HomeMy WebLinkAbout1994-138k �►t-snil! (1o11s�A lt�to. ) 1/5/94 (ENG) RES4.MAG\gfk
4, RESOLUTION NO. 94-138
A RESOLUTION OF INDIAN RIVER COUNTY CERTIFYING
"AS -BUILT$$ COSTS FOR CERTAIN PAVING AND DRAINAGE
IMPROVEMENTS TO 126TH STREET (ROSELAND), BETWEEN
78TH AVENUE AND 79TH AVENUE, DESIGNATED AS PROJECT
NO. 9046, AND OTHER CONSTRUCTION NECESSITATED BY
SUCH PROJECT; PROVIDING FOR FORMAL COMPLETION
DATE, AND DATE FOR PAYMENT WITHOUT PENALTY AND
INTEREST.
WHEREAS, the Board of County Commissioners of Indian
River County determined that the improvements described herein
specially benefited the property located within the boundaries as
described in this title, designated as Project No. 9046, are in
the public interest and promote the public welfare of the county;
and
WHEREAS, on January 18, 1994, the Board held a public
hearing in the Commission Chambers at which time the owners of
the property to be assessed were afforded an opportunity to
appear before the Board to be heard as to the propriety and
advisability of making such improvements; and
WHEREAS, after such public hearing was held the County
Commission adopted Resolution No. 94-17, which confirmed the
special assessment cost of the project to the property specially
benefited by the project in the amounts listed in an attachment
to that resolution; and
WHEREAS, the Director of Public Works has certified the
actual "as -built" cost now that the project has been completed is
$1,648.81 per parcel, which is less than $1,750.53 per parcel in
the confirming Resolution No. 94-17,
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that:
1. Resolution No. 94-17 is modified as follows: The
completion date for Project No. 9046 is declared to be August 30,
1994, and the last day that payment may be made avoiding interest
and penalty charges is ninety (90) days after passage of this
resolution.
2. Payments bearing interest at the rate of 8% per
annum may be made in two equal installments, the first to be made
twelve (12) months from the due date and the subsequent payments
1
4 t�
� 94-139
' to.be due yearly from the due date. The due date is ninety (90)
days after the passage of this resolution.
3:The final assessment roll for said project listed in
Resolution No. 94-17 shall be as set forth in attached Exhibit
"A" tothisresolution.
4. The assessments as shown in attached Exhibit "A" shall
stand confirmed and remain legal, valid, and binding first liens
against the property against which such assessments are made
until paid.
5. The assessments shown in Exhibit "A", attached to
Resolution N0.94-17 were recorded by the County on the public
records of Indian River County, and the lien shall constitute
prima facie evidence of its validity.
This resolution was moved for adoption by Commissioner
Adams
and the motion was seconded by
Commissioner Bird
to a vote, the vote was as follows:
and, upon being put
Chairman John W. Tippin Aye
Vice -Chairman Kenneth R. Macht Aye
Commissioner Carolyn K. Eggert Aye
Commissioner Fran B. Adams Aye
Commissioner Richard N. Bird Aye
The Chairman thereupon declared the resolution duly
passed and adopted this 25 day of Oc ob r
1994. '
BOARD OF C0VkTi'COMMISSIONERS
OF INDIANi;'giVER COUN"IM, FLORIDA
gy �,
JOHY W:: TIPP- N ..
firman;'
Attest:
JEEY K. BARTON,
Clerby, //J/ 19
Attachment: Exhibit "A"
C:\WP51\DATA94\126AS9LT.RES
2
y
N
Z -4 7db'7d t�0�o <N�� CA f1 N1
w p x Q $ y
11 tri
Ir
A COD
00 00 .y 000 d V Vt
ON
tz z
oaf oytAr
'+ H
N :: W .�0.-. N �., n �-. .O-. H r
o a
z
a a a ni a
00Go
� 00 owo
CD rn o � � c � c $ � � b
bN~ N �" N b N �-. N ►-. A
00 ON
A� iii
v 'w` �
O O O O O
c
000 � d
8
r b�
vi �onn
8 $ S g 8 tri v
o
o � �
6s 6F) .S ;o (A b y O
A $ A $
A
PO 00 00 00 00
00 00 r
y H
o v�
0% O
PO 0?O PO ?o 00 H PO00
00 00 00 00 00
00 w0
m
%0 00
s * +► �► * O
EA
CD
CD
rA
O� ` C "y <p y ►r"
cr
���-V��ppppp w
NQ y C17
� NR � NO � � •�+
ON
_ 00 ° 00 i•i 00 r. WO dtpo
r
�O tri
�zy
d 00
t • R o o o � o o o CA t�
H
r
�p ao to Nam z old
U' z O
0.' ►rC co co 00 00
00
roto $o $o $ oa $ �°
N o--• b — Nb N �„ N—
bi O� 0 A A W C
ON
�W� w00 w w°' t� y
z Z
o
a bHr, to
t�Ob
tri
roO� � >
A
.r
�br1y
g g o o tom" y tri t!i
O
to
tri
90 PO PO PO
tai
y y
o v�
to
0
PO oho ?0H w
00
C4 00 W
-- A A
0
m
b
0
*
� wc�ny�w
d9
�r►rcv,�w
00
00 00
60
cn 00
�f '� O Z5
NoG��
vii
�rC►-•-
����
rangy
t7D� yLAN`.
arrnv
� wc�ny�w
d9
�r►rcv,�w
00
00 00
60
cn 00
�f '� O Z5
7oC CD�
vii
�rC►-•-
SON.
t7D� yLAN`.
00
o
N
� Q
0
8
603,
d9
PO
00
00 00
60
W
P
N
p�
00
00
-
or
N
OD
a
6
w
IK,
t�
W,
�W
00
W
00w�
a p A
31
z
J
a
6
w
IK,
t�
W,
�W
00
W
00w�
a p A
TOTAL ASSESSMENT $23,083.34
Assessment $23,083.34 = $1,648,81
14 Parcels Per Parcel
126sttin.wkl 17—Oct-94
t
FINAL COST FOR:
126TH STREET (ROSELAND)
BETWEEN 78TH AVENUE AND 79TH AVENUE
DATE: 10/06/94
PROJECT NO. 9046
TOTAL PARCELS 14
TOTAL L.F. 724.83
FINAL COST
CONSTRUCTION
Labor
$9,107.84
Equipment
$7,697.10
Asphalt
$2,938.98
Sod
$2,146.95
Pipe
$2,031.32
Limerock
$2,047.48
Empire Engineering
$352.00
Pan American Engineering
$638.75
(Prime Coat)
Miscellaneous
12LK
$26,996.27
$26,996.27
PERMIT FEES
$300.00
$300.00
ROW ACQUISTION &
$0,00
$0.00
TITLE SEARCH
ENGINEERING
(Based on $2.59/L.F.) $2.59
X 724.83 =
$1,877.31
Sub -Total
$29,173.58
Administration 3.0000775%
$875.23
Recording Fees
$125.50
TOTAL
$30,174.31
25% County's Cost
$7,543.58
75% Property Owner's Assessment
$22,630.73
2% Tax Collector's Fee (75% Figure)
$45261
TOTAL ASSESSMENT $23,083.34
Assessment $23,083.34 = $1,648,81
14 Parcels Per Parcel
126sttin.wkl 17—Oct-94