HomeMy WebLinkAbout2019-124AMENDMENT NUMBER 1 WORK ORDER NUMBER 7
SEBASTIAN CORNERS BUILDINGS RENOVATIONS (IRC -1744)
This Amendment 1 to Work Order Number 7 is entered into as of this 13 day of August
2019, pursuant to that Extension and Amendment of Continuing Contract Agreement for Professional Services
entered into as of this 4th day of November, 2014 (collectively referred to as the "Agreement") and that certain
Extension of Continuing Contract Agreement for Professional Services entered into as of this 24th day of October,
2017 (collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political
subdivision of the State of Florida ("COUNTY") and MBV Engineering, Inc. ("Consultant").
1. The COUNTY has selected the Consultant to perform the professional services set forth in existing Work Order
No. 7, Effective Date September 19, 2017.
2. The COUNTY and the Consultant desire to amend this Work Order as set forth on Exhibit A (Scope of Work)
attached to this Amendment and made part hereof by this reference. The professional services will be performed
by the Consultant for the fee schedule set forth in Exhibit A (Fee Schedule), and within the timeframe more
particularly set forth in Exhibit A (Time Schedule), all in accordance with the terms and provisions set forth in the
Agreement.
3. From and after the Effective Date of this Amendment, the above -referenced Work Order is amended as set forth
in this Amendment. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall
conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in
each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above.
CONSULTANT:
MBV Engineering, Inc.
By:
Title:
(CQ
PS ► � Gy�-f
By:
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY
Bob Solari, Chairman
BCC Approved Date: August 13, 2019
Attest: Jeffrey R. Smith, Clerk of Court and Comptroller
By:
Approved:
Approved as to form and legal sufficiency:
IOWA-
Deputy Clerk
Jason E Bro n, County Administr• or
William D. DeBraal, Deputy County Attorney
alnv
EMBV
ENGINEERING, INC.
MOIA BOWLES VILLAMIZAR & ASSOCIATES
www.mbveng.com CA #3728
August 2, 2019
Mr. Andrew Sobczak, Infrastructure Project Manager
Indian River County Public Works
1801 27th Street
Vero Beach, FL 32960
EXHIBIT A
Via E-mail (asobczak@ircgov.com)
Subject: Amendment 1 to Original Contract (Work Order #7) for Professional Engineering
Services for IRC Project No. 1744 - Sebastian Corners Building Renovations
Indian River County, Florida
Engineer's Project Number: 17-0309 ADD 1
Dear Mr. Sobczak:
As per our coordination, we are hereby submitting our proposal to provide additional professional
services for the above subject project. This proposal shall be considered an amendment to the
original executed Work Order and all Work Order conditions shall be part of this amendment.
Due to unanticipated conditions and requested building modifications during the construction
phase, additional professional services for the below items were required for completion of the
project. Addressing these were not anticipated or included in the original scope of work.
SCOPE OF WORK:
ARCHITECTURAL DESIGN SERVICES:
1. Additional square footage incorporated into project footprint:
1.1. Architectural fees $4,200.00
1.2. MEP fees $3,800.00
2. Additional design revisions to 30% plans & additional design services for interior
furnishings: $3,100.00
3. Construction cost estimation services for design revisions:
$525.00
4. Reselection of design finishes including solid surfacing, laminates, veneers, wall
coverings, paint, flooring and acoustic boards:
$1,800.00
1835 20th Street 1250W. Eau Gallie Blvd.. Suite L 806 Delaware Avenue
Vero Beach. FL 32960 Melbourne. FL 32935 Ft Pierce, FL 34950
772.569.0035 321.253.1510 772.468.9055
Fax 772.778.3617 Fax: 321.253.091 1 Fax 772.778.3617
Mr. Andrew Sobczak
August 2, 2019
Page 2
Proposal 17-0309 ADD 1
5. Graphic signage (vinyl storefront and building mounted illuminated signs):
$1300.00
6. Redesign for Supervisor's Office including the addition of a door and a framing redesign
for glass panels:
$1,200.00
7. Design for acoustic mitigation based on removal of specified wood veneer acousticpanels
from design:
$1050.00
CIVIL PROJECT MANAGEMENT AND OVERSIGHT SERVICES:
1. Additional Project Oversight, sub -consultant management, County meetings, City of
Sebastian coordination:
$1300.00
Total Fee for Additional Architectural & Civil Design Services: $18,275.00