HomeMy WebLinkAbout2019-041WORK ORDER NUMBER AA -LEAPS -1
GEOTECHNICAL INVESTIGATION FOR THE NORTH RELIEF CANAL
UNIVERSAL LOW ENERGY AQUATIC PLANT SYSTEM ULEAPSTm
This Work Order Number AA -LEAPS -1 is entered into as of this 5th day of
March 2019, pursuant to that certain Continuing Contract Agreement for
Professional Services renewed on September 20, 2016 ("Agreement"), by and between
Indian River County, a political subdivision of the State of Florida ("COUNTY") and
Anderson Andre Consulting Engineers, Inc. ("CONSULTANT").
The COUNTY has selected the CONSULTANT to perform the professional
services set forth in Part 1 of this Work Order. The CONSULTANT will perform the
professional services for the fee schedule set forth in Part 2 of this Work Order. The
CONSULTANT will perform the professional services within the timeframe set forth in
Part 3 of this Work Order, all in accordance with the terms and provisions set forth in the
Agreement. Nothing contained in this Work Order shall conflict with the terms of the
Agreement and the terms of the Agreement are incorporated in this Work Order as if
fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as
of the date first written above.
CONSULTANT
ANDERSON ANDRE CONSULTING
ENGINEERS, INC.
By:
Peter G. Andersen, P.E.
Title: VP/Principal
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY '�onin��s,,.
` �� Q c*:
yBob Solari, Chairman -'°ay.�r`+. oQ��'•'
Attest: Jeffrey R. Smith, Clerk of Court and '-•••'
Comptroller
i at g 6 ��&o
Deprlty Clerk
Appr
Jason E Bro n, County Administrator
Approvod a to for. a d: al sufficiency:
illiam K. Debraal, Deputy County Attorney
1
f:\public works\keithm\stormwater projects\leaps\work orders\andersen andre\work order as -leaps 1.doc
WORK ORDER NUMBER AA -LEAPS -1
GEOTECHNICAL INVESTIGATION FOR THE NORTH RELIEF CANAL
UNIVERSAL LOW ENERGY AQUATIC PLANT SYSTEM ULEAPSTM
PART 1 - SCOPE OF WORK
The COUNTY has requested that the CONSULTANT provide a geotechnical engineering
evaluation COUNTY's North Relief Canal Universal Low Energy Aquatic Plant System
(U*LEAPSTM) (hereinafter "ULEAPSTM"). The Work is more particularly described in
Exhibit A, included herein.
PART 2 - COMPENSATION AND PARTIAL PAYMENTS
1. Compensation
The COUNTY agrees to pay and the CONSULTANT agrees to accept, a not -to -exceed fee
of $21,120.00 for services rendered according to Part 1 of this Work Order and as
summarized in Exhibit A. Additional services shall be at the hourly rates as set forth in the
Agreement.
2. Partial Payments
The COUNTY shall make monthly partial payments to the CONSULTANT for all
authorized work pertaining directly to this project performed during the previous calendar
month. The CONSULTANT shall submit invoices monthly for services performed and
expenses incurred pursuant to this Agreement during the prior month.
The CONSULTANT shall submit duly certified invoices in duplicate to the Director of
the Public Works Department. For lump sum line items, the amount submitted shall be the
prorated amount due for all work performed to date under this phase, determined by
applying the percentage of the work completed as certified by the CONSULTANT, to the
total due for this phase of the work. For time and material line items, the amount
submitted shall be based on the actual hours worked and expenses incurred for the billing
period.
The amount of the partial payment due the CONSULTANT for the work performed
to date under these phases shall be an amount calculated in accordance with the previous
paragraph and less previous payments. Per F.S. 218.74(2), the COUNTY will pay
approved invoices on or before the forty-fifth day after the COUNTY receives the
CONSULTANT's invoice.
PART 3 - TIME FOR COMPLETION
The estimated completion time is thirty-five days following issuance of a Notice to
Proceed.
**END OF WORK ORDER**
Page 2of2
F:\Public Works\KeithM\Stormwater Projects\LEAPS\Work Orders\Andersen Andre\Work Order AA -LEAPS I.doc
AACE
EXHIBIT A - ULEAPSTM SCOPE OF WORK
ANDERSEN ANDRE CONSULTING ENGINEERS, INC. AACE Proposal No. P19-1256
Geotechnical Engineering February 19, 2019
Construction Materials Testing
Environmental Consulting
Indian River County BOCC
Public Works - Stormwater Division
1801 27th Street
Vero Beach, FL 32960
Attention: Mr. Keith McCully, P.E.
PROPOSAL FOR GEOTECHNICAL ENGINEERING EVALUATION
PROPOSED UNIVERSAL LOW ENERGY AQUATIC PLANT SYSTEM (ULEAPSTM)
NORTH RELIEF CANAL - 66TH AVENUE AND 53`3 STREET
INDIAN RIVER COUNTY, FLORIDA
As requested, Andersen Andre Consulting Engineers, Inc. (AACE) is pleased to present this proposal
for preparing a subsurface exploration and geotechnical engineering evaluation for the above referenced
project. The purpose of the exploration is to obtain general subsurface soil information so that
geotechnical engineering recommendations can be provided for site preparation procedures, basin/berm
construction, excavations, water control/conveyance structure installations, anticipated seepage losses,
slope stability, and other geotechnical aspects of the project.
PROTECT UNDERSTANDING
The subject approximately 18 -acre former citrus grove property is located on the northeast corner of
66th Avenue and 53rd Street in Indian River County, Florida. It is bordered to the west by the Indian
River Farms Water Control District (IRFWCD) Lateral A Canal and to the north by the IRFWCD
North Relief Canal (NRC). Based on our conversations and our review of the forwarded project -related
information, we understand that Indian River County (IRC) is proposing to construct an aquatic plant
system (named ULEAPSTM) on this property, intended to reduce pollutants in the adjacent NRC.
Based on our conversations and our review of the provided rendering of the proposed ULEAPSTM (30
percent design), we understand that the system will include the following features:
• A pump station near the northwest corner of the site which will convey water from the NRC
into the ULEAPS through piping and structures along the west side of the site.
• Two approximately 3.5 -acre Lettuce Scrubber Basins with perimeter berms. These basins will
have concrete bottom slabs (EL 20.5 ft) and 15 -ft wide HDPE -lined perimeter berms top EL
23.5 ft) and a design water EL of 22.5 ft.
• Four concrete Algal Reaeration Units with associated Concrete Sludge Storage and Compositing
areas, weirs, sluices and structure/pipe connections.
• Water will flow from these features into two Final Settling Basins (bottom EL 10 ft) which, in
turn, connects to a Wetland Polishing Marsh (bottom EL ranges from 12 ft to 14 ft), after which
the water is released back into the NRC through a structure and piping.
Misc. perimeter concrete structures, box culverts, piping, etc. will also be constructed as part of
connecting the various ULEAPS features.
We understand that no deep structures, such as sheet pile weirs, pile supported structures, etc. are
currently planned for the project.
834 SW Swan Avenue, Port St. Lucie, Florida 34983 Ph: 772-807-9191 Fx: 772-807-9192 www.aaceinc.com
PROPOSED UNIVERSAL Low ENERGY AQUATIC PLANT SYSTEM (ULEAPSTm)
NORTH RELIEF CANAL - 66m AVENUE AND 53AD STREET
AACE Proposal No. P19-1256
Page -2-
We understand that this system will be operated by either A) pumping 10 MGD continuously or B)
pumping 10 MGD over 12 hours and then turning the pumps off at night and allowing the water to
remain in the basins until the next morning where the cyde is then repeated.
As part of the system design, it is desired by IRC to estimate the seepage losses that would be expected
for the 12 -hour resting period of the system. As most of the system will be encased with concrete slabs
and HDPE -lined berms, only the un -lined Final Settling Basins and the Wedand Polishing Marsh, as
well as the un -lined berms separating the system from the NRC, will be subject to potential seepage
losses. Further, slope stability of existing and new berms may be investigated (to be determined).
FIELD EXPLORATION PROGRAM
Proposed Field Work
Based on our understanding of the project, on our experience with similar projects, and on our
experience with the soils in the general site vicinity, we propose to perform the following field
exploration program:
• Eight (8) Standard Penetration Test (SPT) borings (ASTM D1586) to depths of about 25 feet
and two (2) SPT borings to depths of about 60 feet below the existing ground surface.
• Ten (10) hand auger borings (ASTM D1452) to depths of 5-7 feet below the existing ground
surface.
• Two (2) temporary well nests, each with up to 3 temporary 2 -inch diameter PVC wells screened
at different elevations. The number of wells per nest and the well screen depth intervals will
depend on the encountered soil conditions. These wells will be utilized for field soil
permeability testing so as to explore the permeability of the subsoils at select levels, for use in
our seepage analysis. Preliminarily, we anticipate installing the wells to depths ranging from 5
to 30 feet, depending on encountered soil conditions.
• Complete up to four (4) double -ring infiltrometer tests (ASTM D3385) to ascertain the
unsaturated vertical infiltration rate.
• Obtain samples for a suitable laboratory testing program to aid in the determination of prudent
engineering properties of the levee soils for use in the stability and seepage analysis.
General Notes
All field work will be completed using truck -mounted drill rig(s), support trucks, and related equipment
and materials. All borings will be backfilled following their completion, and all temporary wells will be
removed once field permeability testing has been completed. The number of borings and wells, as well
as depths, are estimated based on our experience from similar projects. Should the encountered soil
conditions prove to be more homogeneous than anticipated, less borings and possibly shallower borings
may be utilized, resulting in overall cost savings. Alternatively, if highly variable soils are encountered,
we may recommend that additional borings and/or wells be installed.
PROPOSED UNIVERSAL Low ENERGY AQUATIC PLANT SYSTEM (ULEAPSTm)
NORTH RELIEF CANAL - 66"' AVENUE AND 53RD STREET
AACE Proposal No. P19-1256
Page -3-
AACE will take reasonable efforts to reduce damage to property, such as rutting of the ground surface.
However, it should also be understood that in the normal course of our work some such disturbance
could occur. We have not budgeted to restore the site beyond backfilling our boreholes. If there are
any restrictions or special requirements regarding this site or exploration, these should be known prior
to commencing the field work.
The site is currently not accessible to our truck -mounted drilling equipment due to the presence of
former citrus trees. As such, we understand that IRC will conduct a gopher tortoise survey and then
clear paths in the vegetation to allow our equipment and crews to access the desired locations on the
site.
Safety
AACE has a commitment to safety of all its employees. As such, and in accordance with our safety
culture, we will prepare a "Pre -Task Plan" to identify the potential site safety and job hazards associated
with the proposed scope of work. Prior to commencement, and during on-site activities, we will re-
evaluate potential job hazards and appropriate safe working procedures. At this time, we anticipate that
a United States Occupational Safety and Health Administration (OSHA) Level D work uniform
consisting of hard hats, traffic vests, safety glasses, protective gloves, and steel -toed boots will be
required by all personnel in the work area.
LABORATORY TESTING PROGRAM
AACE's project engineer will perform visual classification on the recovered samples and will coordinate
a suitable laboratory testing program of select samples. Laboratory testing may include determinations
of moisture content, organic content, grain -sizes and percent fines, etc.
ENGINEERING ANALYSIS & REPORT
AACE will perform engineering analysis of all data obtained to evaluate general subsurface conditions
and to develop engineering recommendations relative to site preparation procedures, basin and flow -way
excavations, structure/pipe installation, suitability of the excavated materials for use as off-site fill
materials, etc. Further, a limited seepage and slope stability analyses will be completed for an anticipated
maximum of two cross-sections (to be determined) so as to estimate the seepage loss within the Settling
Basins and Polishing Marsh, and also to check for the stability of the perimeter berms and the adjacent
NRC canal banks.
Our recommendations will be presented in a written report upon conclusion of the study, along with
all data developed during the exploration and our laboratory testing.
SCHEDULE
We will perform the initial site visit(s) within 3 to 5 business days after receiving written authorization
to proceed. Weather conditions permitting, we will then mobilize our crew and drilling equipment
within an additional 3 to 5 business days and commence drilling. We estimate that we can complete all
field work within 7 working days. We further estimate that our laboratory testing, engineering analysis,
and report preparation will likely require an additional 10 to 14 business days to complete following the
completion of the field and laboratory exploration program.
PROPOSED UNIVERSAL Low ENERGY AQUATIC PLANT SYSTEM (ULEAPSTh)
NORTH RELIEF CANAL - 66"' AVENUE AND 53RD STREET
AACE Proposal No. P19-1256
COST ESTIMATE
Page -4-
Based on our knowledge of the project to -date, the attached summary of services and corresponding
fees will be necessary to meet our goals. We expect that the total fee for our services will not exceed
$21,120.00. Should we encounter conditions on the site that warrant more investigative effort than
anticipated, we will inform you immediately. AACE will not proceed with additional work without your
approval. Charges will be made for the work actually performed using the unit fees given in the attached
Exhibit A "Project Services and Fees" which were obtained from our Continuing Services Contract with
Indian River County.
TERMS & CONDITIONS
The proposed scope of services is subject to the following terms and conditions: (1) access to boring
locations is to be readily available to our conventional (4x4) truck -mounted drilling equipment, (2) we
have right -of -entry onto the project right-of-way, (3) the proposed number of borings/wells and their
depths will be sufficient for our analysis, and (4) AACE will contact the Sunshine 811 service in an
attempt to locate underground utilities if utility clearance has not already been performed. We cannot
take responsibility for damages to underground structures and/or services which do not subscribe to
Sunshine 811; their locations are to be provided by the client prior to commencement of the field work.
Underground Utility Location Services
Florida Statute 240, Section 556.101 through 556.111 established a state-wide service, whereby persons or companies who
plan to excavate the earth may advise the Sunshine 811 service of the location, date and other operation particulars, to allow
affected utility companies the opportunity to mark the location of their buried lines prior to excavation. The statute provides
for fines and other sanctions to be imposed in the event that such notification is not given. To comply with this statute, if
deemed necessary, representatives of AACE will notify Sunshine 811 of our proposed explorations. In addition, non-
participating utility companies, as identified by us, will be notified of our proposed explorations. This service will require
a lead time of between 2 and 5 business days, prior to the mobilization of exploration equipment, to comply with Sunshine
811 operation procedures.
CLOSURE
We sincerely appreciate the opportunity to present this proposal. If the terms above are acceptable to
you, please sign and return the attached Professional Services Agreement as an indication of your
acceptance and authorization to proceed with the work. Please contact us if you should have any
questions concerning this cost estimate.
ANDERSEN ANDRE CONSULTING ENGINEERS, INC.
Peter G. Andersen, P.E. David P. Andre, P.E.
Principal Engineer Principal Engineer
Attachments: Project Services and Fees
Professional Services Agreement & General Conditions
ANDERSEN ANDRE CONSULTING ENGINEERS, INC.
WWW.AACEINC.COM
AAC
PROPOSED UNIVERSAL Low ENERGY AQUATIC PLANT SYSTEM (ULEAPS
NORTH RELIEF CANAL - 66TH AVENUE AND 53RD STREET
AACE Proposal No. P19-1256
Exhibit A: Project Services and Fees
Page -5-
Our estimated geotechnical services and associates are itemized below. The utilized unit fees were
obtained from our Continuing Services Contract with Indian River County.
1. Initial Site Visit, Layout of Field Work, and Field Work Coordination/Monitoring:
Staff Engineer - 40 hours @ $80.00/hour $3,200.00
2. Mobilization/Demobilization of truck -mounted drilling equipment $250.00
3. SPT Borings (8 borings to 25 feet and 2 borings to 60 feet):
• 250 feet of borehole of depths <25 feet @ 14.00/foot $3,500.00
• 50 feet of borehole of depths 26-50 feet @ $15.00/foot $750.00
• 20 feet of borehole of depths 51-75 feet @ $17.00/foot $340.00
4. Hand auger borings (10 borings to 5-7 feet):
• 70 feet of borehole of depths <10 feet @ $10.00/foot $700.00
5. Temporary well installation and field permeability tests:
Anticipated 6 wells ranging from 5 to 30 feet; average well depth of 20 feet.
• Mobilization for well installation $250.00
• Estimated 120 feet of temporary well @ $28.00/foot $3,360.00
• Estimated 6 well permeability tests @ $375.00/test $2,250.00
• Removal/abandonment of wells; 4 hours @ $80.00/hour $320.00
6. Double -Ring Infiltrometer Tests:
4 @ $500.00/test $2,000.00
7. Laboratory Testing Program:
Visual Classification and Laboratory Test for Classification and Determination of
Strength, Compressibility and Permeability Characteristics.
• Budget Allowance $1,200.00
8. Engineering Services & Report Preparation:
Principal Engineer (P.E.): $150.00/hour
Senior Project Engineer (P.E.): $125.00/hour
Project Engineer (P.E.): $95.00/hour
Staff Engineer: $75.00/hour
Senior Engineering Technician: $55.00/hour
CAD/Clerical Services: $40.00/hour
Estimate:... $3,000.00
Total $21,120.00
ANDERSEN ANDRE CONSULTING ENGINEERS, INC.
WWW.AACE INC. COM
AACE
RACE
ANDERSEN ANDRE CONSULTING ENGINEERS, Inc.
PROFESSIONAL SERVICES AGREEMENT
AACE Proposal No: P19-1256
Project Name: PROPOSED UNIVERSAL LOW ENERGY AQUATIC PLANT SYSTEM (ULEAPS' "`)
NORTH RELIEF CANAL - 66Th AVENUE AND 53RD STREET
Client: Indian River County BOCC
Public Works - Stormwater Division
Attn: Mr. Keith McCully, P.E.
Address: 1801 27th Street
Vero Beach, FL 32960
Client hereby requests and authorizes Andersen Andre Consulting Engineers, Inc. ("AACE") to perform the
following services:
Complete subsurface explorations and geotechnical engineering services for the PROPOSED UNIVERSAL Low
ENERGY AQUATIC PLANT SYSTEM (ULEAPST"t) - 66Th AVENUE AND 53RD STREET, as detailed herein.
Estimated Budget:
$21,120.00
Payment Terms:
Net 30 days from invoice date; invoices will be sent every four weeks for continued or extended projects.
Interest charges, 11/z% per month following the due date.
Proposal Acceptance:
By accepting this Proposal, the Terms and Conditions of this Proposal, including the Terms on this page, and
Andersen Andre Consulting Engineers, Inc.'s General Conditions appearing on the reverse side of this page are
incorporated herein by reference. In the event this Professional Services Agreement was received by facsimile
or via email, Client hereby confirms that the above described Proposal, the Terms and Conditions of this
Proposal, including the Terms on this page, and Andersen Andre Consulting Engineers, Inc.'s General Conditions
have been made available and are incorporated in this agreement.
PURSUANT TO FLORIDA STATUTES SECTION 558.0035 (2013) AN
INDIVIDUAL EMPLOYEE OR AGENT MAY NOT BE HELD
INDIVIDUALLY LIABLE FOR NEGLIGENCE.
Accepted by CLIENT: Accepted for AACE:
By: By: ==—
Name: Name: Peter G. Andersen. P.E.
Title: Title: Principal Engineer
Date: Date: February 19. 2019
Billing Address:
AACE GENERAL CONDITIONS
1- Parties And Scope Of Work: Andersen Andre Consulting Engineers, Inc. (hereinafter
referred to as "AACE") shall include said company, its individual professionals, particular
division, subsidiary or affiliate performing the Work. "Work" means the specific
geotechnical, analytical, testing, environmental or other service to be performed by AACE
as set forth in AACE's proposal, the Client's acceptance thereof, both incorporated herein
by this reference, and these General Conditions. "Client" refers to the person or business
entity ordering the Work to be done by AACE. If the client is ordering the Work on behalf
of another, the Client represents and warrants that the Client is the duly authorized agent of
said party for the purpose of ordering and directing said Work. Further, Client shall disclose
any such agency relationship to AACE in writing before the commencement of AACE's
Work hereunder. Client agrees that AACE's professional duties are specifically limited to the
Work as set forth in AACE's proposal. The Client assumes sole responsibility for
determining whether the quantity and the nature of the Work ordered by the Client is
adequate and sufficient for the Client's intended purpose. Client shall communicate these
General Conditions to each and every third party to whom the Client transmits any part of
AACE's Work. AACE's Work is for the exclusive use of Client, and its properly disclosed
principal. In no event shall AACE have any duty or obligation to any third party. The
ordering of Work from AACE shall constitute acceptance of the terms of AACE's proposal
and these General Conditions.
2 - Scheduling of Work: If AACE is required to delay commencement of the work, or if,
upon embarking on its work, AACE is required to stop, delay or otherwise interrupt the
progress of work as a result of changes in the scope of work requested by the client, to fulfill
the requirements of third parties, interruptions in the progress of construction, or other
causes beyond the exclusive reasonable control of AACE, additional charges will be
applicable and payable by the Client.
3 - Responsibility: AACE's work shall not include determining, supervising, or
implementing the means, methods, techniques, sequences or procedures of construction.
AACE shall not be responsible for evaluating, reporting or affecting job conditions
concerning health, safety or welfare. AACE's work or failure to perform same shall not in
any way excuse any contractor, subcontractor or supplier from performance of its work in
accordance with the contract documents.
4 - Payment Payment shall be due within 30 days after date of invoice. Interest at the rate
of 18% per annum (or the highest rate allowable by law) from 30 days after date of invoice
to date payment is received will be added to all amounts not paid within 30 days after date
of invoice. All attorney fees and expenses associated with collection of past due invoices will
be paid by Client.
5 - Right -of -Entry: Unless otherwise agreed, Client will furnish right -of -entry on the
property for AACE to make the planned borings, surveys, and/or explorations. AACE will
take reasonable precautions to minimize damage to the property caused by its equipment and
sampling procedures, but the cost of restoration or damage which may result from the
planned operations is not included in the contracted amount. If Client desires to restore the
property to its former condition, AACE will accomplish this and add the cost to its fee.
6 - Damage to Existing Man-made Objects: It shall be the responsibility of the Owner
or his duly authorized representative to disclose the presence and accurate location of all
hidden or obscure man-made objects relative to field tests, sampling, or boring locations.
When cautioned, advised or given data in writing that reveal the presence or potential
presence of underground or overground obstructions, such as utilities, AACEwillgive special
instructions to its field personnel. As evidenced by your acceptance of this proposal, Client
agrees to defend, indemnify and save harmless AACE from all claims, suits, losses, personal
injuries, death and property liability resulting from subsurface conditions or damages to
subsurface structures or man made objects, owned by Client or third parties, occurring in the
performance of the proposed work, whose presence and exact locations were not revealed
to AACE in writing, whether such claims or damages are caused in whole or in part by
AACE, and agree to reimburse AACE for expenses in connection with any such claims or
suits, including reasonable attorney's fees. Client's obligation to indemnify is limited to $1
million per occurrence, which Client agrees bears a reasonable commercial relationship to the
Work undertaken by AACE. Client further agrees that these general conditions are a part of
the Work's specifications or bid documents, if any.
7 - Warranty and Limitation of Liability: AACE shall perform services for Client in a
professional manner, using that degree of care and skill ordinarily exercised by and consistent
with the standards of competent consultants practicing in the same or a similar locality as the
project. In the event any portion of the services fails to comply with this warranty obligation
and AACE is promptly notified in writing prior to one year after completion of such portion
of the services, AACE will re -perform such portion of the services, or if re -performance is
impracticable, AACE will refund the amount of compensation paid to AACE for such
portion of the services.
This warranty is in lieu of all other warranties. No other warranty, expressed or implied,
including warranties of merchantability and fitness for a particular purpose is made or
intended by the proposal for consulting services, by furnishing an oral response of the
findings made or by any representations made regarding the services included in this
agreement. In no event shall AACE be liable for any special, indirect, incidental, or
consequential loss or delay or time -related damages. The remedies set forth herein are
exclusive and the total liability of consultant whether in contract, tort (including negligence
whether sole or concurrent), or otherwise arising out of, connected with or resulting from the
services provided pursuant to this Agreement shall not exceed the total fees paid by Client
or $50,000.00, whichever is greater. Client may, upon written request received within five
days of Client's acceptance hereof, increase the limit of AACE's liability by agreeing to pay
AACE an additional sum as agreed in writing prior to the commencement of AACE's
services. This charge is not to be construed as being a charge for insurance of any type, but
is increased consideration for the greater liability involved.
For services involving or relating to pollution, it is further agreed that the Client shall
indemnify and hold harmless AACE and their consultants, agents and employees from and
against all claims, damages, losses and expenses, direct and indirect or consequential
damages, including but not limited to fees and charges of attorneys and court and
arbitration costs, arising out of or resulting from the performance of the work by AACE,
or claims against AACE arising from the work of others. This indemnification provision
extends to claims against AACE which arise out of, are related to, or are based upon, the
disposal, discharge, escape, release or saturation of vapors, fumes, acids, alkalis, toxic
chemicals, liquids, gases or any other material, irritant, contaminant or pollutant in or into
the atmosphere or on, onto, upon, in or into the surface or subsurface. Client's obligation
to indemnify is limited to $1 million per occurrence, which Client agrees bears a reasonable
commercial relationship to the Work undertaken by AACE. Client further agrees that these
general conditions are a part of the Work's specifications or bid documents, if any.
8 - Sampling or Testing Location: Unless specifically stated to the contrary, the fees
included in this proposal do not include costs associated with professional land surveying
of the site or the accurate horizontal and vertical locations of tests. Field tests or boring
locations described in our report or shown on our sketches are based on specific
information furnished to us by others or estimates made in the field by our technicians.
Such dimensions, depths or elevations should be considered as approximations unless
otherwise stated in the report.
9 - Sample Handling and Retention : Generally test samples or specimens are consumed
and/or substantially altered during the conduct of tests and AACE, at its sole discretion,
will dispose (subject to the following) of any remaining residue immediately upon
completion of test unless required in writing by the Client to store or otherwise handle the
samples. (a) NON HAZARDOUS SAMPLES: At Client's written request, AACE will
maintain preservable test samples and specimens or the residue therefrom for thirty (30)
days after submission of AACE's report to Client free of storage charges. After the initial
30 days and upon written request, AACE will retain test specimens or samples for a
mutually acceptable storage charge and period of time. (b) HAZARDOUS OR
POTENTIALLY HAZARDOUS SAMPLES: In the event that samples contain substances
or constituents hazardous or detrimental to human health, safety or the environment as
defined by federal, state or local statutes, regulations, or ordinances ("Hazardous
Substances" and "Hazardous Constituents", respectively), AACE will, after completion of
testing and at Client's expense: (1) return such samples to Client, (u) using a manifest signed
by Client as generator, will have such samples transported to a location selected by Client
for final disposal. Client agrees to pay all costs associated with the storage, transport, and
disposal of such samples. Client recognizes and agrees that AACE is acting as a bailee and
at no time does AACE assume title of said waste.
10 - Discovery of Unanticipated Hazardous Materials: Hazardous materials or certain
types of hazardous materials may exist at a site where there is no reason to believe they
could or should be present. AACE and Client agree that the discovery of unanticipated
hazardous materials constitutes a changed condition mandating a renegotiation of the scope
of work or termination of services. AACE and Client also agree that the discovery of
unanticipated hazardous materials may make it necessary for AACE to take immediate
measures to protect health and safety. AACE agrees to notify Client as soon as practicable
should unanticipated hazardous materials or suspected hazardous materials be encountered.
Client encourages AACE to take any and all measures that, in AACE's professional opinion,
are justified to preserve and protect the health and safety of AACE's personnel and the
public. Client agrees to compensate AACE for the additional cost of working to protect
employees' and the public's health and safety. In addition, Client waives any claim against
AACE, and agrees to defend, indernnify and save AACE harmless from any claim or
liability for injury or loss arising from AACE's discovery of unanticipated hazardous
materials or suspected hazardous materials. Client also agrees to compensate AACE for any
time spent and expenses incurred by AACE in defense of any such claim, with such
compensation to be based upon AACE's prevailing fee schedule and expense
reimbursement policy relative to recovery of direct project costs.
11- Joint and Several Liability: The concept of joint and several liability is basically this:
When two or more parties are considered responsible for causing injury or damage, any one
of the parties may be made to provide compensation for as much as 100% of the damages
assessed. When applied to hazardous materials projects, it is possible that the concept of
joint and several liability could be construed to make AACE partly or wholly responsible
for damages created directly or indirectly by the hazardous materials. Client agrees that it
would be unfair for AACE to be exposed to such an action, because AACE had nothing
whatsoever to do with the creation of the hazardous condition. Accordingly, Client waives
any claim against AACE, and agrees to defend, indemnify and save AACE harmless from
any claim or liability for injury or loss arising from application of a joint and several liability
concept that would, in any manner, hold or seek to hold AACE responsible for creating a
hazardous condition or permitting one to exist. Client also agrees to compensate AACE
for any time spent and expenses incurred by AACE in defense of any such claim, with such
compensation to be based upon AACE's prevailing fee schedule and expense
reimbursement policy relative to recovery of direct project costs.
12 - Legal Jurisdiction: The parties agree that any actions brought to enforce any provision
of this Agreement shall only be brought in a court of competent jurisdiction located in St.
Lucie County, Florida. All causes of action arising out of AACE's Work shall be deemed
to have accrued and the applicable statutes of limitation shall commence to run not later
than either the date of substantial completion of the Work for acts or failures to act
occurring prior to substantial completion, or the date of issuance of final payment for acts
or failures to act occurring after substantial completion of the Work.
13 - Force Majeure: AACE shall not be held responsible for any delay or failure in
performance of any part of this Agreement to the extent such delay or failure is caused by
fire, flood, explosion, war, strike, embargo, government requirement, civil or military
authority, acts of God, act or omission of subcontractors, carriers, client or other similar
causes beyond its control.