HomeMy WebLinkAbout2018-189Change Order #02
PROJECT: US 1 Air Release Valve and 24" Forcemain Replacement
DATE OF ISSUANCE: September 28, 2018
OWNER: Indian River County Dept. of Utility Services
CONTRACTOR: Johnson Davis
OWNER's Project No.: 2018-047
You are directed to make the following changes in the Contract Documents:
Add remove & replace drainage structure (MES) and install valve boxes & pads.
Delete Force Account.
Reason for Change Order:
An existing drainage culvert's concrete mitered end section (MES) was found to conflict with
the temporary 12" by-pass force main route. IRC staff directed the Contractor to remove and
replace the MES. IRC Staff also directed Contractor to install valve boxes & concrete pads so
the by-pass tapping valves may be used for future connection.
The Force Account is being deleted for the Final Pay Request.
Attachments: See itemized schedule
CHANGE IN CONTRACT
PRICE:
Time
Description
Amount
Original Contract Price
$124,000.00
Net Increase (Decrease)
$128,658.00
from previous Change
Orders No. :
(days)
Contract Price prior to this
$252,658.00
Change Order:
Net increase (decrease) of
- $14,000.00
this Change Order:
(days or dates)
Contract Price with all
$238,658.00
approved Change Orders:
ACCEPTED:
=at
CTOR (Signature)
1q,
CHANGE IN CONTRACT TIMES
Description
Time
Original Contract Time:
(days or dates)
Substantial Completion:
Final Completion:
Net change from previous Change
Orders No.:
(days)
Substantial Completion:
Final Completion:
Contract Time prior to this Change
Order:
(days or dates)
Substantial Completion:
Final Completion:
Net increase (decrease) this
Change Order:
(days or dates)
Substantial Completion:
Final Completion:
Contract Time with all approved
Change Orders:
(dayts&���a#refi�i
Substantial Completion:
; o�
Final Completion:
RECOM NDED:
lities Engineer ( W nature)
i )
Date: /G QZ/.6
APPROVED:
OWNER Peter D. O181!1yari
Chairman
Date: Ortoher 16, 2018
APPROVED AS TO FORM
ANIS LSGAI,. SUFF101=NOY
el-
F:\Utililies\UTILITY - Engineenng\Projects - Capital Projects\18-0125 ARV Replacement - US 1 FM\Construction\Cgasq� Orde 942 - Chane Order 02
00942 - Change Order 02.docx e T
00942-1 PLAN REINGOLD
J9e)wM-rY AT TSMNEY
W.
R
C
Summary: Change Order #2
2018-047 US 1 ARV Replacement
Indian River County Utilities
Date: September 28, 2018
Labor Cost
Bid Item
No.
Bid Item Description
Estimated
Quantity
Unit of
Measure
Unit
Price
Total Item
Price
Change Order 2
CO2 -1
Add: Remove and Replace Existing Drainage Structure
(Mitered Pipe End), Form and Pour 5 ea Valve Pads (see
Johnson Davis Proposal)
1
EA
$1,000.00
$1,000.00
CO2 -2
Delete: Force Account
(1)
LS
$15,000.00
-$15,000.00
Total Change Order
-$14,000.00
JTb
JOHNSON -DA VIS INC.
604 HILLBRATH DRIVE
LANTANA, FL 33462-1694
PHONE: 561-588-1170 FAX: 561-
585-5252 CU-CO43087
1 October 2018
Indian River County Dept. of Utility Services
180127 1h. Street
Vero Beach FI. 32960
Attention John Boyer, P.E. (Utilities Engineer)
RE: U.S. 1 ARV and 24: Force Main Replacement Project (Additional Work Item)
John,
Johnson -Davis Inc. shall re -install lea. mitered endse tion at 10595 US -1 in Sebastian, as well as form and
pour Sea. valve pads for the lump sum price of $1,000.7
Thank You,
C-Re-mr(IJ. LIcller
Project Manager
4D
604 Hillbrath Drive, Lantana, FL 33462
"Construct with Confidence"
(561) 815-3023 - cell
(561) 588-1170 — office
(561) 270 —1814 — direct
(561) 585-5252 —fax
rheller@johnsondavis.com
APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT G703 PAGE 1 OF 2 PAGES
US 1 Air Release Valve and 24" Forcemain
Replacement
TO CONTRACTOR: PROJECT: APPLICATION NO: TWO Distribution to:
Indian River County -Engineering Division INVOICE NO: 2 _ Owner
1801 27th Street Project # Bid # 2018-047 _ Architect
Vero Beach, FL 32960
Attn: Mr. John Boyer, P.E. PERIOD TO: 9/30/2018 _ Contractor
Contract date: 5/1/2018 _
FROM (CONTRACTOR): VIA (ENGINEER):
Johnson -Davis Inc. Contract: _
604 Hillbrath Drive
Lantana, FL 33462
CONTRACT FOR: US 1 Air Release Valve and 24" Forcemain Replacement
CONTRACTOR'S CERTIFICATE FOR PA MENT Application is made for Payment, as shown below, in connection with the Contract. Continuation Sheets, AIA Document G703, is attached.
CHANGE ORDER SUMMARY
Change Orders approved in
ADDITIONS
DEDUCTIONS
previous months by Owner
114,658.00
3. CONTRACT SUM TO DATE (Line 1 + 2)
TOTAL
0.00
0.00
Approved this Month
0.00
(Column G on G703)
Number
Date Approved
5. RETAINAGE
issued and payments received from the Owner, and that current payment shown
Change Order #01
07/31/18
128,658.00
herein is now due.
Change Order #02
10/16/18
0.00
(14,000.00)
(Line 3 less Line 4)
0.00
CONTRACTOR: Johnson -Davis, Inc.
TOTAL 1
128,658.00
14,000.00
Net change by Change Orders 114,658.00
1. ORIGINAL CONTRACT SUM
$
124,000.00
2. Net change by Change Orders
$
114,658.00
3. CONTRACT SUM TO DATE (Line 1 + 2)
$
238,658.00
4. TOTAL COMPLETED & STORED TO DATE
$
238,658.00
(Column G on G703)
FOR PAYMENT (Line 6 from prior Certificate)
5. RETAINAGE
issued and payments received from the Owner, and that current payment shown
8. CURRENT PAYMENT DUE
a. 0% Retainage $
$ 134,802.68
herein is now due.
(Column D + E on G703)
$ -
b. % of Stored Material $
(Line 3 less Line 4)
(Column F on G703)
CONTRACTOR: Johnson -Davis, Inc.
State of: FLORIDA County of:
Total Retainage (Line 5a + 5b or
Total in Column I of G703)
$
LAfiISADITU PELKEY
The undersigned Contractor certifies that to the best of the Contractor's Knowledge,
6. TOTAL EARNED LESS RETAINAGE
$ 238,658.00
information and belief the Work covered by this Application for Payment has been
(Line 4 less Line 5 Total)
completed in accordance with the Contract Documents, that all amounts have been
7. LESS PREVIOUS CERTIFICATE
paid by the Contractor for Work for which previous Certificates for Payment were
FOR PAYMENT (Line 6 from prior Certificate)
$ 103,855.32
issued and payments received from the Owner, and that current payment shown
8. CURRENT PAYMENT DUE
$ 134,802.68
herein is now due.
9. BALANCE TO FINISH
$ -
(Line 3 less Line 4)
CONTRACTOR: Johnson -Davis, Inc.
State of: FLORIDA County of:
Palm Beach
Subscribed and sworn to before me this 02nd day of October 2018
f PUB,4
LAfiISADITU PELKEY
Notary Public: --�_
OO
r
N�
Commission X GG 157707
Expires January 22, 2022
By: Date: 10/2/2018
My Commission expires: 01-22-2022
''FOF'
aettdedTINU& 0Notarysernce:
RobertA. Hiv r, V.P.
n./ n - n G
CERTIFICATE FOR PAYMENT
In accordance with the Contract Documents, based on on-site observations and the
data comprising the above application, the Architect certifies to the Owner that to the
best of the Architect's knowledge, information and belief the Work has progressed as
indicated, the quality of the Work is in accordance with the Contract Documents, and
the Contractor is entitled to payment of the AMOUNT CERTIFIED.
AMOUNT CERTIFIED ................................... .
(Attach explanation if amount certified differs from the amount applied for.)
ARCHIT T'
By: Date: G` 4
�h%rrtificate is not negotiable. a AMOUNT CERTIFIED is payable onl to the
tra, named herein. Issuance, payment and acceptance of payment are without
judice to any rights of the Owner or Contractor under this Contract.
IRC PROJECT NO. IRC, -2018-047
US 1 Air Release Valve and 24" Forcemain Replacement
PAY APP NO. 2
US1-Air Release Valve and 24" Forcemain
SCHEDULED VALUE
PREVIOUS APPLICATION
THIS PERIOD
TOTAL COMPLETED
% MATERIALS
BALANCE TO FINISH
Item No. ., a ----._.., -QlY ( UNIT
Unit Price Amount _ ,QUANTITY
Amount
QUANTITY _ Amount_ __.
_ QUANTITY 1;;- Amount
STORCD
QUANTITY Amount
2,000.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
80.00
,000.002
2,000.00---
1
Install & Remove Temporary 8" By -Pass Forcemain (80 LF +/-)
80
LF
$ 25.00
40,000.00
0.00
2.00
40,000.00
2.00
40,000.00
100.00%
0.00
0.00
0.00
2
Install 24" Line Stops
2
EA
$ 20,000.00
Remove Existing 24" DIP and Replace with 24" PVC Forcemain
25,000.00
0.00
1.00
25,000.00
1.00
25,000.00
100.00%
0.00
0.00
0.00
3
(20 LF +/-, Night Work)
1
LS
$ 25,000.00
20,000.00
0.00
1.00
20,000.00
1.00
20,000.00
100.00%
0.00
0.00
0.00
5
Remove &Replace 2" ARV and Manhole
1
LS
$ 20,000.00
5,000.00
0.00
1.00
5,000.00
1.00
5,000.00
100.00%
0.00
0.00
0.00
6
Restoration (Sod, asphalt, etc.)
1
LS
$ 5,000.00
2,000.00
0.00
1.00
2,000.00
1.00
2,000.00
100.00%
0.00
0.00
0.00
7
Public Construction Bond
1
LS
$ 2,000.00
Mobilization, Demobilization, MOT refer to Section 1.03 for
15,000.00
0.00
1.00
15,000.00
1.00
15,000.00
100.00%
0.00
0.00
0.00
8 '
Max. Amount
1
LS
$ 15,000.00
15,000.00
0.00
1.00
15,000.00
9
Force Account
1
LS
$ 15,000.00
co 01
Site 1
25,658.00
120.00
15,394.80
80.00
10,263.20
200.00
25,658.00
100.00%
0.00
0.00
0.00
Add:lnstall & Remove Temporary 12" By -Pass Forcemain
200
LF
$ 128,29
40,000.00
2.00
40,000.00
0.00
0.00
2.00
40,000.00
100.00%
0.00
0.00
0.00
Add:lnstall 24" Line Stops
2
EA
$ 20,000.00
Add: Remove Existing 24" DIP and Replace with 24" PVC
25,000.00
1.00
25,000.00
0.00
0.00
1.00
25,000.00
100.00%
0.00
0.00
0.00
Forcemain
1
LS
$ 25,000.00
20,000.00
1.00
20,000.00
0.00
0.00
1.00
20,000.00
100.00%
0.00
0.00
0.00
Add:Remove & Replace 2" ARV & Manhole
1
LS
$ 20,000.00
5,000.00
0.00
1.00
5,000.00
1.00
5,000.00
100.00%
0.00
0.00
0.00
Add:Restoration (Sod, Asphalt, Etc)
1
LS
$ 5,000.00
15,000.00
1.00
15,000.00
0.00
0.00
1.00
15,000.00
100.00%
0.00
0.00
0.00
Add:Mobilizatiopn to 2nd ARV
1
LS
$ 15,000.00
-2,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
-80.00
-2,000.00
Delete: 8" By -Pass & Related
-80
LF
$ 25,00
Add: Remove & Replace Existing Drn Structure (Mitered Pipe
1,000.00
0.00
0.00
1.00
1,000.00
1.00
1,000.00
100.00%
0.00
0.00
0.00
CO2 -1
End Form & Pour Valve Pads
1
EA
$ 1,000.00
-15,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
-1.00
-15,000.00
CO2 -2
Delete Force Account
-1
LS
$ 15,000.00
238,658.00
115,394.80
123,263.20
0.00
238,658.00
0.00
0.00
SUB TOTAL
US1-Air Release Valve and 24" Forcemain
Replacement
TOTAL 238,658.0j
TOTAL 115,394.80
TOTAL 123,263.20
TOTAL 238,658.00
TOTAL 0.00
TOTAL 0.00
AMOUNT COMPLETED TO DATE
MATERIALS STORED TO DATE
SUB -TOTAL MATERIALS STORED AND COMPLETE TO DATE
RETAINAGE OF WORK COMPLETED AT 0%
TOTAL COMPLETED AND STORED LESS RETAINAGE
LESS PREVIOUS PAYMENT
AMOUNT DUE CONTRACTOR
$238,658.00
$0.00
$238,658.00
$0.00
$238,658.00
$103,855.32
$134,802.68