HomeMy WebLinkAbout2018-177AMENDMENT NUMBER 1 TO WORK ORDER NUMBER 5
Indian River County Conservation / Public Access for Jones Pier — (FTC No.: 05 -039 -FF)
New Pavilion and Restroom Building Architectural Services
This Amendment 1 to Work Order Number 5 is entered into as of this 1R day of c�f n, P er
2018, pursuant to that certain Continuing Consulting Engineering Services Agreement for Professional Services
entered into as of this 17`h day of April, 2018 (collectively referred to as the "Agreement"), by and between
INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and MBV Engineering,
Inc. ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant
will perform the professional services within the timeframe more particularly set forth in Exhibit C
(Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the
Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and
the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if
fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above.
CONSULTANT:
MBV Engineering, Inc.
Title: Vice President
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY .•��SS!OFJERs''•-
By: 1 , �•
Peter D. O' Bryan Chairni
BCC Approved Date: September 18, 2018 ''`•./Np�gNRI`JEP��'�
Attest: Jeffrey R. Smith, Clerk of Cquq and Comptroller
By:
Approved:
Approved as to form and legal sufficiency:
jv.
Jason Bro%kn, County Admi 'strator
Dylan T. Reingold, County Attorney
EXHIBIT A - SCOPE OF WORK
It is our understanding that the COUNTY intends to construct an approximately 1,040 SF open pavilion
with bathrooms at the Jones Pier Historic parcel located at 7770 Jungle Trail, Vero Beach, FL.
The proposed improvements will consist of architectural design services, survey services and civil
coordination for the design, permitting and CA services for the structures. As such, Donadio &
Associates, Architects, P.A. will be retained by MBV Engineering, Inc. to provide the necessary
architectural design services for the pavilion and bathroom structure and as further described below
in the Scope of Services. MBV Engineering, Inc. will provide the necessary project oversight, additional
civil coordination and plan revisions for the watermain as necessary to support the architectural plans
development and permitting of this structure. A description for each service is provided in below in
further detail.
Design Services
1. Architectural Design
• Establishment of design criteria for the development of the proposed new 1040 SF Pavilion.
• On-site visit for field verification of the existing site conditions.
• Preparation of architectural construction documents consisting of floor plans, elevations,
roof plans and details, life safety plan, code review, schedules, general/construction details,
notes and specifications.
• Coordination with MEP and Structural.
• Coordination with Owners Civil Engineer.
• Preparation of Documents for Building Permit Submittal.
• Responding to Building Permit review comments.
• Preparation of (1) Cost Estimate for each building
2. Mechanical / Electrical Engineering (MEP) Design
• Coordination with Donadio & Associates, Architects, P.A.
• Establish design criteria for ventilation, electrical and plumbing.
• Construction documents and specifications for electrical and plumbing, which include but
are not limited to: floor plans, schedules, electrical and plumbing risers, electrical panels,
reflected ceiling plans, details, etc.
• Utility coordination for new electrical service.
• Preparation of Documents for Building Permit Submittal.
• Responding to Building Permit review comments.
3. Structural Design
• Coordination with Donadio & Associates, P.A.
• Establish structural design criteria
• Review of soil investigative reports as provided by Owner.
• Design and preparation of the following:
D Foundation plans and sections based on a conventional shallow foundation system with
a minimum allowable soil bearing pressure of 2,000 psf.
o Roof framing plan and sections.
o Wind design pressures.
• Structural specifications in short format on plans.
• Building and Wall Sections, Roof Framing Plans, Details and Specifications.
• Preparation of Documents for Building Permit Submittal.
• Responding to Building Permit review comments.
4. Civil Design and Oversight
Consultant will provide design services to support Architect in development of structures as
stated under Task 2. Items associated with this task are listed below:
• Coordination with project Architect and MEP
• Coordination with IRC Parks Division
• (1) Revision to previously designed Civil documents for relocation and / or reorientation of
open pavilion / restroom building should Architect and IRC Parks Division deem appropriate
• Modification to Civil documents to incorporate off-site 6" Watermain design and Fire
Hydrant and Fire Hydrant permitting
• Provide overall project oversight throughout project timeline
• Bidding Assistance and Coordination
This Work Order assumes the proposed pavilion structure will be in conformance with the
pavilion structure as depicted in the Phase I Civil documents and not increase in size by more
than 15%.
The Consultant will not be responsible for any permit fees associated with the project.
5. Surveying and Mapping Services
Route Survey of a portion of the east side of Jungle Trail and the north side of Morningside
Drive/77th Place along Lots 1, 3, 5, 7, 9 and 11, Riverside Estates Sub (PB15-50) as shown on
furnished sketch: Establish Horizontal and Vertical Control; Establish Subdivsion control;
establish east right of way of Jungle Trail and north right of way/south lot lines of Morningside
Drive (along lots list previously); observe topographic features, improvements, trees and
vegetation in this area from centerline of road to 20± feet north; locate well, water service (if
visible) for each residence and identify house number
6. County Reviews
The Consultant will coordinate with the COUNTY staff during design development and conduct
reviews at 30, 60 and 90 completion phases. COUNTY Parks Division staff shall provide review
comments to Consultant in order for Consultant to be able to incorporate into the design plans
package.
7. Construction Cost Estimate
The Consultant will prepare one Conceptual Cost Estimate to assist COUNTY with preliminary
budget assistance.
BIDDING PHASE
The COUNTY shall be responsible for setting the providing the front-end bid documents, bid opening
date, advertisement of the bid, scheduling the pre-bid meeting, and scheduling the bid opening. The
Consultant will provide the following:
• Preparation of Documents for Bidding
• Attendance at Pre -Bid Meeting and Pre -Construction Meeting
All construction specifications will be on the applicable plans in lieu of specifications manual. The
Consultant will prepare a pdf file of the final bid package for the COUNTY's use in distribution to
prospective bidders via Demandstar.
CONSTRUCTION PHASE
The Consultant will provide the following scope of services during the construction phase:
Architecture
• Shop Drawing review of Architectural items
• Response to Request for Information
• (2) visits during construction
MEP
• Shop Drawing review of MEP items
• Response to Request for Information
• (2) visits during construction
Structural
• Shop Drawing review of Structural items
• Response to Request for Information
• (5) visits during construction
DELIVERABLES
The Consultant shall provide the COUNTY with the following:
• Two (2) hard copies 11" x 17" and 24" x 36" formats of the plans
• One (1) electronic version of the plans in pdf format
• Technical responses for one (1) addenda, as required for clarifying responses from the pre-bid
meeting
EXHIBIT B - FEE SCHEDULE
The COUNTY agrees to pay and the Consultant agrees to accept for services rendered, pursuant to this
Agreement, fees inclusive of expenses in accordance with the following:
Task
Fee
1. Architecture Design
$
7,000
2. MEP Design
$
2,250
3. Structural Design
$
4,000
4. Civil Design and Oversight
$
4,750
5. Surveying and Mapping
$
2,740
Bidding Phase
$
500
Construction Phase
Architecture
$
1,800
MEP
$
450
Structural
$
1,350
Amendment 1 Total
$ 24,840
ADDITIONAL SERVICES
When required by the COUNTY or the Contract Documents, where circumstances exist beyond the
Consultant's control, Consultant shall provide or obtain from others, as circumstances required, those
additional services not listed as part of the Work Order, the Consultant shall notify the COUNTY
promptly prior to commencing said Additional Services, and if agreed upon, will be paid for by County
in accordance with the Master Agreement, Professionals and vendor intended to provide additional
services shall first be approved by the COUNTY, in writing, by the COUNTY's Project Manager.
The COUNTY has selected the Consultant to perform the professional services set forth on this Work
Order. The professional services will be performed by the Consultant for the fee schedule set forth in
this Work Order. The Consultant will perform the professional services within the timeframe more
particularly set forth in this Work Order in accordance with the terms and provisions set forth in the
Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall
conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be
incorporated in each individual Work Order as if fully set forth herein.
EXHIBIT C - SCHEDULE
Upon authorization to proceed by the COUNTY, the above described services will be provided based
on the following schedule:
• Permit -ready Design Plans 45 days from NTP
• Addressing of Permit Agency Comments 14 days from receipt of comments