DATE: July 24, 2019
Pine straw was applied to Osprey Acres' hiking trails earlier this year to help delineate
the trails and to provide a dust free walking surface that will be welcomed by the public.
It will also discourage growth of exotics within the trail surface, thereby reducing
maintenance costs. Pine straw blends perfectly with the surrounding wooded area,
resulting in a very visually pleasing product, and it is the perfect choice for a wildlife
habitat, having no adverse impact on any of the Preserve's wild residents. Since the
initial application, a second pine straw application is highly recommended. Construction
and landscaping equipment traveling over the trails has worn the pine straw thin in
several areas and two new trails have recently been constructed, each requiring a small
amount of pine straw at their trailheads. Because the construction contractor is only
onsite now to perform punch list items and all landscaping plants have been installed
along the trails, vehicular traffic will be greatly reduced and we expect a long useful life
from newly applied pine straw. A second application will also greatly enhance the
Project's aesthetic impact and beauty for the upcoming ribbon cutting ceremony in
September 2019.
GK Environmental's proposed lump sum not -to -exceed fee for furnishing and installing
the pine straw as discussed in Attachment 1 is $9,685.20. As a result of RFQ 2017053,
GKE was awarded a Continuing Contract Agreement with Indian River County for
Environmental and Biological Support Services on October 10, 2017, thereby waiving
the necessity of the bid process. Funding will be provided from Optional Sales
Tax/Public Works/Osprey Acres Stormwater- Acct# 31524338-066510-16022.
F:\Public Works\KeithM\Stormwater Projects\Osprey Acres\Work Orders\GK Environmental\GKE
4\Stormwater Memo - Work Order No. 4 with GKE.doc
WORK ORDER NUMBER 4
ADDITIONAL PINE STRAW APPLICATION ON HIKING TRAIL SURFACES
AT OSPREY ACRES FLOWAY AND NATURE PRESERVE
This Work Order Number 4 is entered into as of this a2 day of
LJ cJ-� , 2019, pursuant to that certain Continuing Contract Agreement
for Envbnmental and Biological Support Services entered into as of October 10, 2017
("Agreement"), by and between Indian River County, a political subdivision of the State
of Florida ("COUNTY") and G.K. Environmental, Inc. ("CONSULTANT").
The COUNTY has selected the CONSULTANT to perform the professional
services set forth on Attachment 1, attached to this Work Order and made part hereof
by this reference. The CONSULTANT will perform the professional services for the fee
schedule set forth in Attachment 2, attached to this Work Order and made a part hereof
by this reference. The CONSULTANT will perform the professional services within the
timeframe set forth in Attachment 3, attached to this Work Order and made a part
hereof by this reference, all in accordance with the terms and provisions set forth in the
Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any
Work Order shall conflict with the terms of the Agreement and the terms of the
Agreement are incorporated in each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as
of the date first written above.
CONSULTANT
G.K. ENVIRONMENTAL INC
Title:
INDIAN RIVER COUNTY, FLORIDA
BOARD OF COUNTY COMMISSIONERS
Jason E. Brown, County Administrator
Pursuant to IRC Code Section 105.01
Date Approved; 00 ,ZIp ideig
Attest: Jeffrey R. Smith, Clerk of Court and
Comptoller
Deputy Clerk of Court
By
Approved as o orm and leg. ufficiency:
WILL
William K. Debraal, Deputy County Attorney
1
f:\public works\keithm\stormwater projects\osprey acres\work orders\gk environmental\gke 4\work order 4.doc
ATTACHMENT 1 to WORK ORDER NUMBER 4
ADDITIONAL PINE STRAW APPLICATION ON HIKING TRAIL SURFACES
AT OSPREY ACRES FLOWAY AND NATURE PRESERVE
SCOPE OF WORK
The COUNTY has requested that the CONSULTANT furnish and apply additional pine
straw to a minimum three-inch initial application depth, to the surface of four hiking trails
(pine straw reapplication) and to delineated areas on two new trails at the COUNTY's
Osprey Acres Floway and Nature Preserve (hereinafter "Osprey Acres"). The Scope of
Work, quantities, and costs are presented in Exhibit A, included herein.
**END OF ATTACHMENT 1**
Page 2 of 4
F:\Public Works\KeithM\Stormwater Projects\Osprey Acres\Work Orders\GK Environmental\GKE 4\Work Order 4.doc
ATTACHMENT 2 to WORK ORDER NUMBER 4
ADDITIONAL PINE STRAW APPLICATION ON HIKING TRAIL SURFACES
AT OSPREY ACRES FLOWAY AND NATURE PRESERVE
1. COMPENSATION
The COUNTY agrees to pay and the CONSULTANT agrees to accept, a not -to -exceed fee
of $9,685.20 for services rendered according to Attachment 1 of this Work Order and as
summarized on Exhibit A, included herein.
2. PARTIAL PAYMENTS
The COUNTY shall make monthly partial payments to the CONSULTANT for all
authorized work pertaining directly to this project performed during the previous calendar
month. The CONSULTANT shall submit invoices monthly for services performed and
expenses incurred pursuant to this Agreement during the prior month.
The CONSULTANT shall submit duly certified invoices in duplicate to the Director of
the Public Works Department. For lump sum line items, the amount submitted shall be the
prorated amount due for all work performed to date under this phase, determined by
applying the percentage of the work completed as certified by the CONSULTANT, to the
total due for this phase of the work. For time and material line items, the amount
submitted shall be based on the actual hours worked and expenses incurred for the billing
period.
The amount of the partial payment due the CONSULTANT for the work performed
to date under these phases shall be an amount calculated in accordance with the previous
paragraph and less previous payments. Per F.S. 218.74(2), the COUNTY will pay
approved invoices on or before the forty-fifth day after the COUNTY receives the
CONSULTANT's invoice.
**END OF ATTACHMENT 2**
Page 3 of 4
F:\Public Works\KeithM\Stormwater Projects\Osprey Acres\Work Orders\GK Environmental\GKE 4\Work Order 4.doc
ATTACHMENT 3 to WORK ORDER NUMBER 4
ADDITIONAL PINE STRAW APPLICATION ON HIKING TRAIL SURFACES
AT OSPREY ACRES FLOWAY AND NATURE PRESERVE
1. TIME FOR COMPLETION
Complete all pine straw application Work within two weeks of receiving a Notice -to -
Proceed from the COUNTY.
**END OF ATTACHMENT 3**
Page 4 of 4
F:\Public Works\KeithM\Stormwater Projects\Osprey Acres\Work Orders\GK Environmental\GKE 4\Work Order 4.doc
ATTACHMENT 1
G. K. ENVIRONMENTAL, INC.
Environmental Consulting
GEORGE R. KULCZYCKI, CEC, CES, CEI
155 McKee Lane
Vero Beach, FL 32960
Phone 772-567-9129
Email gke@me.com
July 16, 2019
Mr. Keith McCully, P.E.
Stormwater Engineer
Indian River County
1801 27th Street
Vero Beach, Florida 32960-3388
RE: Professional Service Agreement for:
8.3 Ac. / Osprey Acres / Shallow Marsh
Change Order No. 1: Re -Applying Additional Pine Straw to All 4
Trails and Top of Perimeter Berm & Peninsular Berm
Dear Keith,
This letter is in response to the requested proposal for the above
referenced project in Indian River County, Florida, for environmental services as
generally required for Industry Standards and/or State and Federal
Environmental Resource / Individual Permits. G. K. Environmental, Inc. (GKE)
will be pleased to provide this scope of service under this contract, which is
outlined below:
TASK I
1.0 Install an additional 3" of pine straw to all 4 original trails.
1.1 The four (4) trails total 41,420 sq. ft. @ $0.21 / sq. ft. = $8,698.20
TASK 11
2.0 Install an 3" of pine straw along portions of two new trails.
2.1 The new Main Trail application totals 950 sq. ft. @ $0.21 / sq. ft. =
$199.50
2.2 The new Bobcat Run Trail application totals 550 sq. ft. @ $0.21 /
sq. ft. = $115.50
TASK III
3.0 Additional original pine straw installation on Gopher Tortoise Trail.
3.1 The actual square footage of trail area exceeded the original
estimate. The coverage = 3,200 sq. ft. @ $0.21 / sq. ft. (original application unit
cost) = $672.00.
TOTAL cost for all Tasks is $9,685.20
GKE FEES / COMPENSATION
Invoices will be submitted following work completed at GKE hourly rates or as
may be noted for each Task are payable within 30 days of date of invoice(s).
GKE hourly rates (2018/2019) are $140.00 / hour for Principal Ecologist and
$45.00 / hour for administrative / staff assistance, and if needed $85.00 / hour for
CAD operator and $75.00 / hour for field biologist / chemist / field assistant, and
$55.00 per hour for field assistant.
If additional related work beyond the above scope is required, an additional
proposal will be provided.
Your endorsement below will serve as agreement by client to compensate G. K.
Environmental, Inc. for services rendered in connection with this agreement
within thirty (30) days of date of invoice(s).
Page 2 of 3
McCully / Proposal / Osprey Acres
7-16-19