Loading...
HomeMy WebLinkAbout2019-089BCCNA2018 WORK ORDER 14 HOBART WATER PLANT BULK ACID TANK REPLACEMENT This Work Order Number 14 is entered into as of this 11 day of June , 2019, pursuant to that certain Continuing Consulting Engineering Services Agreement for Professional Services entered into as of this 17th day of April, 2018 (collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant will perform the professional services within the timeframe more particularly set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. CONSULTANT: BOARD OF COUNTY COMMISSIONERS Kimley-Horn and Associates, Inc. By: Print Name: Title: Kevin Schanen, P.E. Senior Vice President By: OF INDIAN RIVER COUNTY Bob Solari, Chairman "''° :`ZO•• �'+' ,oma. BCC Approved Date: June 11, 2019 •SER COUNT.•^ Attest: Jeffrey • Smith, Clerk of Court and Comptroller Approved as to form and legal sufficiency: Dylan T. Reingold, County Attorney EXHIBIT #1 Work Order Number 14 Bulk Acid Tank Replacement At Hobart Water Treatment Plant PROJECT UNDERSTANDING The existing bulk sulfuric acid tank at the Hobart Reverse Osmosis Water Treatment Plant (ROWTP) is more than 10 years old and at the end of its service life, and therefore, replacement of the tank is necessary. Since the acid demands have been reduced in the feed water with the use of alternative scale inhibitors, a smaller sized bulk tank is suggested. Associated piping and containment coatings should also be addressed as part of the tank replacement. The scope of work consists of review and inspection of the existing tank conditions and site, preparation of design plans and specifications for a new tank and associated supply piping, coordination with FDEP, and bidding. SCOPE OF SERVICES Task 1: Review Existing Conditions Consultant will review existing tank and piping at the Hobart ROWTP and evaluate options for a replacement tank. Consultant will develop a phasing plan to allow replacement of the existing tank without interrupting service. Task 2: Design Plans and Specification Consultant will prepare plans and specifications for a replacement tank. Plans will consist of a site plan, tank supports, piping, tie-in details, and general details. Photos may be used to depict details. It is anticipated that approximately four (4) drawings will be prepared Specifications will be prepared and consist of the replacement tank, associated piping, coating of existing containment area, and demolition of existing tank. Consultant will provide 90% plans and specifications for review and comment as well as final plans and specifications for construction. Drawings will be provided in electronic (Pdf — portable document format) form. Task 3: Coordination Consultant will prepare a letter of notification to Florida Department of Environmental Protection (FDEP) regarding tank replacement. It is assumed that a FDEP permit is not required for the tank replacement, but that justification for a reduced size tank will be necessary. K:\WPB_Civil\044572048 - South RO Plant Improvements\Scope\20190708 Hobart Acid Tank Scope.docx Page I of 3 Consultant will answer questions from contractors regarding the scope of work during the price proposal phase. Consultant will review one set of shop drawings on the tank and piping during the construction phase of the project. TIME SCHEDULE Services for Tasks 1 through 3 are anticipated to be completed within 3 weeks of notice to proceed. Task 4 will be concurrent with project construction and is anticipated to be completed within 6-8 months, depending on contractor's schedule. FEE SCHEDULE We will provide these services in accordance with our Continuing Consulting Engineering Services Agreement for Professional Services dated April 17th, 2018, by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). The Consultant will provide professional services for a lump sum fee as follows: Task No. Task Task Fee Task 1 Review Existing Conditions, Phasing Plan $ 3,300 Task 2 Design Plans and Specifications $ 14,360 Task 3 Coordination $ 4,050 TOTAL LUMP SUM FEE $ 21,710 ADDITIONAL SERVICES The following services are not included in the Scope of Services for this project, but may be required depending on circumstances that may arise during the execution of this project. Additional services include, but may not be limited to the following: • Construction phase services (beyond those described in Task 3) are not included under this task order, but can be prepared if needed after bidding. • Permitting, including preparation of permit application and supporting information is not believed to be necessary, and therefore not provided. Tank replacement is strictly considered maintenance. K:\WPB Civil\044572048 - South RO Plant Improvements\Scope\20190708 Hobart Acid Tank Scope.docx Page 2 of 3 ESTIMATE FOR ENGINEERING SERVICES PROJECT: Hobart WTP Acid Tank Replacement 5/1/2019 CLIENT: Indian River County Utilities ESTIMATOR MDM DESCRIPTION: Review existing, prepare documents, coordination DIRECT LABOR ( MAN-HOURS ) PRINC SEN PROF REG PROF JL/FH DES/ P2 (TS/NB) CLK P1 EXP SUB Dir E'p LINE TOTAL NO. TASK 1 REVIEW EXISTING CONDITIONS site visit 4 4 5200 50 $1,790 review plans 2 4 4 56 $1,510 2 DESIGN PLANS & SPECS Prepare drawings w/ photos 4 16 48 4 $200 438 $9,402 Prepare specs 10 8 113 $2,381 Review comments 4 6 4 2 125 $2,577 3 COORDINATION Finalize bid docs 4 6 6 90 $1,896 Coordination with purchasing 4 2 39 $831 Answer questions 2 4 2 61 $1,323 TOTAL HOURS 16 0 52 58 28 400 972 521,710 LABOR ($/HOUR) 235 225 150 105 96 80 $0 SUBTOTAL 3760 0 7800 6090 2688 400 520,738 80 K:\WPB Civil\044572048 - South RO Plant Improvements\Scope\20190708 Hobart Acid Tank Scope.docx Page 3 of 3 $3,300 $14,360 $4,050 $21,710 EXHIBIT #1 Work Order Number 14 Bulk Acid Tank Replacement At Hobart Water Treatment Plant P RO.I ECT UNDERSTANDING The existing bulk sulfuric acid tank at the Hobart Reverse Osmosis Water Treatment Plant (ROWTP) is more than 10 years old and at the end of its service life, and therefore, replacement of the tank is necessary. Since the acid demands have been reduced in the feed water with the use of alternative scale inhibitors, a smaller sized bulk tank is suggested. Associated piping and containment coatings should also be addressed as part of the tank replacement. The scope of work consists of review and inspection of the existing tank conditions and site, preparation of design plans and specifications for a new tank and associated supply piping, coordination with FDEP, and bidding. SCOPE OF SERVICES Task 1: Review Existing Conditions Consultant will review existing tank and piping at the Hobart ROWTP and evaluate options for a replacement tank. Consultant will develop a phasing plan to allow replacement of the existing tank without interrupting service. Task 2: Design Plans and Specification Consultant will prepare plans and specifications for a replacement tank. Plans will consist of a site plan, tank supports, piping, tie-in details, and general details. Photos may be used to depict details. It is anticipated that approximately four (4) drawings will be prepared Specifications will be prepared and consist of the replacement tank, associated piping, coating of existing containment area, and demolition of existing tank. Consultant will provide 90% plans and specifications for review and comment as well as final plans and specifications for construction. Drawings will be provided in electronic (Pdf — portable document format) form. Task 3: Coordination Consultant will prepare a letter of notification to Florida Department of Environmental Protection (FDEP) regarding tank replacement. It is assumed that a FDEP permit is not required for the tank replacement, but that justification for a reduced size tank will be necessary. K:\WPB_Civil\044572048 - South RO Plant Improvements\Scope\20190708 Hobart Acid Tank Scope.docx Page 1 of 3 Consultant will answer questions from contractors regarding the scope of work during the price proposal phase. Consultant will review one set of shop drawings on the tank and piping during the construction phase of the project. TIME SCHEDULE Services for Tasks 1 through 3 are anticipated to be completed within 3 weeks of notice to proceed. Task 4 will be concurrent with project construction and is anticipated to be completed within 6-8 months, depending on contractor's schedule. FEE SCHEDULE We will provide these services in accordance with our Continuing Consulting Engineering Services Agreement for Professional Services dated April 17th, 2018, by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). The Consultant will provide professional services for a lump sum fee as follows: Task No. Task Task Fee Task 1 Review Existing Conditions, Phasing Plan $ 3,300 Task 2 Design Plans and Specifications $ 14,360 Task 3 Coordination $ 4,050 TOTAL LUMP SUM FEE $ 21,710 ADDITIONAL SERVICES The following services are not included in the Scope of Services for this project, but may be required depending on circumstances that may arise during the execution of this project. Additional services include, but may not be limited to the following: • Construction phase services (beyond those described in Task 3) are not included under this task order, but can be prepared if needed after bidding. • Permitting, including preparation of permit application and supporting information is not believed to be necessary, and therefore not provided. Tank replacement is strictly considered maintenance. K:\WPB_Civil\044572048 - South RO Plant Improvements\Scope\20190708 Hobart Acid Tank Scope.docx Page 2 of 3 ESTIMATE FOR ENGINEERING SERVICES PROJECT: Hobart WTP Acid Tank Replacement 5/1/2019 CLIENT: Indian River County Utilities ESTIMATOR MDM DESCRIPTION: Review existing, prepare documents, coordination DIRECT LABOR ( MAN-HOURS ) PRINC SEN PROF REG PROF JUFH DES/ P2 (TS/NB) CLK P1 EXP SUB Dir Exp LINE TOTAL NO. TASK 1 REVIEW EXISTING CONDITIONS site visit 4 4 5200 50 $1,790 review plans 2 4 4 56 51,510 2 DESIGN PLANS & SPECS Prepare drawings w/ photos 4 16 48 4 5200 438 $9,402 Prepare specs 10 8 113 $2,381 Review comments 4 6 4 2 125 $2,577 3 COORDINATION Finalize bid docs 4 6 6 90 $1,896 Coordination with purchasing 4 2 39 $831 Answer questions 2 4 2 61 $1,323 TOTALHOURS 16 0 52 58 28 400 972 521,710 LABOR ($/HOUR) 235 225 150 105 96 $0 $0 SUBTOTAL 3760 0 7800 6090 2688 400 S20.738 $0 K:\WPB Civil\044572048 - South RO Plant Improvements\Scope\20190708 Hobart Acid Tank Scope.docx Page 3 of 3 $3,300 $14,360 54,050 521,710