HomeMy WebLinkAbout2018-290WORK ORDER NUMBER 2
CONSTRUCTION OF EMERGENCY BEACH ACCESS AT ROUND ISLAND PARK
This Work Order Number 2018008-2 is entered into as of this 1 &th day of eeember
2018, pursuant to that certain Continuing Consulting Engineering Services Agreement for Professional Services
entered into as of this 17th day of April, 2018 (collectively referred to as the "Agreement"), by and between
INDIAN RIVER COUNTY, a political subdivisionof the State of Florida ("COUNTY") and
Coastal Waterways Design and Engineering, LLC. ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant
will perform the professional services within the timeframe more particularly set forth in Exhibit C
(Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of
the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement
and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as
if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the dgtefirst
written above. .,••gout..... 04;•.
CONSULTANT:
Coastal Waterways Design and
Engineering, LLC
By, I I
P -Sl - --
Stephe . Boehning
P.E., CFM
Title: President/Principal
Coastal Engineer
Date: 191 ?/ "Id
Je
BOARD OF COUNTY COMMISS+ONER
OF INDIAN RIVER COUNTY: �, e
By:
Bob Solari, Chairman ""`"" "-
BCC Approved Date: December 18, 2018
Attest: Jeffrey R. Smith, Clerk of Court and Comptroller
By:
Approved:
Approved as to form and legal sufficiency:
Jason 0. Brown, County Administrator
Ham K. DeBraal, Deputy County Attorney
Coastal Exhibit A 6o121s=Street
Suite 300
#44&SVero Beach, Florida 32960
Waterways Ph: (772) 473-4099
www.coastalwde.com
December 4, 2018
Kendra Cope.
Division of Natural Resources
Indian River County Public Works
180127th Street
Vero Beach, Florida 32960
RE: Indian River County Coastal Construction Control Line (CCCL) Permitting,
Design and Construction Administration Services 'for Beach Access at
Round Island Park to meet Health, Safety, and Security Objectives
Dear Ms. Cope:
Indian River County seeks to provide security and emergency response access, a fire
safety break, and a heavy construction equipment access in south county within the
vicinity of Round Island beach Park. The specific location of the access will consider
impacts to the environment and to the use of the park both during construction and
when the access is actively used for the intended planned purposes. This proposal is to
design and seek state and local permits for a south county beach access to meet the
health, safety, and security objectives as identified by the County.
As requested, attached is the Coastal Waterways proposed scope of services for
professional coastal engineering and environmental'services to be provided by Coastal
Waterways Design & Engineering LLC (COASTAL WATERWAYS) for Indian River
County (COUNTY) for Construction Control Line (CCCL) Permitting, Design and
Construction Administration Services for Beach Access at Round Island Park to meet
Health, Safety, and Security Objectives:
Task la — FDEP CCCL Permit and Indian River County Pre -application
Conference and Conceptual Design: COASTAL WATERWAYS. will conduct by
telephone a pre -application meeting with the Department of Environmental
Protection (DEP) staff and conduct a pre -application meeting with Indian River
County Community Development staff to discuss the conceptual plan for beach
access. COASTAL WATERWAYS will prepare conceptual design drawings to use
during the discussions of the project with FDEP and County staff. COASTAL_
WATERWAYS shall prepare minutes of the pre -application conferences.
Engineering, Floodplain & EmergencpManagement Solutions within our Coastal and Marine Environment
Indian River County CCCL - Round Island Beach Access
December 4, 2018
Page 2 of 6
COASTAL WATERWAYS will obtain beach profile data from Indian River County
and .the Florida Department of Environmental Protection (FDEP). This will form the
basis for the COASTAL WATERWAYS conceptual design that will be utilized in
preparation of the permit sketches.
COASTAL WATERWAYS will prepare a conceptual design to restore' and re -
vegetate the dune consistent with existing FDEP and Indian River County rules
and codes. COASTAL WATERWAYS will prepare a plan drawing, a. cross-
sectional drawing, and an opinion of probable initial construction costs. COASTAL
WATERWAYS will meet with the COUNTY to present the conceptual design. At
this meeting, the COUNTY will approve the conceptual design or identify a
conceptual design to be the basis of preliminary and final design.
Task 1 b — Survey: A topographic survey of the existing conditions is required by
the County and the DEP.
COASTAL WATERWAYS will obtain a topographic survey of the beach and dune
that meets the DEP requirements and provides a basis for the cross-section design
template for permitting and construction documents.
COASTAL WATERWAYS will perform a topographic survey of the Project area
including establishment of a baseline. The survey will; define park features
including parking, buildings, amenities (i.e., existing playground), define the upland
and seaward extent of dune vegetation; identify the top of dune, toe of dune, and
crest width of the dune. The survey will consist of at least one beach profile as
required by FDEP permit Rules, including elevations recorded at least every 25
feet on center and at any break in slope. The profiles shall extend from the
approximate landward toe of dune, or approximately 20 feet landward of the
seaward dune crest, to the zero contour line. Plan view and cross-sectional
drawings of the survey results will be prepared by COASTAL WATERWAYS which
shall serve as the basis of design and permitting for the Project. COASTAL
WATERWAYS shall subcontract a portion of this work to Oceanside Solutions
LLC, a registered surveyeF
Task 2 — Preliminary and Final Design: COASTAL WATERWAYS will prepare
preliminary and final design drawings for the proposed project that will consist of a
approximate 25 -foot wide access for emergency and heavy equipment access to
the beach. For each phase, COASTAL WATERWAYS will provide an opinion of
probable costs and meet with the COUNTY to review the design. Final design shall
include signed .and sealed construction plans and specifications suitable for
bidding and construction of the project.
COASTAL WATERWAYS will prepare a preliminary design to be submitted with
the permit application and subsequently used to prepare 24" x 36" construction
Engineering, Floodplain & Emergency Management Solutions within our Coastal and Marine Environment
Indian River County CCCL - Round Island Beach Access
December 4, 2018
Page 3 of 6
drawings for bidding purposes. The preliminary design will utilize the conceptual
design sketches and will be updated with information from the pre -application .
meeting and our meeting with the COUNTY. Also, the preliminary design will use
information from the survey performed under a separate task of this proposal, if
necessary.
Final design drawing updates will be completed after receipt of the permit, as
necessary, and shall include signed and sealed construction plans and
specifications. For each phase, COASTAL WATERWAYS will provide an updated
opinion of probable costs and meet with the COUNTY to review the design.
Task 3a - DEP Permit Application: Based on the results of the pre -application
conference with FDEP staff and on the preliminary design, COASTAL
WATERWAYS will prepare .a formal application for a FDEP permit for dune
restoration. To fulfill DEP requirements, the COUNTY.will provide to COASTAL
WATERWAYS:
1) a copy of the Warranty Deed for the project property;
2) a signed "Certificate of Owner's Authorization"; and
3) the required FDEP permit application fee..
Task 3b — Indian River County Community Development Administrative
Approval Application: COASTAL WATERWAYS will complete an Indian River
County Administrative Approval Application and submit Community Development
Department for permit approval. Coastal .Waterways will seek a waiver of the $200
Application Fee. Coastal Waterways shall complete the Administrative Approval
Application, Form including Ten (10) Copies of the Plan, Project Description Letter,
One (1) aerial of site with project overlaid showing surrounding 200 feet, One (1)
Copy of the Owner's Deed, Letter of Authorization from Property Owner if owner
is not applicant, Completed Tree Removal Permit -Application, Completed Land
Clearing Permit Application. Coastal Waterways shall provide a Revegetation plan
and a Gopher tortoise survey/plan as prepared by Coastal Waterways
subconsultants.
The Indian River County Dune Vegetation Alteration Application shall include a
survey of the site, including a plan view, Aerial photograph, detailed description of
the proposed re -vegetation and maintenance plan, including vegetation species,
planting schedule, and maintenance schedule. The gopher tortoise survey shall be
conducted by a , Coastal Waterways subconsultant having a valid license as a
FFWCC authorized gopher tortoise agent.
Task 3c — Florida Department of Transportation (FDOT) Permit Application
for Driveway/Connection: COASTAL WATERWAYS will complete and submit an
FDOT Driveway/Connection Permit Application on behalf of the County to
authorize use of the proposed potential driveway to be located north of the existing
Engineering, Floodplain & Emesge=7ManagementSolutions Within our Coastal and Marine Environment
Indian River County CCCL - Round Island Beach Access
December 4, 2018
Page 4 of 6
park entrance. COASTAL WATERWAYS shall provide FDOT' approved design
details and cost estimate for'work in the state road ROW along State Road A -1-A.
Task 3d - DEP Permit and iCounty Approval Processing: COASTAL
WATERWAYS will represent the project before DEP and County permit review
staff towards obtaining permits for the work consistent with the design approved
by the COUNTY in Task 2. COASTAL WATERWAYS will contact FDEP and
County staff to address staff questions and concerns and to expedite their review
and processing of the permit application. COASTAL WATERWAYS will confer with
the COUNTY as to (a) interpretation of FDEP and County rules and regulations,
and (b) responses to any FDEP and County staff .requests for additional
information. COASTAL WATERWAYS will provide written responses to DEP and
County staff to address staff requests for additional information. COASTAL,
WATERWAYS will represent the project before FDEP and County staff toward
securing approval of permits for the project.
Additional surveys, studie's or analysis not identified may be required by the
agencies. These surveys/studies/analysis are beyond the scope of this work. Upon
request by the FDEP for. additional surveys/studies/analysis, COASTAL
WATERWAYS will submit a separate proposal requesting the COUNTY's
authorization for these additional services.
Task 4 - Construction Administration Services: COASTAL WATERWAYS will
assist the. COUNTY with answers to potential bidders questions and assist the
COUNTY with issuance of one (1) addendum if necessary. COASTAL
WATERWAYS will assist the COUNTY Representative in bidding and negotiating
a construction agreement.
COASTAL WATERWAYS will conduct an on-site pre -construction meeting with
the COUNTY Representative and the selected contractor. COASTAL
WATERWAYS will review shop drawings and up to two (2) change orders if
necessary. COASTAL WATERWAYS will make up to five (5) daily site observation,
additional daily site observations will be negotiated at our hourly rates if deemed
necessary. Daily site observations shall include identifying that the Contractor is
performing the scope of work in accordance with the plans, specifications and
permits. In addition, COASTAL WATERWAYS will make a final site observation
and submit a certification to the regulatory agencies to identify conformance of the
project. to the specifications, plans and permit.
Engineering, Floodplain & Emergency Management Solutions within our Coastal and Marine Environment
Indian River County CCCL - Round Island Beach Access Exhibit B and C
December 4, 2018
Page 5 of 6
Deliverables:
Task 1a - FDEP/County Pre -app Conference and Conceptual Design:
meeting minutes
Task lb - Survey: signed and sealed survey
Task 2 - Preliminary and Final Design: signed and sealed plans and technical
,specifications
Task 3a - DEP Permit Application: completed permit application
Task 3b - County. Community Development Application: completed permit
application, vegetation plan and tree removal permit' application,
gopher tortoise survey, completed land clearing application
Task 3c - FDOT Permit Application: completed permit application
Task 3d - DEP Permit and County Approval Processing: RAI responses
Task 4 - Construction Administration Services: site observation reports
General Terms: The COUNTY will provide all application fees, publishing fees, and
additional surveys and testing reports required by the FDEP and any associated
agencies. Additional surveys, studies or analyses may be required by the agencies.
These surveys, studies, or analyses are, beyond the scope of this work but may be
provided by COASTAL WATERWAYS under separate authorization.
Schedule:
Task 1a - FDEP/County Pre -app Conference and Conceptual Design: completed
within 4 weeks of the County's Notice to Proceed.
Task lb - Survey: Completed within 3 weeks of completion Task 1 a services
Task 2 - Preliminary and Final Design: (Preliminary Design) shall be completed
within 4 weeks of completion of Task 1 b services.
Task 3a - DEP Permit Application: completed within 2 weeks of completion 'of Task 2
(Preliminary Design) services.
Task 3b - County Community Development Application: completed within 2 weeks
of completion of Task 2 (Preliminary Design) services.
Task 3c - FDOT Permit Application: completed within 2 weeks of completion of Task
2 (Preliminary Design) services.
Task 3d - DEP Permit and County Approval Processing: dependent upon DEP and
County review timing
Task 4 - 'Construction Administration Services: dependent upon County contract
bidding and negotiation timing
Fee:
The total fee for the work described in Task 1 through Task 4 above is $37,250.00
Task 1a - FDEP/County Pre -app Conference and Conceptual Design: $4,000
Task 1 b - Survey: $5,000
Task 2 - Preliminary and Final Design: $6,600
Task 3a - DEP Permit Application: $4,000
Engineering, Floodplain & EmergencyManagement Solutions within out Coastal and Marine Environment
Indian River County CCCL - Round Island Beach Access
December 4, 2018
Page 6 of 6
Task 3b - County Community Development Application: $6,000
Task 3c - FDOT Permit Application: $900
Task 3d - DEP Permit and County Approval Processing: $5,500
Task 4 - Construction Administration Services: $5,250
If you have any questions regarding this matter, please contact Steve Boehning at (772)
473-4099.
Sincerely,.
COASTAL WATERWAYS
Stephen W B . hning, P.E., CFM
President / Principal Coastal Engineer
Kendra Cope Date
Division of Natural Resources
Indian River County Public Works
Engineering, Floodplain & Emergency Management Solutions within our Coastal and Marine Environment
Figure 1. Indian River County Round Island Beach Park — Emergency and Heavy Equipment Access
Proposed Approximate Survey Limits and Potential Beach Access Location
�� Coastal
Waterways