Loading...
HomeMy WebLinkAbout2019-066AWORK ORDER NUMBER 11 37TH STREET & INDIAN RIVER BOULEVARD INTERSECTION IMPROVEMENTS Project Number: IRC -1910 This Work Order Number 11 is entered into as of this 23 day of April , 2019, pursuant to that certain Continuing Consulting Engineering Services Agreement for Professional Services entered into as of this 17th day of April, 2018 (collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and KIMLEY-HORN AND ASSOCIATES, INC. ("Consultant"). The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant will perform the professional services within the timeframe more particularly set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. EXHIBIT A SCOPE OF WORK The COUNTY desires to reconstruct the 37th Street and Indian River Boulevard intersection as to remove the acute intersection angle such that vehicular site lines are improved. Within the limits of the intersection improvement, additional auxiliary lanes consisting of dual northbound left turn and dual eastbound right turn lanes will be incorporated into the overall improvement. In addition, the intersection will be reconstructed with current standard mast -arm signalization components. The County agrees to provide (in a timely manner) the following material, data, or services as required in connection with the work to be performed under this Agreement; all of which information the CONSULTANT may use and reasonably rely upon: A. Provide the CONSULTANT with a geotechnical investigations, traffic counts, preliminary data or reports available, existingJocation surveys, topographic surveys, and related documents required to complete the construction documents. B. Provide the CONSULTANT with all available drawings, right-of-way maps, and other documents in the possession of the County pertinent to the project. C. The County shall make provisions for the CONSULTANT to enter upon public and private property as required for the CONSULTANT to perform his services. D. The County will promptly execute all permit applications and provide application and review fees necessary to expedite the acquisition of any local, state or federal permits made necessary by the project. E. The County will pay for all permit fees. Work Order No. 11 37th Street & Indian River Blvd Intersection Improvements The PROJECT LIMITS are projected to extend 1,600 feet along 37th Street and 2,250 feet along Indian River Boulevard for a total project length of 3,850 feet (0.73 miles). A. Roadway Analysis and Plans: Roadway set of plans shall consist of the following: Notes: P — Preliminary, C — Complete, but subject to change, F - Final The plans will be prepared based upon English units. Design will be conducted in MicroStation and Geopak. The following additional data shall be utilized for development of the plans: 1. The roadway plans sheets will be drawn at a scale of 1" = 40' prepared on 11" x 17" sheets. 2. Plan sheets shall depict existing right-of-way, section lines, property lines, temporary construction easements, and centerline of construction. Horizontal control points with state plane coordinates for all PC's, PT's, curve radius, curve length and horizontal Pi's shall be included on the Plan or summarized in an alignment table. 3. Plans shall include spot grades adequate to describe any proposed grading. 4. Match lines shall not be located within the limits of an intersection. 60% 90% 100% Cover Sheet C C F Summary of Pay Items P C F Typical Sections C C F Summary of Quantities & General Notes P C F Summary of Drainage Structures Sheets P C F Project Layout C C F Plan and Profile Sheets (40 scale) C C F Intersection Plan & Details p C F Special Details P C F Drainage Structure Sheets p C F Roadway Soil Survey P C F Cross Sections at 100 ft intervals P C F Stormwater Pollution Prevention Plans P C F Signage & Pavement Marking Plans (40 scale double plan) C C F Signalization Plans P C F Construction Cost Estimate and Quantities C C F Notes: P — Preliminary, C — Complete, but subject to change, F - Final The plans will be prepared based upon English units. Design will be conducted in MicroStation and Geopak. The following additional data shall be utilized for development of the plans: 1. The roadway plans sheets will be drawn at a scale of 1" = 40' prepared on 11" x 17" sheets. 2. Plan sheets shall depict existing right-of-way, section lines, property lines, temporary construction easements, and centerline of construction. Horizontal control points with state plane coordinates for all PC's, PT's, curve radius, curve length and horizontal Pi's shall be included on the Plan or summarized in an alignment table. 3. Plans shall include spot grades adequate to describe any proposed grading. 4. Match lines shall not be located within the limits of an intersection. Work Order No. 11 37th Street & Indian River Blvd Intersection Improvements 5. If applicable, soil boring information shall be plotted on cross sections with soil classification and high season water table. 6. All quantities shall reference FDOT Pay Item Numbers. 7. All details shall reference FDOT Index Numbers. 8. All specifications shall reference to County and/ or FDOT Specifications for Road and Bridge Construction. Any deviations are special specifications not included in FDOT Specifications are required in the Technical Specifications. 9. Initial, interim and Final Plan Submittal shall include the following: Three (3) Sets of Signed and Sealed Plans. ii. One (1) Opinion of Probable Construction Cost One (1) CD with drawings in PDF format. iv. The CONSULTANT will provide construction documents and calculations in sufficient quantity as required by the various reviewing agencies. B. Drainage analysis and Plans: 1. Perform drainage investigations and analysis necessary to prepare a design which will drain the project in accordance with the County, St Johns River Water Management District (SJRWMD) and Army Corps of Consultants (ACOE) design criteria. The work will include the analyses for the following: a. Determine Base Clearance Water Elevation Analyze, determine, and document high water elevations which will be used to set roadway profile grades. Determine surface water elevations at cross drains, floodplains, outfalls and adjacent storm water ponds. Determine groundwater elevations at intervals between the above-mentioned surface waters. b. Design of Stormwater Management Facility Design stormwater management facilities to meet requirements for stormwater quality treatment and attenuation. Develop proposed pond layout (shape, contours, slopes, etc.), perform routing calculations, and design the outlet control structure. c. Design of Storm Drains Develop a "working drainage map", determine runoff, inlet locations, and spread. Calculate hydraulic losses (friction, utility conflict and, if necessary, minor losses). Determine Design tailwater and, if necessary, outlet scour protection. d. Drainage Design Documentation Report Compile drainage design documentation into report format. Include documentation for all the drainage design tasks and associated meetings and decisions. 2. A Stormwater Pollution Prevention Plan (SWPPP) will be developed in conjunction with this project. The site specific SWPPP is a requirement of both the EPA National Pollutant Discharge Elimination Work Order No. 11 37th Street & Indian River Blvd Intersection Improvements System (NPDES) General Permit for Stormwater Discharges from Construction Activities, and the FDEP Generic Permit for Stormwater Discharges from Construction Activities. C. Jurisdicational Permitting: The Consultant shall prepare permit applications for the St Johns River Water Management District (SJRWMD) and Army Corp of Consultants (ACOE) for submittal by the County. This will consist of all required evaluation, design, coordination, and follow-up work necessary to support permit applications. The County will review the permit applications as necessary. The Consultant shall assemble and be responsible for the final submittal. The Consultant shall prepare permit sketches for submission by the County to ACOE and SJRWMD for dredge and fill activities, if necessary. The Consultant shall submit all permit sketches on 8.5" x 11" sheets. Sketches shall be neatly scaled, signed and sealed, and reproducible. 1. Environmental Resource Permitting/Section 404 Permitting The Consultant will prepare and submit the joint Environmental Resource Permit (ERP) application package to the SJRWMD and the ACOE. The application includes the ERP standard forms and a compilation of supplemental materials such as permit sketches, Vegetation (FLUCFCS), soils, quadrangle and FEMA -FIRM maps. The Consultant will coordinate on the behalf of the County with each agency identified in this task. This may include up to one (1) meeting with the agencies to discuss requests for additional information (RAI), and written responses to one (1) request for additional information (RAI) including plan modifications. This scope assumes that mitigation measures will not be necessary or required. This scope assumes that coordination with US Fish and Wildlife Service through the preparation of Biological Assessments or Biological Opinions will not be required. Permit application submittals will be made subsequent to the 60% plan set submittal approval by the County. D. Signing and Pavement Marking Plans: Signing and Pavement Marking plans shall include: Preparation of the plan layout, quantities (including signing and pavement marking quantity) and tabulation of quantities. All plans are to be prepared in accordance with the latest design standards and practices (MUTCD), FDOT Standard Specifications, Indexes, and shall be accurate, legible, complete in design and drawn at the same scale as the Roadway Plans, furnished in reproducible form. Plans will be included with the roadway plans and submitted as indicated above. E. Utility Coordination: The CONSULTANT will coordinate with franchise utility operators in the vicinity of the project such that the proposed construction activities can be developed to minimize impacts to existing utilities located within the project limits. Any utility permitting and relocation design required to accommodate the proposed improvements will be addressed as an additional service relative to this scope of work. Work Order No. 11 37th Street & Indian River Blvd Intersection Improvements F. Signalization Plans: Mast -arm traffic signal configurations at the 37th Street and Indian River Boulevard intersection will be designed to meet current County and FDOT standards. Luminaires will be provided on each mast arm pole. The pole analysis and design of the signal systems will be completed and submitted to County for review. Signalization plans will be included with the roadway plans and submitted as indicated above. (THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) Work Order No. 11 37th Street & Indian River Blvd Intersection Improvements FEE SCHEDULE The COUNTY agrees to pay and the Consultant agrees to accept for services rendered pursuant to this Agreement fees inclusive of expenses in accordance with the following: A. Professional Services Fee The basic compensation mutually agreed upon by the Consultant and the COUNTY is as follows: Lump Sum Components Task Labor Fee Roadway Analysis and Plans $ 89,135 Drainage Analysis and Plans $ 25,330 Erosion Control and SWPPP $ 7,750 Jurisdictional Permitting $ 23,540 Signing and Marking Plans $ 10,075 Utility Coordination $ 8,200 Signalization Plans $ 30,650 Project Total $ 194,680 (THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) Work Order No. 11 37th Street & Indian River Blvd Intersection Improvements TIME SCHEDULE Upon authorization to proceed by the COUNTY, final design documents are expected to take approximately nine (9) months from the Notice to Proceed (NTP). NTP Upon BOCC Approval Phase II Submittal (60% Design Plans) 3 months following NTP Phase III Submittal (90% Design Plans) 6 months following NTP Phase IV Submittal (Final Design Plans) 9 months following NTP (THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) Work Order No. 11 37th Street & Indian River Blvd Intersection Improvements IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. CONSULTANT: KIMLEY-HORN AND ASSOCIATES, INC. By: Title: Principal BOARD OF COUNTY COMMIS§I01Nf f�uTy OF INDIAN RIVER COUNTY ( ..os• By: CZ17,--e Bob Solari, Chairman BCC Approved Date: April 23, 2019 Attest: Jeffrey R. Smith, Clerk of Court and Comptroller By: Approved: Approved as to form and legal sufficiency: fLSLIeilia, eputy Clerk Jason ' . Bre wn, County Administrator ylan T. Reingol •, County Attorney T ca E E C1) 37th Street & Indian River Boulevard Intersection Project Manhours for project W E Zco E E •N 0 a12 Task Principal Senior Registered Professional Designer Support Remarks Professional Professional 1 Staff $225 $200 $145 $110 $130 $60 Total Hours = 44 190 362 235.8 506.4 42 Labor Fee = $9,900 $38,000 $52,490 $25,938 $65,832 $2,520 Roadway Fee = $194,680 Design Topo Fee = By County Geotechnical Fee = By County Total Fee = $194,680 N O O 00 N O O V 00 6) GO CO V O N N N N v N (6 m O O (0 O 0) V 00 CO N- 00 N N 6 r- 56 (0 r O 00 56 OD O) O 00 N to co O r CD N N O V V V 00 1Design Analysis Roadway Plans Drainage Plans Permitting Utility Coordination Signing and Marking Plans ISignalization Plans 37th Street & IRB Workplan.xls Design Analysis Activity: Design Analysis Task Principal Senior Registered Professional Designer Support Remarks Professional Professional 1 Staff Provided by IRCO Provided by IRCO Four review submittals/ meetings Cost est. conducted at 30%, 60%, 90% and Finals QC/QA 4 Project Management 4 Subtotal 4 54 52 0 20 12 N CO N 20 0 0 N N N NV V Contract File Project Coordination Geotech Sub -consultant Surveyor County Eng Dept Cost Estimating Project Specifications and Quantities Activity: Roadway Plans Task Principal Senior Registered Professional Designer Support Remarks Professional Professional 1 Staff 2 sheets 3 sheets at 25 hrs/sht 5 sheets at 20 hrs/ sht 100 ft Sections plus driveways (20) @ 3.0 hrs per 100 ft Sections plus driveways (20) @ 2.5 hrs per 1 sheet of details @ 30hrs/sht Subtotal 12 27 73 75 223 0 45 60 36 30 N a- A— 15 20 NJ O— N N CO a— o� m of a- V LC) V co co V •4 - CN N Cover Sheet 'Typical Section and Notes Summary of Quantities Sheet Plan/Profile Sheets 37th Street Indian River Blvd 'HorizNert Control Sheet Cross Sections 37th Street Indian River Blvd Miscellaneous Const. Details QC/QA Project Management Drainage Plans Drainage Plans Task Principal Senior Registered Professional Designer Support Remarks Professional Professional 1 Staff Includes cross drain design site visits 1 stormwater facilities @ 40 hrs per 1 sheets at 20 hrs per sheet 12 structures at 4 hours per 2 sheets at 10 hrs/sht 3 sheets at 10 hrs/sht Subtotal 10 15 80 86 129 0 29 N CO O C7 O CO C O CO C' oO oO CO V r- co a)N N N N co va- c) O !Drainage Analysis 37th Street] Indian River Blvd IField Review IStormwater Management Facitity 8, Drainage Maps 37th Street] Indian River Blvd !Summary of Drainage Structures 'Drainage Structure Sheets N N () t C M Indian River Blvd IStormwater Pollution Prev. Plans N N 0) L CO Indian River Blvd] IQC/QA Project Management J Activity: Permiting Task Principal Senior Registered Professional Designer Support Remarks Professional Professional 1 Staff ERP Subtotal 4 38 56 20 28 18 N N "Cr C "Cr N CO CO C N C C 00 N 00 W C co co co C CO CO N N N co C C C IPre-application Meetings SJRWM] USACE (Preliminary Exhibits for Permit Permit Package SJRWMD USAGE] Request for Information SJRWMD 1 ACOE IQc/QA 1 Project Management N Vl E N a_ SJRWMD ERP ACOE - nationwide Task Principal Senior Registered Professional Designer Support Remarks Professional Professional 1 Staff Coordination w/ Util Co.'s Req est as -built data Subtotal 4 10 8 24 6 12 oo co N oo co v V Ex. Utility Reveiw Electrical Service Provider Coordination Mt. QC/QA 'Project Management N m 0 Signing and Marking Plans Task Principal Senior Registered Professional Designer Support Remarks Professional Professional 1 Staff 2 sheets at 12 hrs/sht 3 sheets at 12 hrs/ sht Subtotal 4 7 9 15.8 36.4 0 V V N N v 4.8 r V LC) c- N C V (Field Inventory (Plan Sheets (double plan) U) Indian River Blvd IQC/QA Project Management N M 0 0 CO N C Activity: Signalization Task Principal Senior Registered Professional Designer Support Remarks Professional Professional 1 Staff Subtotal 8 39 80 15 60 0 0 m Lo 80 o CV .1 - 00 137th Street & Indian River Blvd Mast -Arm Signalization Design Foundation Structural Design' Q 0 U Cr (Project Management