HomeMy WebLinkAbout1995-137FORM 737-6 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
1.63 DIVISION OF PRECONSTRUCTION AND DERIGN
___FADE I OF I COUNTY RESOLUTION
UTILITY RELOCATION AGREEMENT
COUNTY
SECTION
UTILITY JOB NO.
STATE ROAD NO.
COUNTY NAMECEL
& R/W JOB NO.
88
004
3500
607
Indian River
Pl/A '
V
A RESOLUTION AUTHORIZING EXECUTION OF AN UTILITIES AGREEMENT FOR THE ADJUSTMENT,
CHANGEOR RELOCATION OF CERTAIN UTILITIES WITHIN THE RIGHT -OF -NAY LIMITS HEREAFTER
DESCRIBED, AND PROVIDING WHEN THIS RESOLUTION SHALL TAKE EFFECT.
RESOLUTION N0. 25-137
ON -MOTION OF Commissioner Fran Aa s , seconded by Commissioner
Richard Bird , the following Resolution was adopted:
WHEREAS, the State of Florida Department of Transportation proposes to construct or reconstruct a
part of State Road 607
AND WHEREAS, in order for the State of Florida Department of Transportation to further and complete
said project, it is necessary that certain utilities and/or facilities within the Right -of -Nay limits of said State
Road 607 be adjusted, changed or relocated,
AND WHEREAS, the State
Indian River
Department of Transportation an
changes or relocations of said ut
been duly considered,
of Florida Department of Transportation having requested the County of
, Florida, to execute and deliver to the State of Florida
Utilities Agreement, agreeing to make or cause to be made such adjustments,
lities and/or facilities as set out in said Agreement, and said request having
NOW THEREFORE, BE IT RESOLVED by the Board of County Commissioners of the County of
Indian River , Florida, that the Chairman and Clerk of the Board of
County Commissioners be and are hereby authorized to make, execute and deliver to the State of Florida
Department of Transportation an Utilities Agreement for the ad1'ustment, change or relocation of certain utilities
within the Right -of -Way limits of said State Road 607 Section 004 i
BE IT FURTHER RESOLVED that this Resolution be forwarded to the State of Florida Department
of Transportation at Tallahassee, Florida.
INTRODUCED AND PASSED by the Board of County Coin inissiotiers of _ 1= 4x 2I1T.E'a
County, Florida, in regular session, this 17 day of October , 19 95_
4INN RIVER U Y, FLORIDA
0 C NTY MMISSIONERS
man of t le Hoard of CountyC6rnmissioners
Kenneth R. Macht
c__.._T_Araa.ca
O�Ic
ATTEST:
si/
I +Clerk of the board of County Commissioners(j ./bJ.K. BAT
4
rl" /
STAT F FLORIDA DEPARTMENT OF TR.4 PORTATION
FORM 710"010-62 DIVISION OF PRECONSTRUCTION ANU DESIGN
12/88 UTILITY RELOCATION AGREEMENT
PAGE 1 OF 3 (At County Expense)
L4'1"::—
SECTION 0
STATE ROAD 0
COUNTY NAME
PAR 6 JOB 0
FAP 0
7
004
607
Indian River
N/A
Federal Funds
THIS AGREEMENT, made and entered into this day
19_ by
and between the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, hereinafter referred to as
the DEPARTMENT, and the COUNTY OF Indian River
a political ivision of
the State of Florida, acting by and through its Board of County Commissioners, hereinafter ref
mer ed the
COUNTY.
WITNESSETH:
WHEREAS, the DEPARTMENT is constructing, reconstructing or otherwise changing a portion of
the State Highway System designated by the DEPARTMENT as Job No. 88004-3500 ,
from SR 60 to St. Lucie Cnty Line 07
which shall calRoad No. l for the relocation 6 6 the
COUNTY'S facilities along, over and/or under said highway,
NOW THEREFORE, in consideration of the mutual covenants hereinafter contained, it is agreed by
the parties as follows:
1. The COUNTY agrees to make or cause to be made all arrangements for necessary adjustments
or changes of its facilities' where located on public property at COUNTY's own expense and in
accordance with the provisions of Rule 014-46.01 "Utility Accommodation Guide," Florida
Administrative Code, dated May 4, 1970; any supplements or revisions thereof as of the date of this
Agreement, which, by reference hereto, are made a part of this Agreement; and the plans, designs and
specifications of the DEPARTMENT for the construction or reconstruction of said portions of the State
Highway System, prior to the advertising for bid on said project. The COUNTY further agrees to do all
of such work with its own forces or by a contractor paid under a contract let by the COUNTY, all under
the direction of the DEPARTMENT'S engineer.
2. The COUNTY further agrees that said adjustments, changes or relocation of facilities will be
made by the COUNTY with sufficient promptness so as to cause no delay to the DEPARTMENT or its
contractor in the prosecution of such construction or reconstruction work; provided, however, that the
COUNTY shall not be responsible for delay beyond its control; and that such "Relocation Work" will be
done under the direction of the DEPARTMENT'S engineer; and the COUNTY further agrees that in the
event the changes, adjustments or relocation of such facilities or utilities are done simultaneously with
the construction project, that it will be directly responsible for handling of any legal claims that the
contractor may initiate due to delays caused by the COUNTY'S negligence; and that the COUNTY will
not proceed with the "Relocation Work" with its own forces nor advertise nor let a contract for such
work until it has received the DEPARTMENT'S written authority to proceed.
27-K
FORM 710-010-62
12-88
PAGE 3 OF 3
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed by their
duly authorized officers, and their official seals hereto affixed, the day and year first above written.
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
BY: (SEAL)
TITLE:
ATTEST:
Executive Secretary
INDIAN RIVER COUNTY , FLORIDA
n Hives Co Approved Oele
BOAR F COUN 1,1M
ONERS�.
BY:
ills.
Kenneth R. ac t, Chairman ) Budget
APPROVED BY BOARD: 10-7-95 ' Jtiiitiec D 9 9
Rick Mgr.
J.K. BARTON
CLEP,K CIRCUIT
ATTEST: COURT
Approved as to Form & Legality
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
BY:
Assistant Attorney
APPROVED:
BY:
District Utility Engineer
FORM 710.010-62
12/88
PAGE 2 OF 3
3. The COUNTY further agrees that it will maintain and keep in repair, or cause to be maintained
and kept in repair, all of such adjusted, changed or relocated COUNTY owned or operated facilities or
utilities within the right of way of said portion of the State Highway System, and to comply with all
provisions of the law, including Rule 014-46.01.
4. The DEPARTMENT agrees to furnish the COUNTY with all necessary highway construction
plans that are required by the COUNTY to facilitate the COUNTY'S "Relocation Work".
5. The DEPARTMENT further agrees that the COUNTY may relocate its facilities upon the State's
right of way, according to the terms of the standard permit required by the State Statutes for
occupancy of public right of way, and all published regulations lawfully adopted by the DEPARTMENT
as of the date of this Agreement.
S. It is mutually agreed that the COUNTY'S plans, maps, or sketches showing any such facilities
or utilities to be adjusted, changed, or relocated are made a part hereof by reference.
7. The COUNTY covenants and agrees that it will indemnify and hold harmless the FDOT and all
of the FDOT'S officers, agents, and employees from any claim, loss, damage, cost, charge or expense
arising out of any act, action, neglect or omission by the COUNTY during the performance of the
contract.
3 Focm 11U_u1u=
4/8/88
r ,
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
DIVISION OF PRECONSTRUCTION & DESIGN
FINAL NEGOTIATION PROCEDURE
UTILITY RELOCATION SCHEDULE
During the final negotiation stages in clearing a project construction,
the District Utilities Section will furnish to the Utility Agency/owner a
Utility Relocation Schedule Form 710-010-171, Page 1 of 2, to be completed
in sufficient detail to fully describe the Utility Agency/Owner's
relocation/adjustment work. The heading will be completed by the District
Utilities Section. You will be required to complete, sign, date and
return 4 original copies to the District Utilities Section. All
information on the Relocation Schedule should be typed and four (four)
originals submitted. Page 1 of 2 is self-explanatory. Use as many
additional sheets for Blocks "A" and "B" as boxes. Furnish as much
information as necessary to describe in detail all work to be performed.
Page 2 of 2 will be created by the Utility Agency/Owner which shall show a
of the Utility Relocation Schedule It will be the responsibility of the
Agency/owner to monitor the advertisement and letting of the highway
contract in order to perform work as shown on the Utility Relocatior
Schedule to be done before construction begins.
This completed Utility Relocation Schedule will be included in the
contract bid package. pay close attention to sentence on Pacfe 7 of
Listed are some types of contractor activities to which you should relatE
to Utility Relocation Schedule.
CONSTRUCTION ITEMS (1 ) work days
Clearing & Grubbing ( ) work days
Grading and/or Drainage (3 ) work days
stabilizing ( ) work days
Bridge Construction ( ) work days
Protecting Existing Utilities ( ) work days
Pile driving ( ) work days
Traffic Signals ( ) work days
Any special notation which is important to your operations can be shows
here also.
A lump sum number of days for utility adjustment/relocation will be
unacceptable without a schedule of activities identifying each operatio,,
and its relation to contract time.
*NOTE: Attached is sample of Page 2 of 2. This page may be used by you
or you may create your own.
* Days required at each conflict point
4-D
FORM 710-010-171
4/8/88
PAGE 1 Of 2 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
UTILITY RELOCATION SCHEDULE
I NO.
PROJECT NO.
STATE ROAD
COUNTY
PARCELF-
1K15407
88004-3500
607
Indian River
N/A
UMITY AGENCY/OWNER
A. Existing Facilities on Project (Su•►aary as to Type i Location):
AP N®_
�deral Funds
Adjustment of valves outside paved areas of the roadway. Various locations
77+ 20+, etc.
Adjustments of FHAs. Various locations 110+, 10+, 184+, 20+ (for example).
$. Disposition of Facilities (Existing & Proposed) on Project
i Location): (summary as to Type
County will relocate in conjunction with DOT project work.
C. Adjustment/Relocation Schedule
PRECONSTRUCTION ITEMc DAYS ESTIMATED
Preliminary Engineering
Material Procurement 2
Right of Way Acquisition
Contract Negotiations
Other
TOTAL CONSTRUCTION ITEMS (Total days on project from Page 2)
T e a ove data a ase on construct on p ans ated iiine
AGENCY/OWNER is not reapaneiblethis
for circumstances beyond its control. AGENCY/OWNER shall
cooperate with FDOT's contractor to include their utility adjustment/relocation work in
Contractor's Work Progress Schedule under Subarticle 8-3.2 of the Standard Specifications.
The AGENCY'S field representatives can be contacted at:_1$40 25th•q r ¢ VnrO )3 r+
32960 Telephone Number:_ 07 770-5325
SUBMITTED FOR THIS AGENCY BY:
DATE:
stenature
°T. OF TRANSPORTATION APPROVAL BY:
.DATE:
* Per conflicting item
33-E
FORM 710-010-171
4/8/88
Page 2 of 2 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
UTILITY RELOCATION SCHEDULE
WPI
NO.
PROJECT NO. STATE ROAD
COUNTY
PARCEL
PAP NO.
4115407
1 88004-3500 507
Indian River
' N/A
Federal Funds
UMITY AGENCY/OWNER
D.
Construction Activities: (Use activities that apply and activities that are
neaded)s
I.
Before Construction Begins
( ) days
2.
Immediately after Clearing & Grubbing
( ) days
3.
During Grading
( 3 ) days
4.
During Drainage
( ) days
5.
stabilizing
( ) days
6.
Bridge Construction
( ) days
7.
Protecting Existing Utilities
( ) days
8.
Pile Driving
( ) days
9.
Traffic signals
( ) days
10.Highway
Lighting
( ) days
11.
Paving
( I days
NOTE: Total of items 1 thru construction/adjustment/
relocation days on project.
30 days
Continuation o Block A d ) Block B 1 1 special Notat ons
* Days are on an item -by -item basis. There appears to be
approximately 15 points of conflict outside the paved area
with 3, days each; however, this is concurrent with your
work, not in addition to.