days from NTP Contract Time: ACCEPTE By: /�� /rf!Ef, Blue Goose Construction Labor Contractor Date: RECOM ESDEEDD: By: P'`• �� John M. Boyer, .E. Utilities Engineer Date: APPROVED: 1� to w M By: Indian River C, t o��F9s Peter D. O'Bryan, Ch Date: June 19, 201$ Qi APPROVED AS TO FORM •Rj�ERco� . AND LEGAL SUFFICIENCY BY �..r...,_ DYLAN RElNGOLD COUNTY ATTORNEY F:\Utilities\UTILITY - Engineering\Projects - Capital Projects\18-0521 2325 12th St SW\Work Authorization No. 2018-004.doc Indian River County Department of Utilities CONSTRUCTION BUDGET - Labor Contract & Direct Purchase Project: 12th Street SW Water Service Replacement (Vero Highlands) By: John M. Boyer, P.E. Date: June 11, 2018 Attachment 2 LABOR COSTS MATERIAL COSTS (IRC Direct Purchase) Bid Item No. Bid Item Description Estimated Quantity Unit of Measure Labor Unit Price Total Labor Price Material Unit Price Total Material Price 18k Install Water Service -Double Long with 1" meter and box (more than 50 ft) 1 EA $450.00 $450.00 $1,169.70 $1,169.70 181 Install 2" PVC Service Casing 1 EA $400.00 $400.00 $25.00 $25.00 181 Install Water Service Double Long with 2" Saddle and Corp Stop at Main (Abandon Existing Service) 1 EA. $600.00 $600.00 $26.00 $26.00 26b Install or Replace Existing Service Meters (Connect Customer -Side Plumbing) 1 EA $250.00 $250.00 $100.00 $100.00 86a Lawn Restoration (Topsoil & Sod) Includes Watering 50 SY $2.25 $112.50 $2.75 $137.50 91 Mobilization, Demobilization, MOT (based on 10% Labor Cost): 1 LS $200.00 $200.00 $0.00 $0.00 Subtotals: Labor: $2,012.50 Material: $1,458.20 Contingency: 5% $100.63 5% $72.91 Labor: $2,113.13 Material: $1,531.11 TOTAL CONSTRUCTION COST: $3,644.24 FDEP PERMIT FEE: n/r Eng. Design (by Staff): n/r Geotechnical Testing: n/r Stake -Out & As -Built Survey (by Staff): n/r TOTAL PROJECT BUDGET: $3,644.24 F:\Utilities\UTILITY- Engineering\Projects -Capital Projects\18-0521 232512th St SW\Cost Estimate - 12th Street SW.xlsx