Loading...
HomeMy WebLinkAbout1994-004 9�1 `t 12/14/93(,' ?EMENT)RBZ(blf) RECEIVED CIVED i R 4TH STREET WIDENING, JAN - 51994 DRAINAGE IMPROVEMENTS, AND INTERSECTION IMPROVEMENYS PROFESSIONAL CIVIL ENGINEERING AGREEMENT � � fj�� THIS AGREEMENT, entered into this / day of \- /, 199w, by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida, hereinafter referred to as the COUNTY, and KEITH AND SCHNARS, INC. , Stuart, Florida, hereinafter referred to as the ENGINEER, WITNESSETH The COUNTY and the ENGINEER, in consideration of their mutual covenants, herein agree with respect to the performance of professional engineering services by the ENGINEER and the payment for those services by the COUNTY as set forth below. This agreement shall be referred to as the "MASTER AGREEMENT" under which future work orders may apply. The ENGINEER shall provide professional engineering and related services for the COUNTY in all phases of the project described as 4th Street Road Widening, Drainage Improvements, and Intersection Improvements at 4th Street and Old Dixie, from just west of U.S. Highway 1 to West of Old Dixie Highway; serve as the COUNTY' S professional representative for the project as set forth herein; and shall giveprofessional engineering advice to the COUNTY during the performance of the services to be rendered. SECTION I - PROJECT LIMITS The project limits shall be 4th Street right-of-way from west of US Highway 1 to approximately 500' west of Old Dixie Highway, U.S. 1 right-of-way in the vicinity of 4th Street and adjacent areas needed for stormwater management and related work. SECTION II - COUNTY OBLIGATIONS The COUNTY agrees to provide the following material, data, or services as required in connection with the work to be per- formed under this Agreement: A. Provide the ENGINEER with a copy of any preliminary data or reports available. B. Provide the ENGINEER with all available drawings, surveys, right-of-way maps, and other documents in the possession of the COUNTY pertinent to -the project. C. The COUNTY shall be responsible for acquiring all right-of-ways, easements and other rights in land as necessary to complete the project. D. The COUNTY shall make provisions for the ENGINEER to enter upon public or private property as required for the ENGINEER to perform his services. E. The COUNTY will promptly execute all permit applica- 1 1 ^� tion: iecessary to expedite t acquisition of any • local, state or federal permits made necessary by the project. SECTION III - SCOPE OF SERVICES The ENGINEER agrees to perform professional engineering and related services in connection with the project as required and as set forth in the following: A. General 1 . The ENGINEER will endeavor not to duplicate any previous work done on the project. After written authorization to proceed, the ENGINEER shall consult with the COUNTY to clarify and define the COUNTY' S requirements for the project and review all available data. 2 . The ENGINEER will attend conferences with the COUNTY and its representatives upon the request of COUNTY. 3 . In order to accomplish the work described under this Agreement in the time frames and conditions set forth in this Agreement, the ENGINEER will observe the following require- ments: a. The ENGINEER will complete his work on the project within the time allowed by maintaining an adequate staff of registered engineers, designers draftsmen, and other - . employees on the work at all times. b. The ENGINEER will comply with all federal, state, and local laws applicable to this project. The ENGINEER will design the project in such a manner as to be in conformance with all applicable federal, state and local laws. All work shall conform to Florida Department of Transportation Roadway and Traffic Design Standards. c. The ENGINEER will prepare all necessary sketches and completed application forms to accompany the COUNTY' S applications for any required federal, state, or local permits. The ENGINEER shall conduct meetings with permitting agencies and obtain guidelines and approval as necessary. d. The ENGINEER will cooperate fully with the COUNTY inorder that all phases of the work may be properly scheduled and coordinated. • e. The ENGINEER will submit a preliminary set of construction plans to any city, district, county, state or federal regulatory agency from which a permit or other approval is required prior to final approval of the design by the Director of the Public Works Department. f. The ENGINEER will contact - all utility companies having installations in the vicinity of the proposed work and notify said companies of the time schedule for construction of the project and relocation of utilities, if any. The ENGINEER will provide the COUNTY with necessary information relative to required utility adjustments or relocations and will show the relocated utilities on thefinal design plans. g. The ENGINEER shall report the status of this 2 sx 41 project toy th' Director of the Public )rks Department upon request and hola all drawings, calculations and related work open to the inspection of the Director or his authorized agent at any time, upon reasonable request. 4. The ENGINEER will furnish additional copies of the drawing, specifications and contract documents as required by the COUNTY for prospective bidders, materials suppliers, federal, state and local agencies from whom approval of the project must be obtained, and other interestedart' p ies, but may charge only for the actual cost of providing such copies. Upon award of the contract, the ENGINEER will furnish to the COUNTY five ( 5) sets ' of the drawings, specifications and reports. The cost of these sets of documents are not included in the basic compensation paid to the ENGINEER, but will be paid as a direct expense. All original documents, survey notes, field books, tracings, and the like including all items furnished to the ENGINEER by the COUNTY pursuant to this Agreement, are and shall remain the property of the COUNTY, and shall be delivered to the COUNTY upon completion of the work. 5. The ENGINEER shall prepare right-of-way maps of sufficient detail for acquisition of new right-of-way. Negotiation for all land rights shall be accomplished by the COUNTY, unless the COUNTY requests the ENGINEER to perform -these services in a subsequent work order to this AGREEMENT. In this event, the ENGINEER shall be compensated for such additional services. 6 . The ENGINEER acknowledges that preparation of applicable permits for the COUNTY' S submittal through governmental regulatory agencies, including St. Johns River Water Management District, Florida Department of Transportation roadway alteration, Department of Transportation drainage connection, FEC Railroad, Indian River Farms Water Control District, Florida Department of Environmental Protection, U.S. Army Corp of Engineers, Environmental Protection Agency, and all other necessary permit applications are included within the scope I R of basic compensation as provided, herein. Any additional work required by regulatory agencies pursuant to regulations established after the date of this Agreement shall be an addi- tional the service and n COUNTY shall compensate the ENGINEER in accordance with SECTION VI - Additional Work, of this Agreement . 7 . County will provide all existing survey data to the Engineer. The ENGINEER shall perform field surveys as determined to be necessary by the ENGINEER and the COUNTY' S Public Works Director for final design and preparation of construction plans for the project and acquisition of new right- of-way. Anticipated land surveying information includes, but may not be limited to: a location survey which will establish the physical location of all visible, aboveground, permanent structures located within the existing and proposed right-of-way and limits of construction; Controlled aerial photography will also be available from the Florida Department of Transportation. 3 s 8 . e project length is one-h mile, more or less. • 9. The Indian River Boulevard typical section east of U.S. 1 shall be available from 4the Florida Department of Transportation. The 4th Street typical section west of U.S. 1 shall be at least a five-lane urban typical with center lane to be a bi-directional left turn lane and closed drainage system and sidewalks. 10 . The intersection improvements are required for 4th Street at Old Dixie Highway. These improvements shall consist of, but not be limited to, turn lanes, drainage, structures, signalization, and signing and marking. The Consultant , shall coordinate the improvements on 4th Street at US 1 with Florida Department of Transportation' s design Consultant for the intersection improvements as required. 11. As a minimum, the Construction Drawings will include cross sections of the right-of-way at 100' intervals, based on field survey information provided by the COUNTY. 12. The survey information provided by the COUNTY will be in the form of AutoCad drawing files (AutoCad Release 12.0) . Additional controlled aerial photography as prepared by FDOT will also be provided by the COUNTY. 13 . Technical specifications are required and will be included on the construction drawings or supplied with contract documents as approved by the Public Works Director. However, the ENGINEER shall show on his Construction Drawings, all technical information and details required to construct non-standard or unusual items not covered by the technical specificationsor by • Florida Department of Transportation (FDOT) specifications. P P 14. Scope of Services P a. The ENGINEER recognizes that the COUNTY may have data which may be used with respect to this project. The ENGINEER will endeavor to utilize . the COUNTY' S data to the most practical extent possible on this project. b. The ENGINEER will attend up to three ( 3) conferences with the COUNTY and its representatives and other interested parties upon request of the COUNTY. Additional conferences will be billable as Additional Services. These meetings are in addition to COUNTY review meetings identified in paragraph h, below. c. The ENGINEER shall arrange for and obtain for the COUNTY, soil survey investigations, including percolation testing. In addition, borings and soil tests and the like shall be performed by an approved soils testing laboratory, to determine dewatering operations, drainage conditions, foundation conditions, suitable subgrade conditions, etc. The County must approve the testing lab being used, based on quotations from three ( 3) established firms. The ENGINEER will arrange for all such explorations and tests as part of his basic service. However, the actual costs of the explorations and soil tests shall be treated as a direct cost to the ENGINEER and paid for by the COUNTY. 4 The ENGINEER shall spare good standard practice designs for the project and shall prepare detailed Construction Drawings for the roadway and drainage structures contained within the project limits. FDOT design standards shall be used for the project. A summary of quantities shall be included. The summary of quantities shall be provided on the Construction Drawings and also provided in an 8-1"x 11" format, similar to a standard bid tab sheet. e. A minimum of 100 ' right-of-way is required from west of US 1 to west of Old Dixie Highway. Right-of-way maps, legal description, title search, and updates are required for this project. Additional right-of-way may be required on US 1 on the northwest quadrant to construct a southbound right turn lane. The Construction Drawings for this project will consist of the following sheets: 1. Cover Sheet. 2 . General Notes and Summary of Quantities Sheet. 3 . Drainage plan. 4. Plan & Profile sheets. A horizontal scale of 1'=20" and double plan and profile - sheets shall be used: 5. Cross Section Sheets. 6. Detail Sheet. 7. Intersection Detail Sheets. 8. Signalization Plans. 9. Signing and Marking Plans. 10. Maintenance of Traffic Plans. • f. The ENGINEER shall prepare an "Opinion of Probable Construction Cost" for the project. g. The ENGINEER shall prepare the necessary local, state and federal permit applications for signature by the COUNTY and provide the necessary Construction Drawings and calculations for the permit applications. The COUNTY shall provide aerials, tax maps, etc. as required for the various permit application submittals. Anticipated permits for this project are from St. Johns River Water Management District (SJRWMD) , Florida Department of Transportation, US Army Corps of Engineers Dredge & Fill Permits, Indian River Farms Water Control District and FEC Railroad. The COUNTY shall submit the permit applications to the appropriate authorities. The ENGINEER shall be reimbursed for the cost of all documents. h. Fifty percent, ninety percent and final review meetings shall be held between the ENGINEER and the COUNTY. For each meeting, the Engineer shall provide the COUNTY with three ( 3 ) sets of review documents for the project. The ENGINEER shall be reimbursed for the cost of the documents. The . COUNTY shall expeditiously review the check documents and indicate thereon any revisions requested. The ENGINEER shall make revisions as directed by the COUNTY. • 5 7 fi e - SECTION IVB- T? ' FOR COMPLETION The time for completion of 90% design drawings, permit applications and cost estimate shall be two hundred forty ( 240) days and the final plans shall be complete 30 days thereafter. Work shall not commence until the County issues a Notice-to- Proceed. SECTION V - COMPENSATION The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant, to this Agreement fees in accordance with the following: r 1 . Professional Services Fee • a. Keith and Schnars, Inc. agrees to perform the services as delineated herein at a Lump Sum with "Not-to-Exceed" fee amount of Fifty-One Thousand Nine Hundred Fourteen Dollars ( $51,914. 00) . Actual billings will be based on hourly rates, per Schedule of Rates and Fees as contained herein. The total man- hour fee for the project will not surpass the "Not-to-Exceed" fee stipulated above. Reimbursable expenses such as blueprints, postage, photocopies, etc. shall be reimbursed as provided for in the previously mentioned rate schedule. Travel will not be reimbursed to attend meetings with -Indian River County staff or permit agencies within 100 miles of Indian River County. Exhibit A, attached, provide the detail break-down of the contract man- hours and fee for the entire project. Any and all work performed other than that specifically listed in Section B, "Scope of Services" , unless agreed upon at the signing of the Engineering Contract, shall be considered Additional Services. Compensation for Additional Service work shall be at a lump sum price to be negotiated between Keith and Schnars, Inc. and the COUNTY, or at the COUNTY'S option, Additional Service work may P be performed on an hourly basis,. plus reimbursable expenses, per the Schedule of Rates and Fees as contained herein. SCHEDULE OF RATES AND FEES FOR PROJECTS REQUIRING PROFESSIONAL LIABILITY AND ERRORS AND OMISSIONS INSURANCE COVERAGE Project Manager or Project Engineer $70. 00/hour Project Designer $60. 00/hour Project Surveyor (PLS) $75. 00/hour Survey Field Crew $75.00/hour Construction Observer/Inspector $40. 00/hour Project Designer/CADD Draftsperson $40. 00/hour Administrative $21. 00/hour Reimbursable expenses are invoiced based on actual costs times a factor of 1.10. All other direct costs such as permit application fees, etc. are charged without markup. 6 I � rye, 2 . Dire( Payment for Additional Se ices The COUNTY agrees to pay on a direct basis for services or goods provided by others working in conjunction with the ENGINEER, as follows: a. Soil Survey The COUNTY shall make direct payment ,to the approved soil laboratory for soil survey work requested by the ENGINEER which is necessary in designing the project, and approved by the COUNTY in writing. b. Printing and Reproduction and Travel The COUNTY shall make direct payment to the ENGINEER for the cost of printing project plan sheets required for utility coordination. The maximum cost allowed per blueprint for sheets utilized for this purpose shall be $1. 00. The maximum cost per mylar or sepia for sheets utilized for this purpose shall be $4.00 . c. The Consultant shall be reimbursed for the mileage at the latest State approved rates per mile, except for travel to and from the County within a radius of 100 miles. SECTION VI — ADDITIONAL WORK In the event changes are requested by the COUNTY to the contract plans after said plans have been approved and accepted by the COUNTY and upon the issuance of a work order for said additional work by the Director of the Public Works Department, said additional work may commence in accordance with the fee schedule included in the work order. SECTION VII - PARTIAL PAYMENTS The COUNTY shall make monthly partial payments to the ENGINEER. The ENGINEER shall submit duly certified invoices in tripli- 4 • cate to the Director of the Public Works Department. The Contract shall be divided into units of deliverables, which shall include, but not be limited to, reports, findings, and drafts, that must be received and accepted in writing by the Director of Public Wo.r-ks_prior to payment. A 10% retainage wrt'i bewithheldby the COUNTY until Fina ayme tea SECTION VIII - EXTRA WORK In the event extra work is necessary by the ENGINEERS due to a change in scope of the project, such work shall be the subject of a supplemental work order approved by the Board of County Commissioners. SECTION IX - RIGHT OF DECISIONS All services shall be performed by the ENGINEER to the satisfaction of the Director of the Public Works Department who shall decide all questions, difficulties, and disputes of whatev- er nature which may arise under or by reason of this Agreement and according to the prosecution and fulfillment of the service 7 L - hereunder, and 'le character, quality, am it and value thereof, and the Director' s decision upon all claims questions and disputes shall be final, conclusive and binding upon the parties hereto unless such determination is clearly arbitrary or unreasonable. Adjustments of compensation and contract time because of any major changes in the work that might become necessary or be deemed desirable as the work progresses shall be reviewed by the Director of the Public Works Department. In the event that the ENGINEER does not concur in the judgment of the Director of the Public Works Department as to any decisions made by him he shall present his written objections to the County Administrator; and the Public Works Director and the ENGINEER shall abide by the decision of the County Administrator of Indian River County, unless the decision is clearly arbitrary or unreasonable. SECTION X - OWNERSHIP AND REUSE OF DOCUMENTS A. Ownership All reports, tracings, plans, specifications, field books, survey information, maps, contract documents, and other data developed by the ENGINEER for the purpose of this Agreement shall become the property of the COUNTY and shall be made available by the ENGINEER at any time Upon request of -the COUNTY. When all work contemplated under this Agreement is complete, all of the above data shall be delivered to the Director of the Public Works Department. B. Reuse of Documents All documents, including but not limited to drawings and specifications, prepared by the ENGINEER pursuant to this Agreement are related exclusively to the services described herein. They are not intended or represented to be suitable for reuse by the COUNTY or others on extensions of this project or on any other project. Any such utilization or adaptation will entitle the ENGINEER to further compensation at rates to be agreed upon by the COUNTY and the ENGINEER. The ENGINEER shall not be held liable for any reuse of the Documents and shall not be held liable for any modifications made to the documents by others. SECTION XI - NOTICES Any notices, reports or other written communications _from the ENGINEER to the COUNTY shall be considered delivered when posted by certified mail or delivered in person to the Director of the Public Works, Department. Any notices, reports or other communications from the COUNTY to the ENGINEER shall be consider- ed delivered when posted by certified mail to the ENGINEER at the last address left on file with the COUNTY or delivered in person to said ENGINEER or his authorized representative. Such in person deliveries shall be evidencedbysigned receipts. 8 SECTION XII - MINATION The obligation to provide . further services under this Agreement may be terminated by either party upon seven (7) days written notice in the event of substantial failure by the other party to perform in accordance withthe terms hereof through no fault of the terminating party. In the event of any termina- tions, the ENGINEER will be paid for all services rendered to the date of termination, all expenses subject to reimbursement hereunder, and other reasonable expenses incurred by the ENGINEER as a result of such termination. SECTION XIII - AUDIT RIGHTS The COUNTY reserves the right to audit the records of the ENGINEER related to this Agreement at any time during the prosecution of' the work included herein and for a period of one year after final payment is made. SECTION XIV - SUBLETTING The ENGINEER shall not sublet, assign, or transfer any work under this Agreement without the written consent of the COUNTY. When applicable and upon receipt of such consent in writing, the ENGINEER shall cause the names of the engineering and surveying firms responsible for the major portions of each separate spe- cialty of the work to be inserted on the reports or other data. SECTION XV - WARRANTY The ENGINEER warrants that he has not employed or retained any company or person other than bona fide employee working solely for the ENGINEER to solicit or secure this contract and that he has not paid or agreed to pay any company or person other than a bona fide employee working solely for the ENGINEER any fee, commission, percentage fee, gifts or any other considera- tions, contingent upon or resulting from the award or making of this contract. For breach violation of this warranty, the COUNTY shall have the right to annul this contract without liability. SECTION XVI - DURATION OF AGREEMENT' This Agreement shall remain in full force and effect for a period of two years after the date of execution thereof or until completion of all project phases as specified by the Public Works Director, whichever occurs first, or unless otherwise terminated by mutual consent of the parties hereto or pursuant to Section XII of this contract. SECTION XVII - INSURANCE AND INDEMNIFICATION During the performance of the °work covered by this Agree- ment, the ENGINEER shall provide the COUNTY with evidence that the ENGINEER has obtained and maintains the insurance listed in the Agreement. 1. ENGINEER shall procure and maintain for the duration of the contract, insurance against claims for injuries to persons or damages to property which may arise from or 9 in inection with the perf mance of the work hereunder by the ENGINEER, his agents, representatives, employees or sub-contractors. The cost of such insurance shall be included in the ENGINEER' S bid. 2 . Minimum Scope of Insurance A. Worker' s Compensation as required by the State of Florida. Employers Liability of $100,000 each accident, $500,000 disease policy limit, and $100,000 disease each employee. B. General Liability $1,000,000 combined single limit per accident for bodily injury and property damage. County shall be an additional insured. C. Auto Liability $1,000 ,000 combined single limit per accident for bodily injury and property damage for owned and non-owned vehicles. County shall be an additional insured. D. Professional Liability Insurance providing coverage for negligent acts, errors, or omissions committed or alleged to have been committed by ENGINEER with a limit of $500,000 per claim/annual aggregate. There shall be no more than $5,000 deductible per claim amount unless the Engineer provides a Certified Copy of a financial report which has been approved by the County Risk Manager. This insuraride.. shall extend coverage to loss of interest, earning, __profit, use and business interruption, cost of replacement power, and other special, indirect and consequential damages. 3 . Any deductibles or self insured retentions greater than $5,000 must be approved by the Risk Manager for Indian River County with the ultimate responsibility for same going to the ENGINEER. • 4. ENGINEER' S insurance coverage shall be primary. 5. All above insurance policies shall be placed with insurers with a Best' s rating of no less that A + VII . The insurer chosen shall also be licensed to do business in Florida. 6. The insurance policies procured shall be "Claims Made" policies or as generally available on the open insurance market. 7 . The Insurance Carriers shall supply Certificates of Insurance evidencing such coverage to the Indian River County Risk Management Department prior to the execution of this Contract. 8. The insurance companies selected shall send written verification to the Indian River County Risk Management Department that they will provide 30 days written notice to the Indian River County Department of Risk Management of its intent to cancel or terminate said policies of insurance. 9. A written safety inspection plan must be submitted to the Indian River County Risk Management Department for approval prior to the signing of the contract. 10 --~ � ---- ---- \ \ � 44, ` \ . ` . ` 161 1(14113 I‘ \ ` ` \ � • • ~--~-� ` ` . ` • % ‘ , . i . . Page 1 of 2 4th STREET WIDENING IMPROVEMENTS No. of No. of TASK DESCRIPTION Sheets Units ********* Hours Per Sheet/Unit ****** Admn. Survey Totals PE Designer Tech Drafter Asst. FLS Party Per Unit , .. ' DRAWING LIST: Phase 1: . '• Preliminary Engineering: Design Surveys Engineer's Estimates 1 8 4 2 14 Environmental Review 1 16 4 8 8 36 Contact Utilities 1 16 3 19 1 , Cover Sheet 1 4 8 0 12 Dbl. Plan & Profile Sheets ! 0 Drainage Maps 1 32 4 12 4 4 56 Field Reviews o Plan and Profile Sheets 4 24 8 8 4 4 48 Right-of-Way Maps 4 2 4 -6 ROW Control Maps 0 Signalization Plans Signing and Marking Sheets 4 4 3 7 Typical Sections 1 4 4 4 3 15 1 • , Phase 2: 0 Final Design: . , Cover Sheet 1 1 0- 1 Cross Section Sheets 2 1 2 2 5 Curve and Coord. Data Sheet 1 1 1 4 1 7 Dbl. Plan & Profile Sheets 0 0 0 Drainage Details & Sections 2 4 1 5 2 12 Drainage Maps 1 2 1 4 2 9 General Notes 1 2 1 4 1 8 Key Maps 0 0 0 Misc. Detail Sheets 2 2 . 1 4 1 8 MOT Plans 1 5 1 2 1 9 Plan and Profile Sheets 4 4 1 3 1 9 Reference Monument Sheet 0 0 0 Right-of-Way Maps 2 1 0 0 24 25 ROW Control Maps 0 0 0 Signalization Plans 1 2 2 3 _ 7 Signing and Marking Sheets 4 2 2 3 7 Summary of Drng Structures 1 1 1 2 4 Summary of Quantities 1 2 2 3 7 . , i - -- - . 4.; I , I . - Page 2 of 2 P 4th STREET WIDENING IMPROVEMENTS No. of No. of TASK DESCRIPTION Sheets Units ********* Hours Per Sheet/Unit ****** Admn. Survey Totals PE Designer Tech Drafter Asst. PLS Party Per Unit Typical Sections 1 3 1 4 8 Utility Adjustment Sheets 1 2 2 6 10 00 , OTHER TASKS: : 0 0 0 Coord. w/ Propery Owners 1 4 6 10 Engineer's Estimates 1 2 2 5 9 Legal Descriptions 14 0 0 0 Meetings with Client 0 0 0 Permit Coordination 1 2 2 4 8 Prepare Permit Applications 1 2 2 3 7 Public Meetings 0 0 0 Record Drawings 0 0 0 Review Title Search Data 1 0 0 0 Utility Coordination 1 4 4 2 10 Phase 3: Bidding Assistance: Prepare Bid Specs 1 24 --- 48 24 96 Bid Review / Recommendations 1 24 16 16 56 , , . - ,,,-- . .97- . . Page 1 of 2 4th STREET WIDENING IMPROVEMENTS TASK DESCRIPTION ***** ********TOTAL ESTIMATED MANHOURS ******* Admn. Survey Total PE Designer Tech Drafter Asst. PLS Party Hours Phase 1: Preliminary Engineering: Engineer's Estimates 8 4 2 14 Environmental Review 16 4 8 8 36 Contact Utilities 16 3 19 Cover Sheet 4 8 12 Drainage Maps 32 4 12 4 4 56 Plan and Profile Sheets 96 32 32 16 16 192 Right-of-Way Maps 8 16 24 Signing and Marking Sheets 16 12 28 Typical Sections 4 4 4 3 15 Phase 2: Final Design: Cover Sheet 1 1 Cross Section Sheets 2 4 . 410 Curve and Coord. Data Sheet 1 1 4 ---1 7 Drainage Details & Sections 8 2 10 4 24 -_, Drainage Maps 2 1 4 2 9 General Notes 2 1 4 1 8 Misc. Detail Sheets 4 2 8 2 16 MOT Plans 5 1 2 1 9 Plan and Profile Sheets 16 4 12 4 36 Right-of-Way Maps 2 48 50 Signalization Plans 2 2 3 7 Signing and Marking Sheets 8 8 12 28 Summary of Drng Structures 1 1 2 4 Summary of Quantities 2 2 3 7 Typical Sections 3 1 4 8 Utility Adjustment Sheets 2 2 6 10 OTHER TASKS: Coord. w/ Propery Owners 4 6 - 10 Engineer's Estimates 2 2 5 9 Permit Coordination , 2 2 4 8 Prepare Permit Applications 2 2 3 7 Utility Coordination, 4 4 2 10 . , Page 2 of 2 4th STREET WIDENING IMPROVEMENTS TASK DESCRIPTION ***** ********TOTAL ESTIMATED MANHOURS ******* Admn. Survey Total PE Designer Tech Drafter Asst. PLS Party Hours Phase 3: Bidding Assistance: Prepare Bid Specs 24 48 24 96 Bid Review / Recommendation 24 16 16 56 Page 1 of 2 4th STREET WIDENING IMPROVEMENTS TASK DESCRIPTION *********** ESTIMATED COSTS ******* ***** Adorn. Survey Task Grand PE Designer Tech Drafter Asst. PLS Party Totals Totals $70.00 $60.00 $45.00 $40.00 $21.00 $75.00 $75.00 Phase 1: Preliminary Engineering: Engineer's Estimates $560 $180 $42 $782 Environmental Review $1,120 $180 $320 $168 $1,788 Contact Utilities $1,120 $63 $1,183 Cover Sheet $180 $320 $500 Drainage Maps $2,240 $240 $540 $160 $84 $3,264 Plan and Profile Sheets $6,720 $1,920 $1,440 $640 $336 $11,056 Right-of-Way Maps $560 $336 $896 Signing and Marking Sheets $1,120 $252 $1,372 Typical Sections $280 $240 $160 $63 $743 Phase 2: Final Design: Cover Sheet $40 $40 Cross Section Sheets $120 $180 $160 $460.. Curve and Coord. Data Sheet $70 $60 $180 $40 $350 Drainage Details 8 Sections $560 $120 $450 $160 $1,290 Drainage Maps $140 $60 $180 $80 $460 General Notes $140 $60 $180 $40 $420 Misc. Detail Sheets $280 $120 $360 $80 $840 MOT Plans $350 $60 $90 $40 $540 Plan and Profile Sheets $1,120 $240, $540 $160 . $2,060 Right-of-Way Maps $140 $3,600 $3,740 Signalization Plans $140 $120 $135 $395 Signing and Marking Sheets $560 $480 $540 $1,580 Summary of Drng Structures $70 $60 $90 $220 Summary of Quantities $140 $120 $135 $395 Typical'Sections $210 $60 $180 $450 Utility Adjustment Sheets $140 $120 $270 $530 OTHER TASKS: Coord. w/ Propery Owners $280 $270 $550 Engineer's Estimates $140 $120 $225 $485 Permit Coordination $140 $120 $180 $440 Prepare Permit Applications $140 $120 $135 $395 Utility Coordination , $280 $240 $90 $610 • . , d? Page 2 of 2 4th STREET WIDENING IMPROVEMENTS TASK DESCRIPTION *********** ESTIMATED COSTS ******* ***** Admit. Survey Task Grand PE Designer Tech Drafter Asst. PLS Party Totals Totals $70.00 $60.00 $45.00 $40.00 $21.00 $75.00 $75.00 • Phase 3: Bidding Assistance: Prepare Bid Specs $1,680 $2,160 $504 $4,344 Bid Review / Recommendation $1,680 $720 $336 $2,736 TOTAL SALARY COSTS: $44,914 DIRECT CHARGES: Subconsultant's Fees: Title Searches: 14 a $250 = , $3,500 Mileage: Aerial Photography: Soils Testing: $3,000 Reproductions: $500 TOTAL DIRECT CHARGES $7,000 GRAND TOTALS: $51,914 NOTE 1: Does not include public meetings. If authorized, the services required in connection with public meetings will be provided on a time charge basis in accordance with the rates shown above. NOTE 2: Survey data to be furnished by Indian River County. If Consultant's survey services are required, they will be provided at the rates indicated above. 10. ENGINEER shall include all sub-contractors as insured under its policies or shall furnish separate certificates and endorsements for each sub-contractor. All coverages for sub-contractors shall. be subject to all of the requirements stated herein. 11. ENGINEER hereby agrees to indemnify Indian River County and Representatives thereof from all claims arising solely from negligent acts, errors or omissions of the ENGINEER or ENGINEERS' REPRESENTATIVES. in the performance of Professional Services under this agreement and for which ENGINEER is legally liable. SECTION XVIII - ENTIRETY OF AGREEMENT This writingembodies the entire Agreement and g under- standing between the parties hereto, and there are no other agreements and understandings, oral or written, with reference to the subject matter hereof that are not merged herein and super- seded hereby. No alteration, change, or modification of the terms of this Agreement shall be valid unless made in writing and signed by both � parties hereto. This Agreement, regardless of where executed, shall be governed by and construed according to the laws of the State of Florida. IN WITNESS WHEREOF the parties hereto have executed these presentsIthis 4 day of January , 19944. KEITH & SCHNARS, INC. INDIAN RIVER COUNTY, FLORIDA STUART, FLO DA • BY: ".1';'‘ BY 11\ K J- Jo. n_ .4J . _ Ti ppin... Principal-in-Charge airman WITNESS: Attest: ` .' Jeffrey K. Barton = Clerk of C. , rt - y! WITNESS: ; ,1 ' /G �/�`�//e (Corporate seal is acceptable in place of witnesses) Indian River Co B,j•roved Date Admin. s f Q / V 4 93 Leal e, 12-18 Bud.et OrATEZs+r Pub.Wk. .F_MMm i I�' �Ena. 1 Risk Mar. i r � c:\wp60\contract\4ST-i b.aar 11