HomeMy WebLinkAbout2019-073CCNA2018 WORK ORDER 04
Landfill Gas System Inspection and Independent Landfill Gas Energy Engineering
Support
This Work Order Number 04 is entered into as of this 7thday of May , 2019, pursuant to
that certain Continuing Consulting Engineering Services Agreement for Professional Services entered
into as of this 17th day of April, 2018 (collectively referred to as the "Agreement"), by and between
INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Tetra Tech, Inc.
("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant
will perform the professional services within the timeframe more particularly set forth in Exhibit C
(Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of
the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement
and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as
if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above.
CONSULTANT:
By:
Print Name:
Title: Project Manager BCC Approved Date: May 7, 2019
Matthew Shelton
BOARD OF COUNTY COMMISSIONER$, •••^"`7...
OF INDIAN RIVER COUNTY
Bob Solari Irma •••N
•9y9��'� R C OUN "o
Attest: Jeffrey R. Smith, Clerk of Court and Comptroller
By:
Approved:
Approved as to form and legal sufficiency:
adik)
Deputy Clerk
Jason
dministrator
Dylan T. Reingold, County Attorney
Exhibit A
TETRA TECH
April 10, 2019
Mr. Himanshu Mehta
Indian River County
Solid Waste Managing Director
1325 74th Avenue SW
Vero Beach, FL 32968
RE: WORK AUTHORIZATION; LFG SYSTEM INSPECTION AND INDEPENDENT
LFGE ENGINEERING SUPPORT
Dear Himanshu:
Based on our recent discussions, please accept Tetra Tech's proposal for engineering utility
services related to the Indian River County (IRC) landfill gas to energy project. This proposal
consists of an inspection of your existing LFG system and technical assistance in support of
IRC's pursuit of landfill gas (LFG) as energy source. Our scope of work is divided into the
following phases:
• Phase 1- LFG System Inspection
• Phase 2 - LFG to Energy Consulting Support
Scope of Work
TetraTech will rely on the expertise of its solid waste group, Cornerstone Environmental
(Cornerstone), Dave Knapp and Mike Michels, for this support.
1. LFG System Inspection: Tetra Tech will send 1 senior expert to the IRC landfill to inspect
the existing LFG gas system. This inspection will take up to two (2) days, including travel,
and include an assessment of the condition and operation of the components that comprise
the existing LFG Collection skid including, but not limited to the LFG blowers and motors,
sample ports, flow devices, heat sensing devices, knock -out pot, flare and flare stack, header
line as it daylights at the flare and electrical connections. Limited gas quality data will be
collected at the flare skid (not to include siloxanes or sulfides); collection of wellfield data
as well as monitoring/balancing wellfield system is not included in this scope. IRC will
need to provide a current set of system as-builts including the electrical schematics.
2. LFG to Energy Support: this task includes labor and expenses for 2 round trip visits to
attend a scheduled meeting with IRC and any other party IRC deems appropriate for
negotiations of the agreement between IRC and the energy developer. These charges and
expenses must be approved by the IRC before use.
Other engineering support, if requested after contract award, will be addressed under a separate
agreement between IRC and TetraTech.
T,i Tncb.
Mr. Himanshu Mehta
April 10, 2019
Page 2
Schedule
TetraTech is aware that the contract between IRC and the end-user are being negotiated. The LFG
inspection will be scheduled within two (2) weeks after approval of this proposal and the results
submitted in a memorandum format two weeks after completion of the inspection. Phase 2
meetings/support will be completed at mutually agreed upon schedule and as requested by IRC.
Cost Estimate
A breakdown of the cost for this proposal is provided below:
■ Phase 1: LFG System Inspection - $11,488
s Phase 2: LFGE Engineering/Operations Support - $19,506
Total Estimate — $30,994
Terms and Conditions
This work will be governed in accordance with the terms and conditions previously approved by the
IRC under the continuing engineering services agreement, RFQ2018008 dated April 17, 2018,
utility major. Any modifications to the attached language must be accepted by both parties.
If you have any questions or need additional information, please contact David Knapp by phone or
email at (770) 331-4086 or david.knapp@comerstoneeg.com.
Sincerely,
,ice
ft
Matthew Shelton
Project Manager
cc: Brian Watson, P.E.
Mike Michels, P.E.
Attachment: Cost Spreadsheet
TETRA TECH
ATECH
Exhibit B
ostnel Cl
t rlV
`Iask I. Syskci
Inspecilf�
Task 2 .1,P£
5� p � rrt
i)14ax<ai
Po n
«tai
£
Cost
Uri
Project Manager
$159
8
$1,273
4
$636
12
$1,909
Senior Engineer
$210
$255
$1 17
16
III
$3,360
16
$3,360
32
$6,720
Principal Engineer
$255
$468
50
0
$12,750
$0
51
4
$13,005
$468
Scientist V
Pro'ect Administrator
$84
$252
5
$420
8
$672
Contract Administrator
$100
0
$0
0
$0
0
$0
Labor Total
0
$0 32
$5,608
75
$17,166
107
522,774
Travel and ODCs
Unit
Cost
Units
Cost Units
Cost
Units
Cost
Subtotal
Units
Air Travel
$800
$1,200
0
$2,000
Rental Car and rental gas
$200
$400
0
$600
Vehicle/Lodging/Per Diem!Min
$200
$400
0
$600
Per Diem - Meals
$150
$240$390
Parkin,
$75
Mil
$100
$175
Travel and ODCs Total
$0
$1,425
$2,340
$3,765
Subcontractor (cost +10%)
Unit
Cost
Units
Cost Units
Cost
Units
Cost
Subtotal
Units
GEM 500
$400
1
$440
$0
1
$440
elec/mech
$3,500
1
$3,850
$0
$3,850
Cl Gas
Subcontractor Total
$15011111.1111111111111111
$165
$0
1
$165
$4,455
$0
54,455
€ p
OJ CI TO'l"AI.,
,,{)
4` f .' . 4.
k `). 0'r
$30, ., 4
Exhibit 13
Tetra Tech, Inc.
Indian River County
Professional Services Hourly Rate Fee Schedule
Effective October 1, 2017, through Septembar 30, 202041
Position/Titles
Raw Labor Rates Direct tabor Raw Labor Rates x Multiplier
Rate
Minimum Maximum Multiplier Minimum Maximum
Project Management
Sr Project Manager $ 52.00 $ 80.00 3.0 $ 156.00 $ 240.00
Project Manager $ 4L00 $ 68.00 3,0 $ 123,00 5 204.00
Engineers
Principal Engineer $ 70.00 $ 49.00 3.0 5 210.00 $ 297.00
Sr. Engineer $ 50.00 $ 79.00 3.0 $ 150.00 $ 237.00
Engineer V $ 39.00 $ 61.00 3.0 $ 117.00 5 183.00
Engineer IV $ 3200 $ 49.00 3.0 $ 96.00 5 147.00
Engineer Ill $ 26.00 $ 40.00 3.0 $ 78.00 5 120.00
Engineer 0 $ 24.00 $ 34.00 3.0 5 72.00 $ 102.00
EngineerI 5 22.00 5 29.00 3.0 $ 66.00 5 37.00
Engineering Technician 5 12.00 5 22.00 3.0 $ 36.00 5 66.00
Scientists
Scientist VI 5 45.00 $ 71.00 3.0 5 135.00 $ 213.00
Scientist V $ 31.00 $ 57.00 3.0 $ 93.00 $ 171,00
Scientist 7/ 5 27.00 $ 38A0 3.0 5 81.00 $ 114.00
Scientist III 5 24.00 5 3000 3.0 $ 72.00 $ 90.00
Scientist II 5 20.00 $ 26.00 3.0 5 60.00 $ 78.00
Scientist I $ 19,00 $ 23.00 3.0 $ 57.00 5 69.00
Oeslgn Professionals
Sr CAD/Eng Designer 0 5 39.00 $ 52.00 3.0 5 117.00 $ 156.00
Sr CAD/Eng Designer 1 $ 26.00 $ 40.00 3.0 5 78.00 5 120.00
CAD/Engineering Designer 01 $ 24.00 $ 33.00 3.0 5 72.00 $ 94.00
CAD/EnglnecringDesigner II $ 18.00 $ 24.00 3.0 $ 54.00 5 72.00
CAD/Engineering Designer I $ 16.00 $ 21.00 3.0 $ 48.00 $ 63.00
Surveyors
Sr Land Surveyor $ 41.00 5 50,00 3,0 $ 123.00 $ 150.00
Land Surveyor $ 28.00 5 40.00 3.0 $ 84.00 5 120.00
Survey Crow Chief $ 24.00 5 38.00 3.0 $ 72.00 $ 114.00
Survey Tech $ 17.00 5 30,00 3.0 5 51.00 5 90.00
Architects
Architectural Program Mgr $ 65.00 $ 85.00 3.0 $ 195.00 $ 255.00
Sr Architect $ 55.00 5 75.00 3.0 $ 165.00 $ 225.00
Architect $ 35.00 $ 55.00 3.0 5 105.00 $ 165.00
Architectural Designer 5 17.00 5 35.00 3.0 5 51.00 $ 105.00
Construction Professionals
Construction Project Rep $ 22.00 5 42.00 3.0 $ 66.00 $ 126.00
Construction Manager 11 $ 50.00 5 70.00 3.0 $ 150.00 $ 210.00
Construction Manager I 5 38.00 5 54.00 3.0 $ 114.00 $ 162.00
Construction Administrator 5 23.00 $ 39.00 3.0 $ 69.00 5 117.00
MS Analysts
Sr Analyst $ 30.00 $ 65.00 3.0 $ 90.00 $ 195.00
Project Analyst 0 $ 24.00 $ 40.00 3.0 $ 72.00 5 120.00
ProjectAnalystl $ 18.00 $ 28.00 3.0 $ 54.00 5 84.00
Project Administration
Sr Project Administrator 5 27.00 $ 35.00 3.0 5 81.00 5 105.00
Project Administrator $ 15.00 $ 32.00 3,0 $ 45.00 $ 96.00
Project Assistant $ 12.00 $ 22.00 3.0 $ 36.00 $ 66.00
Contract Administrator $ 25.00 5 36.00 3.0 $ 75.00 $ 108.00
SubconsuRant Cost + 2070
Reimbursable Expenses
Engineer's Reimbursable Travel/Mileage At Cost
Other Direct Costs At Cost
11/These hourly billing rates v4I1 remain effective for the Initial duration of this Agreement, and may be renegotiated should
an additional renewal period be exercised.
Exhibit C
Landfill Gas System Inspection and Independent Landfill Gas Energy Engineering Support
PROJECT SCHEDULE
Tetra Tech is aware that the contract between IRC and the end-user are being negotiated. The LFG
inspection will be scheduled within two (2) weeks after approval of this proposal and the results
submitted in a memorandum format two weeks after completion of the inspection. Phase 2