HomeMy WebLinkAbout2018-278ASECOND AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN INDIAN RIVER COUNTY AND BOWMAN CONSULTING GROUP, LTD THIS SECOND AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN INDIAN RIVER COUNTY AND BOWMAN CONSULTING GROUP, LTD ("Second Amendment) is entered into as of the 11 tiday of December, 2018 by and between Indian River County, a political subdivision of the State of Florida, whose address is 1801 27th Street, Vero Beach, Florida, 32960 ("County"), and Bowman Consulting Group, LTD., a Virginia ' n Corporation authorized to do business in Florida, whose address is 3863 Centerview Drive, Suite 300, Chantilly, VA 20151 (the "Consultant"). RECITALS WHEREAS, on May 23, 2018, County and Consultant entered into an Agreement, for Professional Services for design and construction services for 58th Avenue Pavement Reclamation and Resurfacing from 57th Street to 85h Street (the "Agreement'); and WHEREAS, on June 12, 2018, the County and Consultant entered into a First Amendment to the Agreement for preparation of waterline designs; bid services, construction engineering services and project turnover of utility relocations associated with the construction of 58th Avenue Pavement Reclamation and Resurfacing from 57th Avenue to 851h Street/CR 510; and WHEREAS, County and Consultant desire to amendment the Agreement to include design of the communication network throughout the project; and NOW THEREFORE, in consideration of the mutual undertakings herein and other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, the parties agree, as follows: 1. Recitals. The above recitals are true and correct and are incorporated herein. 2. Amendment of Section 5 Compensation. The first sentence of Section 5 — Compensation is amended to read as follows: "The COUNTY shall pay to Consultant the mutually agreed professional fee of FOUR HUNDRED SIXTY-EIGHT THOUSAND FORTY-NINE DOLLARS ($468,049.00) for Services rendered for the Project, to be paid in monthly installments or a deliverable basis as set forth in the Exhibits." 3. Exhibit "C" to the Agreement shall be revised to include Attachment "I" to this Second Amendment. 4. All other provisions of the Agreement shall remain in full force and effect. Page 1 of 2 IN WITNESS WHEREOF, County and Consultant have executed this instrument this 11 day of December, 2018. BOWMAN CONSULTING GROUP, LTD 4450 W. Eau Gallie Boulevard, Suite 232 Melbourne, Florida 32934 By: Robert A. Hickey, Secretary WITNESSED BY: Approved as to Form and Legal Sufficiency a A Dylan Reingold % Page 2 of 2 INDIAN RIVER COUNTY, FLORIDA By: _20—z N CL 90LA,( Bob Solari, Chairman Board of County Commissioners Approved by BCC December 11, 2018 60 Attest: Jeffrey R. Smith, Clerk of Circuit Court and ComptrolkV. Bv\OUNV. i.." ........... Deputy Clerk AEGOVED 14 "11:4,118 INDIAN RIVER COUNTY :7mr,jKK:r-P!NC. nl\flqION Bowman C o N S U L T l N G ATTACHMENT 1 November 9, 2018 Mr. William Johnson, P.E. Roadway Production Engineer Indian River County 1801 27th Street —Building A Vero Beach, FL 32960 RE: IRC 1325 — 58"' Avenue FDR, Proposal for Additional Engineering Services Dear Mr. Johnson: Bowman Consulting Group has reviewed the plan review comments and based on our meeting of September 13,2018, we respectfully submit this proposal for additional services based on changes in scope of the project. A portion of the County identified work is constructability review .comments and will be handled at no additional charge. However, a portion of the work involves a change in scope and we are requesting additional compensation for this work. This proposal covers the additional work that Bowman and Lassiter Transportation Group will perform. No other subconsultants are involved with this request. We received a list of comments from the County and have reviewed the list, sorted and combined the comments that result in additional services, where applicable. This list was reviewed with the County to assure we understood the scope of work required to be performed and to see if there were things that could be done to streamline the work and reduce cost. The following list is for Bowman. Consulting only and the proposed work to be performed by Lassiter is included in a separate proposal attached hereto. SCOPE OF SERVICES Item No. Comment Issue 10 Update Util Details (3/18) No charge 18 Utility Coordination We have sent out utility notices as a part of the contract. Meeting Some utilities never responded. Adding meetings including coordinate, attend and memorialize' 1 meeting, Engr 4hr 20 Project Layout . Requires modifying the phasing plan. We are closing streets in sections to give the contractor the whole street to work with due to reprofiling the street and changing grades. Streets will be open to local traffic and emergency vehicles. The County desires the 69th Street work to be completed as early in the project as possible. Phasing Plan only: Engr 2hrs + CAD 2hrs 22 Silt Fence out of Clear After review with the County it was determined the only Zone change to the SWPPP drawings is to remove the silt 4450 W. Eau Gallie Blvd., Suite 232, Melbourne, FL 32934 Page 2 November 9, 2018 fencing around the culvert inlets at 58 Ave/62 Lane. No Charge 21, 23, 24, Revise Begin Project Revise Plan & Profile, Intersection and cross section sheets to reflect new limits of work. Approach is to leave sheets in and gray out NIC. Revise drawings including revise typical details for new limits, redesign conforms quantities, cost estimates. Engr 16hrs + CAD 24hrs 33 Ditch Bottom Inlet The County has decided that the existing headwall will be removed and a new junction structure added and pipes connected at this location. It was agreed that this design modification will be detailed on the road plan sheets with control elevations and construction notes only, no profiles or cross sections are proposed Engr 2 + CAD 3hr 34 Directional Drill Fiber After review with the County, it was determined that the best approach for this location is to shallow the conduit up to go over the existing culverts. No Charge. 35, 42, 52 Up Date 85th St Design conforms and change work limits, ramps and other Intersection items that have changed with the right turn lane. Engr 1hr+ CAD 4hr 34, 43, 51 Fiber Optic The County confirmed. that the bury depth be 3' of cover on the conduits. As the depth of these conduits now conflict with existing piping, the alignment will be redesigned to provide more clearance with existing facilities. Engr 16hr + CAD 48hr Design Driveways at Ball Driveway extension including storm drains, County to Field provide connecting grades. Impacts, quantities, costs plan sheets. No Charge. Total Engr hrs = 41hr x 150$/hr = $6,150 Total CAD hrs = 81h x 105$/hr = $8,505 Page 3 November 9, 2018 COMPENSATION We will provide the requested services on a Lump Sum Cost, with estimated task breakdown below: Additional Design Services: Task Design Services Fee Bowman As listed in the above table $14,655 Lassiter As listed in the attached proposal $10,040 Mark up on Subconsultants $0 Total $24,695 Sincerely, Eric L. Flavell, PE, F -ASCE Project Manager/Senior Engineer Bowman Consulting 321.270.8993 eflaVellCaD-bowmanconsulting.com