HomeMy WebLinkAbout2019-122WORK ORDER NUMBER 8
IRC -1801 IRC Courthouse Parking Garage & Seal Replacement
This Work Order Number is entered into as of this13t day of August , 2019 pursuant to that certain Continuing Contract
Agreement for Roof Consultation Services, dated April 15th, 2014, and extended on February 6, 2018 for an additional 3 -
year term, (referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of
Florida ("COUNTY") and REI Engineers, Inc. ("Consultant").
All services performed under this contract shall be supervised and certified by a licensed Professional Engineer (PE) licensed
with the State of Florida and staff employed directly with your firm.
Scope of Services:
Indian River County is requesting that REI Engineers, Inc., review and assess repairs necessary, prepare
construction drawings consisting of roof plans and details which depict the Scope of Work, assist in the bidding
phase, and provide construction administration services for two separate phases of the IRC Courthouse Parking
Garage. Phase One includes three small roofs located above elevator shaft and stairwells. Phase Two includes
replacement of the garage's internal storm drainage system, repair of walls where rebar is exposed, repair of
water -damaged elevator shaft/elevator, repair or replacement of stairs in stairwells, and replacement of building
seals and cleaning/repainting of building at 2000 16"' Avenue, Vero Beach, FL 32960.
All work shall be performed in accordance with the attached Proposal dated April 5, 2019 (EXHIBIT "A") and shall
comply with Standards enumerated in the Continuing Contract Agreement for Professional Services, dated April
15, 2014, and extended on February 6, 2018 for an additional 3 -year term.
Compensation:
The COUNTY agrees to pay, and REI Engineers, Inc., agrees to accept, $50,470.00 for services rendered
according to the Proposal dated April 5, 2019, identified in the attached EXHIBIT "A", incorporated by
reference herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above.
CONSULTANT:
REI ENGINEERS, INC.
By:
Mark Renninger
Branch Manager
By:
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY
Bob Solari, Chairman
BCC Approved Date: August 13, 2019
Attest: Jeffrey
By:
Approved:
Approved as to form and legal suffici
mith, Clerk of Court and Comptroller
andi v)a},d7ikA)
Deputy Clerk
Jason :Iwn, County Adm. - trator
Dylan T. Reingold, County Attorney
ENGINEERS
`EXHIBIT A'
April 5, 2019
Indian River County
1801 27th Street
Vero Beach, FL 32960
Attention: Andrew Sobczak
Infrastructure Project Manager
Reference: Proposal for Engineering Services
Contract Documents and Construction Administration
Indian River County Courthouse Parking Garage Roof and Seal Replacement
REI Proposal No. P17TPA-040 Rev 2
Dear Mr. Sobczak:
In response to our recent discussions, we are pleased to submit this proposal for your consideration. The
engineering services outlined in this proposal are for the parking facility located at Indian River County
Courthouse, 2000 16th Ave. Vero Beach, FL 32960. The following is an outline of the proposed services for
Contract Documents and Construction Administration:
I. CONTRACT DOCUMENTS
A. Conduct site visit(s) to review the structure and assess the requested repairs, provide any
recommended repairslmodifications. and develop detailed Contract Documents for the subject
building.
Prepare comprehensive scaled drawings for two separate project phases. Phase one includes
the replacement of the small roof areas and phase two includes building remediation work. All
plans and details to be developed on Computer Aided Drafting (AutoCAD).
Prepare technical specifications for the requested repairs and recommended
repairs/modifications to the structure.
D. Provide structural framing drawings if the existing structural light gauge is determined to be
deficient at small roof area.
Issue preliminary Contract Documents for Owner/Indian River County Building Department
review. Upon acceptance, final Contract Documents will be prepared and submitted.
F. Hold one Pre -Bid Meeting for potential contractors to review the Contract Documents and resolve
any questions that may arise during the bid stage of the project.
PAGE 1 OF 3
Engineering solutions for tomorrow'"
10150 Highland Manor Drive, Suite 200
reiengineers.com
Tampa. FL 33610 813.944.2137
ENGINEERS
PROPOSAL # P17TPA-040 Rev 2
G. Bids shall be analyzed and a recommendation made based on low bid, alternates, contractor's
past performance and Owner's budget restrictions. Submit a certified Bid Tabulation and
recommendation for award.
II. CONSTRUCTION ADMINISTRATION
A. Review and accept, as appropriate, shop drawings and submittals as required by the Contract
Documents. Return unacceptable submittals to owner as required until compliance with
specifications is realized.
Hold a pre -construction meeting with the successful contractor to ensure a clear understanding
of the plans and specifications.
C. Perform quality assurance site visit once every five working days, Monday through Friday, to verify
work is in compliance with the Contract Documents. Photographs will be taken as deemed
necessary for documentation. REI cannot comment on work that takes place and covered while
REI is not onsite.
D. Prepare and submit reports from each quality assurance site visit relaying information pertaining
to weather, area worked, application methods, material types installed during the site visit, and
listing of non -conforming items requiring Contractor's correction.
E. Certify Contractor's monthly invoicing based on status of work performed as determined from
project site visits.
F. Review any change orders developed to address changes to the contract requirements.
G. Upon notification by the contractor that the job is substantially complete, a substantial completion
inspection will be conducted with REI. Owner, Contractor and Manufacturer personnel. A punch
list will be prepared to list any minor items that require furthertreatment.
Upon notification by the contractor that the job is fully complete, a final inspection will be
conducted with REI. contractor and Owner personnel. A final inspection report will be submitted
upon verifying completion or if necessary, an additional punch list will be prepared.
Upon completion of work, verify compliance of warranties and forward to Owner with close out
documents and final billing.
J. Conduct a 2 -year Contractor Warranty Roof Inspection before the warranty expires to address
warranty issues with the Contractor and Manufacturer.
III. PROPOSED SCOPE OF WORK
A. Perform requested repairs to the parking structure in two phases of construction. Phase one (1)
includes the replacement of three (3) small roofs located above the elevator shaft and stairwells.
Phase two (2) includes the replacement of the garage's internal storm drainage system, repair of
walls where rebar is exposed, repair of water -damaged elevator shaft/elevator, repair or
replacement of stairs in stairwells, and replacement of building seals and cleaning/repainting of
building. All finish items specified will be provided to the Owner for acceptance prior to inclusion
in the Contract Documents.
PAGE 2 OF 3
Engineering solutions for tomorrowTM
10150 Highland Manor Drive, Suite 200
Tampa, FL 33610
reiengineers.com
813.944.2137
IV.
ENGINEERS
PROPOSAL # P17TPA-040 Rev 2
ESTIMATED CONSTRUCTION COSTS & ENGINEERING FEES
A. Based on the anticipated scope of work for this project, the opinion of probable construction costs
and proposed engineering fees are:
Phase One (1) Engineering Fees:
Licensed Roofing Contractor Steel Framing Investigation $630
Structural Design Drawings (Optional) $3,720
Contract Review Draft Documents $3,090
Contract Final Draft Documents $3,090
Bidding Phase $1,250
Submittal Review $460
Construction Monitoring $2,620
Final Inspection $1,310
Subtotal $16,170
Phase Two (2) Engineering Fees:
Contract Review Draft Documents $9.700
Contract Final Draft Documents $9,700
Bidding Phase $1,600
Construction Administration $12,050
Final Inspection $1.250
Subtotal S34.300
Engineering Fee Total $50,470
V. PROJECT SCHEDULE
A. Preliminary Contract Documents shall be completed within thirty (30) days of Notice to Proceed.
Final Contract Documents shall be completed and sealed within fifteen (15) days of receipt of
comments.
B. Phase One (1) Construction Administration shall be performed during the estimated construction
duration and the project closeout process. This work is expected to take twenty-one (21) calendar
days.
C. Phase Two (2) Construction Administration shall be performed during the estimated construction
duration and the project closeout process. This work is expected to take ninety (90) calendar
days.
If this proposal meets with your approval, please provide a Work Order. This proposal will remain firm for a period
of thirty (30) days. After that time, we reserve the right to review scheduled commitments and prices.
If you have any questions. please do not hesitate to call.
REI Engineers
Mark Renninger, PE. RR
Branch Manager
Engineering solutions for tomorrow"'
PAGE 3 OF 3
10150 Highland Manor Drive, Suite 200 reiengineers.com
Tampa, FL 33610 813.944.2137