HomeMy WebLinkAbout2018-292The Reserve At Grand Harbor PD Phase 1, Plat 33
A TRUE COPY
CERTIFICATION ON LAST PAN-
J.R. SMITH, CLERK
MODIFICATION TO
CONTRACT FOR CONSTRUCTION FOR FINAL LIFT OF ASPHALT
CONTRACT NO. PD -13 -10 -03 -FLA (2001020101-77703)
THIS MODIFICATION, made and entered into this 18th day of.
December, 2018, by and between GH VERO BEACH DEVELOPMENT LLC, a
Delaware limited liability company, hereinafter referred to as "Developer", and
INDIAN RIVER COUNTY, a political subdivision of the State of Florida, by and
through its Board of County Commissioners, hereinafter referred to as "County".
WITNESSETH:
WHEREAS, Developer entered into a Contract for Construction for Final
Lift of Asphalt, Contract No. PD -13 -10 -03 -FLA (2001020101-77703)
guaranteeing the installation of the final lift of asphalt the earlier of 2 years from
the project's projected Certificate of Completion (December 16, 2016) or 60 days
prior to turnover to homeowner associationor prior to certificate of occupancy for
the last residence in this phase of the subdivision; and the Developer posted
cash in the amount of $212,131.88 as security to guarantee completion and
entered into a Cash Deposit and Escrow Agreement For Final Lift of Asphalt;
and
WHEREAS, the developer has
1. requested an additional 2 -year extension to December 16, 2020 to
install the final lift of asphalt, as allowed by code;
2. provided an- updated certified cost estimate attached as Exhibit "A"
which amount has been approved by County engineering and did
not change from the initial cost estimate; and
3. paid the required $660.00 extension fee request to County.
NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL
COVENANTS AND PROMISES HEREIN CONTAINED, the parties agree as
follows:
1. The date for completion of the final lift of asphalt. as outlined in the
Contract for Construction for Final Lift of Asphalt, Contract No. PD -13 -10 -03 -FLA
(2001020101-77703) is extended to December 16, 2020.
A TRUE COPY
CERTIFICATION ON LAST PAGE
J,R, SMITH, CLERK
2. The $212,131.88 shall continue to be held in escrow for the
guaranty for the final lift of asphalt and represents 125% of the cost of the final
lift of asphalt to be 'completed as evidenced by developer's engineer's updated
certified cost estimate as approved by County engineering, attached as Exhibit
"A„
3. The extension, fee in the amount of $660.00 established by
Resolution No. 2005-041 and pursuant to Section 913.10(1)(G) of the. Indian
River County Code has been paid.
4. All other terms set out in the Contract for Construction for Final Lift
of Asphalt, Contract No. PD -13 -10 -03 -FLA (2001020101-77703) remain in full
force and effect as well as the Cash Deposit and Escrow Agreement For Final
Lift of Asphalt.
IN WITNESS WHEREOF, the parties hereto have set their hands and
seals on the day and year first above written.
GH VERO BEACH DEVELOPMENT
LLC, a Dela . a e limited liability
company DEVELOPER
By:
printed r ame:
Authorized Signatory
INDIAN RIVER C
OUNTY, FLORID�t•°�..•'' "•- ��. °�.
by and through its Board of County
CommissionersCOUI ` y
ca I
ATTEST: Jeffrey R. Smith, Clerk
of Court
and Comptroller By:
' 1 Bob Solari, Chairman ••!v�y �to�oPv
By: q1)11a&
,-��f-4dl)
Deputy Clerk BCC approved: December 18, 2018
APPROVEb AS TO FORM
AND L AL OF 0 I CY
B " c.
wlL{A ii, UEBRAAL
gamyT749UN 'YATTORKY
2
EXHIBIT "A"
LMJ MASTELLER & MOLER, INC.
M — CIVIL ENGINEERS ^-
RESERVE AT GRAND HARBOR (PHASE 1)
CERTIFIED COST ESTIMATE
Fi N L.LIFT;!SPHALT
12/5/2018
Description
Quantity
Unit
Unit Price
TOTAL
Mobilization
1
LS
$3,500.00
$3,500.00
1.0" SP 9.5 - 2nd Lift (Grand Harbor Reserve Sq.)
3,321
SY
$9.00
$29,889.00
Mill Existing Asphalt (1.5")
9,579
SY
$3.00
$28,737.00
Overlay w/ 1.5" SP 9.5 Asphalt
9,579
SY
$10.50
$100,579.50
Restripe Pavement
1
LS
$4,000.00
$4,000.00
Reset PCP's
1
LS
$3,000.00
$3,000.00
TOTAL
$169,705.50
Surety Amount (125%) $212,131.88
CERTIFICATE OF COST ESTIMATE L✓/U6-
I, Stephen E. Moler, a Florida registered engineering, License No. 33193, do hereby certify to Indian River County that this
cost estimate has been prepared under my responsible direction for those improvements itemized in this exhibit and that the
total cost estimate is true and accurate to the best of my knowledge. This estimate has been prepared, in part, to induce
approval by the County of a final plat for the Reserve at Grand Harbor Phase 1 project, and for the purpose of establishing
proper surety amounts associated therewith.
Stephen E. Moler,
Vice President
J
631-93 • •� +
>�
r00 1 AJ -
4 R IO,P.••4�',c
701VA t_ EN�N`'',�,�
r11111/111111111�11`
STATE OF FLORIDA
INDIAN RIVER COUNTY
THIS IS TO CERTIFY THAT THIS IS
A TRUE AND CORRECT COPY OF
THE ORIGINAL ON FILE IN THIS
OFFICE. N
JEFFRE R. SMI H, ERK
at' _ D.C.
DATE /
File#1357 1655 27th Street, Suite 2 Page 1 of 1
ADMIN\Construction\Maintenance Bond Estimate Vero Beach, Florida 32960
(PerformanceBond FinalLiftAsphalt_Extension_18-1205.xlsx) (772) 567-5300