Loading...
HomeMy WebLinkAbout2019-036WORK ORDER NO. 2 101ST AVENUE WIDENING (87th Street to CR 512) IRC -1902 This Work Order Number 2 is entered into as of this 5th day of March , 2019, pursuant to that certain Annual Professional Surveying and Mapping Services Master Agreement dated October 04, 2016 and that certain Renewal of Annual Professional Surveying and Mapping Agreement dated September 18, 2018, collectively referred to as the "Agreement" by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and CIVILSURV DESIGN GROUP, INC. ("SURVEYOR"). The COUNTY has selected the SURVEYOR to perform the professional services set forth on Exhibit A (Scope of Work), attached to this Work Order No. 2, and made part hereof by this reference. The professional services will be performed by the SURVEYOR for the fee schedule set forth in Exhibit A (CivilSury Design group, Inc. Proposal, dated January 23, 2019), attached to this Work Order and made a part hereof by this reference. The SURVEYOR will perform the professional services within the timeframes more particularly set forth in Exhibit A, attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. CIVILSURV DESIGN GROUP, INC. By:/ j By: Print Name: �lc� h , /ita Title: P, y. BCC Approved Date: March 5 , 2019 Yw Attest: Jeffrey Smith, Clerk of Court and Comptroller Bob Solari, Chairman By: Approved: Jason Deputy Clerk frOUcttiri,.) Approved as to form and legal sufficiency: wn, County Administrator Or') Dylan T. Reingold, County Attorney January 23, 2019 Via e-mail: dschryver@ircgov.com David W. Schryver, P.S.M. County Surveyor, Engineering Division Indian River County 1801 27th Street (Building A) Vero Beach, FL. 32960 (772) 226-1386 CIvILSu V A Tradition of Innovative Engineering EXHIBIT A RE: 101st Avenue, Vero Lakes Estates Thank you very much for your request. In accordance with your request CivilSury Design Group, Inc. is pleased to provide a proposal for a Topographic Survey for the Right -of -Way of 101st Avenue and the intersecting streets from C.R. 512, south to 87th Street. The Topographic Survey shall adhere to the Standards of Practice as set forth by the Board of Surveyors and Mappers pursuant to Rule 5J-17 of the Florida Administrative Code. The Topographic Survey shall depict the following: Horizontal datum shall be based on the East Zone of the Florida State Plane Coordinate System. 1) Have 2 vertical control points per block for future construction. Vertical datum will be dependent on nearest vertical control to project. 2) Spot elevations at 50' intervals including intermediate highs and lows, ditches, Etc. 3) Spot elevations utilizing a 50' grid. 4) All above ground improvements and Underground Utilities as marked by a Utility Locating Service. 5) Prepare the Survey in AutoCAD Civil 3D Version 2013 or newer with 1' contours. 6) Cross Section the ditches at 93rd Street and 89th Street with 50' Sections, 200' East and West of 101St Avenue Right -of -Way. 7) Obtain centerline of ditch elevations along the rear of the lots adjacent to 101St Avenue at 100' intervals more or less. 8) Total linear feet of the project consist of 5,200'+- along 101St Ave., 8 intersections extending 200' East and 200' West, 2,400'+- and 10,400' of adjacent ditches. The Topographic Survey will include the entire Right -of -Way plus 10' beyond of 101st Avenue from the North Right -of -Way line of C.R. 512 South to 50' south of 87th Street. The survey of the eight (8) intersections shall extend outwards approximately 200' East and West of the Right-of-way of 101st Avenue. I anticipate the following man hour utilization; 60 Hours 3 Person Survey crew ($150.00) $9,000.00 44 Hours 2 Person Survey Crew ($120.00) $5,280.00 40 Hours Survey Tech. ($115.00) $4,600.00 20 Hours P.S.M. ($175.00) $3,500.00 3 Hours Director ($190.00) $570.00 The Lump sum fee for Topographic Survey is $22,950.00 Deliverables will include four (4) original signed and sealed drawings of the Topographic Survey as well as a PDF file and AutoCAD digital file. Please feel free to contact me anytime if you have any questions. I anticipate this project to take six weeks to complete. Sincerely. Accepted: CivilSury Design Group, Inc. Scott Worack Director of Surveying and Mapping E-mail: sworack@civilsurv.com Name: Date: www.CivilSurv.com Small Business Enterprise 2525 Drane Field Road 1 Suite 7 1 Lakeland, Florida 33811 p. 863-646-4771 1 f. 863-646-3378 1 toll free 866-397-4771