HomeMy WebLinkAbout2018-146Change Order #01 PROJECT: US 1 Air Release Valve and 24" Forcemain Replacement DATE OF ISSUANCE: July 31, 2018 OWNER: Indian River County Dept. of Utility Services CONTRACTOR: Johnson Davis OWNER's Project No.: 2018-047 You are directed to make the following changes in the Contract Documents: Add replacement of second air release valve and increase the size of the temporary by-pass force mains to 12 -inches diameter. Reason for Change Order: IRC staff found an ARV immediately south of the subject ARV to be leaking. Since it is imperative that the leaking ARV be replaced it is being added to the contract. This CO essentially doubles the scope of work and cost of the original project. Temporary by-pass force main diameter will be increased to ensure wastewater flow may be maintained. Attachments: See itemized schedule CHANGE IN CONTRACT PRICE: Time Description Amount Original Contract Price $124,000.00 Net Increase (Decrease) $0.00 from previous Change Orders No. : (days) Contract Price prior to this $124,000.00 Change Order: Net increase (decrease) of $128,658.00 this Change Order: (days or dates) Contract Price with all $252,658.00 approved Change Orders: ACCEPTED: f N TOR (Siignature) te: CHANGE IN CONTRACT TIMES Description Time Original Contract Time: (days or dates) Substantial Completion: Final Completion: Net change from previous Change Orders No.: (days) Substantial Completion: Final Completion: Contract Time prior to this Change Order: (days or dates) Substantial Completion: Final Completion: Net increase (decrease) this Change Order: (days or dates) Substantial Completion: Final Completion: Contract Time with all approved Change Orders: (days or dates) Substantial Completion: Final Completion: RECO ENDED: By: U ities Engineer ( nature) Date: a� 0 U ro 0 U 4-10 CphSMISS/011- ; FAUtilities\UTILITY - Engineering\Projects - Capital Projects\18-0125 ARV Replacement - US 1 FM\Construction\Change Orders\009E he O r 01 . ocx 00942 - Change Order 01 A= C3 Y 00942-1 DYLAN REINGOLD GOUNTY ATTORNEY 698 J01hNS0*VA HS 6VC 604 11lt.1AZ ❑1l DRIVE Ab L tsr t.t.I. r1. M.If!-1694 rnO.Ye 561-5.18-11-0 r: u: s61sa5 ssa cr C0430ar 28 July,'_018 Project: US 1 Air Release Valve and 24" Forcemain Replacement Date: 28 July, 2018 Bid Bid Item Item No. Description 1 Install & Remove Temporary 8" By -Pass Forcemain (801f +/-) 2 Install 24" Line Stops 3 Remove Existing 24" DIP and Replace with 24" PVC Forcemain (201f+/-) 4 Remove & Replace 2" ARV & Manhole 5 Restoration (Sod, Asphalt, Etc.) 6 Public Construction Bond 7 Mobilization 8 Force Account: Change Order #1 Bid Bid Item Item No. Description C01 Add: Install & Remove Temporary 12' By -Pass Forcemain (2001f +/-, total). Includes 4 wet taps, all fittings, restraints, etc. (Two Locations) CO2 Add: Install 24" Line Stops CO3 Add: Remove Existing 24" DIP and Replace with 24" PVC Forcemain (201f 004 Add: Remove & Replace 2" ARV & Manhole COS Add: Restoration (Sod, Asphalt, Etc.) C06 Add: Mobilizationto 2nd ARV C07 Delete: 8" By -Pass & Related . Sincerely, Richard.l. Miller I Project Pohna;eF Jive, Lantana. FL 33462 'Construct with Confidence - (561) 815-3023 - cell (561) 588.1170 -office 15611270 -1814 - direc t (561) 585.5252 =/ax ri+eller�jolmsondovis. com Estimated Unitof Unit Total Quantity Measure Price Price 80 LF $25.00 $2.000.00 2 EA $20,000.00 $40,000.00 1 LS $25,000.00 $25,000.00 1 LS $20,000.00 $20,000.00 1 LS $5,000.00 $5,000.00 1 LS $2,000.00 $2,000.00 Subtotal: $94,000.00 1 LS 15000.00 $15,000.00 $15,000.00 Total Bid Amount: $124,000.00 Estimated Unit of Unit Quantity Measure Price 200 LF 2 EA 1 LS 1 LS 1 LS 1 LS -80 LF vc sur • } ,•.",� CA J • „tom Nua.tfk 604141ibatn ome- Umar, Ft. 73a6I • PMne: 561.58&1171 • fre 561 -SYS -5751 Ft. ' . Kites lim- Ft. Pterce, FL MM -P"w 772458.920D • r9 Total Price $128.29 $25,658.00 $20,000.00 $40,000.00 $25,000.00 $25,000.00 $20,000.00 .520,000.00 $S,00o.00 $5,000.00 $15,000.00 $15,000.00 $25.00 -$2,000.00 Total CO 1: $128,658.00 Original Contract Price: $124,000.00 Total Change Orders: $128,658.00 New Contract Price: $252,658.00