Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2019-131
CONTRACT DOCUMENTS AND SPECIFICATIONS FOR VERO LAKE ESTATES 85th STREET MILLINGS FROM 101st AVENUE TO 96th AVENUE BID NO. 2019012 PROJECT NO. IRC -1628 PREPARED FOR THE BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA BOB SOLARI, CHAIRMAN SUSAN ADAMS, VICE-CHAIRMAN COMMISSIONER JOSEPH E. FLESCHER COMMISSIONER TIM ZORC COMMISSIONER PETER D. O'BRYAN JASON E. BROWN, COUNTY ADMINISTRATOR JEFFREY R. SMITH, CLERK OF COURT AND COMPTROLLER DYLAN REINGOLD., COUNTY ATTORNEY RICHARD B. SZPYRKA, P.E., PUBLIC WORKS DIRECTOR JAMES W. ENNIS, P.E., PMP, ASSISTANT PUBLIC WORKS DIRECTOR WILLIAM JOHNSON, P.E., ROADWAY PRODUCTION ENGINEER 00001 - Project Tjtle Page - REV 04-07 00001 - 1 F.\Public Works \ENGINEERING DIVISION PROJECTS\1628-85th Street_961h Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00001 - Project Title Page - REV 04-07.doc Section No. Title TABLE OF CONTENTS DIVISION 0 - BIDDING DOCUMENTS, CONTRACT FORMS, AND CONDITIONS OF THE CONTRACT 00001 Cover Sheet 00010 Table of Contents BIDDING DOCUMENTS 00100 Advertisement for Bids 00101 Statement of No Bid 00102 Bidder Information Form 00200 Instructions to Bidders 00300 Bid Package Contents 00310 Bid Form & Itemized Bid Schedule 00430 Bid Bond 00452 Sworn Statement under Section 105.08, Indian River County Code, on Disclosure of Relationships 00454 Sworn Statement under the Florida Trench Safety Act 00456 Qualifications Questionnaire 00458 List of Subcontractors 00460 Certification Regarding Prohibition Against Contracting with Scrutinized Companies CONTRACT FORMS 00510 Notice of Award 00520 Agreement 00550 Notice to Proceed 00610 Public Construction Bond 00620 Sample Certificate of Liability Insurance 00622 Contractor's Application for Payment 00630 Certificate of Substantial Completion 00632 Contractor's Final Certification of the Work 00634 Professional Surveyor and Mapper's Certification as to the Elevations and Locations of the Work CONDITIONS OF THE CONTRACT 00700 EJCDC Standard General Conditions of the Construction Contract 00800 Supplementary Conditions to the General Conditions 00942 Change Order Form 00946 Field Order Form 00948 Work Change Directive 00010-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00010 - Table of Contents - REV 04-07.doc DIVISION 1 - GENERAL REQUIREMENTS DIVISION 2 - TECHNICAL PROVISIONS APPENDIX A - PERMITS APPENDIX B - FERTILIZER ORDINANCES APPENDIX C - INDIAN RIVER COUNTY TRAFFIC ENGINEERING DIVISION SPECIAL CONDITIONS FOR RIGHT-OF-WAY CONSTRUCTION + + END OF TABLE OF CONTENTS + + 00010-2 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00010 - Table of Contents - REV 04-07.doc SECTION 00100 - Advertisement for Bids BOARD OF COUNTY COMMISSIONERS 1801 27th Street Vero Beach, Florida 32960 ADVERTISEMENT FOR BIDS INDIAN RIVER COUNTY Sealed bids will be received by Indian River County until 2:00 P.M. on Wednesday, May 15, 2019. Each bid shall be submitted in a sealed envelope and shall bear the name and address of the bidder on the outside and the words "VERO LAKE ESTATES 85th STREET MILLINGS FROM 101St AVENUE TO 96th AVENUE and Bid No. 2019012". Bids should be addressed to Purchasing Division, Room B1-301, 1800 27th Street, Vero Beach, Florida 32960. All bids will be opened publicly and read aloud at 2:00 P.M. All bids received after 2:00 P.M., on the day specified above, will not be opened or considered. INDIAN RIVER COUNTY PROJECT NO. IRC -1628 INDIAN RIVER COUNTY BID NO. 2019012 PROJECT DESCRIPTION: The project will consist of placement of millings on 85th Street between 101St Avenue and 96th Avenue in Vero Lake Estates and will include driveway turnouts, drainage system improvements, earthwork, and installation of signs and pavement markings. All material and equipment furnished and all work performed shall be in strict accordance with the plans, specifications, and contract documents pertaining thereto. Detailed specifications are available at: www.demandstar.com or by selecting "Current Solicitations" at http://www.ircgov.com/Departments/Budget/Purchasinq. All communications concerning this bid shall be directed to IRC Purchasing Division at purchasing(ircgov.com. All bidders shall submit one (1) original and one (1) copy of the Bid Proposal forms provided within the specifications. Please note that the questionnaire must be filled out completely including the financial statement. BID SECURITY must accompany each Bid, and must be in the form of an AIA Document A310 Bid Bond, properly executed by the Bidder and by a qualified surety, or a certified check or a cashier's check, drawn on any bank authorized to do business in the State of Florida. Bid Security must be in the sum of not less than Five Percent (5%) of the total amount of the bid, made payable to Indian River County Board of County Commissioners. In the event the Contract is awarded to the Bidder, Bidder will enter in a 00100 - Advertisement for Bids REV 04-07 00100 - 1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents \00100 - Advertisement for Bids REV 04-07.doc Contract with the County and furnish the required 100% Public Construction Bond and. certificates of insurance within the timeframe set by the County. If Bidder fails to do so, the Bid Security shall be retained by the County as liquidated damages and not as penalty. The County reserves the right to delay awarding of the Contract for a period of ninety (90) days after the bid opening, to waive informalities in any bid, or reject any or all bids in whole or in part with or without cause/or to accept the bid that, in its judgement, will serve the best interest of Indian River County, Florida. The County will not reimburse any Bidder for bid preparation costs. A Pre -Bid Conference will be held on Thursday, April 25, 2019 at 10:00 A.M., in the first floor Conference Room A1-303 of the Indian River County Administration Building located at 1801 27th Street, Vero Beach, Florida, 32960. ATTENDANCE AT THIS CONFERENCE BY ALL BIDDERS IS HIGHLY ENCOURAGED. INDIAN RIVER COUNTY By: Jennifer Hyde Purchasing Manager For Publication in the Indian River Press Journal Date: March 31, 2019 & April 7, 2019 For: Indian River Press Journal Please furnish tear sheet and Affidavit of Publication to: INDIAN RIVER COUNTY PURCHASING DIVISION 1800 27th Street Building "B" Vero Beach, FL 32960 * * END OF SECTION** 00100 - Advertisement for Bids REV 04-07 00100 - 2 F:\Public Works\ENGINEERING DIVISION PROJECTS \-1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids \Bid Documents\Master Contract Documents\00100 - Advertisement for Bids REV 04-07.doc SECTION 00101 — Statement of No Bid Statement of No Bid Should you elect not to bid, please complete and send this page by email (purchasing@ircgov.com), fax (772-770-5140) or by mail to Indian River County Purchasing, 1800 27th Street, Vero Beach, FL 32960. Please select all of the following that apply. Our decision not to bid on the subject project was based on: Project is located too far from our base of operations Project value too low Project specifications unclear (please explain below) Material availability may be a challenge Our current schedule will not allow us to perform Unable to meet insurance requirements Other: Other: General comments regarding the bid and/or plans and specifications: 000101-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\00101 - Statement of No Bid.doc SECTION 00102 -= Bidder Information Form Bidder Information Forrn Please return one copy of this form with your hid to assist us in learning more about where our solicitation opportunities are most often found. Please tell us how you found out this Request forQualifications was released/available: II 1I II II Indian River Press Journal (TCPaIm) Demandstar/Onvia Email from Purchasing Division Indian River County Web Site Planroom (Please provide the name): Other (please describe): 0'00102-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street 96th Ave to 101s1 Ave_ Roadway Improvements\1- Admin\BIds\Bid Documents\Master Contract Documents\00102 = Bidder information Form.doc SECTION 00200 - Instructions to Bidders TABLE OF CONTENTS Article No. - Title Page ARTICLE 1 - DEFINED TERMS 1 ARTICLE 2 - COPIES OF BIDDING DOCUMENTS 1 ARTICLE 3 - QUALIFICATIONS OF BIDDERS 1 ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE 2 4 4 4 5 5 6 6 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS 6 - PREPARATION OF BID 6 - BASIS OF BID; EVALUATION OF BIDS 7 - SUBMITTAL OF BID 8 - MODIFICATION AND WITHDRAWAL OF BID 9 - OPENING OF BIDS 9 BIDS TO REMAIN SUBJECT TO ACCEPTANCE 9 AWARD OF CONTRACT 9 CONTRACT SECURITY AND INSURANCE 10 SIGNING OF AGREEMENT 11 ARTICLE 5 - PRE-BID CONFERENCE ARTICLE 6 - SITE AND OTHER AREAS ARTICLE 7 - INTERPRETATIONS AND ADDENDA ARTICLE 8 - BID SECURITY ARTICLE 9 - CONTRACT TIMES ARTICLE 10 - LIQUIDATED DAMAGES ARTICLE 11 - SUBSTITUTE AND "OR -EQUAL" ITEMS ARTICLE 12 ARTICLE 13 ARTICLE 14 ARTICLE 15 ARTICLE 16 ARTICLE 17 ARTICLE 18 - ARTICLE 19 - ARTICLE 20 - ARTICLE 21 - 00200 - Instructions to Bidders REV 04-07 00200 - i F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00200 - Instructions to Bidders REV 04-07.doc SECTION 00200 - Instructions to Bidders TABLE OF ARTICLES (Alphabetical by Subject) Subject Article Award of Contract 19 Basis of Bid; Evaluation of Bids 14 Bid Security 8 Bids to Remain Subject to Acceptance 18 Contract Security and Insurance 20 Contract Times 9 Copies of Bidding Documents 2 Defined Terms 1 Examination of Bidding Documents, Other Related Data, and Site 4 Interpretations and Addenda 7 Liquidated Damages 10 Modification and Withdrawal of Bid 16 Opening of Bids 17 Pre -Bid Conference 5 Preparation of Bid 13 Qualifications of Bidders 3 Signing of Agreement 21 Site and Other Areas 6 Subcontractors, Suppliers and Others 12 Submittal of Bid 15 Substitute and "Or -Equal" Items 11 00200 - Instructions to Bidders REV 04-07 00200 - F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00200 - Instructions to Bidders REV 04-07.doc SECTION 00200 - Instructions to Bidders ARTICLE 1 - DEFINED TERMS 1.01 Terms used in these Instructions to Bidders will have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below which are applicable to both the singular and plural I thereof: A. Bidder --The individual or entity who submits a Bid directly to OWNER. B. Issuing Office --The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered. C. Successful Bidder --The lowest responsible Bidder submitting a responsive Bid to whom OWNER (on the basis of OWNER's evaluation as hereinafter provided) makes an award. D. ENGINEER — references County Engineer or their designee. ARTICLE 2 - COPIES OF BIDDING DOCUMENTS 2.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the Advertisement for Bids or Invitation to Bid may be obtained from the Issuing Office. 2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither OWNER nor ENGINEER assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.03 OWNER and ENGINEER in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use. ARTICLE 3 - QUALIFICATIONS OF BIDDERS 3.01 To demonstrate Bidder's qualifications to perform the Work, within five days of OWNER's request Bidder shall submit written evidence such as financial data, previous experience, present commitments, and such other data as may be called for below. A. Bidder must have at least five years' experience in the construction of similar projects of this size and larger. B. Bidder must have successfully constructed, as prime CONTRACTOR, at least three projects similar in scope to this project. C. Bidder must have good recommendations from at least three clients similar to the OWNER. D. The Bidder's superintendent and assistants must be qualified and experienced in similar projects in all categories. 00200 - Instructions to Bidders REV 04-07 00200 - 1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 E. Bidder must be able to provide evidence of authority to conduct business in the jurisdiction in which the project is located. 3.02 Each bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract. 3.03 The OWNER reserves the right to reject bids from Bidders that are unable to meet the listed required qualifications. ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE 4.01 Subsurface and Physical Conditions A. The Supplementary Conditions identify: 1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Bidding Documents. 2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that ENGINEER has used in preparing the Bidding Documents. B. Copies of reports and drawings referenced in paragraph 4.01.A will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in paragraph 4.02 of the General Conditions has been identified and established in paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any "technical data" or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings. 4.02 Underground Facilities A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to OWNER and ENGINEER by OWNERs of such Underground Facilities, including OWNER, or others. 4.03 Hazardous Environmental Condition A. The Supplementary Conditions identify those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that ENGINEER has used in preparing the Bidding Documents. B. Copies of reports and drawings referenced in paragraph 4.03.A will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in paragraph 4.06 of the General Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any "technical data" or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings. 00200 - Instructions to Bidders REV 04-07 00200 - 2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents \00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in paragraph 4.06 of the General Conditions. 4.05 Upon a request directed to the Purchasing Division (purchasinqaircgov.com or (772) 226-1416), OWNER will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. 4.06 "[This paragraph has been deleted intentionally]"] 4.07 It is the responsibility of each Bidder before submitting a Bid to: A. examine and carefully study the Bidding Documents, including any Addenda and the other related data identified in the Bidding Documents; B. VISIT AND BECOME FAMILIAR WITH AND SATISFY BIDDER AS TO THE GENERAL, LOCAL, AND SITE CONDITIONS THAT MAY AFFECT COST, PROGRESS, AND PERFORMANCE OF THE WORK; C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, or performance of the Work; D. carefully study all reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions, and carefully study all reports and drawings of a Hazardous Environmental Condition, if any, at the Site which have been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions; E. obtain and carefully study (or assume responsibility for doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (overhead, surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto; F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times and in accordance with the other terms and conditions of the Bidding Documents; 00200 - Instructions to Bidders REV 04-07 00200 - 3 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 G. become aware of the general nature of the work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents; H. correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents; I. promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by ENGINEER is acceptable to Bidder; and J. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work. 4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. ARTICLE 5 - PRE-BID CONFERENCE 5.01 The date, time, and location for a Pre -Bid conference is specified in the Advertisement for Bids. Representatives of OWNER and ENGINEER will be present to discuss the Project. Bidders are HIGHLY ENCOURAGED to attend and participate in the conference. ENGINEER will transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. ARTICLE 6 - SITE AND OTHER AREAS 6.01 The Site is identified in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents. ARTICLE 7 - INTERPRETATIONS AND ADDENDA 7.01 CONE OF SILENCE. Potential bidders and their agents shall not communicate in any way with the Board of County Commissioners, County Administrator or any County staff other than Purchasing personnel in reference or relation to this solicitation. This restriction shall be effective from the time of bid advertisement until the Board of County Commissioners meets to authorize award. Such communication may result in disqualification. 00200 - Instructions to Bidders REV 04-07 00200 - 4 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 7.02 All questions about the meaning or intent of the Bidding Documents are to be submitted to PURCHASING (purchasinq(cr�ircgov.com) in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties through the Issuing Office as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 7.03 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by OWNER or ENGINEER. ARTICLE 8 - BID SECURITY 8.01 Each Bid must be accompanied by Bid Security made payable to OWNER in the amount of five percent of the Bidder's maximum base bid price and in the form of a certified check; cashier's check; or an AIA Document A310 Bid Bond issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. The Bid Bond shall be executed by such sureties as are named in the current list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. The Surety must be authorized to issue surety bonds in Florida. The Bidder shall require the attorney-in-fact who executes any Bond, to affix to each a current certified copy of their Power of Attorney, reflecting such person's authority as Power of Attorney in the State of Florida. Further, at the time of execution of the Contract, the Successful Bidder shall for all Bonds, provide a copy of the Surety's current valid Certificate of Authority issued by the United States Department of the Treasury under 31 United States Code sections 9304- 9308. The Surety shall also meet the requirements of paragraphs 5.01 and 5.02 of the General Conditions. 8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to' execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, OWNER may annul the Notice of Award and the Bid security of that Bidder will be retained by the owner. The Bid Security of other Bidders whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of seven days after the Effective Date of the Agreement or 91 days after the Bid opening, whereupon Bid Security furnished by such Bidders will be returned. 8.03 Bid Security of other Bidders whom OWNER believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening. ARTICLE 9 - CONTRACT TIMES 9.01 The number of calendar days within which, or the dates by which, the Work is to be (a) Substantially Completed and (b) also completed and ready for final payment are set forth in the Agreement. 00200 - Instructions to Bidders REV 04-07 00200 - 5 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 ARTICLE 10 - LIQUIDATED DAMAGES 10.01 Provisions for liquidated damages, if any, are set forth in the Agreement. ARTICLE 11 - SUBSTITUTE AND "OR -EQUAL" ITEMS 11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration of possible substitute or "or -equal" items. Whenever it is specified or described in the Bidding Documents that a substitute or "or - equal" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to ENGINEER, application for such acceptance will not be considered by ENGINEER until after the Effective Date of the Agreement. The procedure for submission of any such application by CONTRACTOR and consideration by ENGINEER is set forth in the General Conditions and may be supplemented in the General Requirements. ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS 12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to OWNER in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to OWNER a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by OWNER. If OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid. 12.02 If apparent Successful Bidder declines to make any such substitution, OWNER may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which OWNER or ENGINEER makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the Effective Date of the Agreement as provided in paragraph 6.06 of the General Conditions. 12.03 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom CONTRACTOR has reasonable objection. ARTICLE 13 - PREPARATION OF BID 13.01 The Bid form is included with the Bidding Documents. 00200 - Instructions to Bidders REV 04-07 00200 - 6 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 13.02 All blanks on the Bid form shall be completed by printing in ink or by typewriter and the Bid signed. A Bid price shall be indicated for each section, Bid item, alternative, adjustment unit price item, and unit price item listed therein, or the words "No Bid," "No Change," or "Not Applicable" entered. 13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice- president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature. 13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown below the signature. 13.06 A Bid by an individual shall show the Bidder's name and official address. 13.07 A Bid by a joint venture shall be executed by each joint venturor in the manner indicated on the Bid form. The official address of the joint venture must be shown below the signature. 13.08 All names shall be typed or printed in ink below the signatures. 13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid form. 13.10 The address and telephone number for communications regarding the Bid shall be shown. 13.11 The Bid shall contain evidence of Bidder's authority and qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the Contract. Bidder's state contractor license number or county registration number for the state or county of the Project, if any, shall also be shown on the Bid form. 13.12 All supporting information requested in the Bid Form must be furnished. Do not leave any questions or requests unanswered. 13.13 In accordance with Florida Statutes Section 218.80, the "Public Bid Disclosure Act", Indian River County as OWNER is obligated to disclose all license, permit, impact, or inspection fees that are payable to Indian River County in connection with the construction of the Work by the accepted bidder. All permit, impact, or inspection fees payable to Indian River County in connection with the work on this County project will be paid by Indian River County, with the exception of re -inspection fees. The Bidder shall not include ANY PERMIT, IMPACT, NOR INSPECTION FEES payable to Indian River County in the bid. ARTICLE 14 - BASIS OF BID; EVALUATION OF BIDS 14.01 Unit Price A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid schedule. 00200 - Instructions to Bidders REV 04-07 00200 - 7 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 B. The total of all estimated prices will be determined as the sum of the products of the estimated quantity of each item and the unit price Bid for the item. The final quantities and Contract Price will be determined in accordance with paragraph 11.03 of the General Conditions. C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. 14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in paragraph 11.02 of the General Conditions. 14.03 The Bidder's attention is called to the fact that any estimate of quantities of work to be done and materials to be furnished under the Specifications as shown on the Bid Schedule, or elsewhere, is approximate only and not guaranteed. The OWNER does not assume any responsibility that the final quantities shall remain in strict accordance with the estimated quantities, nor shall the Bidder plead misunderstanding or deception because of such estimate of quantities or of the character, location of the work, or other conditions pertaining thereto. ARTICLE 15 - SUBMITTAL OF BID 15.01 The Bid form is to be completed and submitted with the Bid security and the following data: A. Sworn Statement under Section 105.08, Indian River County Code, on Disclosure of Relationships. B. Sworn Statement under the Florida Trench Safety Act. C. Qualifications Questionnaire. D. List of Subcontractors. E. Certification Regarding Prohibition Against Contracting with Scrutinized Companies 15.02 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the advertisement or invitation to Bid and shall be enclosed in an opaque sealed envelope plainly marked with the Project Title and Bid Number (and, if applicable, the designated portion of the Project for which the Bid is submitted), Bid Number, the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If mail or other delivery system sends a Bid, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside with the notation "BID ENCLOSED." A mailed Bid shall be addressed to Indian River County, Purchasing Division, 1800 27th Street, Vero Beach, Florida, 32960. 00200 - Instructions to Bidders REV 04-07 00200 - 8 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID 16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. 16.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with OWNER and promptly thereafter demonstrates to the reasonable satisfaction of OWNER that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work. ARTICLE 17 - OPENING OF BIDS 17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids. ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE 18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period. ARTICLE 19 - AWARD OF CONTRACT 19.01 OWNER reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. OWNER further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be non -responsible. OWNER may also reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder. OWNER also reserves the right to waive all technicalities and informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder. The County will not reimburse any Bidder for bid preparation costs. Owner reserves the right to cancel the award of any Contract at any time before the execution of such Contract by all parties without any liability to the Owner. For and in consideration of the Owner considering Bids submitted, the Bidder, by submitting its Bid, expressly waives any claim to damages, of any kind whatsoever, in the event the Owner exercises its right to cancel the award in accordance herewith. 19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest. 19.03 In evaluating Bids, OWNER will consider whether or not the Bids comply with the prescribed requirements, and such altemates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award. 00200 - Instructions to Bidders REV 04-07 00200 - 9 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 19.04 In evaluating Bidders, OWNER will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions. 19.05 OWNER may conduct such investigations as OWNER deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents. 19.06 If the Contract is to be awarded, OWNER will award the Contract to the Bidder whose Bid is in the best interests of the Project. 19.07 OWNER has no local ordinance or preferences, as set forth in FS 255.0991 (2) in place, therefore no preference prohibited by that section will be considered in the acceptance, review or award of this bid. 19.08 Any actual or prospective bidder or proposer who is aggrieved in connection with the bidding and/or selection process may protest to the OWNER's Purchasing Manager. The protest shall be submitted in writing to the Purchasing Manager within seven (7) calendar days after the bidder or proposer knows or should have known of the facts giving rise to the protest. 19.09 CONTRACTOR certifies that it and its related entities as defined by Florida law are not on the Scrutinized Companies that Boycott Israel List, created pursuant to s. 215.4725 of the Florida Statutes, and are not engaged in a boycott of Israel. In addition, if this agreement is for goods or services of one million dollars or more, CONTRACTOR certifies that it and its related entities as defined above by Florida law are not on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, created pursuant to Section 215.473 of the Florida Statutes and are not engaged in business operations in Cuba or Syria. OWNER may terminate this Contract if CONTRACTOR is found to have submitted a false certification as provided under section 287.135(5), Florida Statutes, been placed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or been engaged in business operations in Cuba or Syria, as defined by section 287.135, Florida Statutes. OWNER may terminate this Contract if CONTRACTOR, including all wholly owned subsidiaries, majority-owned subsidiaries, and parent companies, that exist for the purpose of making profit, is found to have been placed on the Scrutinized Companies that Boycott Israel List or is engaged in a boycott of Israel as set forth in section 215.4725, Florida Statutes. Accordingly, firms responding to this solicitation shall return with their response an executed copy of the attached "Certification Regarding Prohibition Against Contracting With Scrutinized Companies." Failure to return this executed form with submitted bid/proposal/statement of qualifications will result in the response being deemed non-responsive and eliminated from consideration. ARTICLE 20 - CONTRACT SECURITY AND INSURANCE 20.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, 00200- Instructions to Bidders REV 04-07 00200 - 10 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 . sets forth OWNER's requirements as to Public Construction Bond and insurance. When the Successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by the required insurance certificate(s) and Bond, unless the Bond has been waived due to the total contract being less than $100,000. ARTICLE 21 - SIGNING OF AGREEMENT 21.01 When OWNER gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within fifteen (15) days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER. 21.02 OWNER shall return one fully signed counterpart to Successful Bidder. 21.03 Should Bidder to whom the Contract has been awarded refuse or fail to complete the requirements of Article 21.01 above, the additional time in calendar days, required to correctly complete the documents will be deducted, in equal amount, from the Contract time. Or, the OWNER may elect to revoke the Award and the OWNER shall hold the Bid Bond for consequential damages incurred, and the Contract may be awarded as the OWNER desires. * * END OF SECTION * * 00200 - Instructions to Bidders REV 04-07 00200 - 11 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents \00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 SECTION 00300 - Bid Package Contents THIS PACKAGE CONTAINS: SECTION TITLE SECTION NUMBER Bid Form 00310 Bid Bond 00430 Sworn Statement on Disclosure of Relationships 00452 Sworn Statement Under the Florida Trench Safety Act 00454 Qualifications Questionnaire 00456 List of Subcontractors 00458 Certification Regarding Prohibition Against Contracting with Scrutinized Companies 00460 SUBMIT ONE (1) ORIGINAL AND ONE (1) COPY OF THIS COMPLETE PACKAGE WITH YOUR BID **END OF SECTION** 00300 - Bid Package Contents - REV 04-07 • 003001 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00300 - Bid Package Contents - REV 04-07.doc Indian River County Purchasing Division 1800 27th Street Vero Beach, FL 32960 Phone (772) 226-1416 Date: ADDENDUM NO April 25, 2019 Page 1 of 3 Project Name: Vero Lake Estates 85th Street Millings from 101' Avenue to 96th Avenue Project. Number: IRC -16.28 Bid Number: 2019012 Bid Opening Date; Wednesday, May 15, 2019 at 2:00 p.m. TO ALL PROSPECTIVE BIDDERS: TO PROSPECTIVE BIDDERS AND OTHERS CONCERNED: This ADDENDUM is released to provide the minutes and sign in sheet from the Pre -Bid Conference and is intended to clarify, correct, or change the Bidding Requirements of the Contract Documents. Therefore, it hereby supersedes anything to the contrary in the Bidding Requirements or Contract Documents. This ADDENDUM is hereby made a part of and shall be attached to the subject Bidding Requirements and Contract Documents. All questions about the meaning or intent of the Bidding Documents are to be submitted to the Purchasing Department in writing at purchasing@ircgov.com. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties through the Issuing Office as having received the Bidding Documents. Questions received less than ten (10) calendar days prior to the date for opening of Bids shall not be answered (Deadline May 5, 2019 by 2:00 PM). Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All Bids must be received by the Purchasing Division office located at Room B1-301, 1800 27th Street, Vero Beach, Florida 32960 prior to the date and time shown above. Late bids will not be opened. Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable :by OWNER or ENGINEER F..:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85thStreet 96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract D'oc'uments\Addendums\1628 Addendum'No 1_20190425,docx Bid.Number 2019012 Addendum No: 1 Page 2of3 CLARIFICATIONS / CORRECTIONS/QUESTIONS: 1. The roadway improvements to Vero Lake Estates ,85th Street Millings, from 1015t Avenue to.96th Avenue Optional / Alternative Bid has been revised to include: a Signing & Pavement Marking sheets S1 -S6. These sheets include the addition of new sign placement, roadway striping and Retro -Reflective Pavement Markers. 2.. Signing & Pavement Marking sheets Sl -S6 shall conform to Sections 706 and 711 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction, January, 2018. Bid Item No. 700-1-11 Bid Item No. 706-3 Bid Item No. 711-11-125 Bid Item No. 711-16-101 Bid Item No: 711-16-201 Single Post,Sign, F&I Ground Mount, Up to 12 SF— Per Assembly Retro -Reflective Pavement Markers (Bi -Directional Amber/Amber) — Per Each Thermoplastic, Standard, White, Solid, 24" for Stop. Line and Crosswalk. - Per Linear Foot Thermoplastic, Standard, White, .Solid, 6" — Per Linear Foot Therrnoplastic, Standard, Yellow, Solid, 6" — Per Linear Foot 3. Cover Sheet 1 of the Bid Set drawings has been revised to reflect the scopeof these revisions. 4. Sheet 8 of the Bid Set drawings has been revised to show the addition of the items to the. Summary of Pay Items. 5. Signing & Pavement Marking Sheets S1 -S6 have been added to the Bid Set drawings. 6. The Itemized Bid Schedule Section 00310, pages 3 & 4 of the Contract. Documents has been modified to reflect the revisions to Sheets 1, 8 and S1 -S6 of the Bid Set drawings. The revised Itemized Bid Schedule shall supersede the original Itemized Bid Schedule: Attachments: 1: Revised Itemized Bid Schedule. Section 00310, pages 3 & 4 of the Contract Documents. 2. Revised Sheets 1, 8 and S1 -S6 of the Bid Set drawings. 3. Pre -Bid Meeting Minutes 4. Pre -Bid IVM'eeting Sign In Sheet F:\PublicWorks\EN0INEE8ING DIVISION PROJECTS\1628-85th Street 96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid documents\Master Contract docunientts\Addendurris\1628 Addendum No 1_20190425:dpcx Bid Number 20f901.2 Addendum No. 1 Company Name Page 3 of 3 *This Addendum must be acknowledged with submittal package and/or by return of this Acknowledgement with your submittal package ************ Timothy Rose Contracting Name: Timothy Rose (Type_ Printed) Authorized Signature . President Date. 05.15.19 Telephone:772.564.7800 Email: Tim Rose7@corncas<t.net F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-8Sth Street :?6th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Docunierits\Master Contract Documents\Addendums\1628_Addendum No1_20190425.dbcx Board of County Commissioners 1801 27th Street Vero Beach, Florida 32960-3365 Telephone: (772) 567-8000 Fax: (772) 778-9391 PRE-BID MEETING MINUTES VERO LAKE ESTATES 85TH STREET MILLINGS FROM 101ST AVENUE TO 96TH AVENUE IRC -1628 April 25, 2019 at 10:00 AM Conference Room A1-303 The following meeting notes set forth our understanding of the discussions and decisions made at the subject meeting. Any questions, additions, or comments regarding the meeting notes must be received no later than Sunday, May 5, 2019 at 2:00 PM. This meeting was recorded as part of the project records. PROJECT NAME Vero Lake Estates 85th Street Millings from 101St Avenue to 96th Avenue BID NUMBER 2019012 INTRODUCTIONS/SIGN IN SHEET CONTRACT DETAILS Bid Opening: Wednesday, May 15, 2019 at 2:00 PM Contract Time: 150 days to substantial completion 180 days to final completion Liquidated Damages: $1,665.00 per day CONTACTS BIDDING PROCESS All communications concerning this bid shall be directed to Indian River County Purchasing Division at purchasing@ircgov.com PROJECT DESCRIPTION: The project will consist of placement of millings on 85th Street between 101' Avenue and 96th Avenue in Vero Lakes Estates and will include driveway turnouts, drainage system improvements, earthwork, and installation of signs and pavement markings. UTILITIES AT&T Comcast FP&L Indian River County Telecommunications Indian River County Traffic Indian River County Utilities F:\:Public Works\ENGINEERING DIVISION PROJECTS \\1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\l.- Admin\Meetings\PreBid\1628_Pre-Bid Meeting Minutes 20I90d25.doc OTHER ISSUES • Review and comment with questions and clarifications as soon as possible, no further comments 10 days prior to bid opening (Bid opening is May 15, 2019, deadline for questions is May 5, 2019). • The Notice to Proceed to be determined after award of bid. • Maintenance of Traffic: o Contractor will be required to submit a Maintenance of Traffic Plan signed & sealed by a Florida registered professional engineer to the Traffic Division and receive approval. o Access for all residences, roads, school buses, sanitation and US Postal Service shall be maintained at all times. o The Maintenance of Traffic Plan shall meet the FDOT Index 600, FY 2017-2018 edition & MUTCD minimums. • Excavation material — to be removed and disposed of by Contractor unless otherwise called for in plans and bid documents. This material may be utilized on site if deemed suitable. • Testing by TBD • Work hours are 7:00 AM -5:00 PM. • A hurricane contingency plan shall be submitted to the County prior to construction in case of a significant tropical/weather event. • Material storage and staging areas. • ,Invoicing: Contractor shall submit monthly invoices — one (1) original Contractor's Application for Payment (Section 00622 in Contract Docs), including Surety's Consent and all applicable releases of liens. • PERMITS — SJRWMD permit is not required for this project. DISCUSSION • Clarification was given that the work hours are Monday through Friday. • It was asked if the Itemized Bid Schedule could be distributed to the bidders in Excel format. It was determined after the meeting that it will not be distributed. • The Autocad file can be provided to the successful bidder of this project. • The roadway construction method of "Chip Seal" is not an option for this project. • The budget for this project was not available at the time of the meeting. • Material storage and staging areas have not been identified at this time. • There is an Addendum forthcoming that will include the pavement markings for the Alternative Bid. • Meeting adjourned at 10:20 AM. ATTACHED Sign in sheet F:\Public Works\ENGINEERING DIVISION PROJECTS \I628 -85th Street_96th Ave to lolst Ave_ Roadway Irnprovements\I- Admin \Meetings\PreBid'':1628_Pre-Bid Meeting Min utes_20 I 90425.doc „r. , ".1.1,- }-^ .,Kr 1 t�^1j'• s i _ . � � .t2F >: +! .'v`..GJ"! �n� _.ia _y I.Y.,.•. 7r 1c �:# 4 _ . t. 3:yr:'x.Sp,'�v:`i•.•�”, •-i •3 LYf ^4�'C:t:'r, -y wt �'tt� e'as�r,.. t-: �Y ; r°y:r y ti- ''C .�•f,tj'�l�i` ^,'.%'tl_".•ay1P'YE 'k Y''Y"F� 'M. 'A. sj ./MCTlt"?l ''A 11^+ni:: l, Ff° 1_ +.,. .:. ,t. 1 ry.. . '-' ` ' 'Y` ,, `%ii4 . �,. • _ -'�- ��.�;' �-� ...r �k .ltr ,. ..:°. y fC''MIME AN '.6{ �- c..12 ,�.., , �'r �. '� _ ..i .,;. at.. ep..*,t, Ec -+ �'s3 'iSJ :,, 7 . ,�•F.+',�..'0 2'��}f:i - f i .. � ��i - Y4 F't r , •,. Y ..A'K- -.. ¢C .F' �� :PRE-BM�EETING'= ;r . �.. ?. ti ariP fy rar ,s .'i •. +y -' 't ;,�' .,t • '' �-�i .: �cE:f'R�i,'S,^.-:s3.. S +7.d. •.3. ..• fbt£ �-,'' 9.,t :'� t �, _S :,,ykts. - -•,=cir . r1:..w i. ;� �# Rt r etvy-:1��'vy ;¢ >ri..,•.i;^' :f < SIGN -,IN SHEET -i�,yp.4�' 'i'iu''� ,/� ��y' YJx,•a!_n."aF' 2��, 't''r - t ...]MT.+ SL �k+T'L •.rt -7.... •f+"• .� `.” 3 �..c ': i. �:.�1°x.,.. .r.Y.r'�..r.�ii ',%�. `..th. �"_C.•': „�r-,:N.. +r :-- , „..ti �Y:: fiixs -r- r 5 x r .`,a"':fy,'•,�e- : 1 ::Y-.y1':rt,,.y �C..:.�;.., a- �f:: ..A >?',ijs *: R . ,�., r d v - - .i!'.. >4.J '! _ a' rkt.sa 'Y23.',-if.:t rit' £.:-' •yn' :t t n 4.` k t t.M ♦. " rS` ' A.,, '?itv.., Ste h,.f; '1 v, r. l '�"•n '�s,+.r.';'ati.�- i�' ti. � x,., -;r. ..� l ;-+, •.''eY....,:..`, •• 3� ', t r . 6. ,'��� � ,?�;f:-xx rsp � .,- ., s,.. -• .• Y' 7 tre.,, F XF .r C �! �'� r' 'r'r 1.Sy'SF`f.'`�`',:;; i ; 4 \ ...k;' Yi F .} w.? ,b•.... ���^�.✓. � '\^'�:f.V?�-9-,,,,.-4:,6,- � T .?+f: 1" . L . 5 . t:L v=,_ ,. ;2•,,• "} t:2-a� r �. •�SV-'s,• ;5�,.,, � ` •ti�j. r.v .h� c.ti..,�� y:J t�� sk,� S;', r o -.4r ?r:' -d Wt-f't<--.`•. �C�-'•..- µ.r. �F. i } ,.u�,,r. . ,s" k>•"a' u•t5.¢ .-. ',F,,�sG ,.�. '.�: '?etr ..4�. k ,^��.:.-+S• �°5, vel. .}k �ty�,. v'::!' . ,..e. - -,Jo ,;. ?,. ' . 4 i� • 2 y...� !. �.yl:�y+,..,,: '.�. ,', NWi Jr �� �,u.}t, , a i% y., a f, tel` t ^• '9'i':.;;: :�-, >..-4w.r.,. {_''c v'• ..P f..,.r f' x a. h . ^r i' �.,a r•(W- c•5`,C �s},,�+1 ti J 4� ) irl. ''r _ .�" -•- .ts. , �. :.. r. _r_ "eR w.. a .nw�,tu`�,iA r i--» 'is^�y2' n'�, {.i.•>•" -cam w,'C„1�Si_�rX•YC-?4:� *�. -+: F: ''2 .:�N +' 4r `+ ' ME 4 ` t„ 1, f �7, 3 :R=IVER.COVN�TY ENGINEERI•N>G..J ROAD„ s p, 'ODUCTI,ONe t '3..t:R . r .,r,•n^n. :, ek,Yr. .''�O}1 '. l'.. '��'�''�r�#.�?-'yl�"`a��'=. t,::n •�'•`‘g D . QTR `��f; 4W ::�° '�IFDIAN� ii :R<'COuriZ'wY�AD _ �¢+ .. ,:t ^>�'rli" :4 'wt- ` R�� �' 14JS'AA^1' � '97 , � .;f'' .._ Roome�A.l•-3.U3 ��,. .,Z'r,; .r ,+ ,.2 ,gym.. .•�,!Y,s ^�ys�k'., +vF '1,;.. '�4�i•'',�, a.fi�•:.�^"N''..:.%>�s ct 1� N 'e? ^ .. .P ea S°TRATION' BUILDING} \' A - ,i13s;s' J:�d. � �=v�h. .�, ��[. :h.. t Ss.. ,�.,C y .f_. 'd!1 � 3 ��°y. �.1J��... rte-: ? i' .s-?. : �p y . , °ti• .. N ..�ti; .:TZ• aY•o M li, e2 ,-fi .,yy , �"�'. ' �'' a}' , f��, PI. J �� r:�tv.. aGl-. _ 'i• . !f� � � ..,c rtk;.. �_ - �.Z •• :R ;� _r '-ak: .a. ail. :t ,yk„ .. - ti - " '✓ : �i•T ".h7 y: _.',�fk C. -i •'wY'• e+m1ti r5:' ft S, , s :9 ,c . .fit,{, .i....,• 4 � :,+ ie ty;, 1. .. �d.. }�( ,�.fti-� �i.,:.''3�!s y. iryar.h.'r �, S a}. _�' � F;.'.✓ai> .-. ....:. 1 � ri fa.v: Via._ y� i:•iY� tii'?NYs..:2.q�+ k"`',�,xa"'•Y '+1,-. r., M '+:"s •.c....\ 3W 'ib.T 0 ,'ly+��Ca�t �k..r � -,� ,J < i .mow � � .:.=� Y".(hT�".'Zr"4 � '�' l -K%^ '^ - !% E,T- ee : ' . _ r .rf - •.� .: M�af 4''Y.; >•fa' ', °" ��.'r""5d.: �'.�ieaa-Yt= { .rf� .r g� 'S,���r� _ �.., n•+t..... 'j _ J,, 4 •� ,y,:f �:i" � ,.a, i' '�ii�i't..- ��„ ,•a--�rfiC. :',ir2a. '.�•N+ f,m N3.S.HEET<�... . .-_ _.v ,t,:.: ;;r:�: y `^ ,� :' 4 y� , . :.% ytr. k,' "`7�4m, w�lu., � ��i,X}� �• z' sem., ';4' tt "4'� •" '* tt+i.+St 0 3 -'Y,Ll - 7 - '± � a` �� �''•�� S G,/5 ROADWAY ,PROD7CTI. r. .;_ al. .. " 'o-!ai>`:'`ii-t•.� :�lM1,.3?� ^'7i^! Ja^o:t% �r `S'.._..v" � _,lF %eL' _ Y '.e'r{.(,s •;.:,.- i,Y. 0Yf.0: •K. y �. • � -� f3T „rs; :.,I,.w z t s :r „x , a„ ('t�•r;Mr-• . r fa s n2e r^ 1'• � �} M c �^''Ca..�li � ,�. 4'� .s d� P.fa :'i: ij- C , < k� L' %T�trl'�S"'�' A, x� '(.;cr: 0. F..( _{:'P -.:J :yam. •��:f r � ..f. .:,. ,a ... AT':�r"1,.z, { ,'9a�.t,. lys-, -cs., �f -i Y. •..A - krf .mac:: 3. L a Iii S L', \ .if��e�G 'i. !iJ }. -S Y •��1:e4(S . N .I a.[•:w, t',, .•i i M( .'.F: • ui <'Y •Y �-''S.... Z l.. . �A;xf?,ate • }Y:'q..���iNY ! J. •l.e �. w`S+Y?"r '•t��i�o: ��'rt:t��� .d ,+'?o';,ry .,'w '' 4 � : j' 7 ,,' ,. ;p � = ' <.....,}y:. .L. ,, �o.' ^ ,7, fi-f b� �� ;.., :�� ..:a _ �"• a• :(, i �:i: �:�., +'9 .,i:� 7..soy : � t..E 3. .,! ` .} 5., `e•' ?:n:a r ;.- 'a. `{ xJ:. .,ew-r s e., /( �3i n' t�.. �lJ'":i :$�i?�.^ a„,o,'i '•' i'].� � 1' . r :�' K [�,+.•�;%` x .1.5 Sr4M4 .-,,";.d.�5� .A�->t': 4 a'Y.. ,,, :Ci` -is .;-'•y.'a•%. `s' c. G^� 1f` d, i•ti :',y`� `P` tl .., i}•� .#r-�k4 lt"• o- .C' ,r{,,, O,ni _ .,�. �n•,,.. .-5 n? -%.( N GJ^: '�f u' §.zl•S.1` sfl •�; �y fa. ri YY' .��,!�^f'v.:-1-1' ��•*�,,y ST{•� fT%T•4 �- �l,��J•. �r: .. Tu',''?} u': �GY w .^ `�Y;�"�.' •l .fi!, i, .�, ;ei �-a. s T' �. r<, '' ��:..:., k,.t#�t A"',e-,�`+:'xa ,1'.,,i �'�'[ { it r > i •%, p ,,,, 9: e '% ."•.-. . fk W,.�F• •>•-.y � .yM�.���� ��,� {,�t��:�;,< .. .• '1SEf.^.'•f -.j"; `•, .1l•�� '�1 (-�StY y 'S'hMJ.. » , f ),rarb", P�+f,•,,Ya:�.' .'tr'-FI'ir'", 4y.. Gl• I.?. ,j Jx P ,'ftL'. <4: i .3.,'�.�.•_ J , ,.., ' x £ , zs, as ,,.',n, • d` a,_ r !'•°t`kt•� Srca�+,•'R' y,N' �' +.�'�-f `!` ;. �-, �• 7y�• ,1 J 44 S✓ RY�,1.$ a�1�e .. vl L4 3tl- s +i(.n _:i'� .t' i' i./...+, ( i�" ..'Y 'i: ;;, r�ik 2 a ' ax z; ,' r. r _..<.�✓ 9 .!. (.. 4" r.'�°%^'�+v .. �3 fi'.3-b 1'- •..b• .; :i J:.S/ F��,.,n 4�t:.. :k .+. J i � r }_ `�i�il,ai' y - +�, ..� RE, , „ - 'yr '.9- �k `" S�Gt:7: % ...1 e:��� �r _• ��.. .i3Ory .l " n'u.-�S.w't'�. r'Q,i` �'F,i 1�i5• i m G `�'z,�.> . S �•. .s"Gk:.r w -AF' '���:� �,, �.�-;,��:� _,IGN �'.1:'" ,' .,.'.'° ,.et- Z• '.'4.:i '4.. .c- i :'`S! 'ifl,' .4 ' a a `, 3� A- A �: � B6 - �RIvE�CU;TY ENG. < ) _. „•.0 i. ,,„L..ro 3 y, y..�,ak,. P- a.'ir` . Y" •'41 / if P" •,.off' ;?! v •1x.,s r"�,' N- ", 5 t �+.••. :�, r.'r G-..,t4:7,Y.,' �A; ' �n.. .:�'7i•���' i ���a� .��:� yau� •.r M ,, 5'r � ;4S- $ �- ' 7h•Ar....r3%3}L.M L t ti`L• r�2 Y;!.qy}�}•,�. ry C f'4.':, 4 .. Y }.: ,y'. fit. x.'rJ•.,,-,�:... h� ,Y .¢c!�� ,l,r,y1 , NDIAN C. _ AnL+'-?,.'•;`3 �Q •'y7a •r... ._.,< • .� . C +Yia,. ' � .e �Y-�rllY 'f-QE� 'i'�ii" ,e., ' '�:h ;N' •��i•.;.�.�.7•`-`EQc ':, �3�..,.''!.�:it�•e:}�C", .a•`.D- '='!"�- `�''" 7 S 'te n•. x .+r.?+igTfid, r M u2' ;�� i4' y.�. �,... z. .•r... a: '. N -n_ Po . ,y, _ . ,' 5;• s f es, . ' .t. `� r:: ^l ;f�y. ,r2: ,lyrF ., ir(.r... ..1,r'?�' a r'" a , moi... , ^ 'k{.. v '`•."i1- •>r�"� ;fix W k - ai,`r,7 .u. } s -�^ � s� ;k �� ^" a �' .. tti� : It- ` �' it• „y,... 8 y- . • 5 y'. wr,.t':�.iwy.rw .*,aa<. :��}•a .F� H ' i '^ i 'S^ �yv+t I _ -•Gx+`. "rf>•,�'z' ; .sjt �t ; as r�VERQ '1;r5. �1 a1^V t^ ism, wEr' •y,.+`i��. .. >u , g� � d,*fi. r:4.1'f".�� � r.:Yw, .: f '.Il; w ! 4-''''''1;r: V n:x.. r;:. eii _ .:/,a '•.'>-' ;ly: 'moi • ,.� r•�,. h C, ,�.., ,sS .n�•.va�,.}� .'r• ,:Art , f Fl .� r�.wr� Y ,� � •c3!•'n -^rte' :��.t ''..a�K.. .l''j •"._ e7v •x_�,,,-.rrrt 1._r r. rtrd� ,_k, ka ^ti ih ..i -f . .,:$ I o. y -; 9'� #' ' �.' �-•"'�:a�1`-`�,r cXr, _ ' "4 i,• a y_, i, :.dk�kY ;,1* Yak , '% 'x i � i t a1-',` • h: +.rF-'-t� :. • r�<s-:` �+',: t73;:: Sw� Fii-a‘4..."S4-......,44• $r .. cfnr r_ .,i✓�.., .c ;y"dw' -Y..C,: ,' 'u ,{,�-4`} ".z .r z,- �,•�, 1i�.�.�;jj,,,,.�� ,>?a. �>�#••� 4• �a^,Ff ay"� }-r.�"W'�.},j � ..,•Mt i•• •G}�C. s� r' �i'� ��"�y- '�.. -' ,}�!/'::,a ..�Y�.P.- .,}nJ:`'ls. �c�"3�i�"�: �.�,1'u.;.���t"'+.kC.F�'.•C_ia.il:,.!v?;�,A`�,i-�i� ,1�•Ra-�.-+.�-?TaK-1.� - L 4 > ; ' .:x'•r_s3i .r ,,:. RAW hx E § '�Y' v % :INDIAN RIVER COUNTY ADIVIIl�TISTfRATION BUILDING; 'tea .Yua„'' ' J.•�F••F f, .�.a*}r 'a:: 'a�?z., S^ _ r.5, .k. , ,�...;.- :E';-,}•�.� � na£: yy+,,�..,.., 7�p °'-ri r ,„ �" f - '- >; e . ' ' .. "- .. ; ,. .•.,. F, fi •,.,+ eriktZ a ,r_ ti:'` :�'.`r.••..(� r i' 'S" x•:5 . , "r 4"^..f'�,' ,.•'it' ^r, .c? ,,.;``i .. a r 4 �. "r :• syr .:•dx�':'r#'r,..- �G$:•"y_ 4' • ,. " .. ROOm.A 1 X303. Buildmp A. ,� 4' 11 ,,.�.�, 1"s H, _ b' _;k. ..r•:-..� i. t••�'i^; L' � ; l^� . � �f d' kxsT.:.e � �� L? .•I^; M4 . '� .»x i',!- � _ 2Y- •' efe '�d ,.(�(,.• .` �,,O�S'k•;Y: __.. frP.!',<v'r . � S� F , La.:a �a ^ . ISY r' -, �' }t k .th' ` II' LAKE_ESTA,,ES. 85•,STREET MILLINGS Cfy+ •{ x,35 x @: % I: '� c -- % - - x 4 �: ms`s! L. , f :r - •.Yn "1- 1-4 1 a-` k E - .,Fl- .'1�Y r �T� �'r aS�saai M1�y+ .�;�� fir• .tn� ,, �•• 'r-fea��}Ai'i-Y:4•^�Vi'aKi>'�'F``F�^a't�`av",n ,'+2.,+6'J.��,��,�,}F.^ir= C� ..YS%r,.aa�:'t �«F`fi:-„',a"¢I="- L. - »-Fi. t; -Sty " r: •1 �., ;r -.i ep _1,, .'.? x � �� dr 9 S .3s:., NUE-1,,, �..'" :FROM 1:011 AVENUE TO�9.6 4A;VENUE ,. , :� A�y�• `[ ✓'.. .;'k- 'y.••,'v: :y9 ±'d1 , .l: V, �a"+;1•C•T" - . e�U e- i 3' :'j- - .,, �a `r.e Stii „a.. 1 •Y. Y'. .. 1{�fq �'�['. fi s' _...r 75,`'`i 7 ,,.} 1'•kr..,¢S.F F� ,�� ;. , �:�,r� PROJECTy}{IRC 1.6 S�: :�.. ���;l p •.6i'riYF a� 5. -�a� "�.�^ ti., sr.; ^s a�� .� : -P•v( �"'it S� - v' 2 •�va5�' ra�Y.y..4,j, - -it a R ' 'y ; • S, y ' - t MLT.:. - 'rill ., A rill 21 9'£at 1>0:.0,0 }A M r .at •t� Z epr'• 4a: !, > �5'v - �' i'� " h�'� � - t�: . `?.' h fi�r"�"'��'' a.' � �P� � 4� fi +'C�•.-'F'M• �-}y, P 1 tl_ N r tJ . i J�XS.S = k` -u . ,.. YJ4' � y ,r'tr ,--J�� •. :�• k s�,,. =; ;: •. . �. � �a ".., rs�'a r3. x 2 leu^ >•„ xar 2 n:AiNC.:.i.�N.}t ,M� 5.-..•e>Siv�v.. ,'t..Y•L±+�S:h.S_, .3-:£�St:... `J'i .,: ----•'�--- , te�-^� , -. .��'��'- NAME m� ;t ..k4�;: '• � i - A. ,t� tri -V � ---^�,;; ' ; ;--� - -�-:. ��•xt,,w't�-- , ,tea ,iCOMPA1�IYu 47.kirRESS ;r.. ,� ?�:� J, -'_" •r :s- ns--x��. _r. '��r�.��r'�.�`k€��- o3PHONE '#T�EA?C�# /..MEELL=# 7i x: li .- ... t,_ ., ...__ _ - .._. .r7.... , _ w,�.�. � - ..-� __, •�.-% re`,,d,r �.4 TAPE ATE : a�r� .. � ..>9:�a. r. _. _ .. ER... _.... ,.. ,;> V11 a , =A -s , 172- ...-`2.•..• Eo •-14-4.5 , 144.ii›,--is-e.-3@ 1 12.-cL-�✓. torte ,1 , 1 f301' 2'71 TU- 'S?; '.2:4014..-0;e3. • s.. . hr 2 .P p "s $13-, 9l -415 W%'51,: euPS 5Alp- f a'Cvn? ,// d Jcr gCsnycr ((iriirfra ha. T,.d T+'.z• - r.. �,r ' ? fid 7 '7 X16. y �,6 y6. G Y66 r 6,: /�. yad� ra,.y crCaovi7^�ccI7a'.• �,._ , p r`. (' , 014. -der sopie, ,4 < rz:f Pie/.Ge- .'1.Q, 31-flG 7Z y /pair ec,�'zq l C-K44S tai✓i 1 .ZnJ`C 77t. --Z. /'lo -.67`-73/9 %z <% L a.L d( 1 1Pribli PR()t1 (. S 1628=8frh•Strezi '9Gth Avelod svAvcr2Roadw4y hn.rO ernciits,1,:Adsiiil \7eeiin-,`Pref3id':ib_8 kr 13id Sieil lis Shi.et 2019042.;;dix: rt j j,IL4 , . T M +no h'GS-u.: , wl�ti -g, y ! _Tu"<'2 - � ij ....5��-.....�y$.�ii-, .'",,C•e..•'^"'w•-ez. 4.. .s•5�•s 'ry,�!•..t. ;aft'-.'�•.'4•.�., , an�A" ,..J'S rJ.3' A :v r _,�: nn d � any •?y °�'j a -.Y33� „,-�s .. q. , ",, .:^;.e. ._ �rv7'S�� �*..'ti� -`• ., . . . �b �� h '$� y,''s i r S :^7�. A•% - �, r a . i•' �n?fF".,S r4 6•, +�v,rr++Y �tA,'�r , _ 4u:1?','gs'�t'J+it:r: r ;''•K°w .x . ? - .� , ,�. , F,µ • IANC - ;3 :Ny. �•. '�. '�F'' a6 " `i F.'('�'Yx�3,,� f .v j.< ,�ya3't' - "�xuy-n":Xs '?-'iGt'�"' r.�r. � K :, � --1 "., , ---.._ �^�-te A, ..v, , T '' f x' G ' r ''' 1 .^o' r• r*Pn ---1-7, •f:, ^;y."'"' ,.� ns ^rM1. .X�'. .�.'� �'�7-a%fi�.;,�3i'..7-f`d!^.,_:aaS'.«.we ,C>„ f- ..�../ ,}.a` ? n Lff F n Y-f� f R �.•� • . �.. •i - .,'v - Y ... r. ' REBID . • TING r- -4, ;st3,: _' ' � i i . ..:., '?s '__'"f:,R1,a'14.7.,';.?,---c1,4 -7�� >3!?,�;K -uE Y7k..‘u•l', �' ,... . ;� V .� i:-12 y�;� 3 Yk,. ir,r^, 7. :T 1.•.y- -.1M• r.,_,� kx y .,. ti.,z:s-'s >y�,'' <tk 'rc.•.;:ra ! Ja L s ;Yr'aF� � �r SIGN IN:SHEETF,' �� w . r. !. T -,y.m•.sm�- ;�Ji .�4T1'Z �...,Q. .. r-...k�.:+^'-'. #?"5 ". © p'4'a• `p i�° " _ ''� • E c 3o-'+," i .a d • F �' Tn pj, ht `x cl ' F' s b ', 3? R COUNTY ENGFINEE Gri ROAllWAY PRODUCTION .lrk ',F -- j, .�. ... -• a ru rw -•to. oa",u7ke v Aq. '7 �s ' •i �3?1:.1,fi .Sa .:;..t 1+ :iut; Y7.^.D: .c; �c,.'" t 62 - .6".M.'F .. 87 6nI• '"�''f r r r '�' .- t '.`K';, -',•^,J' ;4 •n:' INDIAN RIVER•CO JNTY• MINISTRATION BUfILDING ` :, ,. .„ ? - ' , i, xt :.-' .L,-1-- •- .awe " •;�' t ,�,r ..r, - :�:. G ,a .Room3A`1-3U3- Buildin E1? " J' 4 ,4 J�6.. , sij=2.7'rix Cf - F'w.+-,r����•i1 .A�' ..�TV9.'�'.' :t� .v1y :� ''.°�o"y S t�) ; h� } (: r ® LAKEESTATE5.,85.STxREETMEL�LINGS�� ,n:t.9' sr.a:`,r _ ... #±':C.!+:`Ft�.'.:. Y r' "- i ..a' ;, r �. F . tSt r;. - 'till th �k'g-5' ' ' a: t«t .c.•}'vc.y 4, .EROM 1:01 F AVENUE �T4 96.: V1 k, ' F L . �, ,w : t i • C?4�;°i f'li :. 3's y • `„ 3a i% r, -� -, i. 5 ,g.�'-2: .0 - C' m .s "' G G r - a 'F � "tr, �r. Via' i77,. . F-' acK. °s: y "y •', - c;.!'i ••Y1r.: '_�P«,, ,, . : PROJECT IRC 1=628 ` . 4 1 :. .>7r :-�.7• .. _ :. a1, s, �1�•'<# "y ;;,, a,-¢¢kkI� fix �„m�ki�#'�"-� ,;�, a« �+"'7t✓,x. �`-�.r. �e.�� y, •a• � s 1, ^. . 0� -c .,aic.� a', 4`t't . y'•'a j K, : , '<3 x -�� - ...- 201t9wat Of A.M. ' s 1 ' .sY� ,�c M it L �.. �yt.'fajry , 0, i- .. �;1 ; .�. ' .aa • 's� ��'fu•• :3`��f, •" aT'..,N- 3�.5 .. x'n,'fi,"n.,. - ? .� � 'ro 6• 5 .F�^,-S•'�1'�,n• .���' � ",T".+f �r .i:�' . � �{�,�-l.; b. - : f't` yssy; ...• � '� :1A)14: ��t. ..�-.'f�i 4 •C� .e :1: � 1�s,« ? y t :� n �3,a: ( t-, �.�f.;:a. ¢+ 11.w-� �;e*,- �T- '+Y �2'rw,�� t 1-Y:�'fx' .+�w� -.+i'�'i�S• , } ., ".t;% �t ysr_. ;•4` S!�"y .�''�,,�y„-r7iy1 T a,••-1 .. � ' 4v . , j7, - , k•} i«<m^r•• :.:n .. , f'u' �ad�'.'i'Y :s. :•c �j... �« ls .I :.a x . ?''�''�•Ii!Y+r',.y.t rn }y' .r -,S , _ . A ( 1.1.- � xj ;:. ,� `+-•.i,... . "� .f w +,. �. �i^ fc..'.•, . ' r .r- «k,; a...--: a ��-'7 .•� :1'�y •,trt*,°: -. , �r , -: At- .r:• , n r • v.5,7 '�x<p.,r.•.. 'S... 'i {..a..;«J "n 1;'c ry;« wc.a: ., " ' -,-' F:°: .� {'i . �v.Ci'Y,yc'!r .it�.,..i �i' L•' j'rii 5��. yyr }' .. G: �° �� ..:z•-. l `" i;i'•>;R .rr,x-c. =a .. QFC �A ^ �� •,�,-. �., .,,.� r . , 4 n •;4t,.,a.•t'�-' 'r ''` '4fb..r!;•- 'cd r-, c 11,.- c7v2-'' ..+ a''YY.� _arn'• ,, �;,, ,. z. , ; , :sR- _ Zx r� a t.. rear k!�C• •,;,•�.s n ..., F ..�1 ^ v Jr,}. a .:: n,Wr`. .,{. "f�'i .� f-v.s, w;r' . , _ C• ` oto }.. f j '7i� ''�'� a £�r��?}%�. ��4s '�' � c'• ,;,aJl �.�s-.: '� -5�,' r.. , a ..>'+1.=r � k' M � ..r. ....,: r'15�G+t"..4 F .a:c?iS,''C3hn. �'f, � A+''..vJ'r ,tt . ?rri ti }} �yah- � �'rCr� li- 'a`J R. � �� yl- �}.�,�,�'3'F T �i �� Yar,..ft kurL r?iro?'3: �•1� ��VER k'. w- .�'- ..4r, tt*. •. 1k, Ft �. - ,.as�x. .? F .y=.( Yy r. 4 • : is a ` :� _ r' :.q 1: � 1:r?i... , ' 't. ,�$ „3 .. Eti Yri •a -, !i •j°`!' f .} , rw y i �,. ti kir. _ � .,y . ,r •moi. ,,-- •�' " ^est '� •+. •.ii:' , !! � v..a, - ?, . 4X p. - . .� - ^•. �,,. }� K-r��'•:� 'a�" �' .�� �'C�.�.ay ,vhb.,++e. '.�� i ''v ,yn :. h�- . 4- - a - F:y. a - ;:3 �� �'-'' �'.� :GL's; �� IT.GK�S-n' F � ''. +�-�. �..hFS . .. •!:4;�' ."'_E :a. 472 -.•ar"`'" , _3', t ' s; :z ''t'rr: NAME�.e�.,*�'�,�?'"� '.�.�.,,.� ,.�� :•_��..: r, . d S, ,W: t r vter ` a�COMP��:&..A"DDRESS,'�.�,..a�-�..�,.,,.� .„, ' . 4 e !r b 4 ''. , 1. -- r ':e .�, ':f �PHO1�E:#.,/ EAX•,#1/CELL.#���•�.� ..'i gTZ f, .:'r --1-7' r."'^ [ '..".' .«a`.' 9�- �;. . �>k'”„t;�EIVILgADDRES.� r:_� 7„,, a • 772. -.r.6 `=i 7 ..d'1/43 7 7.2 A - 70 co,oriC,R_ ; r .. ,C : ', 1 - ;2 zG --1+: x•6 �Scn! DIQGGov.a ,cqM - 1,So.w .a l ti rl,,�G•� ;.(. 77' - :2Z:Co: — Z'-/1 g :off 11.07 0wVhcl I rC O V ,-e=01-vl, 1:U'Ci61ic.�i/o'rks1L'1�(�l\liLRINEi:I)ly,SaU\.f?KOJIcGS+1,'i°�'R�ihiirre;•96th”.�vctolUlsf'�iC_huad��t�IiiipFti���ment.l diiiw�»eetinesCf?i�l3d'ah28_l'rr-Liul''SieuIn515cY_'_Ui90f<.dac .:*7T...F K 'i^ f._ J nom.. :.+7^.. n.i'.--. M.� .i:i i4s4,`:f!-`: r."a 3{i p,.tx7:s i�r; t'�i. <1 ,c•:: yr %.,:..8 r >Y _, •c.. �+ r7.:�y-.� ''a"'.i;4 ." . a:: �l ,,''±.+tt�� .��'^7 A 1T� ♦ Yn. ''{1` �F'X. ��.+�ti�Y'i, r^1=.. +tK - RFh�..• 'P�•a ;:. r w.R,._<:; " r ,.+v'. ..>rY .,TM..� , '`. .,5a:y . S.,ii r�S: i).:""Sr`.. a Wl, ., .4: :'�]JNw- ..s1 t+ 2... �+' }t: 'ir+ I , ,�i r = ^4"'"?" r'3� 9 tti ,a+�, I.,t' �xsS T f � LL = 9a- �I 4�-Y •S .:�"'".• 4. :;,;,;�,•zi... 4 LL ti[.. ,`1a.. ?�i�„j [`> ru?.� ^%d; .E �t X.r. ay ' r ,..1�•:'� wc +t•.`rS� • ,.f' --,., :<'•� ._'q �+,( •yn t• •?. i re 1 •.k „ A��• ` f rx ,',J a}..y{ i .F wa.. �- $, v�:. • T �. L. v ,y{�t.. y:T�1 'i#:.,lyW�` �J4f'Y it!F'�.N?����f4yr+,i• ....Y:L.a:L` �'t �4^F.�`Si" . .... , f K • . £4r'y ti` �. ,:r..'TrF�"C •' :ta 14. '^Fp`'`�,ti�'° . 3Y't,'i`..2rg.�ss,.% « .le,... r , F 1 'Puhlic ,�,,�. J. '?, ,�e<,bJ �.}�,x:Zs r ^N'2'.6fJi:?.•.r, D t"�"cr.a<u...,� tic 'xS! ".: ;LM.• { ° �A;'�f•x yfi 'i .t Via, r }. .(}' f 'ash 4 s ; �> - a' } y't:,, ��' `^'•T i !�. esa+-i-fr x s �• F•�(- :.y+'f �� t. .• „+r,:.r' •�" Fi- y �' _?r.C� �.. �YM.Yi.• f;.� 1,4 t~' CT'F t .$S ,.y,4":5,•. a. ,J'� .i A - -} .' '•3'' _ ('.hot_�t_,pt''' . d:�rr . .y. ... B' G ,, � `4 hr• -a.- �r�{ ' i-,-- ?&•,- Y..iz.. _.J""�'y'-]-. � ;gas fi �.,, an a't!p-w�.... f,:t 9` .. '-„a;-� .'�cw ire yy rii.. •f' ;t" �.,.. ,� SY w .key }iicci`N Ybd S nC a +1 .f J� ..t �- Eti •it:,,{{al.tk .' ^0 • 4 _ C x.y .. 2^00 �� + .�"Y �.• IC'dty�J`M C�.. :]i4 •. �°..x�`7'%.�.'�•���.�'ilwck...+._,�.` � :y er _ II} �- r.,, '•}!.7(i' "ns w *, MT 1' j'.:.Y.f yY,. < t`t �3.x�t •it;, ytr ..•rE.�aa � �k'�7' mf.��% 3' ..sY” , ` �.. :INDIAN; ;j," ter. . 1.. ' 2'! . •�gf: , ,• �- '� yr H��INIi yrY -A.. :•:2 • yN,u"M1-. ' .n '' '�4' : ' ,,k� -. "fi ) � om,-pi °' ..t i�'l`:7 `k!S e � y.��"`�. SvK� •. ''. •.Sia'. k 3'•'� ss��-M•�' t ty .. .. '%n, �x�4 f..,'Fa"=: . , u: .� r.?.. .rs }-.. %yyi ..- ;.�J. ' r " „- 3' .. :t � . ��. ��; - :, •?r>�^ F t. - f4 , .G j _ ' RIV`�ER. COUNTY • 3C'`�. `'rK'.%'�`u k*.a�r �y.`Y:.s, t�''%S^{ry""•`V`.�^ c' ` z 6 r ,' ,a,. ¢. a� - � 1. PRE=BID y� .'zy`�y,-y'r�i. '�.i .jiKx tT^ X,' fM' ,nf 'fix' n SIGN .IN �-�.ra„K fE; -- f' . "i^,}." i8� `M?"^.- ? . . _ J i ,d'•'.{l� h MIEETING � r..: t (r, t �,w � s•G', r tly^ "' ''" £ '"? : "e:t :;'�'s(;V•x. -h S.. '14£JiFi�l'"r. 'fp'• ... '>. * 'l it S .�4p t s sv`RYj:: vt,.Q_ N<;F' SHEET n;; ,..v {w ;3:..,, .•=ww s " .� pJ .,���A.n �� �fW LAD .t' r, 4,- '' ' � , ROADWAY PROD:U r•'3:eg 1 -cfr,` '1 ' . ^ .,7.--n:;i .gip? °'' �;=-fid' f K.'K :.nta�', J` r dki. :.f' :}", I@ _ STRA<T,IONBUILDN .. .� �•x` ri 2 :n `J>`..�.C..'" AT,4._. ,,, +t "d.. i"' ".Cf"^.9i'_ "$4..'" a•. Bu�ldmg'A y,�f }j- �.r: .'ltk'c{L M•i.1 f �.. .inn „`WK'a, .U[.� 71.. t M �k 39„-r'r{ STREETL. 1_.s c ,J�';xY;:4 '3"• ,kF"�?'1�ik't_r' P f t}x� y, .s tl l4^?J k^.[r1.1 +� 7,.t �' •j r '. Y ♦ S+�w" w'`7 y � - � � '4r)i' �f a? -Tt� T. -.19 AX.NUE • r $ C•7rif.r l V ..,'� i-�' I+„f. n? 'S' ;� -' i.. •. '�,� �r * �#? i' �S Sr -' Y }:. •Fi '�.•i� +� ,�. r � 4. at �j. 'x• ply. ���!!k, '�",,y?r' �. ''" -'.iY +� •:'^K'u.4�f' ,yy�d ? ; - ',rN .�. at 1:0.00 A, : ' aK7i • r,+y fr�.''lt" u' �. x y?�1 .Y 'iv"L -a. `,,f ,.�+ • t,�`. •Y4�' . � •Y� � y. •Xwl, Q• � Y• �+f•• . „• � SI -4.14,,,1 .,9-..ss� i . � �K � '.., ..M1'-�.�.�r.��- �: ... "•:tY.tv'Yw kt•r4t�•RK.T.�'efiC. .�,.vsS Y. -. :. i�r-'•ti ^ • � '- ' s .t?i ,,Ta„, i,..`.?^ ^.;:s:- 4 .r. �'I �L. Y 7 ,r•�ti. 1 t>'D 5 a y }. 4�' r �..."t c �--•. �' 1, ";8'�r. +, r_�n: .'z..s, 'ilT %yx...13X%.` f r •^t '`' -•t ,a:3 �'.y` ,�; fy,_ .!" FS t !. x - ' mr. � ''1` �4 3 t * : ' ..., • ,•',. � �-'S' � s t:. ilr• �'rk' 't2'.- 'o'.i$4."7 .. t • 9 ' .+ • Y�L�"tCS+'��• t1 f lr -lam -144. A m. s'- r 4 :;.•� ,' J� ;•�5 # M .i.. �n "7`;+"••..h �'+[ ],--t±;a. .•-'' 2h sY`t ;dos. ..J :.b�.,•.,, : �y • _ a - Fn E ENGIN '' - 4 ;�a s �' .r2 .,' ,- •,,. ". "bf R•■/`�'OUNTYAD• (�.J •fi: +,et1r`'.Y'.+s' >; 1pt+•y sn. �' .Room^A•1,3.03 ..• '1:0,17n•..'R 4a , ,y 4.,,rt,l.'4-�+; AKE4EST�AT rF ��30�tr �, u'1I7� i �'C x'..:,,, '^r Yi. 'i . F.1.�� 'P�n!+ ,.Yy'.tg.' ` �.u x,,_,il .,� '.1... iM1y..'�j t✓� . Y' l��y v L� ¢rte'`, ,Jt�ix*�4'`- ..;?-�'�G�i .r t' iF^ '. • '{�" L.Y ,�Hii � i • !y: . r«xk ✓ �i >>f l`74, flT,( wf`. f.. e' /r'��$.L •r t moi.. a 1•,,.-..�2— ��'1�4a1-�'J.✓�' ��x .SYf�:��.�L'j�.�aG{' �� .I. t.. r- tea' �?{7yCI' t $"' ' ., {i r?'• 54:x. 'r�Ltt u'Jt fi%�LG.. .+Y �s # �3��:�,•rCih,�iY.'•t. Q� 1.\.'"'C Y.,`-.. +YJ±. s,'��N"' �y ., ,`.. '4 - t _ 7 t. •S,ts Yss.,F.n i.Ji,. � T_ �';..��., yyam�.. 3' �. sr '>.0 �G i v Mt fus4 „i„-..., /�` 7+ '4� .;s t r�• ,+tl. x)� q_ . 1Ct4'y ::i'i'L •%1� �7 -1' . ,yk' 5. . �' �.,,'3, Y? �P; � ��I:a '� 14af;L" � ,,. •, -..3.R' l> ¢:.F:✓,,.i-•'':'rr`:...t. j ..:' J, .•'i!' ,.3� - 9i;.u;a'•!"r���-•�•1 , yy� .. .. � ��;E�:.b..v.. �;� a,„ e. t .F..•,� �rj r:..• ,�-� �. �a`ikl, ^K ( ..=•F:i�`v-'Sf+.. '•.i! <.v'L.i i _eS'i '� ti .a: z � -r-sok `f1�t ,'� - FROM1,01; -. - � ?4 ata. J.{ -Je ,,5 u� . X t" 'S.% ♦ � I f tSL�- Y w = AVENUEw j ,n'' � Gs�fi }".�t �K,C?�'` �•- S"� .xl $ t ,+ `{fit �-:;. ..:PROJECT.IRC-162:8; :Jf n�" �aJ�-��xp]y��Tt�, y... - .'i`”+' - .`:' •!!�'.�f�'t�V FfYY `SYF. Q j ;, rilar 2019 .i- .fx .�.., 4•' r r. #!t Y.�in. � '''''*V4. � ed.4�"x ��ii$Ri' f -- At �' F ♦N .tri. 3l< 'a••, ,!<, .W%'?x`c'. ? t tr ��' '�'+ •^1 ; t[+t4 . i x ., 3x: .x o -o- .at' .4 t` '�k' .. � , '} .xT - ! �"�"�7 4.' ..x����� z-��.s�.sl�.�� .r AA �.� C� F � , ��. "' }% - 4 . ,;.'H' f..f t F. FFA '.M1. -ikCfr - .1. » �i'Y ti• 5 .'i .d �. 1 ,f�•.y i[} 1 "�•t� ' �[`N�J i�a"� '. 1-1 -�� �1?, `� LJG' !F�.n., �j W� ��FM'_� �t.:t: ' � �r'...^}id 4 NAME '. -- ;:_., , P. , s,; . " , A't _� _ Si'fi] `X.+t_ �,_C,0 so rAw. Aro ESS, , , ;�r • __r -K rp�� ��_.. Y�.... �._. ��}'y5{ice "M"f�,'ri oxyro tr %SFA*X yixtLLkkit,o � „ ^�[y�Si1 '\ .:.L� a �.C�. J'4.-�.�-ZaF_.��r„-v -Trg!:.. ; rtir,,, � t -m -x riADRESS__ L.. J. l C � ,�: sJ J '7 1.1 -.4 t (0,-..Z 7a;8 .,4 (. e Cd :d F I f' _ c.0.-.---- °,v'.,----77x.-—a(:(0-• ( J_ 1 L L lnu�it..o Y�. t�-nlfip2C C� ' `) 2 -2,2G -.1 'IS � . t,,;,3'o�^iso"1�1;Q:GG'o�•.coM -4-1Z.4...-. 1.u...1(74....:66(1 ki, 77Z. — `Zz 4,0 -- 1511 t . d041S-f-1 r.rC. 0;v•.:c.01,1A I :,J?iibik Vdorks\L(\l�l\Ulatl�Ci:JJiC�1510\;1'.R(9J1.C:LS,I;i?3 R?ibStrret''9b1h- e'io;l(Jl;f', �°e .l-adiiiiii\M.ectiries\!*11i.d\ib2R: Pic=Ciid Sieu lu SIie0..2019Q4;251z1a 1. 1.44',:c'7; :.:f:,. i 9• is t v! :it:tt.,t' ., 3.Y': .� .ter. rx...t : ya., t. •. '€. . 'r �"$ :t : ''c, n. .. ."ti ','; vy, II?„ a ? r„�.. .tom y.J •i} :Srt- :F : �. . zs „;:... .,.<n. ,z��i r}. ,;. rSe.• w�:�e :3 �r`.. .! ?'t 4' '� .�� '+.`. �4"" :>k <-'�. s'::„yt.�a" <. K < f v.k1 .(_ r}� �:�R�' .� �iF' �...�: - ��rY. �� : � . v; .. S.v' • - f- },7it 3~»c;. � �- +;-.�.ty _r'� L""Ri.•1� �i'u'Z� •� r' 3-s . � > ,yY. .GP ;a- £ . yi5f �`�� t� S.,'� a �1'�w . ' K�`0<: PStri�':'•"�o.S•rr,:h: %�, g'k � : �' q �.rr ,,}W 0 ' ( ..� a k s • 1" t • •. 1' � , ,,•ao, �h idtLt'%'. }"Ti+�L._.. �J~>c, t'�+3�:.3 c°` .{s" r ri_c .aX;Y,,1iy,a- fid ra. ,.°`. r.. " >, r, -, 1•-s=INDI ;r• . s ,,f�x� s= >u 3 alp F- •c ��- '�., x.' � �{�' ?L, . ti�::r!,n t�,'�t "' !}, •4''ix^•,fZf;?' 't w: r» ,?�,,•'Tr � .$.. v G - ii,, ^ •9'• ?fi; :_ r ""' '. x tr: .p„•t g' _ 4s . ('` Y ,F - . t- - -A. x �l'} ti .- z �arf : J z a.`-� ;r � t".' <. !a . t _ .�' . ri}5'F. r1 : � �, bt. �`_- r1 i.r _ a; : ti "- > v... '.;+'_ ? v:- il; " L.`� w}.'4 i.•,,le i• f• �� [,• dF,a• �`., "^zR• . L.F•-4,f •-. ..p Ff? 3 •. •a rt' _ ,+n'•'`k�, S'• ,,- .Fs. _ r." .N_a y „ s�.? J Trr l %r � 7•-.1 .m. ..-rb.ff...n'�%'»,�Y'�'..5o�jy�:� Ic'il3n :Mg ^d.. ^ 'i .i'?'r, -•iSg-;...r-,-.w•..�-:. ..-,.� x�.• y k •.i' _',ru.10,,,•, . ••+; •y:„ '.S'.P -4.5. .?' r4:44i:v.. .. �.'Ln f . t'i`i ;.PRE-B'ID,.IV�EET ,r _ ire' .w •r, } .• '+.1 ,v . �r*s` 5 :� t a'�i" luY,y�� "`�'1;r. f� 7� .N,4 F' Y�z:.ri �c T �, ,• ! :aS.- ''" k*fcu�-T-ti '- ti• ;'�r' �','M1t• iv-$` _ S 4 � r•, _ �x �'=�:. SIGN' -IN- ,�y"���1`:y�"�,���"., ,�,>� (,,,,,,� y, •�y ,iy; + -4�.: 7..u. -. yJL £t, r �w�a��'C4.E."fh!'!^ •;:c i`w:�Tlig-i'n�k27�. � Vie. �i�}CCC;�4vy',.: �, ''* V" RIVE , wk a• .-� ,. ,, R°. fk N ENGINES ... __ : i'• J«e± ss^ : -'. t `a' ,,.J - k:��"�;'�i,,.,s. ;.,..J''�'cz�..'I..�� r "' _ ,�r �:.. -• .ir���s �i'�fi' 4_ vf� �r :.e n ,. w�+1,-?. ,-.: -'':...... �., +.. ' :ry:,, r. _ .a.✓37-x 'Ft C ( ''J:�...�.�-i- .4�.�f.JY'L Y' fi�;�., Vi r ' ° s... -r .}} i �.r r1,:v,,,.�, 'ras.x ..'C.<.^r L: r.' �.. Y . 'a�L• 'S _ "-: �F 4 t. ! it Lh:::. `}'.x^`37: 'S .,y y�^,.'.R r +;VL 7� '.'5�...�. i.-.1'.`. ,��, x�u_ r.'S(. �yM�:fY� : HEET�- . -�,u � � S ,Py^�.r. km i.,, L. fii _ f r 1.... SY,';+•- ;z: •� 1- `l C; s°' ;��"'a: �•Efi:"°�.. 's{c . i;,s=.ti.., i:.: 1- `lit a�..��. ,y. n.., _ s ...`+ - G 1 x '- ,�I'`i'� 6 G/ ROADWAY PROD: v -,,f-P. -- .t ' . n %fi'a'•- `� �yats .4eryyy'� :ar }�rq�{P �n a, 1y=3" ` , 9•". '3s�c f . 1 MINI,: ;c + •' fw? t'�Yrae?•)�. - .. +w�'�`�n'i;c rr- r %°r; 1, d fey ;. 'rES'"" ;�e� � w}} , ,� � .�. '_ b? F "e 'Mrr(aQ `" . P :-ee:, ± i ,ra '%..[krc�.. _,, -th'� 1. .t'. ,'.- MILLINGS. ,'tfP'isc� =" `'�.. '-4, �.1!.. w�}V5Mi'• F.'. •''' c2. S k i+ '� thy€ E`4r '''' 4,, y µ fi ik ' al �.! '�'�,'. •' b ri, l � tr .;'�•X - - X• C �.r a 'i,l +5 IRC 1628'; u �, :,, .ar h .v,?.,' .. u.Ydnc'f •lrvt.'... N".s ... i' s!'T�.. �.w'+�,@;rF�'"'a. s,.t-'�' • at 10.;00 A M •.4t rY ?! "•. _ w'k�-. ". a '4' za ' civ ..;M . -. •"S: ^n" •7..} .'d `'cam':. ! ,x•, - .✓, r�, ,.e.fr - .':r -S ; s' .rc ._�.Hn;�_. __,u3 ��_e.2" -fit. •� ... '.e.., .aN �1CT0 << 1���. '�'" •i+, . � Via a ,H. ,''.�`h .ry,;ph �er„y..d5'K• zl 4r. �:x'��...=s..-,eb�.:..._.._.:�'Cr`,'w ."Y. l. 7x*.i? 4' ta: r Mx(� r•„d.. q Y�:.+'i. -']Zt l� JCC;. ,•P" rt't. Y'.✓i ��. i., „ .•,c {�(. . eT.,,' {,�!.. s Jr �iG+1r�"`ill � 'f•. YY1 -%�. 1'K?' ny'..,.S;ttr.. '✓,L,. rr: •rt�r' rJ {. �1.•':.:+�•=W�l i' 'F.:Y hr.._ `: �.'a. 1-. � "Y-� :r' F _� �. .n.� �. -11,... .f� r J 1-. ,' y"r.. R. 'S, 1 � �� x.i�J's: � '; . kYF 'tet- � Y •f"'. $ C 7,} .lug .,�E . Je"41'•• 's ' ;' ' y <,..:'As w,;r�..:'_ r ��._: ry-��y.�:s :4 ti atr'�' � - r.+. : *• .,' c ,.�.,ri.3 i �a r .,,7 'i 'inti .d>+.a 'y=' w 4 '� -n'. S"�', �s } .fit^ i c ' �'.• r_v- ,<w E;;s;:;. •v •s. �,r' 'rtr..; l.? '. ..?��+: as. : - �vi'.. 7• . ks;� ,» e.• � 1r�. .'�'-. -�� 41, .-.[�dk�.o , �, .:.whyi>'K :..T `': 'tv'.•"�c n iF 'j. t r Ti 4%.. _J �' h4.: Y G. 4 , �%' .tit r ,+i},'r5.r c'{ ,'� t :+'° ,2} ::•- 'e<!,+,i#a,.. iall'�'r.6.4.'^ ..• LN.r',--:_ . \; Y: K..� �.p' r ': �y fn'.r l•.wcy1:1,r< .V': 'r..+� i -� 7: f f' , 'i...� tl c 1 ii . ak. � . o a. A: -1.'h t�, .,; ,,�}Yy N �J ya' , � �'".S._ brr K z >>.` L,.. = y.�'C� r '1/2,iw ¢" 1.,r'F , s � r w .: uw • .4;. o -- 13033Bildmpp•A, � 4 . ?it•':-�. ' > " �'„ ^^''.. `°'' ' ?I:'L Y, r.:-='- -",.+ ';t riT` `s y�'3! �'' .k eF '� 7 .',�: s It k`VERLAKEEST�T�ES85STRE=ET /.. u' wl'O t.%+ 'k-�.c' u 9S r_R'h - „rimk' ' x t 'n r st .; ' uF�ROM1:01.AVEUE_T0�;9;6 ; u:: 2� • `Vii` .% T ,.'qt 3 a!' ".lf zPR®JECT c' ir •rt vGc.x.,t' y �i1�d- Rq,/, +LJ •;':5' S' '•4•4444f [�, Sa :%P Y .:Y� a1F L� .T,L_ O Yf t 1'L .l' - K�;�«. 1i r,.,,t.�. .y m.v ;Y••�..y`�� yYi �11v ,a�."i: •.ei. :'r ,Y. i} rr r:,�,�4 . r�i•� X11 � f1 �` kJ".1' -' .tib'v'x==` s��,.�;.•:.t F W < �fw:.l� jv :;a..L, r .Y -r .1' ii-' •L9• . ;'i`•4'e .•h "f}.4 t' ^,. P 't ,aF�ay_ e, v :L.. ,,-.y ;.---'.}'-w ,g . 4 s ..•s.F . ,.. ,r rvv?. s-„ ,44.V. - {as .- , �`- "h. 'l -,. _ +` S; .... >� - .r�:'\i-.kA` -j., >s3: u;'5`` "ck',.• c r;; 5,. 019 1N�,r', tw' ,1 r_rl.'�•• ...�'1' "'.°' ".i,!' Nr 4, .i: . X VrL K . . .� `i..• . <t3b: zu: rte ,. : ,} 'Fh ,� ;r d' ' ++�,-"' ..W� ..-'..��6�:,�.'....-usS::�;i+'L'x'.a.fl.a _ _ f'.`#_".; ;t:..'Sy14i�.. -'#.- `+",';tir a. s :.'T•`.'iiva ; AME 4f .t, _ t„ -a a, �' 'r�l»5 :Yl'r"�.F_ts"'.yc",`• a; COMP,ANY .:0 '0D•RESS. � . _ Tr'.'V'..r_-'7,..'. PHONES /.;;-.A'� CI CELL,,#.,1:74=47m wvrcxi:5r �>;. ...�._r<:....}_ _ .'�: 3�'wY;:1,•r.iri.`R�:4 ,. ;fix; ,27 _ ;EMAIL'ADDRESS _ggA. :,, It t4=k r�` • • • :-...AJC) C t2a',46) , r .t:P. .,4 1 ill. '2=' i'TU• 'ST.. .N/e47/4> P l .4., %t-- 3:ZRz o s 5k9&e. P : ps+ s f • - � 5 • �5l4e 0.-. AUL l't 60/1 6' yid t Y6 y 6'y6 6 '7 7,2...q4„:4 tr�e7.cv»- p .:� �. 0 .r,G'/ °std 7rt . ./ZZ -AZA $ r..P -e ' l4 3 y1ftG . 7 j,Z -zq •-- yf 4 . . •-X72-.:?-ire ' 9 y a ( P/.: •� • �y �G . ,, 4'1:12':.,'.Z.1 •4/�/y Ls fi :� L.ca;�( 1 Wiliks\t \(tI\la ftl\( I)f:C'IS1O" PRG),I! (1 16?' 11th Street961h';v e,to.:101 t'A e Road' av lmproVemoiits,l.,l\;dmw Meetir.V,P ei3id':i3id Sit!) ln"Sheet 201:90425.dt+c SECTION 00310 - Bid Fortis PROJECT IDENTIFICATION: Project Name:. County Project Number: Bid Number: Project Address: Project Description: THIS BID IS SUBMITTED TO: VERO LAKE ESTATES 85th STREET MILLINGS FROM 101' AVENUE TO 96th AVENUE IRC -1628., 2019012 85th Street from 101st Avenue to 96th Avenue, Vero Beach, Florida 32967 The project will consist of placement of millings on 8.5m Street between 101s1 Avenue and 96th Avenue in Vero Lake Estates and will include driveway turnouts, drainage system improvements, earthwork, and installation of signs and pavement markings. INDIAN RIVER COUNTY 1800 27th Street VERO BEACH, FLORIDA 32960 1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the forrri included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents. 2.01 Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. The Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER. 3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that: A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents; and the following Addenda, receipt of all .which is hereby acknowledged. Addendum Date Addendum Number 04.25.19 1 B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work. C. Bidder is familiar with and is satisfied as to all federal, -state and local Laws and Regulations that may affect cost, progress and performance of the Work. 00310 - Bid Form REV 04-07 0010-i F:\1Public WorI s1ENGINEERING,DIVISION PROJECTS11626:65th Sliect 96th Ave' to iOlstAve_ Roadway Improve,'merilsll-Admin\Bids\Bid Documents Waster Contract Documenls100310 -131d Fbrm REV Q4-07.doc Rev. 05/16/01 D. Bidder has carefully studied all: (1) reports of .explo.rations and tests of subsurface conditions at or contiguous. to the Site and ail drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the 'Site. (except Underground Facilities) which have been identified in the Supplementary Conditions es provided in paragraph 4..02 of the General Conditions, and (2) reports and drawings of a Hazardous Environmental Condition, if any, which have been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions. E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, suhsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be -employed by Bidder, and safety precautions and programs incident thereto. F. Bidder does not consider that :any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents. G. Badder is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents. H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all _additional examinations, investigations, explorations, tests, .studies, and data with the Bidding Documents. 1. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding. Documents, and the written resolution thereof by ENGINEER is acceptable to Bidder. J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted. 4.01 Bidder further represents that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any individual or entity to refrain from bidding; and. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. [The remainder of page intentionally left blank] 00310 Bid FOrlll REV 04-07 00310 - 2 F:\PublcWorkslENGINEERINGDIVISIONPROJECTS\1628-85111Slreet 961hAveto-lolslAve Roadway Improvements\1=Adnvn\DidslRIdDocuments\MasterCoeliac! Docualenls\00310- Bid.forniREV 04.07:doc Rev. 05/16101 * ADDENDUM 1 4/25/19 ITEMIZED BID SCHEDULE ��-�' ������� ��M�, VERO ESTATES 85th STREET MILLINGS FROM ^^~~~-- - NAME; LAKE 101st AVENUE TO 96th AVENUE PROJECT NO: \RC4628'B0 NO. 2019012 BIDDER'S NAME: Timothy Rose Contracting . ox"n^���3 64*npyv"^=�,~��!.��'�'���~�^'`",~~^°^"�=~.~�°`,~ ��N .~~°�°'~_~~°.=`,..,~_....~....~_. fl ' 101-1 MOBILIZATION LS �»'1z�'o» 1 30,126.00 102-11 MAINTENANCE LS I6On ' '00 1 21,600.00 104-1 ARTIFICIAL EROSION `~`^^``~~'`~^--- CONTROL PRODUCTS (JUTE MESH) SY 8.50 38 323.00 104-10-3 SEDIMENT BARRIER LF 3.00 1.203 3849.00 104'18 INLET PROTECTION SYSTEM EA 250'08 14 3500.00 104`20 CHEMICAL TREATMENT -FLOC LOGS, DRUMS EA 28 0.00 12 3360.00 110-14 CLEARING &GRUBBING L8 15,490.00 l 15/4g0.00 110-7-1 MAILBOX, F&\SINGLE (RGU]CAT|ON) EA 150_00 1 150.00 120-1 REGULAR EXCAVATION Cy 11.75 6.5.85 77/373'75 120'6 EMBANKMENT CY 9.00 402 361800 ' 160-4 TYPE "B"STABILIZATION (12"8UBGRADELBR4N (ROADWAY) Sy 2.75 15.060 41,431.50 284-1 ASPHALT MILLINGS (8" THICK) TW0 LIFTS) 8Y 7.58 13,980 104/050.00 284-1A ASPHALT MILL!NGS (6' TH1CK) (DRIVEWAYS) SY 10'50 71 745.50 425-1-621 INLETS, DTBOT, TYPE C.xi0' EA 2000.00 4 8000.0O 430'174-215 PIPE CULVERT, 15"SD ' (12"X18") (RCP) LF 72.0048 ]4�b '00 430'175'115 PIPE CULVERT, (STORM)' LF 26'00 160 4160.00 480475'118 PIPE CULVERT, ROUND, 18"8/CD(PP)(CLASS ||) (STORM) LF 35.00 120 4I00.00 48O`17S'l18A PIPE CULVERT, ROUND, 1O"G/CD(Ck1P) MITERED END SECTION, i5"CD LF EA 40.00 125 0.00 40 8 1600.0U 10/000.00 480-982-123 430'984-823 MITERED END SECTION, ELUP/ARCH, 15' SD (12'x18") EA 0O 15 '00 2 3000.0 0 530-1,0 GUARDRAIL -ROADWAY, GENERAULOWSPEED TL -2 LF 105'00 300 31/500`0V 570'1-2 PERFORMANCE TURF, SOD (BAH|8) SY 2.20 21.804 47,968.80 ^700-141 SINGLE P0ST SIGN, F&I GROUND MOUNT, UPTO128F AS 3I5.80 4 1300.00 700-1-50 SINGLE SIGN POST, RELOCATE AS 150''00 28 4200,00 999-1 AS -BUILT DRAWING (BY REGISTERED SURVEYOR) Ls 11,000.00 l 11,000.00 00310-3 r:11DvmicWommewoINssmxSDIVISION 62.8 -05th tAdmwommRidoocumomawastnoonm" * ADDEN.DUM 1 4/25/19 ITEMIZED IIID SCHEDULE PROJECT VERU LAKE ESTATES 85th STREET MILLINGS FROM l09st AVENUE TO 96th AVENUE PROJECT NO: IRC -1628, BID NO. 2019012 Timothy Rose Contracting 'S NAME: if o;. = 5.01 Bidder shall complete the Work in accordance with the Contract Documents for the price(s) contained in the Bid Schedule: A. The Discrepancies between the multiplication of units of Work ;and unit prices will be resolved in favor of the unit prices. Discrepancies between the. indicated ,sum of any column of figures and the correct sum thereof will be resolved in favor of the correct. sum. Discrepancies between words and figures will be resolved in favor of the words. B. The Owner reserves the. right to omit or add to the construction of any portion or portions of the work heretofore enumerated or shown on the plans. Furthermore, the Owner reserves the right to omit in its entirety any one or more items of the Contract without forfeiture of Contract or claims for loss of anticipated profits or any claims by the Contractor on account of such omissions.. C; Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided. The quantities actually required to .complete the contract and work may be less or more than so •estimated, .and, if so, no action.for damages or for loss of profits. -shall accrue to the Contractor by reason thereof. D. Unit Prices have been computed in accordance with paragraph 11.03.B of the General Conditions. 6.01 Bidder agrees that the Work will be substantially completed and ready for final payment in accordance with paragraph 14.07.B of the General Conditions on or before the dates or within the number of calendar days indicatedin the Agreement. 6.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified, which shall be stated in the. Agreement. 7.01 A. The following documents are attached to and made a condition of this Bid: Itemized Bid Schedule Required Bid security in the form of B A1A Sworn Statement Under the Florida Trench Safety Act; D Qualifications Questionnaire; E. List of Subcontractors; F. Sworn Statement Under Section 105.08, Indian River County Code, on .Disclosure of Relationships G Certification Regarding Prohibition Against Contracting with Scrutinized Companies 8.01 The terms used in this. Bid with initial :capital letters have the meanings indicated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions. 00310 - Bid Form REV 04-07 00310- 5. FS1Public WarkstENGINEERING DIVISION PROJECTS11628-BSUl Skeet 9611i Ave to 10151 Aye Roadway lmprovements\1-Admin\Bids\Bid DocimierilslMaster Canlract Docurnentst00310--Btd Form REV 04-01.doc SUBMITTED on May 15 , 2019 .. State Contractor License No. CGCo52940 If Bidder is: An Individual Name (typed or printed): By: (SEAL). (Individual's signature) Doing business as Business address: Phone No.:. .. FAX No.: Email: A Partnership (SEAL) Name: ( ) By: (S{gnatUre of general partner- attach evidence of authority to sign) Name (typed or printed): Business address:. Phone No. . FAX No.: .Email: A Corporation Corporation Name: Timothy Rose Contracting State of Incorporation:. Florida Type (General JSiness, Professional, Service, Limited Liability): Contractor (SEAL) Signature.— attach- evidence of:authority to sign) Name (typed or printed): Timothy Rose Title: President Attest �gnafuof Corporate Secrefaiy) (CORPORATE SEAL) 'Business address: 136o SW Old Dixie Hwy Suiteio6 Vero Beach FL 32962 Phone No.: 772.564.7800 FAX No.:. 772.S64.7888 Email TimRose7(Thcomcast.net Date of Qualification to do business is 1991 A Joint Venture. Joint Venture Name: (SEAL) 00310 - Bid Form REV 04=07 00310-"6 F:1Public Works\ENGINEERING DIVISION PROJECTS\1620-05t11 Slree1_061h Ave to 101st Ave_ Roadway Improvements11-Admin\Rids\BId Ooc.ments\Master.Conliaat pocuments100310 - Bid Form REV 04-07.doc- By: (Signature of joint venture partner attach evidence of authority to sign) Name (typed or printed): Title: Business address: Phone No!. FAX No.: Joint Venture Narne: (SEAL) By: (Signature attach evidence of authority to sign) Name (typed or printed): Title: Business address: Phone No.: FAX No.:' Email: Phone and FAX Number, and Address for receipt of offibial communications; (Each joint venturor must sigri. The manner of -signing for each individual, partnership, and corporation thatis a party to the joint venture -should be in the manner indicated above.) * END OF SECTION * * 00310 - Bid Form REV 04-07 0011:1- FAPOidlcWoiks\EN-GINEOING OVISION OFOJEdfS11628-80i Street 9QIIIAVe Lo 101A Ave_ Roadway ImprgyamentM1Admi01Bilpirf Dodurrierr4V4irsto:r. Contact b•ObLinr6ri(sIdd1O-Eild Form REV b4-32).7.doc Document A310TM — 2010 Conforms with The American Institute of Architects AIA Document 310 Bid Bond CONTRACTOR: SURETY: (Nu ne, legal sialtrs.and address) (Name, legal status and principal phtce r f business) Timothy Rose Contracting, Inc. 1360 SW Old Dixie Highway Suite 106 Vero Beach, FL 32962 Hartford Fire Insurance Company One Hartford Plaza Hartford, CT 06155-0001 OWNER: (Name, legal status and address) Indian River County Purchasing Division, Room B1-301 1800 27th Street Vero Beach, FL 32960 BOND AMOUNT: $ 5% Five Percent of Amount Bid PROJECT: (Name, location or address, and Project number, lion)) Vero Lake Estates 85th Street Millings From 101st Avenue to 96th Avenue 2019012 This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. - Project No. IRC -1628 - Bid No. The Contractor and -Surety arc bound to the Owner in the amount set forth above; for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond arc such that if the Owner acceptsthe bid of the Contractor within the time specified in the bid documents, or within such time.period as may be agreed to by the Owner -and Contractor, and the Contractor either (1) enters into a contract with the Ower in accordance with the terms of such bid, and gives such bond or bonds as May be specified in the bidding or Contract Docuimcnts, with a. surety admitted in the, jurisdiction dale Project and otherwise acceptable to the Owner, for the'faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the -amount of this I3ond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perlbrm the Work covered by said hid, then this obligation shall he null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice oIaii agreement between the Owner and Contractor to extend the time in which the Owner may accept the hid. Waiver .1 notice by the Surety shall not apply to any extension exceeding sixty (60) days in the. aggregate beyond the time for , acceptance of bids speoilied in the bid documents; and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty. (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this. Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall he deemed deleted herelrom and provisions confbmting to such Statutory or other legal requirement shall be deemed. incorporated herein. When so furnished, the intent is that this Bond shall be construed as -a statutory bond and not asa common law bond. Signed and scaled this 15th day of May, 2019 (Witness) (Witness) D nia Banks Timothy Rose Contracting, Inc. (Principal) (Sea!) PreAdt“-- `(!'illi) Hartford ;insurance Company (Surety) jf y /� �: s 15ea!) By: (Til/e)Charl4s J. Nielson Attorney -in -Fact S-0054/AS 8/10 POWFR OF ATTORNFY KNOW ALL PERSONS BY THESE PRESENTS THAT: Direct Inquiries/Claims to: THE HARTFORD BOND, T-12 One Hartford Plaza Hartford, Connecticut 06155 Bond.Clai msOthehartford.c om call: 888-266-3488 or fax: 860-757-5835 Agency Name: NIELSON HOOVER & COMPANY INC Agenc Code: 21-229752 X X X Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of Unlimited : D. A. Belis, Tracey C. Brown -Boone, Natalie C. Demers, David R. Hoover, Stephanie McCarthy, Laura D. Mosholder, John R. Neu, Charles D. Nielson, Charles J. Nielson, Joseph Penichet Nielson, Daniel Frank Oaks, Brett Rosenhaus, Kevin Wojtowicz of MIAMI LAKES, Florida their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and. executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have caused these presents to be signed by its Senior Vice •President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. John Gray, Assistant Secretary STATE OF CONNECTICUT SS. Hartford COUNTY OF HARTFORD On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. M. Ross Fisher, Senior Vice President )110 ,-.zti.tk Kathleen T. Maynard Notary Public CERTIFICATE My Commission Expires July 31, 2021 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of 5 / 15 / 2 019 Signed and sealed at the City of Hartford. Kevin Heckman, Assistant Vice President POA 2013 SECTION 00452 SWORN STATEMENT UNDER SECTION 105.08, INDIAN RIVER COUNTY CODE, ON DISCLOSURE 01? RELATIONSHIPS THIS FORM. MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICER AUTHORIZED TO ADMINISTER OATHS. I . This sworn statement MUST be submitted with Bid, Proposal or Contract No. 20190.12 for VERO LAKE ESTATES: 85m. STREET MILLINGS FROM 1015► AVENUE TO 961h AVENUE 2. This sworn statement is .submitted by: Timothy Rose Contracting (Name of entity submitting Statement) whose business .address is: 136o SW Old Dixie Hwy Suite 106 Vero Beach FL 32962 3. My iiaine is Timothy Rose (P.lease print name ofindividual signing) and my relationship to the entity named above is. President 4. I understand that an "affiliate" as defined in Section 105.08, IndianRiver County Code, means: The term "affiliate" includes those officers, directors, executives, partners, shareholders, en ployees, members, and agents who are active in the management .of the entity.. 5. I understand that the relationship with a County Corrimissioner or County employee that must be disclosed as follows: Father, mother, son, daughter, brother; sister, uncle, aunt, first cousin, nephew, niece, husband, wife; father -.in-law, mother-in-law, :daughter• -iii -law, son-in-law, brother-in-law; sister-in-law, stepfather, Stepmother, stepson, stepdaughter:, stepbrother, stepsister, half brother, half sister, grandparent, or grandchild. 6. Based on information and belief, the statement, which I have Marked below, is true in relation to the entity submitting this sworn statement. [Please indicate which statement applies] XX Neither the -entity submitting this sworn stateinent, nor .any officers, directors, executives, partners, shareholders, -employees, meinbers, or agents who are active in management of the entity, have any relationships as defined in section 105.08, Indian River County Code, with any County Commissioner or County employee. 00452-1 F:\PublicVVorks\ENGINEERING DIVISION PROJECTS11628-85th Street 96111 Ave to 401st Ave_ Roadway.lrnprovements\1 Admin\Bids\Bid Documents\Master Contract Documents\00452 Disclosure of Retalionships.doc The entity submitting this sworn statement, or one or more of the officerS,. directors, exeetitives, partners, -shareholders, employees, members; or agents, who are active in management of the entity have the following relationships with a County Cortunissioner or .County employee; Nanie:o.f Affiliate Name of COUnty COMM N6Oper Relationship or entity or eniplOyee STATE OF Florida 7 05.15.19 (Date) COUNTY OF Indian River The fOregOing instrument was acknowledged before me this 15th day of May , 2019 'by who is personally known to me or who has produced as identification.• SIGN: 1\1LsOl'ARY T313LIC ft% PRINT: Deborah. West 00452-2 Notary Public, State at large My Commission Expires: (Seal) rec.7,,is;..z.:Aca, v•,,N - s 6 -lb ii:e7,07 MY COMMISSION Al FE904:r7 EXPiRES:0Gtob 03,2019 I F:\Publio WorkEil0IN'EERING DIVISION PROJECTS11628-85th Strpgt. 0601 Aveio 101st Ave_ Ro,adway Imprpvernents\ t-Adiniri\BicMf3id DocOmpAtsaasier Contract POcujfierits100452 DiclOstgp of RelOtionthip-s.doc SECTION 00454 - Sworn Statement Under the Florida Trench Safety Act THIS FORM MUST BE SIGNED BY THE BIDDER WHO VVILL BE RESPONSIBLE FOR THE EXCAVATION WORK ('BIDDER"), OR ITS AUTHORIZED REPRESENTATIVE, IN THE PRESENCE OF A NOTARY PUBLIC AUTHORIZED TO ADMINISTER OATHS. 1. This Sworn Statement is submitted with Project No. !RC -1628 for VERO LAKE ESTATES 8511 STREET MILLINGS FROM 101St AVENUE TO 961`1 AVENUE. 2. This Sworn Statement is submitted by Timothy Rose Contracting (Legal Name of Entity Submitting Sworn Statement) hereinafter "BIDDER". The BIDDER'S address is 1360 SW Old Dixie Hwy Suite 106 Vero Beach FL 32962 BIDDER's Federal Employer Identification Number (FEIN) is 65-0284242 3. My name is Timothy Rose and my relationship to the BIDDER (Print Name of Individual Signing) is President (Position or Title) I certify, through my signature at the end of this Sworn Statement, that I am an authorized representative of the BIDDER. 4. The Trench Safety Standards that will be in effect during the construction of this Project are contained Within the Trench Safety Act, Section 553.60 et.seq. Florida Statutes and refer to the applicable Florida Statue(s) and/or OSHA Regulation(s) and include the "effective date" in the citation(s). Reference to and compliance with the applicable Florida Statute(s) and OSHA Regulation(s) is the complete and sole responsibility of the BIDDER. Such reference will not be checked by OWNER or ENGINEER and they shall have no responsibility to review or check the BIDDER's compliance with the Trench Safety Standards. 5. The BIDDER assures the OWNER that it will comply with the applicable Trench Safety Standards. 6. The BIDDER has allocated and included in its bid the total amount of $ 1000.00 based on the linear feet of trench to be excavated over five (5) feet deep, for compliance with the applicable Trench Safety Standards, and intends to comply with said standards by instituting the following specific method(s) of compliance on this Project: Angle of Repose The determination of the appropriate method(s) of compliance is the complete and sole responsibility of the BIDDER. Such methods will not be checked by the OWNER or ENGINEER for accuracy, completeness, or any other purpose. The OWNER and ENGINEER shall have no responsibility to review or check the BIDDER's compliance with the Trench Safety Standards. 7. The BIDDER has allocated and included in its bid the total amount of $ based on the square feet of shoring to be used for compliance with shoring safety requirements and intends to comply with said shoring requirements by instituting the following specific method(s) of compliance on this Project: N/A 00454 _ Florida Trench Safety Act - REV 04-07 00454 -1 F: Pubbc WortcsSENG>INEERING DIVISION PROJECTS11620-85th Street 96tli Ave to 101st Ave Roadway lmprovementsll •Admin\Bids\Bid DocumenlslMester Contract Dacumen1s\00454 - Florida Trench Saltily Act - REV 04-07.doc The determination of the appropriate method(s) of compliance is the complete and sole responsibility of the BIDDER. Such methods will not be checked by the OWNER or ENGINEER for accuracy, completeness or any other purpose, The OWNER and ENGINEER shall have no responsibility to review or check the BIDDER's compliance with the Trench Safety Standards. 8, The BIDDER; in 'submitting this bid, represents that it has obtained and considered all available geotechnical information, has utilized said geotechnical information and that, based on such information and the BIDDER's own information, the BIDDER has sufficient knowledge of the Project's surface and subsurface site conditions and characteristics to assure BIDDER's compliance with the applicable Trench Safety Standards in designing the trench safety system(s) for the Project. BIDDER' Timothy Rose. Contracting ' Position or Title.: President Date: 05.15.19 STATE OF Florida COUNTY OF Indian River Personally, appeared before me, the undersigned. authority, Timothy Rose who after first being sworn by me, affixed his/her signature in the space :provided `above on this 15th day of _ May , 2019 . .Notary IFui lic,,..tate at Targe My Corninssion Expires: \of • <J r.fCO?lthd'3SION #FF904573 sS EX IRE& Octo=btc 03, 2019 '.; END OF SECTION * * 04459 - Florida Trench Safety Act - REV '04-07 00454 2 F.\Public Works \ENGINEERING DIVISION PROJECTS162&a5in:SI eel_96Ifl Ave. lo.109st.Ave_ Roadway Impiovements11-Adnijelpids1Bid Documents\Master Contract bocunents\00454 - Ftoiida Trench Safety Act - REV 04-07.doc SECTION 00456 -- QUALIFICATIONS QUESTIONNAIRE NOTICE: THE OWNER RETAINS THE DISCRETION TO REJECT THE BIDS OF NON - RESPONSIBLE BIDDERS. Documentation SubmittedwithProject No: IRC -1628 Project Name: VERO LAKE ESTATES 85th STREET MILLINGS FROM 1011: AVENUE TO 96th AVENUE 1. Bidder's Name / Address: Timothy Rose. Contracting 136o SW Old Dixie Hwy Suite 106 Vero Beach FL 32962 2. Bidder's Telephone & FAX Numbers: 772.564.7800 / 772.564.7888 3: Licensing and Corporate Status; a. Is Contractor License current? Yes b. Bidder's Contractor License No CGC052940 [Attach a copy Contractor's License to the bid] c. Attach documentation from the State/of Florida Division of Corporations that indicates the business entity's status is, active and that lists the names and titles of all officers. 4. Number .of years the firm has performed business as a Contractor in construction work of the type involved in this contract: 28 5. What is the .last project OF THIS NATURE that the firm has completed? City of Sebastian Street Milling & Paving: 6. Has the firrn ever failed to complete work awarded to you? No [If your answer is "yes", then attach a separate page to this questionnaire that explains the circumstances and list the project name, Owner, and the Owner's telephone, number for each project in which the firm failed to complete the work.] 7. Has the firm ever been assessed liquidated damages? No [If your answer is "yes", then attach a separate page to this questionnaire thatexplains the circumstances and list the project name, Owner, and the Owner's telephone number for each project in which liquidated damages have -been assessed.] 8. Has the firm ever been charged by OSHA for violating any OSHA regulations? No [If your answer is "yes", then attach :a separate page to this questionnaire that explains the circumstances and list the project name, Owner, and the Owner's telephone number for each project in which OSHA violations were alleged.] 9. Has the firm implemented a drugfree workplace program in compliance with Florida Statute 287.087? Yes 00456 - Qualifications :QueStW0riaire 00456 -. 1 F;tpublic Works\ENG1NEERINt DIVISION"PROJECTS\1628 851h SVee_l 96th Ave to 101st Ave_ Roadway Improvemenlsl9-Admin\Blds\Bid Docunwnls\Meelei C9nlrael Documenls100456 -Qualifications Quesllonnairo.doc (In the case of a tie, •preference will be given to businesses with drug-free workplace programs) 10. Has the firm ever been charged with noncompliance of any public policy or rules? No [If your answer is "yes", then attach a separate page to this questionnaire that explains the circurnstances and list the project name, Owner, and the Owner's telephone number for each project.] 11. Attach to this questionnaire,. a notarized financial statement and other 'information that documents the firm's financial strength and history.. 12 Has the firm ever defaulted on any of its projects? No - [If your answer is "yes", then attach a separate page to this. c{uestionnaire that explains the circumstances and list the project name, Owner, and the Owner's telephone number for each project in which a default occurred.] 13. Attach a separate page to this questionnaire that summarizes the firm's current workload and that derno.nstrates its .ability to meet the project schedule. 14. Name. of person who inspected the site of the proposed work for the firm: Name: Timothy Rose Date.of Inspections: 4.25.19 15. Name of on-site Project Foreman.: Donnie Flood Number of years of experience with similar projects as a Project Foreman: '7 16. Name of Project Manager: Timothy Rose Number of years of experience with similar projects as a Project Manager: 35 17. State your total bonding capacity: 10 Million 18. State your bonding capacity per job: 5 Million 19, Please provide name, address, telephone number, and contact person of your bonding company: [The remainder of this page was left blank intentionally] Hartford Fire Insurance Company One Hartford Plaza Hartford, CT 06155-0,001 Jarrett Merlucci Phone: 305.722.2664 00456 - Qualirications Questionnaire 00456 - z F:IPLUIIc Wood s1ENGINEERING piV1$ION PROJECTS11628.051h Street 661h AVB io'11)1st Ave Roadway Improvementstl-Admin1F31ds\Bid Documents Mastor Conlracl Documents100456-.OualIlicaltons Quesliohnalre.dpc 19. Complete the following table for SIMILAR projects: Narne of Project Date Completed Owner Contact Person: Name/ Email Address/Phone Original Contract Amount Final Contract Amount Sarno Road 09/2018 City of Melbourne Tom Baker, PE 321-608-7310 Thomas.Baker@mlbfl.org 520,994.39 566,770.92 Shell St Improvements p 03/2016 City of Satellite Beach David King, P.E. 386-761-6810 dkingPglha.com 548,748.55 510,034.21 Barber St Reconstruction 12/2016 City of Sebastian Frank Watanabe. 321-409-6341 cwtransePgmail.com 478,118.50 478,11.8.50 Coolidge St Improvements 03/2015 City of Sebastian Frank Watanabe 321-409-6341 cwtransePgmail.com 460,037.00 466,161.28 Sebastian Street Milling & Paving 09/2017 City of Sebastian Frank Watanabe 321-409-6341 cwtranse@gmail.com 663,250.00 663,250.00 Sebastian Milling Paving 04/2019 City of Sebastian R. Scott Baker 772-228-7013 RBaker@a CityofSebastian.org 808,025.30 808,025.30 58th Ave Resurfacing 04/2019 Indian River County William Johnson 772-226-1986 wjohnson@ircgov.com 2,825,641.68 2,473,250.48 Old Dixie Resurfacing PhaseI Phase 11 09/20152.22 08/2016 Indian River County James Ennis, PE PMP 772 226 1221 jennis@ircgov.com 1 ,79 ,4 35 2,467,160.62 1 ,745;660.08 2,195,986.53 Oslo Road Indian River 10/2014 Improvements County ao4.56 ennis@ircgov.com F,1PudicWorkctENGlNEERING DIV151ONPROJECTSti82a•85ih 5U cot MBlh Melo lutztAve_RoShcrey Impiaicm-ntsli.hdmin ds181d Dopmentc11.1aRe. Contract DONmentsVJ0456- Cealkaeons DuesOonn:dieane James Ennis, PE 772-226-1221 3,812,202 -Quarkafi sflue riiO3r le [NOTE: If t'eynested by the County, the Bidder shall furnish references, and other information, sufficiently comprehensive to permit an appi•aisal.of its abilities as a contractorlr_ -- om---� 4 (Signature) President (Position or Title) 05.15.19 END OF SECTION** (Date) 00456"- Qualifications 00estionnaIre 00456 -:4 r;\Public WorksVENGINEERING bivIStON PROJECTS\1628;651h Street 96th Ave to 101st Ave Roadway. Improvements\1 Admin\Bids\Bld Dacumentsthnster.Contrect Documenls100456-0Ailllfeetiene'Quetionneire:doc' Florida 1 epartment of Transport,' tion RON DESANTIS GOVERNOR TIMOTHY ROSE CONTRACTING, INC. 1360 SW OLD DIXIE HIGHWAY VERO BEACH, FLORIDA 32962 Dear Sir/Madam: 605 Suwannee Street Tallahassee, FL 32399-0450 March 25, 2019 *REVISED* RE: CERTIFICATE OF QUALIFICATION KEVIN J. TI-IIBAULT, P.E. SECRETARY The Department of Transportation has qualified your company for 'the type .of work indicated below. Unless your company is notified otherwise, this Certificate of Qualification will expire 6/30/2020. However, the new application is due 4/30/2020. In accordance with S.337.14 (1) F.S. your next application must be filed within (4) months of the ending date of the applicant's audited annual financial statements. If your company's maximum capacity has been revised, you can access it by logging into the Contractor Prequalification Application System via the following link: HTTPS://fdotwpl.dot.state.fl.us./ContractorPreQualification/ Once logged in, select "View" for the most recently approved application, and then click the "Manage" and "Application Summary" tabs'. FDOT APPROVED WORK CLASSES: DRAINAGE, FLEXIBLE PAVING, GRADING, GRASSING, SEEDING AND SODDING, HOT PLANT -MIXED BITUM. COURSES, SIDEWALK You may apply for a Revised Certificate of Qualification at any time prior to the expiration date of this certificate according to Section 14-22.0041(3), Florida Administrative Code (F.A.C.), by accessing your most recently approved application as shown above and choosing "Update" instead of "View." If certification in additional classes of work is desired, documentation is needed to show that your company has done such work with your own forces and equipment or that experience was gained, with another contractor and that you have the necessary equipment for each additional class of work requested. All prequalified contractors are required by Section 14-22.006(3), F.A:C., to certify their work. underway monthly in order to adjust maximum bidding capacity to available bidding capacity. You can find the link to this report at the website shown above. AA:cj Sincerely, Alan Autry, Mghager Contracts 96iinistration Office www.fdot.gov • .,�5C...: 3,' s'"U0R-,.. 7w�Ea'iCt;rik.• ••`•::.i sL•r."Ju 47-- .....N/1:aa�si:x•3.tip.+s.-K I e6't� 't_•s:'..e+'}t.eii10u rr-%nrtiw°..: ..:. --p.:e'.i.Q.Y.a ..:f3<s:a:144.V...:.,•c^.vl•Yti,.ti:..zC'4",ef,,,!,,V1,-J.ntw',r.j: •;a:>h"1iX.O.4 ':: L.p'1.V1.y1=10 4 kms. r• i :4,, ..,,„ „,,,„ >� ..+"'-W'-t.%..:.tL • 01S RICK•SCOTT, GOVERNOR JONATHAN ZACHEM SECRETARY ;.. „., ' .'._C a:ji�» oz3;ws'" STATE OF FLORIDA DEPARTMiEN I OF C US NES$ P FESS OVAL IREGULAI1ON9 tr,.r Via: " 4., 1� L_?: f r, -_/: Florida� , e. a ,.., 'CONSTRUCT* ,.,��[ "' 4I .• as s , ,f. '",..A-...' p er - ' - e-_„,...7.--.E.4-4,:,-�,'�j, a` - NG BOARD tx;_" ,� THE.GENERAL COi� RR� 4-C ,�� f .,, 1x t MC%XLJ.T`__'{y,n',liFi�. 4� 3'+^'V.�} PROV1S l� Ss�OF`Gi`IA�I? '� v-t , � .N, 4,-,) Cay, �H'E�RaE� I I� E'RT.I ��f, UNDER THE wry. �.s 4 - t ! ,i.l t• rte..'P f 4 { �ER:'�` $9�•F1 OR—I`DA STA' UTES iI 1i, .'YP"-''1 1, e• k L" Ca` 4 " 5S. k pd 0 11'�,--'i`''s 1x 1.,6 � may, T om:.>r• • �k I^- ,�Id ©I. {i �' �J 1 .y , , ,ru,fr-'a al c, l,13p ;r tiui K.,„ F1 b i� i^ it 5r rl j [ ' ' i 1 1 SUI_:.., f� ^r7•R•Y-`„,r_ '-. �I'd-,� •' +, 7_u=-+ :4 j���KIlCii i �9 r,0i • .' `� .-.N • 1 '- , PP. .6 ,."' r - M lE ,H irCei irU , f ; ,: "i r 6 , ., - t- -Y 4.,, FA 9�8" .t . "�'+'�'d4�j,t,_, .', • .) "I ^IY,! (','J -7- d 9 1 LSF' i E N S tl ` 'i lt: ART' iSr2'.4;4,9fi4'0 a . ii 1.. EX 0 RAT10' 9,t1 A�TEt-P tile381- 31, 2020 Always verify licenses online at MyFloridaLicense.com Pdy 3 �,,�,a, Do not alter this document in any form. ,,- , 1',t C7” 0. p6PdcL'o- ' . This is your license. It is unlawful for anyone other than the licensee to use this document. a . ••, -: ..w::.:.6,;0,"4,.:,.�6".4.oV.• !L'.w -p>, :F'�= - --- .tek.. :..-- ...Mg ..,. —,� _-:...-:,...:.•_..f. f:.r:i ..... n......r 2019 FLORIDA PROFIT CORPORATION ANNUAL REPORT FILED DOCUMENT# S75343 Jan 22, 201e Entity Name: TIMOTHY ROSE CONTRACTING, INC. Secretary of State 9093647305CC Current Principal Place of Business: 1360 OLD DIXIE HWY SW STE 106 VERO BEACH, FL 32962 Current Mailing Address: 1360 OLD DIXIE HWY SW STE 106 VERO BEACH, FL 32962 US FEI Number: 65-0284242 Name and Address of Current Registered Agent: ROSE, TIMOTHY W. 1360 OLD DIXIE HIGHWAY SW 106 VERO BEACH, FL 32962 US Certificate of Status Desired: No The above named entity submits this statement -for the purpose of changing its registered office or registered agent, or both, in the State of Florida. SIGNATURE: Electronic Signature of Registered Agent Officer/Director Detail : Title P Title SEC Name ROSE, TIMOTHY W. Name ROSE, RONALD Address 1360 OLD DIXIE HWY SUITE 106 Address 1360 SW OLD DIXIE HWY #106 City -State -Zip: VERO BEACH FL. 32962 City -State -Zip: VERO BEACH FL 32962 Title TREA Name ROSE, LISA A Address 1360 SW OLD DIXIE HWY #106 City -State -Zip: VERO, BEACH FL 32962 Date, I hereby certifyy lha(the information indicated on this report or supplemental report is true arid accurate and that my electronic signature shall have the same legal effect as if made under oath; that 1 am an officeror director of (he corporation or the receiver or trustee empowered to execute this repod'as required by Chapter 607, Florida Statutes; and that my name appears above, or on an attachment with all other like empowered. SIGNATURE: TIMOTHY W. ROSE PRESIDENT 01/22/2019 Electronic Signature of Signing Officer/Director Detail Date 10:22 AM Timothy Rose Contracting, Incorporated Profit & Loss April 2019 05/03/19 Accrual Basis Ordinary Income/Expense Income Construction Income Total Income Cost of Goods Sold Construction Equipment Rep... Contract Labor Contract Services Dump Fees Equipment Fuel & Oil Equipment Rental Materials & Supplies Payroll Leasing Permits and Bonds Total COGS Gross Profit Expense Advertising. and Promotion Bank Service Charges Bidding Cost: Expense Business Licenses and Permits Computer and Internet Expen... Continuing Education Dues and Subscriptions, Insurance Expense Worker's Comp Ins Insurance Expense - Other Total Insurance Expense Office Supplies Parking and Tolls Payroll Administrative Fees Payroll Expenses Payroll Tax Expense Pension 401k Plan Postage Professional Fees Legal Fees Total Professional Fees' 'Repairs and Maintenance Telephone Expense Utilities Total .Expense Net Ordinary Income Other Income/Expense Other Income Interest Income Total Other income Net Other Income Net Income Apr 19 1,236,665.73 1,236,665:73' 26, 223.90 17,800.00 61,220.34 12,973.04 8,292.60 673.28. 14,647.04 11.3,496:44 5,335.95 260,662.59 976,003.14 20.00 392:96 134.72 -3,039.71 300.00 2,015.00 19.00 7,583.57 14, 089.49 21;673.06 233.92 196.66 5,516.17 33,601.96 11,910.41 2,508.62 51:48 1,000.00 1,000.00 226.49 1,303.14 606:99 78,67.0.87 897,332:27 1,296.83 1,296.83 1,296.83 898,629.10 Esc DEBnIt WEST ✓,Y C'�) AA .c 1 ION !" 1.1904570 Uctu'.rk 03, 2019 4 :b:Y.rV'Zft��4'L34, C�f'� Page 1 STATUS OF CONTRACTS ON HAND ' Give full.information about all of your contracts, whether prime or subcontracts; whether In progress or awarded but not yet begun; and regardless of its location and with whom contracted. 1 2 3 4 5 6 I 7 •s - -4= 3 y.: t'" ' vr~1 � _' ti _.._ -4 , .,,,r . CLASSES OF W.ORK3 - k i -i; c� ,, . fit , - , 1 . r ,7--,:k":7-=,.• ti' , ` 4`DOTPROJECTSANN OCATION_OF,pIMOfi1C OL AREI . { C N RACT O1 ` UBCONTRAGT.){ F' i E • •lAMOUNT •ti 1�``r'AMOU Tn '! 1_ SBA, LANCE OFA u 4 OM LLETED OUNTcTO BE 00 Eft tgY7APP,LICNT.8r j'',.CONTRAG.T-� _fa. _;h,� ISUBL� E _` A UNT ca-.-4s.:, `AS - B y . 1 yIP.ERFORMING . ' ,, •i :,NI ERS .r'j 1,!, �, O TR IaS ONTO RR'' r_ r x ""t i«. `2` x' ",,.-:,3 r,�..._.. .. '`- n :: _ _.+ ' `c'e. -r! 5.DOT WQRK_ i $ T .._ fr. T.: rr— ,r,. _ , ---7-"-, • - _�: $ ., ._ _II `lel ! (Col: 5'Subfotaq.S " ,. �. . -a �...' > :i .,..-_,. ...•.•- 1 ,� . !�CL+'A$SESgOO F'WORKy r r "µ r y.,,5,, �''1" �' L ' LOCATION OFS'lcONTRACT,(Ms; rOTWE� (Nort-DOT) PROJECTS OWNER, AND i---)'-- .,---1. V c ') NORKaYOU ARE PERFORMING ;' 4 T -riANIQUNT•u , 'SUBLETr 01.17 i-• tOTHERS' . '•kBAIANCEOF,itV .�. 3 ray {CONTRACT' +•S 4c,,,,,:4'7., ^.a�7 r ! i ' £�.•7`k+"'� F ° " S•J t rl t f' y% , ,.. T, : i --�—^" .SUBCONTRAM) ;�? ,. "AMOUNTrZ-!• . [[ Fi'. _A'�.. O NTA.,, -2-.1,4".../3'3y .- k^ .•;t'z., i r4,2 - -t'•fi Drainage/Sidewalks/Flexable Paving Atlantic Blvd Indian River County Vero Beach $310,259.50 512,936.00 $136,742.70 5136,742.70 Drainage/Sidewalks/Flexable Paving Dunkin Donuts DTO Property Vero Beach $208,716.00 50.00 $196,407.00 $196,407.00 Drainage/Flexable Paving Shade Hangers Indian River County Sebastian $125,609.40 $50,400.00 538,282.70 $38,282.70 Drainage Ariel Fish House Liftstation David Krebs Sebastian $62,411.00 $0.00 $48,462.81 $48,462.81 Drainage/Sidewalks/Flexable Paving 45th St Industrial Charles Sullivan Vero Beach $2,921,637.00 557,600.00 $2,704,700.00 $2,704,700.00 Drainage Indian River Landfill Indian River County Vero Beach 5636,013.50 50.00 5636,013.50 $636,013.50 Drainage Lakes of Brookhaven Vero Beach Lakes Vero Beach 5261,886.12 $0.00 $261,886.12 $261,886.12 Drainage/Sidewalks/Curbing Dr Jones Dental Adam Jones Vero Beach $205,087.00 50.00 5203,336.74 5203,336.74 Drainage/Sidewalks/Curbing Willis Family Farm Chris Willis Vero Beach FL $617,129.00 $0.00 5617,129.00 $617,129.00 Drainage/Sidewalks/Curbing Auto Zone Vero Beach 5226,016.00 $0.00 5226,016.00 5226,016.00 Drainage/Flexable Paving Old Dixie Hwy / Highland Dr Indian River County Vero Beac $415,984.32 50.00 $415,984.32 $415,984.32 a:X - .f' `i•ar_' _ =:;:_V `"".' t. i l_' ...:-:-"=„. '--.7-7,-__:_-___;._-_ «_ "_ ";-....r:-4-77-i....-":17'.:-7.7 _ i , LOTHERWORKI '" K, $5,484,960.89 .:(COI 5 Subtotal) ;,Y -.rw•. _ _. ,. ,,.t.14 _7_44,4' ;"— _ r_ . _ z ._.=, s= „.-.:2" ,..r -- PLEASE+ENTER ATiTACHMENTiTOTALS`ON.THIS LINE r•<• _ t' r :.7-4...._ "':: ': •__ ; , 4T_-_3 rt r.«'i'':-`'-';"",€"ue;F' .: 7...4'..: TOTAL UNCOMPLETED WORK ON HAND TO BE DONE BY YOU $5,484,960.89 50.00 GRAND TOTAL 55,484,960.89 NOTE: Columns 3 and 4 to show total contract (or subcontract) amounts. Column 5 to be difference between columns 3 and 4. Amount in columns 6 or 7 to be uncompleted portion of amount in column 5. All amounts to be shown to nearest $100.00. The Contractor may consolidate and list as a single item all contracts which individually do not exceed 3% of the TotalrofC.olumns6ana,Miist;B.;i7 .FilledfinFandtMust P:grea wtth-litated0 `Attachment(s),,Ifyfurnistieds -te;_.fT total, and which, in the aggregate, amount to less than 20% of the total. TYPE OF BUSINESS BUSINESS ADDRESS VERO BEACH, FL 32962 2018 - 2019 LOCAL BUSINESS TAX INDIAN RIVER COUNTY, FLORIDA MUST BE DISPLAYED IN A CONSPICUOUS PLACE 509 CONTR-EXCAVATION 512 CONTR-GENERAL/CERTIFIED 571 CONTR-UNGRND UTILS/REGISTERED 1360 SW OLD DIXIE HWY 106 NAME TIMOTHY ROSE CONTRACTING INC MAILING ROSE, TIMOTHY WILLIAM ADDRESS 1360 SW OLD DIXIE HWY STE 106 VERO BEACH, FL 32962-6444 Paid 08/22/2018 40.00 000-00018611 ACCOUNT* 11.970 RECEIPT* 5125407.000 EXPIRES SEPTEMBER 30, 2019 AMOUNT PENALTY TRANSFER TOTAL 40.00 0.00 0.00 40.00 This receipt is in addition to and not in lieu Of any other license required by law or municipal ordinance and is subject to regulations of zoning, health and any other lawful authority. Owner must notify the TeX Collector's Office of any changes in business narne, ownarship, location addressor mailing ackiress. *CAROLE JEAN JORDAN, CFC TAX COLLECTOR INDIAN RIVER COUNTY, FLORIDA • _ L jLI 2291171 C 1i rri 3 - c® eWnt Person 4,-11, Uhhigad Ge e t 4 _. -.I" CP ..��x= Trench Safety' A� _,Vi tins attend) 'Ours of trolling ci in Tench and Excavation Safety J Date •11S .11.1C--(11 ''.1: 0171171.�.'iila--1�,:Ti/ii AAL`-. glias—r'Tjl�.,., ,=,jL,••.Z-. .-I"= �Z..t,_,LZS .ii! Z,'R SECTION 00458 - List of Subcontractors The Bidder IVIUST list below the name and address of each Subcontractor who will perform work under this Contract in excess of one-half percent of the total bid price, and shall also list the portion of the work which will be done by such Subcontractor. After the opening of Bids; additions, changes or substitutions will not be allowed unless approved by Indian. River County after a request for such a change has been submitted in writing by the Contractor, which shall include reasons for such request. Subcontractors must be properly licensed and hold a valid Certificate of Competency. Documentation 'Submitted With Project No. IRC -1628 for VERO LAKE ESTATES 851 STREET MILLINGS FROM 101SE AVENUE TO 96t—I' AVENUE Note: Attach additional sheets- if required. ** END OF SECTION** 00458 - List of Subcontractors REV 04-07 00458 -1 F:\Public WorksIENGINEERING DIVISION PROJECTSI1628-85th Slreet 9611i Ave'to 101st Ave_ Roadway tmprovemenls\l Admin\Bids\Bid DocumenlsVJasler Contract Documenls\00458 - Lisl.ot Subconlractors REV 04-07.doc Work to be Performed Subcontractor's NamelAddress Portion of Work (%o) 1. Stiping/Signs Complete Striping & Signage, LLC P. 0. Box 651054 Vero Beach, Florida 3)965 5% 2. 3. Paving Community Asphalt Corporation 9675 NW 117 Avenue Suite 1 108 Miami, FL 33178 60% 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Note: Attach additional sheets- if required. ** END OF SECTION** 00458 - List of Subcontractors REV 04-07 00458 -1 F:\Public WorksIENGINEERING DIVISION PROJECTSI1628-85th Slreet 9611i Ave'to 101st Ave_ Roadway tmprovemenls\l Admin\Bids\Bid DocumenlsVJasler Contract Documenls\00458 - Lisl.ot Subconlractors REV 04-07.doc SECTION 00460 — CERTIFICATION REGARDING PROHIBITION AGAINST CONTRACTING WITH SCRUTINIZED COMPANIES I hereby certify that 'neither the undersigned entity, nor any of its wholly owned subsidiaries, majority- owned subsidiaries, parent companies, or affiliates ofsuch entities or business associations, thatexists for the purpose of making, profit have been placed on the Scrutinized Companies that Boycott Israel List created pursuant to S. 215,4725' of the Florida Statutes, or are engaged ina,boycott of Israel. In addition, if this solicitation is fora contract for goods or services of one million dollars or more, I hereby certify that neither the undersigned entity., nor any of its wholly owned subsidiaries, majority, - owned ajority-owned. subsidiaries.; parent companies, or affiliates of such entities or business associations, that exists for the purpose of making profit are on the Scrutinized Companies with Activities in Sudan List or the Scrutinized. Companies with Activities in the Iran Petroleum Energy'Sector List, created pui-suant to s. 215.473 of the Florida Statutes, or are engaged in business operations in Cuba Or Syria as defined in said statute. I understand andagree that the County may immediately terminate any contract resulting from this solicitation upon written notice if the undersigned entity (or any of those r -elated entities of respondent as defined above by Florida law) are found to have submitted a false certification or:any ofthe following occur with respect to the company ora related entity: (1) it has been pla_ced:on the Scrutinized Companies that Boycott Israel List; oris engaged in a boycott of Israel, or (ii) for any contract for goods or services of one million dollars or more, it has been placed on the Scrutinized Companies with Activities hi Sudan List or the Scrutinized Companies with Activities iin the Iran Petroleum Energy Sector List, or it is found to have been engaged in business operations in Cuba or Syria. Name of RespondentJtmothy Rose By; rte`` " -- ((authorized Signature) Title: President Date: 05.15.1.9 00460 - Certification Regarding Prehitiilion Againal Contracting 00460- 1 R\PublicWorks\ENGINEERING DIVISION. PROJECTS\l62S--05dtSlieet 96IhAve to101stAve_ Roadwaylmprevernents\1-Admin�nidst8id Docurnents\MasterConkect Documeritsi00460-Certificatiort Regerdtng Protilbillon Agatnt.ContraclIng.doc BOARD OF COUNTY COMMISSIONERS Month Day, 20_ VIA EMAIL Persons Name Vendor name Vendor address City/State, Zip NOTICE OF AWARD Reference: Indian River County Bid # 2019012 Project Name: VERO LAKE ESTATES 85th STREET MILLINGS FROM 101St AVENUE TO 96th AVENUE Dear Mr. I am pleased to inform you that on XXX , 20_, the Board of County Commissioners awarded the above referenced project to your company. The following documents are required before the applicable County department can issue a "Notice to Proceed" letter. 1. Public Construction Bond in the amount of 100% of the contract amount. ($XXXX.00) 2. Certificate of Insurance, must name Indian River County as an additional insured and must provide for a 30 day Notice of Cancellation. 3. Agreement, execute the enclosed two (2) copies. In accordance with section 255.05(1)(a), Florida Statutes, you are required to execute a Public Construction Bond for the above referenced project. Please submit the Bond and the Certificate of Insurance to this office at the address provided below no later than Date XX, 20 . Failure to comply with the established deadline for submittal of required documents may be grounds for cancellation of the award. Enclosed are two copies of the Agreement. Please execute both copies and return them together with the required bonds and Certificate of Insurance to the Purchasing Office. Thank you for your prompt attention and if you have any questions, please do not hesitate to contact our office. Sincerely, Jennifer Hyde, Purchasing Manager cc: James W. Ennis, P.E., PMP, Assistant Public Works Director William Johnson, P.E., Roadway Production Engineer Office of Management & Budget • Purchasing Division 1800 27th Street, Vero Beach, Florida 329600(772) 567-8000 Ext. 1416•Fax: (772) 770-5140 E-mail: purchasing @ircgov.com 1 00510 - Notice of Award REV 04-07 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00510 - Notice of Award REV 04-07.doc SECTION 00520 - Agreement (Public Works) TABLE OF CONTENTS Title Page ARTICLE 1- WORK 2 ARTICLE 2 - THE PROJECT 2 ARTICLE 3 - ENGINEER 2 ARTICLE 4 - CONTRACT TIMES 2 ARTICLE 5 - CONTRACT PRICE 3 ARTICLE 6 - PAYMENT PROCEDURES 3 ARTICLE 7 - INDEMNIFICATION 5 ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS 5 ARTICLE 9 - CONTRACT DOCUMENTS 6 ARTICLE 10 - MISCELLANEOUS 7 FTHE REMAINDER OF THIS PAGE WAS LEFT BLANK INTENTIONALLY1 00520 - Agreement (Public Works) REV 06-14 00520 - 1 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00520 - Agreement (Public Works) REV 06-14.doc SECTION 00520 - Agreement (Public Works) THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Timothy Rose Contracting, Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1 - WORK 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: The project will consist of placement of millings on 85th Street between 101St Avenue and 96th Avenue in Vero Lake Estates and will include driveway turnouts, drainage system improvements, earthwork, and installation of signs and pavement markings. ARTICLE 2 - THE PROJECT 2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Project Name: VERO LAKE ESTATES 85th STREET MILLINGS FROM 101st AVENUE TO 96th AVENUE County Project Number: IRC -1628 Bid Number: 2019012 Project Address: 85th Street Between 101st Avenue to 96th Avenue Vero Beach, Florida 32967 ARTICLE 3 — ENGINEER 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and will act as OWNER's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4 - CONTRACT TIMES 4.01 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment 00520 - Agreement (Public Works) REV 06-14.doc 00520 - 2 F:\Purchasing\Bids12018-2019 FY (2019000)\2019012 85th St Millings \00520 - Agreement (Public Works) REV 06-14.doc A. The Work will be substantially completed on or before the 950th calendar day after the date when the Contract Times commence to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions on or before the 980th calendar day after the date when the Contract Times commence to run. ************************************************************************************************************ 4.03 Liquidated Damages A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. Liquidated damages will commence for this portion of work. The parties also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER $1,665.00 for each calendar day that expires after the time specified in paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER $1,665.00 for each calendar day that expires after the time specified in paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment. ARTICLE 5 - CONTRACT PRICE 5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents, an amount in current funds equal to the sum of the amounts determined pursuant to paragraph 5.01.A and summarized in paragraph 5.01.B, below: A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. B. THE CONTRACT SUM subject to additions and deductions provided in the Contract: Numerical Amount: $ 921,263.40 Written Amount: Nine hundred twenty-one thousand, two hundred sixty-three dollars and forty cents ARTICLE 6 - PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions and the Contract Documents. 6.02 Progress Payments. A. The OWNER shall make progress payments to the CONTRACTOR on the basis of the approved partial payment request as recommended by ENGINEER in accordance with the provisions of the Local Government Prompt Payment Act, 00520 - Agreement (Public Works) REV 06-14.doc 00520 - 3 F:\Purchasing\Bids\2018-2019 FY (2019000)\2019012 85th St Millings \00520 - Agreement (Public Works) REV 06-14.doc Florida Statutes section 218.70 et. seq. The OWNER shall retain ten percent (10%) of the payment amounts due to the CONTRACTOR until fifty percent (50%) completion of the work. After fifty percent (50%) completion of the work is attained as certified to OWNER by ENGINEER in writing, OWNER shall retain five percent (5%) of the payment amount due to CONTRACTOR until final completion and acceptance of all work to be performed by CONTRACTOR under the Contract Documents. Pursuant to Florida Statutes section 218.735(8)(b), fifty percent (50%) completion means the point at which the County as OWNER has expended fifty percent (50%) of the total cost of the construction services work purchased under the Contract Documents, together with all costs associated with existing change orders and other additions or modifications to the construction services work provided under the Contract Documents. 6.03 Pay Requests. A. Each request for a progress payment shall be submitted on the application for payment form supplied by OWNER and the application for payment shall contain the CONTRACTOR'S certification. All progress payments will be on the basis of progress of the work measured by the schedule of values established, or in the case of unit price work based on the number of units completed. After fifty percent (50%) completion, and pursuant to Florida Statutes section 218.735(8)(d), the CONTRACTOR may submit a pay request to the County as OWNER for up to one half (1/2) of the retainage held by the County as OWNER, and the County as OWNER shall promptly make payment to the CONTRACTOR unless such amounts are the subject of a good faith dispute; the subject of a claim pursuant to Florida Statutes section 255.05; or otherwise the subject of a claim or demand by the County as OWNER or the CONTRACTOR. The CONTRACTOR acknowledges that where such retainage is attributable to the labor, services, or materials supplied by one or more subcontractors or suppliers, the Contractor shall timely remit payment of such retainage to those subcontractors and suppliers. Pursuant to Florida Statutes section 218.735(8)(c), CONTRACTOR further acknowledges and agrees that: 1) the County as OWNER shall receive immediate written notice of all decisions made by CONTRACTOR to withhold retainage on any subcontractor at greater than five percent (5%) after fifty percent (50%) completion; and 2) CONTRACTOR will not seek release from the County as OWNER of the withheld retainage until the final pay request. 6.04 Paragraphs 6.02 and 6.03 do not apply to construction services work purchased by the County as OWNER which are paid for, in whole or in part, with federal funds and are subject to federal grantor laws and regulations or requirements that are contrary to any provision of the Local Government Prompt Payment Act. In such event, payment and retainage provisions shall be governed by the applicable grant requirements and guidelines. 6.05 Acceptance of Final Payment as Release. A. The acceptance by the CONTRACTOR of final payment shall be and shall operate as a release to the OWNER from all claims and all liability to the CONTRACTOR other than claims in stated amounts as may be specifically excepted by the CONTRACTOR for all things done or furnished in connection with the work under this Contract and for every act and neglect of the OWNER and others relating to or arising out of the work. Any payment, however, final or otherwise, shall not release the CONTRACTOR or its sureties from any obligations under the Contract Documents or the Public Construction Bond. 00520 - Agreement (Public Works) REV 06-14.doc 00520 - 4 F:\Purchasing\Bids\2018-2019 FY (2019000)\2019012 85th St Millings\00520 -Agreement (Public Works) REV O6-14.doc ARTICLE 7 - INDEMNIFICATION 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS 8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations: A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work. D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site which have been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions. E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by CONTRACTOR, including applying the specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the Contract Documents to be employed by CONTRACTOR, and safety precautions and programs incident thereto F. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. G. CONTRACTOR is aware of the general nature of work to be performed by .OWNER and others at the Site that relates to the Work as indicated in the Contract Documents. H. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 00520 - Agreement (Public Works) REV 06-14.doc 00520 - 5 F:\Purchasing\Bids\2018-2019 FY (2019000)\2019012 85th St Millings\00520 - Agreement (Public Works) REV 06-14.doc CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. ARTICLE 9 - CONTRACT DOCUMENTS 9.01 Contents A. The Contract Documents consist of the following: 1. This Agreement (pages 00520-1 to 00520-9, inclusive); 2. Notice to Proceed (page 00550-1); 3. Public Construction Bond (pages 00610-1 to 00610-3, inclusive); 4. Sample Certificate of Liability Insurance (page 00620-1); 5. Contractor's Application for Payment (pages 00622-1 to 00622-6 inclusive); 6. Certificate of Substantial Completion (pages 00630-1 to 00630-2, inclusive); 7. Contractor's Final Certification of the Work (pages 00632-1 to 00632-2, inclusive); 8. Professional Surveyor & Mapper's Certification as to Elevations and Locations of the Work (page 00634-1); 9. General Conditions (pages 00700-1 to 00700-45, inclusive); 10. Supplementary Conditions (pages 00800-i to 00800-11, inclusive); 11. Specifications as listed in Division 1 (General Requirements) and Division 2 (Technical Provisions); 12. Drawings consisting of a cover sheet and sheets numbered 1 through 30, inclusive, with each sheet bearing the following general title: VERO LAKE ESTATES 85th STREET MILLINGS; 13. Addenda (if applicable ); 14. Appendices to this Agreement (enumerated as follows): Appendix A — Permits Appendix B — Indian River County Fertilizer Ordinances Appendix C — Indian River County Traffic Engineering Division, Special Conditions for Right -of -Way Construction 15. CONTRACTOR'S BID (pages 00310-1 to 00310-7, inclusive); 16. Bid Bond (page 00430-1); 00520 - 6 F:\Purchasing\Bids\2018-2019 FY (2019000)\2019012 85th St Millings \00520 - Agreement (Public Works) REV 06-14.doc 00520 - Agreement (Public Works) REV 06-14.doc 17. Sworn Statement Under Section 105.08, Indian River County Code, on Disclosure of Relationships (pages 00452-1 to 00452-2, inclusive); 18. Sworn Statement Under the Florida Trench Safety Act (pages 00454-1 to 00454-2, inclusive); 19. Qualifications Questionnaire (page 00456-1 to 00456-4, inclusive); 20. List of Subcontractors (page 00458-1); 21, Certification Regarding Prohibition Against Contracting with Scrutinized Companies (page 00460-1); 22. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto: a) Written Amendments; b) Work Change Directives; c) Change Order(s); ARTICLE 10 - MISCELLANEOUS 10.01 Terms A. Terms used in this Agreement will have the meanings indicated in the General Conditions. 10.02 Assignment of Contract A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 10.03 Successors and Assigns A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 10.04 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 00520 - Agreement (Public Works) REV 06-14.doc 00520 - 7 F:\Purchasing\Bids\2018-2019 FY (2019000)\2019012 85th St Millings\00520 - Agreement (Public Works) REV 06-14.doc 10.05 Venue A. This Contract shall be governed by the laws of the State of Florida. Venue for any lawsuit brought by either party against the other party or otherwise arising out of this Contract shall be in Indian River County, Florida, or, in the event of a federal jurisdiction, in the United States District Court for the Southern District of Florida. 10.06 Public Records Compliance A. Indian River County is a public agency subject to Chapter 119, Florida Statutes. The Contractor shall comply with Florida's Public Records Law. Specifically, the Contractor shall: (1) Keep and maintain public records required by the County to perform the service. (2) Upon request from the County's Custodian of Public Records, provide the County with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119 or as otherwise provided by law. (3) Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the contractor does not transfer the records to the County. (4) Upon completion of the contract, transfer, at no cost, to the County all public records in possession of the Contractor dr keep and maintain public records required by the County to perform the service. If the Contractor transfers all public records to the County upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the County, upon request from the Custodian of Public Records, in a format that is compatible with the information technology systems of the County. B. IF THE CONTRACTOR HAS QUESTI®iNS REGARDING THE APPLICATION OF CHAPTER 119, FLGR1 IA STATUTES, ES, TO THE CONTCTOR°S DUTY TO PROVIDE PUBLIC RECO F' DS RELATING TO THIS CONT i ACT, CNTCT THE CUSTOi"IAN OF PU LIC RECORDS AT: (772) 2264424 publicrecords(c�ircgov.com Indian. River County Office of the County Attorney 1801 27th Street Vero Beach, FL 32960 C. Failure of the Contractor to comply with these requirements shall be a material breach of this Agreement. 00520 - Agreement (Public Works) REV 06-14.doc 00520 - 8 F:\Purchasing\Bids\2018-2019 FY (2019000)\2019012 85th St Millings\00520 - Agreement (Public Works) REV 06-14.doc IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to OWNER and CONTRACTOR. All portions of the Contract Documents have been signed or identified by OWNER and CONTRACTOR or on their behalf. This Agreement will be effective on August 13 , 2019 (the date the Contract is approved by the Indian River County Board of County Commissioners, which is the Effective Date of the Agreement). OWNER: INDIAN RIVER COUNTY By: By: I/�i�(c. , :,.., Jason :.wn, County • dmin-0J �. i1'EriCOON ' Attest APPROVED AS TO FORM AND LEGAL SUFFIC Y: Dylan Reingold, County Attorney Jeffrey R. Smith, Clerk of Court and Comptroller Attest: (SEAL) AA) Deputy Clerk Designated Representative: Name: James W. Ennis, P.E., PMP Title: Assistant Public Works Director 1801 27th Street Vero Beach, Florida 32960 (772) 226-1221 Facsimile: (772) 778-9391 ne f ov6d %,Vjt' x/04 License No. a6 -d.. (2 9 (Where applicable) Agent for service of process: Designate Ree r-senta�(v�•� Nam i Title: 4'r 5 / Olress: Phone: `'7 _56 - .1.1?) Facsimile: A--5b��7rgy (If CONTRACTOR is a corporation partnership, attach evidence of authority to sign.) cioe& or a * * END OF SECTION * * 00520 - Agreement (Public Works) REV 06-14.doc 00520 - 9 F:\Purchasing\Bids\2018-2019 FY (2019000)\2019012 85th Sl Millings\00520 - Agreement (Public Works) REV 06-14.doc 2019.) FLORIDA PROFIT CORPORATION ANNUAL REPORT • DOCUMENT# S75343 Entity Name: TIMOTHY ROSE CONTRACTING, INC. Current Principal Place of Business: 1360 OLD DIXIE HWY SW STE 106 VERO BEACH, FL 32962 Current Mailing Address: 1360 OLD DIXIE HWY SW STE 106 VERO BEACH, FL 32962 US FEI Number: 65-0284242 Name and Address of Current Registered Agent: ROSE, TIMOTHY W. 1360 OLD DIXIE HIGHWAY SW 106 VERO BEACH, FL 32962 US FILED Jan 22, 2019 Secretary of State 9093647305CC Certificate of Status Desired: No The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida. SIGNATURE: Electronic Signature of Registered Agent Officer/Director Detail : Title Name Address City -State -Zip: Title Name Address City -State -Zip: ROSE, TIMOTHY W. 1360 OLD DIXIE HWY SUITE 106 VERO BEACH FL 32962 TREA ROSE, LISA A 1360 SW OLD DIXIE HWY #106 VERO BEACH FL 32962 Title Name Address City -State -Zip: SEC ROSE, RONALD 1360 SW OLD DIXIE HWY #106 VERO BEACH FL 32962 Date I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under oath; that 1 am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607, Florida Statutes; and that my name appears above, or on an attachment with all other like empowered. SIGNATURE: TIMOTHY W. ROSE PRESIDENT 01/22/2019 Electronic Signature of Signing Officer/Director Detail Date SECTION 00550 - Notice to Proceed TO: Dated (BIDDER) ADDRESS: Contract For: VERO LAKE ESTATES 85th STREET MILLINGS FROM 101St AVENUE TO 96th AVENUE Project No: IRC -1628 IRC Bid No. 2019012 You are notified that the Contract Times under the above contract will commence to run on . By that date, you are to start performing your obligations under the Contract Documents. The contract has allocated 150 calendar days for Substantial Completion of this project and 180 calendar days for Final Completion. In accordance with Article 4 of the Agreement the date of Substantial Completion is and the date of readiness for final payment is CONTRACTOR shall not commence work under this Contract until he has obtained all insurance required under Article 5 and such insurance has been delivered to the OWNER and approved by the OWNER, nor shall the CONTRACTOR allow any Subcontractor to commence work on his subcontract until all similar insurance required of the Subcontractor has been so obtained and approved. All such insurance shall remain in effect until final payment and at all times thereafter when CONTRACTOR may be correcting, removing or replacing defective Work in accordance with Article 13. Also, before you may start any Work at the Site, you must: (add other requirements, if applicable) INDIAN RIVER COUNTY (OWNER) By: (AUTHORIZED SIGNATURE) (TITLE) 00550 - Notice to Proceed REV 1-4-11 00550 - 1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00550 - Notice to Proceed REV 1-4-11.doc Rev. 05/01 00610 - PUBLIC CONSTRUCTION BOND INSTRUCTION FOR PUBLIC CONSTRUCTION BOND The front or cover page to the required public construction payment and performance bond shall contain the information required by Fla. Stat. 255.05(1)(a), and be substantially in the format shown on the first page following this instruction. The Public Construction Bond shall be in the form suggested by Fla. Stat. 255.05(3) as shown on the second page following this instruction. A Power of Attorney from a surety insurer authorized to do business in Florida, authorizing the signature of the Attorney in Fact who executes the Public Construction Bond shall accompany that Bond. 00610 - 1 00610 - Public Construction Bond F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\00610 - Public Construction Bond.doc JILUI`J"UU5U5J4 RECORDED IN THE PUBLIC RECORDS OF JEFFREY R SMITH, CLERK OF COURT INDIAN RIVER COUNTY FL BK: 3233 PG: 1619 Page 1 of 3 8/27/2019 10:14 AM Public Work F.S. Chapter 255.05 (1)(a) Cover Page THIS BOND 1S GIVEN TO COMPLY WITH SECTION 255.05 OR SECTION 713.23 FLORIDA STATUTES, AND ANY ACTION INSTITUTED BY A CLAIMANT UNDER TH1S'BOND FOR PAYMENT MUST BE IN ACCORDANCE WITH THE NOTICE AND TIME LIMITATION PROVISIONS IN SECTION 255.OS(2) OR SECTION 713.23 FLORIDA STATUTES. BOND NO: CONTRACTOR NAME: CONTRACTOR ADDRESS: CONTRACTOR PHONE NO: SURETY COMPANY NAME: SURETY PRINCIPAL BUSINESS ADDRESS: SURETY PHONE NO: OWNER NAME: OWNER ADDRESS: OWNER PHONE NO: OBLIGEE NAME: (If contracting entity is different from .the owner, thecontracting pub]ic entity) OBLIGEE ADDRESS: OBLIGEE PHONE NO: BOND AMOUNT: CONTRACT NO: Of applicable) DESCRIPTION OF WORK: PROJECT LOCATION: LEGAL DESCRIPTION: (If applicable) 048668G Timothy Rose Contracting, Inc. .13.60 Old Dixie Hwy SW, Ste 106 Vero Beach_ Florida 32962 (7.72) .564-7800 .. WFSTFIFI D One Park Circle, P.O. Box 5001 Westfield Center, 0:H 4425.1-5001 (904)661-4700 Indian River County, a. political subdivision of the State of Florida 1800 27th Street Vero Beach, FL 32.960 j772) .226-1416 $ 921,263.40 Vero Lake _Estates 85th Street Petition Paving .101stAve.n.ue.to 96th Avenue . Vero .Beach FL fliOI.TPACE. All other bold page(s) are deemed subsequent to this.pagc rcgordlesi of any page numher(s) that may be printed thereon. 00610-2 0061-0- Public Construction Bond PUBLIC CONSTRUCTION BOND Bond No. 048668:G {enter bond..number) BY THIS BOND, We Timothy Rose Contracting - Inc. , as Principal and WESTFIELD , a corporation, as Surety, are bound to Indian River County, FL , herein. called Owner, in the sum of $ 921,263.40 „for payment of which we bind ourselves, our heirs, personal representatives, 'successors, and assigns; jointly and s.everall.y.. THE CONDITION OF THIS BOND is that if Principal: *: 1. Performs the contract datedAugust 2$ 2.019. , between. Principal and Owner for construction of Vero Lakea5tates 85th Street Petition Poring ,. the contract being made. a. part of this bond _by reference; at the times .and in the mariner prescribed in the contract; and . .2. Promptly. makes payments to all claimants, as defined in Section 255.0:5(1; ), Florida Statutes, supplying Principal with labor,.materials, or supplies, used directly or indirectly by Principal in the prosecution of the work provided for in the.contract; and - 3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, Including appellate proceedings, that Owner sustains because of a default by Principal under •the contract; and 4. Performs the guarantee of all work and materials furnished under the contract. for the time specified in the contract, then this bond is void; otherwise it remains in full force: Any action.,instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in Section 255.05(2)., Florida Statutes. Any changes in or under -the contract documents and compliance or noncompliance with any formalities connected with the.contract or th.e. changes does:not;affect•Surety's obligation. under this bond. DATED ON August 28, 2019, 00610-3 Timothy Rose Contracting Inc.. (Name of Piincipal). By . p-- s Attorney .in::Fact) Jose h' .WESTFIELD (Name of. Surety), 00610 Public Construction. Bond General Power of Attorney CERTIFIED COPY POWER NO. 0990102 00 Westfield Insurance Co. Westfield National Insurance Co. Ohio Farmers Insurance Co. Westfield Center, Ohio Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a "Company" and collectively as "Companies," duly organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center, Medina County. Ohio, do by these presents make, constitute and appoint CABOT W. LORD, JOSEPH E. COONS, JOINTLY OR SEVERALLY of PALM CITY and State of FL its true and lawful Attorney(s)-in-Fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of suretyship • LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE GUARANTEE, OR BANK DEPOSITORY BONDS. and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate seal of the applicable Company and duly attested by itsSecretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in WESthe TF ELD INSU ANemises. Said CEo TE COMPANY, WESTFIELD NATIIONALintment is made under and by fyyINSURANCE COMPANY and OHIO oritof the following rolution dFARMERS the INSURANCEf COMPANYof each of the "Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: The Attorney -in -Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney -in -Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary." "Be it Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any P or power of attorneycertificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile any seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." (Each adopted at a meeting held on February 8, 2000), In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY have caused these presents to be signed by their National Surety Leader and Senior Executive and their corporate seals to be hereto affixed this 21st day of MARCH A.D., 2014 . Corporate ,a•"S�..:4�Seals . C••.•„ s Affixed S., `' .�o. •� ` a qtr .• '14ZT}, 117,1 SEisl)t) '4.4 State of Ohio "`"'"•'"". County of Medina ss.: a�nN c�A( jy 4�. SL n': SEAL, :m On this 21st day of MARCH depose and say, that he resides in COMPANY, WESTFIELD NATIONAL I executed the above instrument; that they were so affixed by order of the Notarial Seal Affixed State of Ohio County of Medina ss.: '\NSU'" WESTFIELD INSURANCE COMPANY y'NATIONAL INSURANCE COMPANY to (,_OHO FARMERS IINURANECOMA .�ARTEPEQ�3�? 0. _t;•.• 2.13.48� ••a; • 4Nr_ By Dennis P. Baus, National Surety Leader and Senior Executive A.D., 2014 , before me personally came Dennis P. Baus to me known, who, being by me duly sworn, did Wooster, Ohio; that he is National Surety Leader and Senior Executive of WESTFIELD INSURANCE NSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which he knows the seals of said Companies; that the seals affixed to said instrument are such corporate seats; that Boards of Directors of said Companies; and that he signed his name thereto by like order. ,Perxed/6-&ft_ David A. Kotnik, Attorney at Law, Notary Public My Commission Does Not Expire (Sec. 147.03 Ohio Revised Code) I, Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which is still in full force and effect; and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in full force and effect. • In ,ly,itne;�s.,WJ,ereof l 'have. hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this 28th day of s`.:;:....4....,11,4'. -.t,, .2019,. G •gS •••• •eyFi.a ;.. s:- ...•-Tevi.,• ,� iN iu►�, fy SEAL ;m_ ,o• ;•OF. �. ,; �issi r %r = z O, z •.• 1 El 4 B r ..r••v- o , o •ar °j *' 'O . Q.:t�. r ....,. BPO ;C2 (coitibiq.e.- (06-o2) a Frank A. Carrino, Secretary Secretary TIMOR -1 OP ID: TJ ACORL1 1/4.----- CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 08/21/2019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER 772-286-4334 Stuart Insurance, Inc. 3070 S W Mapp Palm City, FL 34990 Rick Halcomb, CIC, ARM CONTACT Tani Jacobson NAME: PHONE 772.286-4334 1 FAX 772.286-9389 (A/C, No, Ext): (A/c, No): E-MAILtjacobson@stuartinsurance.net INSURER(S) AFFORDING COVERAGE NAIC # INSURER A: Everest Denali Ins Co 16044 TS iNmotUR D hy Rose Conttractinq Inc13 Ve60 ro BeacDh, FL w32962W, Ste 106 INSURER B: National Union Fire Insurance 19445 Markel American INSURER C 28932 INSURER D : $ 1,000,000 INSURER E : INSURER F : X COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL INSD SUBR WVD POLICY NUMBER POLICY EFF IMM/DD/YYYY) POLICY EXP IMM/DD/YYYYI LIMITS A X COMMERCIAL GENERAL LIABILITY X CF3GL00172191 06/06/2019 06/06/2020 EACH OCCURRENCE $ 1,000,000 CLAIMS -MADE X OCCUR PRS (RENTED PREEMIMI E SES (Ea occurrence) 100,000 $ X Contractual Liab MED EXP (Any one person) $ 5,000 X Incl XCU PERSONAL 8 ADV INJURY $ 1,000,000 GEN'L AGGREGATE POLICY OTHER: X LIMIT APPLIES O - JEPRCT PER: LOC GENERAL AGGREGATE $ 2,000,000 PRODUCTS - COMP/OP AGG $ 2,000,000 $ A AUTOMOBILE X X X LIABILITY ANY AUTO OWNED AUTOS ONLY AUTOS ONLY PIP $10000 ' x SCHEDULED AUTOS NON-OWNEDUUO X CF3CA00143191 06/06/2019 06/06/2020 COMBINED SINGLE LIMIT (Ea accident) $ 1,000,000 BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ (PerePROPERTY)DAMAGE $ $ B X UMBRELLA LIAB EXCESS LIAB X _ OCCUR3,000,000 CLAIMS -MADE BE035882715 06/06/2019 06/06/2020 EACH OCCURRENCE $ AGGREGATE $ 3,000,000 DED RETENTION $ $ WORKERS COMPENSATION . AND EMPLOYERS' LIABILITYY ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below / N N / A PER STATUTE OTH- ER E.L. EACH ACCIDENT $ E.L. DISEASE - EA EMPLOYEE $ E.L. DISEASE - POLICY LIMIT $ C Contractors Equip 1% DED, MIN $1000 MKLM31M0051334 06/06/2019 06/06/2020 Rented Equipment 50,000 $1000 ded DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached If more space is requi ed) RE: Vero Lake Estates 85th Street Petition Paving from 101st Avenue to 96th Avenue Project (alternate bid) —Indian River County is additional insured with respect. to general liability and auto liability CERTIFICATE HOLD IRCBD-1 Indian River County 1801 27th St Vero Beach, FL 32960 A Anon ne. innwr,n-„ SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIIVVE /7 „,e),,,,c ,in,t,„4----___ © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD AlCJ/RO® LIABILITY V CERTIFICATE OF la������ l INSURANCE DATE (MM/DD/YYYY) 8/21/2019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the poiicy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER SUNZ Insurance Solutions, LLC ID: (Essential) c/o Essential HR, Inc. dba First Star HR 4455 LBJ Freeway, Suite 1080 Dallas, TX 75244 NAMEACT Jennifer Hauqer PHONE FAX No.IL Ext): 972-404-0295 (AIC, No): AMA ADDRESS: jennifer.hauger(a'�.firststarhr.com INSURER(S) AFFORDING COVERAGE NAIC # INSURERA: SUNZ Insurance Company 34762 INSURED Essential HR Inc. dba FirstStar HR 4455 LBJ Freeway Suite 1080 Dallas TX 75244 INSURER B : INSURERC: INSURER D : $ INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER: 50682766 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL INSD SUBR WVD POLICY NUMBER POLICY EFF (MM/DDIYYYY) POLICY EXP (MM/DD/YYYY) LIMITS COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ CLAIMS -MADE OCCUR DAMAGE TO RENTED PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEM_ AGGREGATE POLICY OTHER: LIMIT APPLIES PRO - JECT PER: LOC GENERAL AGGREGATE $ PRODUCTS - COMP/OP AGG $ $ AUTOMOBILE LIABILITY ANY AUTO OWNED AUTOS ONLY HIRED AUTOS ONLY _ SCHEDULED AUTOS NON -OWNED AUTOS ONLY COMBINED SINGLE LIMIT (Ea accident) $ BODILY INJURY (Per person) $ BODILY INJURYPer accident ( ) $ PROPERTY DAMAGE (Per accident) $ $ UMBRELLA LIAR EXCESS LIAB OCCUR CLAIMS -MADE EACH OCCURRENCE $ AGGREGATE $ DED RETENT ON $ $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANYPROPRIETOR/PARTNERIEXECUTIVE OFFICER/MEMBEREXCLUDED7 (Mandatory in NH) 9 yes, describe under DESCRIPTION OF OPERATIONS below Y/N - N/A WCO25-00001-018 10/1/2018 10/1/2019 ,/ PER STATUTE H EER E.L. EACH ACCIDENT $ 1,000,000 E.L. DISEASE - EA EMPLOYEE $ 1,000.000 E.L. DISEASE - POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Coverage provided for all leased employees but not subcontractors of: Timothy Rose Contracting, Inc. 1360 SW OLD DIXIE HWY SUITE 106 Effective date: 10/1/2013 62200099 Indian River County 1801 27th Street Vero Beach FL 32960 I -. -. . - ___. , . . v . SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE _ ' ,I Rick Leonard ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD 50682766 1 Essential HR Inc PEO 025 MASTER CERT 1 Natalie Matthews 1 8/21/2019 8:13:09 AM (CDT) 1 Page 1 of 1 • `A OR®° CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 9/19/2018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER, Insurance Solutions, LLC ID: (Essential) c/o Essential HR, Inc. dba First Star HR 4455 LBJ Freeway, Suite 1080 Dallas, TX 75244 CONNAME: Jennifer Hauger FAX PHO"r o. Ext): 972404-0295 (A/C, No): fA/E-MAIL ADDRESS: Jennifer.haugerAfirststarhr.com INSURER(S) AFFORDING COVERAGE NAIC # INSURERA: SUNZ Insurance Company 34762 INSURED Essential HR Inc. dba FirstStar HR 4455 LBJ Freeway Suite 1080 Dallas TX 75244 INSURER B : INSURERC: INSURER D : $ INSURER E: $ INSURER F COVERAGES CERTIFICATE NUMBER: 44300498 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL INSD SUBR WVD POLICY NUMBER POLICY EFF (MM/DD/YYYY) POLICY EXP (MM/DD/YYYY) LIMITS COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ DAMAGE RENTED PREM SESO( (Ea occurrence) $ CLAIMS -MADE OCCUR MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $ GE 'L AGGREGATE POLICY OTHER: LIMIT APPLIES PRO- JECT PER: LOC PRODUCTS - COMP/OP AGG $ $ AUTOMOBILE LIABILITY ANY AUTO OWNED AUTOS ONLY HIRED AUTOS ONLY SCHEDULED AUTOS NON -OWNED AUTOS ONLY COMBINED SINGLE LIMIT (Ea accident) $ BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ $ UMBRELLA LIAB EXCESS LIAR OCCUR CLAIMS -MADE EACH OCCURRENCE $ AGGREGATE $ $ DED RETENTION $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANYPROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBEREXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below Y/ N N / A WCO25-00001-018 WCPE0000018405 10/1/2018 10/1/2017 10/1/2019 10/1/2018 i,, / STATUTE OTH- ER E.L. EACH ACCIDENT $1,000,000 E.L. DISEASE - EA EMPLOYEE $ 1 000 000 E.L. DISEASE - POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Coverage provided for all leased employees but not subcontractors of: Timothy Rose Contracting, Inc. 1360 SW OLD DIXIE HWY SUITE 106 Effective date: 10/1/2013 CERTIFICATE HOLDER CANCELLATION 62200099 Indian River County Board of County Commissioners 1801 27th Street Vero Beach FL 32960 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE Glen J Distefano ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD 44300498 1 Essential HR Inc PEO 025 MASTER CERT 1 Natalie Matthews 1 9/19/2018 10:29:05 AM (CDT) 1 Page 1 of 1 IMOR-1 OP ID: TJ 1 A (C4C:)R®° ieft...... CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 05/31/2018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER 772-286-4334 Stuart Insurance, Inc. 3070 S W Mapp Palm City, FL 34990 Rick Halcomb, CIC, ARM CONTACT Tani Jacobson PHONE 772-286-4334 I FAX 772.286-9389 (AIC, No, Ext): (AIC, No): E-MAIL tjacobson@stuartinsurance.net ADDRESS: INSURER(S) AFFORDING COVERAGE NAIC # INSURER A :Westfield Insurance Co. 24112 INSURED Timothy Rose Contracting Inc 1360 Old Dixie Hwy SW, Ste 106 Vero Beach, FL 32962 INSURER B : Travelers CMM6079889 INSURER C : 06/06/2019 INSURER D : $ 1,000,000 INSURER E : 500,000 $ INSURER F : REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTRINSD TYPE OF INSURANCE ADDL SUBR WVA POLICY NUMBER POLICY EFF (MM/DDIYYYY) POLICY EXP (MMIDD/YYYYI LIMITS A X COMMERCIAL GENERAL LIABILITY CMM6079889 06/06/2018 06/06/2019 EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTED PREMISES (Ea occurrence) 500,000 $ CLAIMS -MADE X OCCUR EXP (Any one person) $ 5,000 X Contractual LiabMED PERSONAL &ADV INJURY $ 1,000,000 X Inc! XCIJ GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE POLICY OTHER X LIMIT APPLIES 78, PER: LOC PRODUCTS - COMP/OPAGG $ 2,000,000 Emp Ben. $ 1,000,000 A AUTOMOBILE X X X LIABILITY ANY AUTO OWNED AUTOS ONLY AUTOS ONLY PIP $10000 X SCHEDULED AUTOS AUTO ONLY CMM6079889 06/06/2018 06/06/2019 COMBINED SINGLE LIMIT (Ea accident) 1,000,000 $ BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ (Per PROPERTYDAMAGE$ $ B X UMBRELLA LIAB EXCESS LIAB X OCCUR CLAIMS -MADE ZUP-61M977995-18-NF 06/06/2018 06/06/2019 EACH OCCURRENCE $ 3,000,000 AGGREGATE $ $ DED RETENTION $ WORKERS COMPENSATION AND EMPLOYERS' LIABILITYY ANY PROPRIETOR/PARTNER/EXECUTIVENIA OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below / N PER OTH- STATUTE ER E.L. EACH ACCIDENT $ E.L. DISEASE - EA EMPLOYEE $ E.L. DISEASE - POLICY LIMIT $ A Contractors Equip CMM6079889 06/06/2018 06/06/2019 Rented Equipment 50,000 $1000 ded DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Grading of Land/Site Prep - State of Florida dfeshoh@ircgov.com CANCELLATION ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD IRCBD-1 Indian River County 1801 27th St Vero Beach, FL 32960 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. ENTATIVE AUTHORIZED REPRES,,,,,„6--______ 7,I (,l `' •C f ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD SECTION 00622 - Contractor's Application for Payment VERO LAKE ESTATES 851—" STREET MILLINGS FROM 101St AVENUE TO96thAVENUE Application for Payment No. For Work Accomplished through the period of through To: Indian River County (OWNER) From: (CONTRACTOR) Bid No.: 2019012 Project No.: IRC -1628 1) Attach detailed schedule and copies of all paid invoices. 1. Original Contract Price: $ 2. Net change by Change Orders and Written Amendments (+ or -): $ 3. Current Contract Price (1 plus 2): $ 4. Total completed and stored to date: $ 5 Retainage (per Agreement): of completed Work: % of retainage: $ Total Retainage: $ 6. Total completed and stored to date less retainage (4 minus 5): $ 7. Less previous Application for Payments: $ DUE THIS APPLICATION (6 MINUS 7): $ CONTRACTOR'S CERTIFICATION: UNDER PENALTY OF PERJURY, the undersigned CONTRACTOR certifies that (1) the labor and materials listed on this request for payment have been used in the construction of this Work; (2) payment received from the last pay request has been used to make payments to all subcontractors, laborers, materialmen and suppliers except as listed on Attachment A, below; (3) title of all Work, materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all Liens, security interests and encumbrances (except such as are covered by a Bond acceptable to OWNER indemnifying OWNER against any such Lien, security interest or encumbrance); (4) all Work covered by this Application for Payment is in accordance with the Contract Documents and not defective; and (5) If this Periodic Estimate is for a Final Payment to project or improvement, I further certify that all persons doing work upon or furnishing materials or supplies for this project or improvement under this foregoing contract have been paid in full, and that all taxes imposed by Chapter 212 Florida Statutes, (Sales and Use Tax Act, as Amended) have been paid and discharged, and that I have no claims against the OWNER. Attached to or submitted with this form are: 1. Signed release of lien forms (partial or final as applicable) from all subcontractors, laborers, materialmen and suppliers except as listed on Attachment A, together with an explanation as to why any release of lien form is not included; 00622 - 1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00622 - Contractor's Application for Payment - 03-10 rev.doc Rev. 05/01 00622 - Contractor's Application for Payment - 03-10 rev 2. Updated Construction Schedule per Specification Section 01310. Dated By: STATE OF FLORIDA COUNTY OF INDIAN RIVER Page 2 of 5 (CONTRACTOR — must be signed by an Officer of the Corporation) Print Name and Title Before me, a Notary Public, duly commissioned, qualified, and acting, personally appeared , who being by me first duly sworn upon oath, says that he/she is the of the CONTRACTOR mentioned above and that he/she has been duly authorized to act on behalf of it, and that he/she executed the above Contractor's Application for Payment and Contractor's Certification statement on behalf of said CONTRACTOR; and that all of the statements contained herein are true, correct, and complete. Subscribed and sworn to before me this day of , 20 is personally known to me or has produced as identification. (SEAL) Please remit payment to: Contractor's Name: Address: NOTARY PUBLIC: Printed name: Commission No.: Commission Expiration: **************************************************************************************************** [The remainder of this page was left blank intentionally] 00622 - 2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00622 - Contractors Application for Payment - 03-10 rev.doc Rev. 05/01 00622 - Contractor's Application for Payment - 03-10 rev Page 3 of 5 SURETY'S CONSENT OF PAYMENT TO CONTRACTOR: The Surety, ,a corporation, in accordance with Public Construction Bond Number , hereby consents to payment by the OWNER to the CONTRACTOR, for the amounts specified in this CONTRACTOR's APPLICATION FOR PAYMENT. TO BE EXECUTED BY CORPORATE SURETY: Attest: Secretary Corporate Surety STATE OF FLORIDA COUNTY OF INDIAN RIVER Business Address BY: Print Name: Title: (Affix Corporate SEAL) Before me, a Notary Public, duly commissioned, qualified, and acting, personally appeared , to me well known or who produced as identification, who being by me first duly sworn upon oath, says that he/she is the for and that he/she has been authorized by it to approve payment by the OWNER to the CONTRACTOR of the foregoing Contractor's Application for Payment. Subscribed and sworn to before me this day of , 20 Notary Public, State of My Commission Expires: **************************************************************************************************** [The remainder of this page was left blank intentionally] 00622 - Contractor's Application for Payment - 03-10 rev 00622 - 3 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents \00622 - Contractors Application for Payment - 03-10 rev.doc Rev. 05/01 Page 4 of 5 CERTIFICATION OF ENGINEER: I certify that I have reviewed the above and foregoing Periodic Estimate for Partial Payment; that to the best of my knowledge and belief it appears to be a reasonably accurate statement of the work performed and/or material supplied by the Contractor. I am not certifying as to whether or not the Contractor has paid all subcontractors, laborers, materialmen and suppliers because I am not in a position to accurately determine that issue. Dated SIGNATURE CERTIFICATION OF INSPECTOR: I have checked the estimate against the Contractor's Schedule of Amounts for Contract Payments and the notes and reports of my inspections of the project. To the best of my knowledge, this statement of work performed and/or materials supplied appears to be reasonably accurate, that the Contractor appears to be observing the requirements of the Contract with respect to construction, and that the Contractor should be paid the amount requested above, unless otherwise noted by me. I am not certifying as to whether or not the Contractor has paid all subcontractors, laborers, materialmen and suppliers because I am not in a position to accurately determine that issue. Dated SIGNATURE **************************************************************************************************** [The Remainder of This Page Was Left Blank Intentionally] 00622 - 4 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids \Bid Documents\Master Contract Documents \00622 - Contractor's Application for Payment - 03-10 rev.doc Rev. 05/01 00622 - Contractor's Application for Payment - 03-10 rev Page 5 of 5 ATTACHMENT A 1. List of all subcontractors, laborers, materialmen and suppliers who have not been paid from the payment received from the last Pay Request and the reason why they were not paid (attach additional pages as necessary): 2. List of all subcontractors, laborers, materialmen and suppliers for which a signed release of lien form (partial or final as applicable) is not included with this Pay Request, together with an explanation as to why the release of lien form is not included (attach additional pages as necessary): 00622 - Contractor's Application for Payment - 03-10 rev 00622 - 5 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00622 - Contractor's Application for Payment - 03-10 rev.doc Rev. 05/01 PROJECT NAME: VERO LAKE ESTATES 85th STREET MILLINGS FROM 101' AVENUE TO 96th AVENUE Project No. IRC -1628 Payment Application No. F:\Public Works\ENGINEERING DIVISION PROJECTS\1628.85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids \Bid Documents\Master Contract Documents \00622 -Contractors Application for Payment Spreadsheet Example.doc PREVIOUS APPLICATION WORK COMPLETED THIS PERIOD TOTAL COMPLETED SCHEDULED VALUE % MATERIALS BALANCE TO FINISH Item No. Description Unit Quantity Unit Price Amount QUANTITY TOTAL QUANTITY TOTAL QUANTITY TOTAL STORED QUANTITY TOTAL SUBTOTAL SUBTOTAL 0.00 0.00 0.00 0.00 0.00 0.00 FORCE ACCOUNT 1 LS I GRAND TOTAL _ TOTAL 1 0.00 1 1 1 I AMOUNT COMPLETED TO DATE MATERIALS STORED TO DATE SUB -TOTAL MATERIALS STORED AND COMPLETED TO D DATE m RETAINAGE AT 10% 0 rn TOTAL COMPLETED AND STORED LESS RETAINAGE N ^' LESS PREVIOUS PAYMENT rn AMOUNT DUE CONTRACTOR $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628.85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids \Bid Documents\Master Contract Documents \00622 -Contractors Application for Payment Spreadsheet Example.doc SECTION 00630 - Certificate of Substantial Completion Date of Issuance: , 20 OWNER: Indian River County CONTRACTOR. CONTRACT FOR: VERO LAKE ESTATES 85th STREET MILLINGS FROM 101St AVENUE TO 96th AVENUE Project No.: IRC -1628 OWNER's Bid No. 2019012 Project Description: The project will consist of placement of millings on 8917 Street between 101St Avenue and 964 Avenue in Vero Lake Estates and will include driveway turnouts, drainage system improvements, earthwork, and installation of signs and pavement markings. This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To: OWNER And To. CONTRACTOR The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on DATE OF SUBSTANTIAL COMPLETION A tentative list of items to be completed or corrected is attached hereto. This list may not be all- inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar days of the above date of Substantial Completion. 00630 - Certificate of Substantial Completion REV 04-07 00630 - 1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00630 - Certificate of Substantial Completion REV 04-07.doc The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: OWNER: CONTRACTOR: The following documents are attached to and made a part of this Certificate: [For items to be attached see definition of Substantial Completion as supplemented and other specifically noted conditions precedent to achieving Substantial Completion as required by Contract Documents.] This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR's obligation to complete the Work in accordance with the Contract Documents. Executed by ENGINEER on: (Date). ENGINEER: By: (Authorized Signature) CONTRACTOR accepts this Certificate of Substantial Completion on CONTRACTOR: By: (Authorized Signature) (date). OWNER accepts this Certificate of Substantial Completion on (date). OWNER: INDIAN RIVER COUNTY By: (Authorized Signature) * * END OF SECTION * * 00630 - 2 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00630 - Certificate of Substantial Completion REV 04-07.doc 00630 - Certificate of Substantial Completion REV 04-07 SECTION 00632 - CONTRACTOR'S FINAL CERTIFICATION OF THE WORK (TO ACCOMPANY CONTRACTOR'S FINAL APPLICATION FOR PAYMENT) PROJECT NAME: VERO LAKE ESTATES 85th STREET MILLINGS FROM 101St AVENUE TO 96th AVENUE PROJECT NO: IRC -1628 STATE OF COUNTY OF Personally before me the undersigned officer, authorized by the laws of said state to administer oaths, comes , who on oath says: That he is the CONTRACTOR with whom Indian River County, Florida, a political subdivision of said state, did on the day of ,20 , enter into a contract for the performance of certain work, more particularly described as follows: UNDER PENALTY OF PERJURY, affiant further says that said construction has been completed and the Contract therefore fully performed and final payment is now due and that all liens of all firms and individuals contracting directly with or directly employed by such CONTRACTOR have been paid in full EXCEPT: Name Description/Amount who have not been paid and who are due the amount set forth. Affiant further says that: 1. CONTRACTOR has reviewed the Contract Documents. 2. CONTRACTOR has reviewed the Work for compliance with the Contract Documents. 3. CONTRACTOR has completed the Work in accordance with the Contract Documents. 4. All equipment and systems have been tested in the presence of the ENGINEER or his representative and are fully operational with no defects or deficiencies except as listed below. 00632-1 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\00632 - Contractor's Final Certification REV 04-07.doc 5. The Work is complete and ready for final acceptance by the OWNER. 6. CONTRACTOR hereby certifies that it has no claims against the OWNER. (Corporate Seal) (Contractor) By: Subscribed and sworn to before me this _ day of , 20 Notary Public State of Florida at Large My Commission expires: + + END OF SECTION + + 00632-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\00632 - Contractors Final Certification REV 04-07.doc SECTION 00634 - PROFESSIONAL SURVEYOR AND MAPPER'S CERTIFICATION AS TO ELEVATIONS AND LOCATIONS OF THE WORK (TO BE COMPLETED BY A FLORIDA PROFESSIONAL SURVEYOR AND MAPPER RETAINED BY THE CONTRACTOR AND TO ACCOMPANY CONTRACTOR'S FINAL APPLICATION FOR PAYMENT) I CERTIFY that I am a Florida Professional Surveyor and Mapper retained by: (Insert name of CONTRACTOR) Who is the CONTRACTOR for the following Project: PROJECT NAME: VERO LAKE ESTATES 85th STREET MILLINGS FROM 101St AVENUE TO 96th AVENUE PROJECT # IRC -1628 I FURTHER CERTIFY that I have personally performed the survey work for the preparation of Record Drawings for the CONTRACTOR for this project or that such work was performed under my direct control and supervision. I FURTHER CERTIFY that all constructed elevations and locations of the Work are in conformance with the Contract Documents, except for discrepancies listed below. [Attach additional sheets as necessary] CERTIFIED BY: (SURVEYOR'S SEAL) Printed Name: Florida Professional Surveyor and Mapper Registration Number: Date Signed and Sealed by Professional Surveyor and Mapper: Company Name: Company Address: Telephone Number: 00634 - 1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids \Bid Documents\Master Contract Documents\00634 - Professional Surveyor and Mappers Cert.doc Rev. 06/01 00634 - Professional Surveyor and Mapper's Cert STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT Prepared by ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE and Issued and Published Jointly By PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE a practice division of the NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS AMERICAN CONSULTING ENGINEERS COUNCIL AMERICAN SOCIETY OF CIVIL ENGINEERS This document has been approved and endorsed by The Associated General Contractors of America Construction Specifications Institute Copyright ©1996 National Society of Professional Engineers 1420 King Street, Alexandria, VA 22314 American Consulting Engineers Council 1015 15th Street N.W., Washington, DC 20005 American Society of Civil Engineers 345 East 47th Street, New York, NY 10017 TABLE OF CONTENTS Title Page ARTICLE 1 - DEFINITIONS AND TERMINOLOGY 5 1.01 Defined Terms 5 1.02 Terminology 7 ARTICLE 2 - PRELIMINARY MATTERS 8 2.01 Delivery of Bonds 8 2.02 Copies of Documents 8 2.03 Commencement of Contract Times; Notice to Proceed 8 2.04 Starting the Work 8 2.05 Before Starting Construction 8 2.06 Preconstruction Conference 9 2.07 Initial Acceptance of Schedules 9 ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 9 3.01 Intent 9 3.02 Reference Standards 10 3.03 Reporting and Resolving Discrepancies 10 3.04 Amending and Supplementing Contract Documents 10 3.05 Reuse of Documents 10 ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS 11 4.01 Availability of Lands 11 4.02 Subsurface and Physical Conditions 11 4.03 Differing Subsurface or Physical Conditions 11 4.04 Underground Facilities 12 4.05 Reference Points 13 4.06 Hazardous Environmental Condition at Site 13 ARTICLE 5 - BONDS AND INSURANCE 14 5.01 Performance, Payment, and Other Bonds 14 5.02 Licensed Sureties and Insurers 15 5.03 Certificates of Insurance 15 5.04 CONTRACTOR's Liability Insurance 15 5.05 OWNER's Liability Insurance 16 5.06 Property Insurance 16 5.07 Waiver of Rights 17 5.08 Receipt and Application of Insurance Proceeds 18 5.09 Acceptance of Bonds and Insurance; Option to Replace 18 5.10 Partial Utilization, Acknowledgment of Property Insurer 18 ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES 18 6.01 Supervision and Superintendence 18 6.02 Labor; Working Hours 19 6.03 Services, Materials, and Equipment 19 6.04 Progress Schedule 19 6.05 Substitutes and "Or -Equals" 19 6.06 Concerning Subcontractors, Suppliers, and Others 21 00700 - General Conditions REV 5-10-13 00700 - 2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Nlaster Contract Documents\00700 - General Conditions REV 5-10-13.doc 6.07 Patent Fees and Royalties 22 6.08 Permits 22 6.09 Laws and Regulations 22 6.10 Taxes 22 6.11 Use of Site and Other Areas 22 6.12 Record Documents 23 6.13 Safety and Protection 23 6.14 Safety Representative 24 6.15 Hazard Communication Programs 24 6.16 Emergencies 24 6.17 Shop Drawings and Samples 24 6.18 Continuing the Work 25 6.19 CONTRACTOR's General Warranty and Guarantee 25 6.20 Indemnification 26 ARTICLE 7 - OTHER WORK 26 7.01 Related Work at Site 26 7.02 Coordination 27 ARTICLE 8 - OWNER'S RESPONSIBILITIES 27 8.01 Communications to Contractor 27 8.02 Replacement of ENGINEER 27 8.03 Furnish Data 27 8.04 Pay Promptly When Due 27 8.05 Lands and Easements; Reports and Tests 27 8.06 Insurance 28 8.07 Change Orders 28 8.08 Inspections, Tests, and Approvals 28 8.09 Limitations on OWNER's Responsibilities 28 8.10 Undisclosed Hazardous Environmental Condition 28 8.11 Evidence of Financial Arrangements 28 ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION 28 9.01 OWNER'S Representative 28 9.02 Visits to Site 28 9.03 Project Representative 28 9.04 Clarifications and Interpretations 29 9.05 Authorized Variations in Work 29 9.06 Rejecting Defective Work 29 9.07 Shop Drawings, Change Orders and Payments 29 9.08 Determination for Unit Price Work 29 9.09 Decisions on Requirements of Contract Documents and Acceptability of Work 29 9.10 Limitations on ENGINEER's Authority and Responsibilities 30 ARTICLE 10 - CHANGES IN THE WORK; CLAIMS 30 10.01 Authorized Changes in the Work 30 10.02 Unauthorized Changes in the Work 30 10.03 Execution of Change Orders 30 10.04 Notification to Surety 31 10.05 Claims and Disputes 31 00700 - General Conditions REV 5-10-13 00700 - 3 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK 32 11.01 Cost of the Work 32 11.02 Cash Allowances 34 11.03 Unit Price Work 34 ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES 34 12.01 Change of Contract Price 34 12.02 Change of Contract Times 35 12.03 Delays Beyond CONTRACTOR's Control 35 12.04 Delays Within CONTRACTOR's Control 35 12.05 Delays Beyond OWNER'S and Contractor's Control 35 12.06 Delay Damages 36 ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 36 13.01 Notice of Defects 36 13.02 Access to Work 36 13.03 Tests and Inspections 36 13.04 Uncovering Work 37 13.05 OWNER May Stop the Work 37 13.06 Correction or Removal of Defective Work 37 13.07 Correction Period 37 13.08 Acceptance of Defective Work 38 13.09 OWNER May Correct Defective Work 38 ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION 39 14.01 Schedule of Values 39 14.02 Progress Payments 39 14.03 CONTRACTOR's Warranty of Title 40 14.04 Substantial Completion 41 14.05 Partial Utilization 41 14.06 Final Inspection 42 14.07 Final Payment 42 14.08 Final Completion Delayed 42 14.09 Waiver of Claims 43 ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION 43 15.01 OWNER May Suspend Work 43 15.02 OWNER May Terminate for Cause 43 15.03 OWNER May Terminate For Convenience 44 15.04 CONTRACTOR May Stop Work or Terminate 44 ARTICLE 16 - DISPUTE RESOLUTION 44 16.01 Methods and Procedures 44 ARTICLE 17 - MISCELLANEOUS 44 17.01 Giving Notice 44 17.02 Computation of Times 44 17.03 Cumulative Remedies 44 17.04 Survival of Obligations 45 17.05 Controlling Law 45 00700 - General Conditions REV 5-10-13 00700 - 4 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Adnun\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc GENERAL CONDITIONS ARTICLE 1 - DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in the Contract Documents and printed with initial or all capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural thereof. 1. Addenda --Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the Contract Documents. 2. Agreement --The written instrument which is evidence of the agreement between OWNER and CONTRACTOR covering the Work. 3. Application for Payment --The form acceptable to ENGINEER which is to be used by CONTRACTOR during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos --Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupa- tional Safety and Health Administration. 5. Bid --The offer or proposal of a bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 6. Bidding Documents --The Bidding Requirements and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 7. Bidding Requirements --The Advertisement or Invitation to Bid, Instructions to Bidders, Bid security form, if any, and the Bid form with any supplements. 8. Bonds --Performance and payment bonds and other instruments of security. 9. Change Order --A document recommend- ed by ENGINEER which is signed by CONTRACTOR and OWNER and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Agreement. 10. Claim --A demand or assertion by OWNER or CONTRACTOR seeking an adjustment of Contract Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim. 11. Contract --The entire and integrated written agreement between the OWNER and CONTRACTOR concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 12. Contract Documents --The Contract Documents establish the rights and obligations of the parties and include the Agreement, Addenda (which pertain to the Contract Documents), CONTRACTOR's Bid (including documentation accompanying the Bid and any post Bid documentation submitted prior to the Notice of Award) when attached as an exhibit to the Agreement, the Notice to Proceed, the Bonds, these General Conditions, the Supplementary Conditions, the Specifications and the Drawings as the same are more specifically identified in the Agreement, together with all Written Amendments, Change Orders, Work Change Directives, Field Orders, and ENGINEER's written interpretations and clarifications issued on or after the Effective Date of the Agreement. Approved Shop Drawings and the reports and drawings of subsurface and physical conditions are not Contract Documents. Only printed or hard copies of the items listed in this paragraph are Contract Documents. Files in electronic media format of text, data, graphics, and the like that may be furnished by OWNER to CONTRACTOR are not Contract Documents. 13. Contract Price --The moneys payable by OWNER to CONTRACTOR for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of paragraph 11.03 in the case of Unit Price Work). 14. Contract Times --The number of days or the dates stated in the Agreement to: (i) achieve Substantial Completion; and (ii) complete the Work so that it is ready for final payment as evidenced by ENGINEER's written recommendation of final pay- ment. 15. CONTRACTOR --The individual or entity with whom OWNER has entered into the Agreement. 16. Cost of the Work --See paragraph 11.01.A for definition. 00700 - General Conditions REV 5-10-13 00700 - 5 F:\Public Works\ENGINEERING DNISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents \00700 - General Conditions REV 5-10-13.doc 17. Drawings --That part of the Contract Documents prepared or approved by ENGINEER which graphically shows the scope, extent, and character of the Work to be performed by CONTRACTOR. Shop Drawings and other CONTRACTOR submittals are not Drawings as so defined. 18. Effective Date of the Agreement --The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 19. ENGINEER --The individual or entity named as such in the Agreement. entity having a contract with ENGINEER to furnish services as ENGINEER's independent professional who is identified as such in the Supplementary Conditions. 21. Field Order --A written order issued by ENGINEER which requires minor changes in the Work but which does not involve a change in the Contract Price or the Contract Times. 22. General Requirements --Sections of Division 1 of the Specifications. The General Requirements pertain to all sections of the Specifica- tions. 23. Hazardous Environmental Condition --The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, or Radioactive Material in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto in connection with the Work. 24. Hazardous Waste --The term Hazardous Waste shall have the meaning provided in Section 1004 of the Solid Waste Disposal Act (42 USC Section 6903) as amended from time to time. 25. Laws and Regulations; Laws or Regulat- ions --Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all govern- mental bodies, agencies, authorities, and courts having jurisdiction. 26. Liens --Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 27. Milestone --A principal event specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Comple- tion of all the Work. 28. Notice of Award --The written notice by OWNER to the apparent successful bidder stating that upon timely compliance by the apparent successful bidder with the conditions precedent listed therein, OWNER will sign and deliver the Agreement. 29. Notice to Proceed --A written notice given by OWNER to CONTRACTOR fixing the date on which the Contract Times will commence to run and on which CONTRACTOR shall start to perform the Work under the Contract Documents. 30. OWNER --The individual, entity, public body, or authority with whom CONTRACTOR has entered into the Agreement and for whom the Work is to be performed. 31. Partial Utilization --Use by OWNER of a substantially completed part of the Work for the pur- pose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. 32. PCBs --Polychlorinated biphenyls. 33. Petroleum --Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non -Hazardous Waste and crude oils. 34. Project --The total construction of which the Work to be performed under the Contract Documents may be the whole, or a part as may be indicated elsewhere in the Contract Documents. 35. Project Manual --The bound documentary information prepared for bidding and constructing the Work. A listing of the contents of the Project Manual, which may be bound in one or more volumes, is contained in the table(s) of contents. 36. Radioactive Material --Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 37. Resident Project Representative --The authorized representative of ENGINEER who may be assigned to the Site or any part thereof. 00700 - General Conditions REV 5-10-13 00700 - 6 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc 38. Samples --Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 39. Shop Drawings --All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for CONTRACTOR and submitted by CONTRACTOR to illustrate some portion of the Work. 40. Site --Lands or areas indicated in the Contract Documents as being furnished by OWNER upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by OWNER which are designated for the use of CONTRACTOR. 41. Specifications --That part of the Contract Documents consisting of written technical descriptions of materials, equipment, systems, standards, and workmanship as applied to the Work and certain administrative details applicable thereto. 42. Subcontractor --An individual or entity having a direct contract with CONTRACTOR or with any other Subcontractor for the performance of a part of the Work at the Site. 43. Substantial Completion --The time at which the Work (or a specified part thereof) has progressed to the point where, in the opinion of ENGINEER, the Work (or a specified part thereof) is sufficiently complete, in accordance with the Contract Documents, so that the Work (or a specified part thereof) can be utilized for the purposes for which it is intended. The terms "substantially complete" and "substantially completed" as applied to all or part of the Work refer to Substantial Completion thereof. 44. Supplementary Conditions --That part of the Contract Documents which amends or supplements these General Conditions. 45. Supplier --A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with CONTRACTOR or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by CONTRACTOR or any Subcontractor. 46. Underground Facilities--AII underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 47. Unit Price Work --Work to be paid for on the basis of unit prices. 48. Work --The entire completed construction or the various separately identifiable parts thereof re- quired to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 49. Work Change Directive --A written statement to CONTRACTOR issued on or after the Effective Date of the Agreement and signed by OWNER and recommended by ENGINEER ordering an addition, deletion, or revision in the Work, or responding to differing or unforeseen subsurface or physical conditions under which the Work is to be performed or to emergencies. A Work Change Directive will not change the Contract Price or the Contract Times but is evidence that the parties expect that the change ordered or documented by a Work Change Directive will be incorporated in a subse- quently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Times. 50. Written Amendment --A written statement modifying the Contract Documents, signed by OWNER and CONTRACTOR on or after the Effective Date of the Agreement and normally dealing with the nonengineering or nontechnical rather than strictly construction -related aspects of the Contract Docu- ments. 1.02 Terminology A. Intent of Certain Terms or Adjectives 1. Whenever in the Contract Documents the terms "as allowed," "as approved," or terms of like effect or import are used, or the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of ENGINEER as to the Work, it is intended that such action or determination will be solely to evaluate, in general, the completed Work for compliance with the requirements of and information in the Contract Documents and conformance with the design 00700 - General Conditions REV 5-10-13 00700 - 7 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc concept of the completed Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). The use of any such term or adjective shall not be effective to assign to ENGI- NEER any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility contrary to the provisions of paragraph 9.10 or any other provision of the Contract Documents. B. Day 1. The word "day" shall constitute a calendar day of 24 hours measured from midnight to the next midnight. C. Defective 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it does not conform to the Contract Documents or does not meet the requirements of any inspection, reference standard, test, or approval referred to in the Contract Documents, or has been damaged prior to ENGINEER's recom- mendation of final payment (unless responsi- bility for the protection thereof has been assumed by OWNER at Substantial Completion in accordance with paragraph 14.04 or 14.05). D. Furnish, Install, Perform, Provide 1. The word "furnish," when used in connection with services, materials, or said services, materials, or equipment to the condition. 2. The word "install," when used in connection with services, materials, or in final position said services, materials, or equipment complctc and ready for intended use. 3. The words "perform" or "provide," when used in connection with services, materials, or equipment, shall mean to fumish and install said services, materials, or use. 4. When "furnish," "install," "perform," or "provide" is not used in connection with services, materials, or equipment in a context clearly requiring an obligation of CONTRACTOR, "provide" is implied. E. Unless stated otherwise in the Contract Docu- ments, words or phrases which have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 - PRELIMINARY MATTERS 2.01 Delivery of Bonds A. When CONTRACTOR delivers the executed Agreements to OWNER, CONTRACTOR shall also deliver to OWNER such Bonds as CONTRACTOR may be required to furnish. 2.02 Copies of Documents A. OWNER shall furnish to CONTRACTOR up to ten copies of the Contract Documents. Additional copies will be furnished upon request at the cost of reproduction. 2.03 Commencement of Contract Times; Notice to Proceed A. The Contract Times will commence to run on the thirtieth day after the Effective Date of the Agree- ment or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. A Notice to Pro- ceed may be given at any time within 30 days after the Effective Date of the Agreement. In no event will the Contract Times commence to run later than the ninetieth day after the day of Bid opening or the thirtieth day after the Effective Date of the Agreement, whichever date is earlier. 2.04 Starting the Work A. CONTRACTOR shall start to perform the Work on the date when the Contract Times com- mence to run. No Work shall be done at the Site prior to the date on which the Contract Times commence to run. 2.05 Before Starting Construction A. CONTRACTOR's Review of Contract Docu- ments: Before undertaking each part of the Work, CONTRACTOR shall carefully study and compare the 00700 - General Conditions REV 5-10-13 00700 - 8 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc Contract Documents and check and verify pertinent figures therein and all applicable field measurements. CONTRACTOR shall promptly report in writing to ENGINEER any conflict, error, ambiguity, or discrepancy which CONTRACTOR may discover and shall obtain a written interpretation or clarification from ENGINEER before proceeding with any Work affected thereby; however, CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless CONTRACTOR knew or reasonably should have known thereof. B. Preliminary Schedules: Within ten days after the Effective Date of the Agreement (unless otherwise specified in the General Requirements), CONTRAC- TOR shall submit to ENGINEER for its timely review: 1. a preliminary progress schedule indicating the times (numbers of days or dates) for starting and completing the various stages of the Work, including any Milestones specified in the Contract Documents; 2. a preliminary schedule of Shop Drawing and Sample submittals which will list each required submittal and the times for sub- mitting, reviewing, and processing such submittal; and 3. a preliminary schedule of values for all of the Work which includes quantities and prices of items which when added together equal the Contract Price and subdivides the Work into component parts in sufficient detail to serve as the basis for progress payments during performance of the Work. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work. C. Evidence of Insurance: Before any Work at the Site is started, CONTRACTOR and OWNER shall ach deliver to the other, with copies to each Conditions, certificates of insurance (and other evidence of insurance which either of them or any CONTRACTOR and OWNER respectively aro 2.06 Preconstruction Conference A. Within 20 days after the Contract Times start Work and to discus✓ the schedules referred to in para and other submittals, procc ting Applications for 2.07 Initial Acceptance of Schedules A. Unless otherwise provided in the Contract Documents, at least ten days before submission of the first Application for Payment a conference attended by CONTRACTOR, ENGINEER, and others as appropri- ate will be held to review for acceptability to ENGI- NEER as provided below the schedules submitted in accordance with paragraph 2.05.B. CONTRACTOR shall have an additional ten days to make corrections and adjustments and to complete and resubmit the schedules. No progress payment shall be made to CONTRACTOR until acceptable schedules are submitted to ENGINEER. 1. The progress schedule will be acceptable to ENGINEER if it provides an orderly progression of the Work to completion within any specified Milestones and the Contract Times. Such acceptance will not impose on ENGINEER responsibility for the progress schedule, for sequencing, scheduling, or progress of the Work nor interfere with or relieve CONTRACTOR from CONTRACTOR's full responsibility therefor. 2. CONTRACTOR's schedule of Shop Drawing and Sample submittals will be acceptable to ENGINEER if it provides a workable arrangement for reviewing and processing the required submittals. 3. CONTRACTOR's schedule of values will be acceptable to ENGINEER as to form and substance if it provides a reasonable allocation of the Contract Price to component parts of the Work. ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is called for by one is as binding as if called for by all. B. It is the intent of the Contract Documents to describe a functionally complete Project (or part there- of) to be constructed in accordance with the Contract 00700 - General Conditions REV 5-10-13 00700 - 9 F:\Public Works \ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc Documents. Any labor, documentation, services, materials, or equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the intended result will be provided whether or not specifically called for at no additional cost to OWNER. C. Clarifications and interpretations of the Contract Documents shall be issued by ENGINEER as provided in Article 9. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifica- tions, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the stan- dard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual or code, or any instruction of a Supplier shall be effective to change the duties or responsibilities of OWNER, CONTRACTOR, or ENGINEER,or any of their subcontractors, consultants, agents, or employ- ees from those set forth in the Contract Documents, nor shall any such provision or instruction be effective to assign to OWNER, ENGINEER, or any of ENGINEER's Consultants, agents, or employees any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies 1. If, during the performance of the Work, CONTRACTOR discovers any conflict, error, ambiguity, or discrepancy within the Con- tract Documents or between the Contract Documents and any provision of any Law or Regulation applicable to the performance of the Work or of any standard, specification, manual or code, or of any instruction of any Supplier, CONTRACTOR shall report it to ENGINEER in writing at once. CONTRACTOR shall not proceed with the Work affected thereby (except in an emergency as required by paragraph 6.16.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in paragraph 3.04; provided, however, that CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report any such conflict, error, ambiguity, or discrepancy unless CON- TRACTOR knew or reasonably should have known thereof. B. Resolving Discrepancies 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and: a. the provisions of any standard, specification, manual, code, or instruction (whether or not specifically incorporated by reference in the Contract Documents); or b. the provisions of any Laws or Regulations applicable to the performance of the Work (unless such an interpretation of the provisions of the Contract Documents would result in violation of such Law or Regulation). 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof in one or more of the following ways: (i) a Written Amendment; (ii) a Change Order; or (iii) a Work Change Directive. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, by one or more of the following ways: (i) a Field Order; (ii) ENGINEER's approval of a Shop Drawing or Sample; or (iii) ENGINEER's written interpretation or clarifi- cation. 3.05 Reuse of Documents A. CONTRACTOR and any Subcontractor or Supplier or other individual or entity performing or 00700 - General Conditions REV 5-10-13 00700 - 10 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc furnishing any of the Work under a direct or indirect contract with OWNER: (i) shall not have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of ENGINEER or ENGINEER's Consultant, including electronic media editions; and (ii) shall not reuse any of such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of OWNER and ENGINEER and specific written verification or adaption by ENGINEER. This prohibition will survive final payment, completion, and acceptance of the Work, or termination or completion of the Contract. Nothing herein shall preclude CONTRACTOR from retaining copies of the Contract Documents for record purposes. ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. OWNER shall furnish the Site. OWNER shall notify CONTRACTOR of any encumbrances or restrictions not of general application but specifically related to use of the Site with which CONTRACTOR must comply in performing the Work. OWNER will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. If CONTRACTOR and OWNER are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, as a result of any delay in OWNER's furnishing the Site, CONTRACTOR may make a Claim therefor as provided in paragraph 10.05. B. Upon reasonable written request, OWNER shall furnish CONTRACTOR with a current statement of record legal title and legal description of the lands upon which the Work is to be performed and OWNER's interest therein as necessary for giving notice of or filing a mechanic's or construction lien against such lands in accordance with applicable Laws and Regulations. C. CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports of explorations and tests of subsurface conditions at or contiguous to the Site that ENGINEER has used in preparing the Contract Documents; and 2. those drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) that ENGINEER has used in preparing the Contract Documents. B. Limited Reliance by CONTRACTOR on Technical Data Authorized: CONTRACTOR may rely upon the general accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementa- ry Conditions. Except for such reliance on such "technical data," CONTRACTOR may not rely upon or make any Claim against OWNER, ENGINEER, or any of ENGINEER's Consultants with respect to: 1. the completeness of such reports and drawings for CONTRACTOR's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by CONTRACTOR, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any CONTRACTOR interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If CONTRACTOR believes that any subsurface or physical condition at or contiguous to the Site that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which CONTRAC- TOR is entitled to rely as provided in paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 00700 - General Conditions REV 5-10-13 00700 - 11 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inher- ent in work of the character provided for in the Contract Documents; then CONTRACTOR shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by paragraph 6.16.A), notify OWNER and ENGINEER in writing about such condition. CONTRACTOR shall not further disturb such condition or perform any Work in connection therewith (except as aforesaid) until receipt of written order to do so. B. ENGINEER's Review: After receipt of written notice as required by paragraph 4.03.A, ENGINEER will promptly review the pertinent condition, determine the necessity of OWNER's obtaining additional exploration or tests with respect thereto, and advise OWNER in writing (with a copy to CONTRACTOR) of ENGINEER's findings and conclusions. C. Possible Price and Times Adjustments 1. The Contract Price or the Contract Times, or both, will be equitably adjusted to the extent that the existence of such differing subsurface or physical condition causes an in- crease or decrease in CONTRACTOR's cost of, or time required for, performance of the Work; subject, however, to the following: a. such condition must meet any one or more of the categories described in para- graph 4.03.A; and b. with respect to Work that is paid for on a Unit Price Basis, any adjustment in Contract Price will be subject to the provisions of paragraphs 9.08 and 11.03. 2. CONTRACTOR shall not be entitled to any adjustment in the Contract Price or Contract Times if: a. CONTRACTOR knew of the existence of such conditions at the time CONTRACTOR made a final commitment to OWNER in respect of Contract Price and Contract Times by the submission of a Bid or becoming bound under a negotiated contract; or b. the existence of such condition could reasonably have been discovered or revealed as a result of any examination, investigation, exploration, test, or study of the Site and contiguous areas required by the Bidding Requirements or Contract Documents to be conducted by or for CON- TRACTOR prior to CONTRACTOR's making such final commitment; or c. CONTRACTOR failed to give the written notice within the time and as re- quired by paragraph 4.03.A. 3. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, a Claim may be made therefor as provided in paragraph 10.05. However, OWNER, ENGINEER, and ENGINEER's Consultants shall not be liable to CONTRACTOR for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by CONTRACTOR on or in connection with any other project or anticipated project. 4.04 Underground Facilities A. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to OWNER or ENGINEER by the owners of such Underground Facilities, including OWNER, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. OWNER and ENGINEER shall not be responsible for the accuracy or com- pleteness of any such information or data; and 2. the cost of all of the following will be included in the Contract Price, and CONTRAC- TOR shall have full responsibility for: a. reviewing and checking all such information and data, 00700 - General Conditions REV 5-10-13 00700 - 12 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc b. locating all Underground Facilities shown or indicated in the Contract Documents, c. coordination of the Work with the owners of such Underground Facilities, including OWNER, during construction, and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated 1. If an Underground Facility is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, CONTRACTOR shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any Work in connection therewith (except in an emergency as required by paragraph 6.16.A), identify the owner of such Underground Facility and give written notice to that owner and to OWNER and ENGI- NEER. ENGINEER will promptly review the Underground Facility and determine the extent, if any, to which a change is required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. During such time, CONTRACTOR shall be responsible for the safety and protection of such Underground Facility. 2. If ENGINEER concludes that a change in the Contract Documents is required, a Work Change Directive or a Change Order will be issued to reflect and document such consequences. An equitable adjustment shall be made in the Contract Price or Contract Times, or both, to the extent that they are attributable to the existence or location of any Underground Facility that was not shown or indicated or not shown or indicated with reasonable accuracy in the Contract Documents and that CONTRACTOR did not know of and could not reasonably have been expected to be aware of or to have anticipated. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment in Contract Price or Contract Times, OWNER or CONTRACTOR may make a Claim therefor as provided in paragraph 10.05. 4.05 Reference Points A. OWNER shall provide engineering surveys to establish reference points for construction which in ENGINEER's judgment are necessary to enable CONTRACTOR to proceed with the Work. CON- TRACTOR shall be responsible for laying out the Work, shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations without the prior written approval of OWNER. CONTRACTOR shall report to ENGINEER whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for the accurate replacement or relocation of such reference points or property monuments by professionally qualified personnel. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: Reference is made to the Supplementary Conditions for the identification of those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that have been utilized by the ENGINEER in the preparation of the Contract Documents. B. Limited Reliance by CONTRACTOR on Technical Data Authorized: CONTRACTOR may rely upon the general accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Except for such reliance on such "technical data," CONTRACTOR may not rely upon or make any Claim against OWNER, ENGINEER or any of ENGINEER's Consultants with respect to: 1. the completeness of such reports and drawings for CONTRACTOR's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any CONTRACTOR interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. 00700 - General Conditions REV 5-10-13 00700 - 13 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc C. CONTRACTOR shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. CONTRACTOR shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by CONTRACTOR, Subcontractors, Suppliers, or anyone else for whom CONTRACTOR is responsible. D. If CONTRACTOR encounters a Hazardous Environmental Condition or if CONTRACTOR or anyone for whom CONTRACTOR is responsible creates a Hazardous Environmental Condition, CONTRACTOR shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by paragraph 6.16); and (iii) notify OWNER and ENGI- NEER (and promptly thereafter confirm such notice in writing). OWNER shall promptly consult with ENGINEER concerning the necessity for OWNER to retain a qualified expert to evaluate such condition or take corrective action, if any. E. CONTRACTOR shall not be required to resume Work in connection with such condition or in any affected area until after OWNER has obtained any required permits related thereto and delivered to CONTRACTOR written notice: (i) specifying that such condition and any affected area is or has been rendered safe for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed safely. If OWNER and CONTRACTOR cannot agree as to entitlement to or on the amount or extent, if any, of any adjustment in Contract Price or Contract Times, or both, as a result of such Work stoppage or such special conditions under which Work is agreed to be resumed by CONTRACTOR, either party may make a Claim therefor as provided in paragraph 10.05. F. If after receipt of such written notice CONTRACTOR does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special condi- tions, then OWNER may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. If OWNER and CON- TRACTOR cannot agree as to entitlement to or on the amount or extent, if any, of an adjustment in Contract Price or Contract Times as a result of deleting such portion of the Work, then either party may make a Claim therefor as provided in paragraph 10.05. OWNER may have such deleted portion of the Work performed by OWNER's own forces or others in accordance with Article 7. G. To the fullest extent permitted by Laws and Regulations, OWNER shall indemnify and hold harmless CONTRACTOR, Subcontractors, ENGI- NEER, ENGINEER's Consultants and the officers, directors, partners, employees, agents, other consultants, and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition, provided that such Hazardous Environmental Condition: (i) was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be included within the scope of the Work, and (ii) was not created by CONTRACTOR or by anyone for whom CONTRACTOR is responsible. Nothing in this para- graph 4.06.E shall obligate OWNER to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultants, and the officers, directors, partners, employees, agents, other consultants, and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by CONTRACTOR or by anyone for whom CONTRACTOR is responsible. Nothing in this paragraph 4.06.F shall obligate CONTRACTOR to indemnify any individual or entity from and against the consequences of that individual's or entity's own negli- gence. I. The provisions of paragraphs 4.02, 4.03, and 4.04 are not intended to apply to a Hazardous Environmental Condition uncovered or revealed at the Site. ARTICLE 5 - BONDS AND INSURANCE 5.01 Performance, Payment, and Other Bonds A. CONTRACTOR shall furnish performance 00700 - General Conditions REV 5-10-13 00700 - 14 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc mance and payment of all CONTRACTOR's or by the Contract Documents. CONTRACTOR shall B. All Bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the current list of "Com- panies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All Bonds signed by an agent must be accompanied by a certified copy of such agent's authority to act. C. If the surety on any Bond furnished by CON- TRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements of paragraph 5.01.B, CONTRACTOR shall within 20 days thereafter substitute another Bond and surety, both of which shall comply with the requirements of paragraphs 5.01.13 and 5.02. 5.02 Licensed Sureties and Insurers A. All Bonds and insurance required by the Contract Documents to be purchased and maintained by OWNER or CONTRACTOR shall be obtained from surety or insurance companies that are duly licensed or authorized in the jurisdiction in which the Project is located to issue Bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.03 Certificates of Insurance A. CONTRACTOR shall deliver to OWNER, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by OWN- ER or any other additional insured) which CON- TRACTOR is required to purchase and maintain. mentary Conditions, certificates of insurance (and other evidence of insurance requested by CONTRA 5.04 CONTRACTOR's Liability Insurance A. CONTRACTOR shall purchase and maintain such liability and other insurance as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from CONTRACTOR's performance of the Work and CONTRACTOR's other obligations under the Contract Documents, whether it is to be per- formed by CONTRACTOR, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of CONTRACTOR's employees; 3. claims for damages because of bodily injury, sickness or disease, or death of any person other than CONTRACTOR's employees; 4. claims for damages insured by reasonably available personal injury liability coverage which are sustained: (i) by any person as a result of an offense directly or indirectly related to the employment of such person by CONTRACTOR, or (ii) by any other person for any other reason; 5. claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including loss of use resulting therefrom; and 6. claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, mainte- nance or use of any motor vehicle. B. The policies of insurance so required by this paragraph 5.04 to be purchased and maintained shall: 1. with respect to insurance required by paragraphs 5.04.A.3 through 5.04.A.6 inclusive, include as additional insureds (subject to any customary exclusion in respect of professional liability) OWNER, ENGINEER, ENGINEER's 00700 - General Conditions REV 5-10-13 00700 - 15 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628.85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc Consultants, and any other individuals or entities identified in the Supplementary Condi- tions, all of whom shall be listed as additional insureds, and include coverage for the respec- tive officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of all such additional insureds, and the insurance afforded to these additional insureds shall provide primary coverage for all claims covered thereby; 2. include at least the specific coverages and be written for not less than the limits of liability provided in the Supplementary Conditions or required by Laws or Regulations, whichever is greater; 3. include completed operations insurance; 4. include contractual liability insurance covering CONTRACTOR's indemnity obligations under paragraphs 6.07, 6.11, and 6.20; 5. contain a provision or endorsement that the coverage afforded will not be canceled, materially changed or renewal refused until at least thirty days prior written notice has been given to OWNER and CONTRACTOR and to each other additional insured identified in the Supplementary Conditions to whom a certificate of insurance has been issued (and the certificates of insurance furnished by the CON- TRACTOR pursuant to paragraph 5.03 will so provide); 6. remain in effect at least until final payment and at all times thereafter when CON- TRACTOR may be correcting, removing, or replacing defective Work in accordance with paragraph 13.07; and 7. with respect to completed operations insurance, and any insurance coverage written on a claims -made basis, remain in effect for at least two years after final payment (and CONTRACTOR shall furnish OWNER and each other additional insured identified in the Supplementary Conditions, to whom a certificate of insurance has been issued, evidence satisfactory to OWNER and any such additional insured of continuation of such insurance at final payment and one year thereafter). 5.05 OWNER's Liability Insurance A. In addition to the insurance required to be provided by CONTRACTOR under paragraph 5.01, -Deem-meets. 5.06 Property Insurance A. Unless otherwise provided in thc Supple (subject to such deductible amounts as may bo by Laws and Regulations). This insurance shall: 1. include the interests of OWNER, ENGINEER's Consultants, and any other individuals or entities identified in thc Supplementary Conditions, and the officers, directors, partners, employees, agents, and and any of them, each of whom is deemed to 2. be written on a Builder's Risk "all risk" or open peril or special causes of lose policy form that shall at least include insurance for ieaast thc following perils or causes of loss: fire, debris removal, demolition occasioned by en forcement of Laws and Regulations, water 3. include expenses incurred in tho cover materials and equipment - . , - 00700 - General Conditions REV 5-10-13 00700 - 16 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc aymcnt recommended by ENGINEER; by OWNER; 6. include testing and startup; and 7. be maintained in effect until final pay writing by OWNER, CONTRACTOR, and ENGINEER with 30 days written notice to each B. OWNER shall purchase and maintain such the interests of OWNER, CONTRACTOR, Subcontractors, ENGINEER, ENGINEER's Consul - the Supplementary Conditions, each of whom is deemed to have an insurable interest and shall be C. All the policies of insurance (and the ccrtifi D. OWNER shall not be responsible for purchas- ing and maintaining any property insurance specified in this paragraph 5.06 to protect the interests of CONTRACTOR, Subcontractors, or others in the Work to the extent of any deductible amounts that are identified in the Supplementary Conditions. The risk of loss within such identified deductible amount will be borne by CONTRACTOR, Subcontractors, or others suffering any such loss, and if any of them wishes property insurance coverage within the limits of such amounts, each may purchase and maintain it at the purchaser's own expense. E. If CONTRACTOR requests in writing that other special insurance be included in the property TOR by appropriate Change Order or Written 5.07 Waiver of Rights A. OWNER and CONTRACTOR intend that all will protect OWNER, CONTRACTOR, Subcontractors, ENGINEER, ENGINEER's Consul or additional insureds (and the officers, directors, policies and will provide primary coverage for all losses and damagos caused by tho porils or sauces -of recovery against any of the insureds or additional waive all rights against each other and thei r respective officers, directors, partners, employees, perils or causes of loss covered by such policies and directors, partners, employees, agents, and other caused. None of the above waivers shall extend to issued. B. OWNER waives all rights against CONTRACTOR, Subcontractors, ENGINEER, partners, employees, agents, and other consultants and subcontractors of 1. loss, duc to business interruption, loss beyond direct physical loss or damage to 00700 - General Conditions REV 5-10-13 00700 - 17 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents \00700 - General Conditions REV 5-10-13.doc cause of loss covered by any property or part thereof by OWNER during partial utilization pursuant to paragraph 11.05, after 11.01, or after final payment pursuant to paragraph 14.07. C. Any insurance policy maintained by OWNER covering any Iosc, damage or consequential Toss referred to in paragraph 5.07.B shall contain any such low, damage, or consequential loss, the ENGINEER's Consultants and the officers, directors, partners, employees, agents, and other consultants 5.08 Receipt and Application of Insurance Proceeds A. Any insured loss under the policies of -e e -e -e t_ • e- __ . - with OWNER and made payable to OWNER as fiduciary for the insureds, as their interests may shall deposit in a separate account any money so other special agreement is reached, the damaged Work shall be repaired or replaced, the moneys -se and the cost thereof covered by an appropriate B. OWNER as fiduciary shall have power to days after the occurrence of los to OWNER's 5.09 Acceptance of Bonds and Insurance; Option to Replace A. If either OWNER or CONTRACTOR has any receipt of thc certificates (or other evidence shall ach provide to the other provided as the other may reasonably request. If Contract Documents, such party shall notify the other party in writing of such failure any change in thc required coverage. Without and a Change Order shall be isucd to adjust the Contract Price accordingly. 5.10 Partial Utilization, Acknowledgment of Property Insurer A. If OWNER finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work as provided in paragraph 14.05, no such use or occupancy shall commence before the insurers providing the property insurance pursuant to paragraph 5.06 have acknowledged notice thereof and in writing effected any changes in cover- age necessitated thereby. The insurers providing the property insurance shall consent by endorsement on the policy or policies, but the property insurance shall not be canceled or permitted to lapse on account of any such partial use or occupancy. ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. CONTRACTOR shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. CON- TRACTOR shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction, but CONTRACTOR shall not be responsible for the negligence of OWNER or ENGINEER in the design or specification of a specific 00700 - General Conditions REV 5-10-13 00700 - 18 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc means, method, technique, sequence, or procedure of construction which is shown or indicated in and expressly required by the Contract Documents. CON- TRACTOR shall be responsible to see that the completed Work complies accurately with the Contract Documents. B. At all times during the progress of the Work, CONTRACTOR shall assign a competent resident superintendent thereto who shall not be replaced without written notice to OWNER and ENGINEER except under extraordinary circumstances. The superintendent will be CONTRACTOR's representative at the Site and shall have authority to act on behalf of CONTRACTOR. All communications given to or received from the superintendent shall be binding on CONTRACTOR. 6.02 Labor; Working Hours A. CONTRACTOR shall provide competent, suitably qualified personnel to survey, lay out, and construct the Work as required by the Contract Docu- ments. CONTRACTOR shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during regular working hours, and CONTRACTOR will not permit overtime work or the performance of Work on Saturday, Sunday, or any legal holiday without OWNER's written consent (which will not be unreasonably withheld) given after prior written notice to ENGINEER. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the General Re- quirements, CONTRACTOR shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All warranties and guarantees specifically called for by the Specifica- tions shall expressly run to the benefit of OWNER. If required by ENGINEER, CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. All materials and equipment shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 6.04 Progress Schedule A. CONTRACTOR shall adhere to the progress schedule established in accordance with paragraph 2.07 as it may be adjusted from time to time as provided below. 1. CONTRACTOR shall submit to ENGINEER for acceptance (to the extent indi- cated in paragraph 2.07) proposed adjustments in the progress schedule that will not result in changing the Contract Times (or Milestones). Such adjustments will conform generally to the progress schedule then in effect and additional- ly will comply with any provisions of the General Requirements applicable thereto. 2. Proposed adjustments in the progress schedule that will change the Contract Times (or Milestones) shall be submitted in accordance with the requirements of Article 12. Such adjustments may only be made by a Change Order or Written Amendment in accor- dance ccordance with Article 12. 6.05 Substitutes and "Or -Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be submitted to ENGINEER for review under the circumstances described below. 1. "Or -Equal" Items: If in ENGINEER's sole discretion an item of material or equipment proposed by CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by ENGINEER as an "or -equal" item, in which case review and approval of the proposed item may, in 00700 - General Conditions REV 5-10-13 00700 - 19 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc ENGINEER's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substi- tute items. For the purposes of this paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. in the exercise of reasonable judgment ENGINEER determines that: (i) it is at least equal in quality, durability, appearance, strength, and design characteristics; (ii) it will reliably perform at least equally well the function imposed by the design concept of the completed Project as a functioning whole, and; b. CONTRACTOR certifies that: (i) there is no increase in cost to the OWNER; and (ii) it will conform substantially, even with deviations, to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items a. If in ENGINEER's sole discretion an item of material or equipment proposed by CONTRACTOR does not qualify as an "or -equal" item under paragraph 6.05.A.1, it will be considered a proposed substitute item. b. CONTRACTOR shall submit suffi- cient information as provided below to allow ENGINEER to determine that the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by ENGINEER from anyone other than CONTRACTOR. c. The procedure for review by ENGI- NEER will be as set forth in paragraph 6.05.A.2.d, as supplemented in the General Requirements and as ENGINEER may decide is appropriate under the circumstances. d. CONTRACTOR shall first make written application to ENGINEER for review of a proposed substitute item of material or equipment that CONTRACTOR seeks to furnish or use. The application shall certify that the proposed substitute item will perform adequately the functions and achieve the results called for by the general design, be similar in substance to that specified, and be suited to the same use as that specified. The application will state the extent, if any, to which the use of the pro- posed substitute item will prejudice CONTRACTOR's achievement of Substan- tial Completion on time, whether or not use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with OWNER for work on the Project) to adapt the design to the proposed substitute item and whether or not incorporation or use of the proposed substi- tute item in connection with the Work is sub- ject to payment of any license fee or royalty. All variations of the proposed substitute item from that specified will be identified in the application, and available engineering, sales, maintenance, repair, and replacement services will be indicated. The application will also contain an itemized esti- mate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and claims of other contractors affected by any resulting change, all of which will be considered by ENGINEER in evaluating the proposed substitute item. ENGINEER may require CONTRACTOR to furnish additional data about the proposed substitute item. B. Substitute Construction Methods or Proce- dures: If a specific means, method, technique, se- quence, or procedure of construction is shown or indicated in and expressly required by the Contract Documents, CONTRACTOR may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by ENGINEER. CONTRACTOR shall submit sufficient information to allow ENGINEER, in ENGINEER's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. The procedure for review by ENGINEER will be similar to that provided in subparagraph 6.05.A.2. C. Engineer's Evaluation: ENGINEER will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to para- graphs 6.05.A and 6.05.B. ENGINEER will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until ENGINEER's review is complete, which will be evidenced by either a Change Order for a substitute or an approved Shop Drawing for an "or equal." ENGINEER will advise 00700 - General Conditions REV 5-10-13 00700 - 20 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc CONTRACTOR in writing of any negative determination. D. Special Guarantee: OWNER may require CONTRACTOR to furnish at CONTRACTOR's ex- pense a special performance guarantee or other surety with respect to any substitute. E. ENGINEER's Cost Reimbursement: ENGINEER will record time required by ENGINEER and ENGINEER's Consultants in evaluating substitute proposed or submitted by CONTRACTOR pursuant to paragraphs 6.05.A.2 and 6.05.B and in making changes in the Contract Documents (or in the provisions of any other direct contract with OWNER for work on the Project) occasioned thereby. Whether or not ENGINEER approves a substitute item so pro- posed or submitted by CONTRACTOR, CON- TRACTOR shall reimburse OWNER for the charges of ENGINEER and ENGINEER's Consultants for evaluating each such proposed substitute. F. CONTRACTOR's Expense: CONTRACTOR shall provide all data in support of any proposed substitute or "or -equal" at CONTRACTOR's expense. 6.06 Concerning Subcontractors, Suppliers, and Others A. CONTRACTOR shall not employ any Subcontractor, Supplier, or other individual or entity (including those acceptable to OWNER as indicated in paragraph 6.06.B), whether initially or as a replacement, against whom OWNER may have reasonable objection. CONTRACTOR shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom CONTRACTOR has reason- able objection. B. If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, or other individuals or entities to be submitted to OWNER in advance for acceptance by OWNER by a specified date prior to the Effective Date of the Agreement, and if CONTRACTOR has submitted a list thereof in accordance with the Supplementary Conditions, OWNER's acceptance (either in writing or by failing to make written objection thereto by the date indicated for acceptance or objection in the Bidding Documents or the Contract Documents) of any such Subcon- tractor, Supplier, or other individual or entity so identified may be revoked on the basis of reasonable objection after due investigation. CONTRACTOR shall submit an acceptable replacement for the rejected Subcontractor, Supplier, or other individual or entity, and the Contract Price will be adjusted by the difference in the cost occasioned by such replacement, and an appropriate Change Order will be issued or Written Amendment signed. No acceptance by OWNER of any such Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, shall constitute a waiver of any right of OWNER or ENGINEER to reject defective Work. C. CONTRACTOR shall be fully responsible to OWNER and ENGINEER for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as CONTRACTOR is responsible for CONTRACTOR's own acts and omissions. Nothing in the Contract Documents shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between OWNER or ENGINEER and any such Subcontractor, Supplier or other individual or entity, nor shall it create any obligation on the part of OWNER or ENGINEER to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. D. CONTRACTOR shall be solely responsible for scheduling and coordinating the Work of Subcon- tractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with CONTRACTOR. E. CONTRACTOR shall require all Subcontrac- tors, Suppliers, and such other individuals or entities performing or furnishing any of the Work to commu- nicate with ENGINEER through CONTRACTOR. F. The divisions and sections of the Specifica- tions and the identifications of any Drawings shall not control CONTRACTOR in dividing the Work among Subcontractors or Suppliers or delineating the Work to be performed by any specific trade. G. All Work performed for CONTRACTOR by a Subcontractor or Supplier will be pursuant to an appropriate agreement between CONTRACTOR and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of OWNER and ENGINEER. Whenever any such agreement is with a Subcontractor or Supplier who is listed as an additional insured on the property insurance provided in paragraph 5.06, the agreement between the CONTRACTOR and the Subcontractor or Supplier will contain provisions whereby the Subcontractor or Supplier waives all rights against OWNER, CONTRACTOR, ENGINEER, ENGINEER's Consultants, and all other individuals or entities 00700 - General Conditions REV 5-10-13 00700 - 21 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc identified in the Supplementary Conditions to be listed as insureds or additional insureds (and the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them) for all losses and damages caused by, arising out of, relating to, or resulting from any of the perils or causes of loss covered by such policies and any other property insurance applicable to the Work. If the insurers on any such policies require separate waiver forms to be signed by any Subcontractor or Supplier, CONTRACTOR will obtain the same. 6.07 Patent Fees and Royalties A. CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if to the actual knowledge of OWNER or ENGINEER its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by OWNER in the Contract Documents. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultants, and the officers, directors, partners, employees or agents, and other consultants of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.08 Permits A. Unless otherwise provided in the Supple- mentary Conditions, CONTRACTOR shall obtain and pay for all construction permits and licenses. OWNER shall assist CONTRACTOR, when necessary, in obtaining such permits and licenses. CONTRACTOR shall pay all govemmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement. CONTRACTOR shall pay all charges of utility owners for connections to the Work, and OWNER shall pay all charges of such utility owners for capital costs related thereto, such as plant investment fees. 6.09 Laws and Regulations A. CONTRACTOR shall give all notices and comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, neither OWNER nor ENGINEER shall be responsible for monitoring CONTRACTOR's compli- ance with any Laws or Regulations. B. If CONTRACTOR performs any Work know- ing or having reason to know that it is contrary to Laws or Regulations, CONTRACTOR shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work; however, it shall not be CONTRACTOR's primary responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve CONTRACTOR of CONTRACTOR's obligations under paragraph 3.03. C. Changes in Laws or Regulations not known at the time of opening of Bids (or, on the Effective Date of the Agreement if there were no Bids) having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Times. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment, a Claim may be made therefor as provided in paragraph 10.05. 6.10 Taxes A. CONTRACTOR shall pay all sales, consum- er, use, and other similar taxes required to be paid by CONTRACTOR in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance of the Work. B. OWNER qualifies for state and local sales tax exemption in the purchase of all material and equipment. 6.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas 1. CONTRACTOR shall confine construction equipment, the storage of 00700 - General Conditions REV 5-10-13 00700 - 22 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. Should any claim be made by any such owner or occupant because of the performance of the Work, CONTRACTOR shall promptly settle with such other party by negotiation or otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law. 3. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultant, and the officers, directors, partners, employees, agents, and other consultants of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against OWNER, ENGINEER, or any other party indemnified hereunder to the extent caused by or based upon CONTRACTOR's performance of the Work. B. Removal of Debris During Performance of the Work: During the progress of the Work CONTRAC- TOR shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materi- als, rubbish, and other debris shall conform to applica- ble Laws and Regulations. C. Cleaning: Prior to Substantial Completion of the Work CONTRACTOR shall clean the Site and make it ready for utilization by OWNER. At the com- pletion of the Work CONTRACTOR shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition allproperty not designated for alteration by the Contract Documents. D. Loading Structures: CONTRACTOR shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.12 Record Documents A. CONTRACTOR shall maintain in a safe place at the Site one record copy of all Drawings, Specifica- tions, Addenda, Written Amendments, Change Orders, Work Change Directives, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all approved Shop Drawings will be available to ENGI- NEER for reference. Upon completion of the Work, these record documents, Samples, and Shop Drawings will be delivered to ENGINEER for OWNER. 6.13 Safety and Protection A. CONTRACTOR shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. CONTRACTOR shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equip- ment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. CONTRACTOR shall comply with all applica- ble Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. CONTRACTOR shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. All damage, injury, or loss to any property referred to in paragraph 6.13.A.2 or 6.13.A.3 caused, directly or indirectly, in whole or in part, by 00700 - General Conditions REV 5-10-13 00700 - 23 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents \Master Contract Documents\00700 - General Conditions REV 5-10-13.doc CONTRACTOR, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of OWNER or ENGINEER or ENGINEER's Consultant, or anyone employed by any of them, or anyone for whose acts any of them may be liable, and not attributable, directly or indirectly, in whole or in part, to the fault or negligence of CONTRACTOR or any Subcontractor, Supplier, or other individual or entity directly or indirectly employed by any of them). CONTRACTOR's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and ENGINEER has issued a notice to OWNER and CONTRACTOR in accordance with paragraph 14.07.B that the Work is acceptable (except as otherwise expressly provided in connection with Substantial Completion). 6.14 Safety Representative A. CONTRACTOR shall designate a qualified and experienced safety representative at the Site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of safety precautions and programs. 6.15 Hazard Communication Programs A. CONTRACTOR shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged be- tween or among employers at the Site in accordance with Laws or Regulations. 6.16 Emergencies A. In emergencies affecting the safety or protec- tion of persons or the Work or property at the Site or adjacent thereto, CONTRACTOR is obligated to act to prevent threatened damage, injury, or loss. CONTRACTOR shall give ENGINEER prompt written notice if CONTRACTOR believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If ENGINEER determines that a change in the Contract Documents is required be- cause of the action taken by CONTRACTOR in response to such an emergency, a Work Change Directive or Change Order will be issued. 6.17 Shop Drawings and Samples A. CONTRACTOR shall submit Shop Drawings to ENGINEER for review and approval in accordance with the acceptable schedule of Shop Drawings and Sample submittals. All submittals will be identified as ENGINEER may require and in the number of copies specified in the General Requirements. The data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified perfor- mance and design criteria, materials, and similar data to show ENGINEER the services, materials, and equipment CONTRACTOR proposes to provide and to enable ENGINEER to review the information for the limited purposes required by paragraph 6.17.E. B. CONTRACTOR shall also submit Samples to ENGINEER for review and approval in accordance with the acceptable schedule of Shop Drawings and Sample submittals. Each Sample will be identified clearly as to material, Supplier, pertinent data such as catalog numbers, and the use for which intended and otherwise as ENGINEER may require to enable ENGI- NEER to review the submittal for the limited purposes required by paragraph 6.17.E. The numbers of each Sample to be submitted will be as specified in the Specifications. C. Where a Shop Drawing or Sample is required by the Contract Documents or the schedule of Shop Drawings and Sample submittals acceptable to ENGI- NEER as required by paragraph 2.07, any related Work performed prior to ENGINEER's review and approval of the pertinent submittal will be at the sole expense and responsibility of CONTRACTOR. D. Submittal Procedures 1. Before submitting each Shop Drawing or Sample, CONTRACTOR shall have determined and verified: a. all field measurements, quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers, and similar information with respect thereto; b. all materials with respect to intended use, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; c. all information relative to means, methods, techniques, sequences, and procedures of construction and safety 00700 - General Conditions REV 5-10-13 00700 - 24 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc precautions and programs incident thereto; and d. CONTRACTOR shall also have reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents. 2. Each submittal shall bear a stamp or specific written indication that CONTRACTOR has satisfied CONTRACTOR's obligations under the Contract Documents with respect to CONTRACTOR's review and approval of that subm ittal. 3. At the time of each submittal, CON- TRACTOR shall give ENGINEER specific written notice of such variations, if any, that the Shop Drawing or Sample submitted may have from the requirements of the Contract Documents, such notice to be in a written com- munication separate from the submittal; and, in addition, shall cause a specific notation to be made on each Shop Drawing and Sample sub- mitted to ENGINEER for review and approval of each such variation. E. ENGINEER's Review 1. ENGINEER will timely review and approve Shop Drawings and Samples in accordance with the schedule of Shop Drawings and Sample submittals acceptable to ENGINEER. ENGINEER's review and approval will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. ENGINEER's review and approval will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of con- struction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. 3. ENGINEER's review and approval of Shop Drawings or Samples shall not relieve CONTRACTOR from responsibility for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called ENGINEER's attention to each such variation at the time of each submittal as required by paragraph 6.17.D.3 and ENGI- NEER has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample approval; nor will any approval by ENGINEER relieve CON- TRACTOR from responsibility for complying with the requirements of paragraph 6.17.D.1. F. Resubmittal Procedures 1. CONTRACTOR shall make correc- tions required by ENGINEER and shall return the required number of corrected copies of Shop Drawings and submit as required new Samples for review and approval. CON- TRACTOR shall direct specific attention in writing to revisions other than the corrections called for by ENGINEER on previous submittals. 6.18 Continuing the Work A. CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as permitted by paragraph 15.04 or as OWNER and CONTRACTOR may otherwise agree in writing. 6.19 CONTRACTOR's General Warranty and Guarantee A. CONTRACTOR warrants and guarantees to OWNER, ENGINEER, and ENGINEER's Consultants that all Work will be in accordance with the Contract Documents and will not be defective. CONTRACTOR's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than CONTRACTOR, Subcontractors, Suppliers, or any other individual or entity for whom CONTRACTOR is responsible; or 2. normal wear and tear under normal usage. 00700 - General Conditions REV 5-10-13 00700 - 25 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc B. CONTRACTOR's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of CONTRACTOR's obligation to perform the Work in accordance with the Contract Documents: 1. observations by ENGINEER; 2. recommendation by ENGINEER or payment by OWNER of any progress or final payment; 3. the issuance of a certificate of Sub- stantial Completion by ENGINEER or any payment related thereto by OWNER; 4. use or occupancy of the Work or any part thereof by OWNER; 5. any acceptance by OWNER or any failure to do so; 6. any review and approval of a Shop Drawing or Sample submittal or the issuance of a notice of acceptability by ENGINEER; 7. any inspection, test, or approval by others; or 8. any correction of defective Work by OWNER. 6.20 Indemnification A. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultants, and the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to the performance of the Work, provided that any such claim, cost, loss, or damage: 1. is attributable to bodily injury, sickness, disease, or death, or to injury to or destruction of tangible property (other than the Work itself), including the loss of use resulting therefrom; and 2. is caused in whole or in part by any negligent act or omission of CONTRACTOR, any Subcontractor, . any Supplier, or any individual or entity directly or indirectly employed by any of them to perform any of the Work or anyone for whose acts any of them may be liable, regardless of whether or not caused in part by any negligence or omission of an individual or entity indemnified hereunder or whether liability is imposed upon such indemni- fied party by Laws and Regulations regardless of the negligence of any such individual or entity. B. In any and all claims against OWNER or ENGINEER or any of their respective consultants, agents, officers, directors, partners, or employees by any employee (or the survivor or personal representative of such employee) of CONTRACTOR, any Subcontractor, any Supplier, or any individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, the indemnification obligation under paragraph 6.20.A shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for CONTRACTOR or any such Subcontractor, Supplier, or other individual or entity under workers' compen- sation acts, disability benefit acts, or other employee benefit acts. C. The indemnification obligations of CON- TRACTOR under paragraph 6.20.A shall not extend to the liability of ENGINEER and ENGINEER's Consultants or to the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them arising out of: 1. the preparation or approval of, or the failure to prepare or approve, maps, Drawings, opinions, reports, surveys, Change Orders, designs, or Specifications; or 2. giving directions or instructions, or failing to give them, if that is the primary cause of the injury or damage. ARTICLE 7 - OTHER WORK 7.01 Related Work at Site A. OWNER may perform other work related to the Project at the Site by OWNER's employees, or let other direct contracts therefor, or have other work 00700 - General Conditions REV 5-10-13 00700 - 26 F:\Public Works \ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids \Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc performed by utility owners. If such other work is not noted in the Contract Documents, then: 1. written notice thereof will be given to CONTRACTOR prior to starting any such other work; and 2. if OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times that should be allowed as a result of such other work, a Claim may be made therefor as provided in paragraph 10.05. B. CONTRACTOR shall afford each other contractor who is a party to such a direct contract and each utility owner (and OWNER, if OWNER is per- forming the other work with OWNER's employees) proper and safe access to the Site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, CONTRACTOR shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. CONTRACTOR shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only cut or alter their work with the written consent of ENGINEER and the others whose work will be affected. The duties and responsibilities of CONTRACTOR under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of CONTRACTOR in said direct contracts between OWNER and such utility owners and other contractors. C. If the proper execution or results of any part of CONTRACTOR's Work depends upon work per- formed by others under this Article 7, CONTRACTOR shall inspect such other work and promptly report to ENGINEER in writing any delays, defects, or deficien- cies in such other work that render it unavailable or unsuitable for the proper execution and results of CONTRACTOR's Work. CONTRACTOR's failure to so report will constitute an acceptance of such other work as fit and proper for integration with CONTRACTOR's Work except for latent defects and deficiencies in such other work. 7.02 Coordination A. If OWNER intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, OWNER shall have sole authority and responsibility for such coordination. ARTICLE 8 - OWNER'S RESPONSIBILITIES 8.01 Communications to Contractor A. Except as otherwise provided in these General Conditions, OWNER shall issue all communi- cations to CONTRACTOR through ENGINEER. 8.02 Replacement of ENGINEER A. In case of termination of the employment of ENGINEER, OWNER shall appoint an engineer to whom CONTRACTOR makes no reasonable objection, whose status under the Contract Documents shall be that of the former ENGINEER. 8.03 Furnish Data A. OWNER shall promptly furnish the data required of OWNER under the Contract Documents. 8.04 Pay Promptly When Due A. OWNER shall make payments to CONTRAC- TOR promptly when they are due as provided in paragraphs 14.02.0 and 14.07.C. 8.05 Lands and Easements; Reports and Tests A. OWNER's duties in respect of providing lands and easements and providing engineering surveys to establish reference points are set forth in paragraphs 00700 - General Conditions REV 5-10-13 00700 - 27 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc • 4.01 and 4.05. Paragraph 4.02 refers to OWNER's identifying and making available to CONTRACTOR copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by ENGINEER in preparing the Contract Documents. 8.06 Insurance A. OWNER's responsibilities, if any, in respect to purchasing and maintaining liability and property insur- ance are set forth in Article 5. 8.07 Change Orders A. OWNER is obligated to execute Change Orders as indicated in paragraph 10.03. 8.08 Inspections, Tests, and Approvals A. OWNER's responsibility in respect to certain inspections, tests, and approvals is set forth in paragraph 13.03.B. 8.09 Limitations on OWNER's Responsibilities A. The OWNER shall not supervise, direct, or have control or authority over, nor be responsible for, CONTRACTOR's means, methods, techniques, se- quences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the performance of the Work. OWNER will not be responsible for CONTRACTOR's failure to perform the Work in accordance with the Contract Documents. 8.10 Undisclosed Hazardous Environmental Condition A. OWNER's responsibility in respect to an undisclosed Hazardous Environmental Condition is set forth in paragraph 4.06. 8.11 Evidence of Financial Arrangements A. If and to the extent OWNER has agreed to furnish CONTRACTOR reasonable evidence that financial arrangements have been made to satisfy OWNER's obligations under the Contract Documents, OWNER's responsibility in respect thereof will be as set forth in the Supplementary Conditions. ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION 9.01 OWNER'S Representative A. ENGINEER will be OWNER's representative during the construction period. The duties and responsibilities and the limitations of authority of ENGINEER as OWNER's representative during construction are set forth in the Contract Documents and will not be changed without written consent of OWNER and ENGINEER. 9.02 Visits to Site A. ENGINEER will make visits to the Site at intervals appropriate to the various stages of construc- tion as ENGINEER deems necessary in order to observe as an experienced and qualified design professional the progress that has been made and the quality of the various aspects of CONTRACTOR's executed Work. Based on information obtained during such visits and observations, ENGINEER, for the benefit of OWNER, will determine, in general, if the Work is proceeding in accordance with the Con- tract Documents. ENGINEER will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. ENGINEER's efforts will be directed toward providing for OWNER a greater degree of confidence that the completed Work will conform generally to the Contract Documents. On the basis of such visits and observations, ENGINEER will keep OWNER informed of the progress of the Work and will endeavor to guard OWNER against defective Work. B. ENGINEER's visits and observations are subject to all the limitations on ENGINEER's authority and responsibility set forth in paragraph 9.10, and particularly, but without limitation, during or as a result of ENGINEER's visits or observations of CONTRACTOR's Work ENGINEER will not supervise, direct, control, or have authority over or be responsible for CONTRACTOR's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the performance of the Work. 9.03 Project Representative A. If OWNER and ENGINEER agree, ENGI- NEER will furnish a Resident Project Representative to assist ENGINEER in providing more extensive observation of the Work. The responsibilities and 00700 - General Conditions REV 5-10-13 00700 - 28 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents \00700 - General Conditions REV 5-10-13.doc authority and limitations thereon of any such Resident Project Representative and assistants will be as provided in paragraph 9.10 and in the Supplementary Conditions. If OWNER designates another represen- tative or agent to represent OWNER at the Site who is not ENGINEER's Consultant, agent or employee, the responsibilities and authority and limitations thereon of such other individual or entity will be as provided in the Supplementary Conditions. 9.04 Clarifications and Interpretations A. ENGINEER will issue with reasonable promptness such written clarifications or interpreta- tions of the requirements of the Contract Documents as ENGINEER may determine necessary, which shall be consistent with the intent of and reasonably inferable from the Contract Documents. Such written clarifications and interpretations will be binding on OWNER and CONTRACTOR. If OWNER and CON- TRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, that should be allowed as a result of a written clarification or interpretation, a Claim may be made therefor as provided in paragraph 10.05. 9.05 Authorized Variations in Work A. ENGINEER may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Times and are compati- ble with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on OWNER and also on CONTRACTOR, who shall perform the Work involved promptly. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, as a result of a Field Order, a Claim may be made therefor as provided in paragraph 10.05. 9.06 Rejecting Defective Work A. ENGINEER will have authority to disapprove or reject Work which ENGINEER believes to be defective, or that ENGINEER believes will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. ENGINEER will also have authority to require special inspection or testing of the Work as provided in paragraph 13.04, whether or not the Work is fabricated, installed, or completed. 9.07 Shop Drawings, Change Orders and Payments A. In connection with ENGINEER's authority as to Shop Drawings and Samples, see paragraph 6.17. B. In connection with ENGINEER's authority as to Change Orders, see Articles 10, 11, and 12. C. In connection with ENGINEER's authority as to Applications for Payment, see Article 14. 9.08 Determinations for Unit Price Work A. ENGINEER will determine the actual quanti- ties and classifications of Unit Price Work performed by CONTRACTOR. ENGINEER will review with CONTRACTOR the ENGINEER's preliminary determinations on such matters before rendering a written decision thereon (by recommendation of an Application for Payment or otherwise). ENGINEER's written decision thereon will be final and binding (except as modified by ENGINEER to reflect changed factual conditions or more accurate data) upon OWNER and CONTRACTOR, subject to the provisions of paragraph 10.05. 9.09 Decisions on Requirements of Contract Documents and Acceptability of Work A. ENGINEER will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. Claims, disputes and other matters relating to the acceptability of the Work, the quantities and classifications of Unit Price Work, the interpretation of the requirements of the Contract Documents pertaining to the performance of the Work, and Claims seeking changes in the Contract Price or Contract Times will be referred initially to ENGINEER in writing, in accordance with the provisions of paragraph 10.05, with a request for a formal decision. B. When functioning as interpreter and judge under this paragraph 9.09, ENGINEER will not show partiality to OWNER or CONTRACTOR and will not be liable in connection with any interpretation or decision rendered in good faith in such capacity. The rendering of a decision by ENGINEER pursuant to this paragraph 9.09 with respect to any such Claim, dispute, or other matter (except any which have been waived by the making or acceptance of final payment as provided in paragraph 14.07) will be a condition precedent to any exercise by OWNER or 00700 - General Conditions REV 5-10-13 00700 - 29 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc CONTRACTOR of such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any such Claim, dispute, or other matter. 9.10 Limitations on ENGINEER's Authority and Responsibilities A. Neither ENGINEER's authority or respon- sibility under this Article 9 or under any other provision of the Contract Documents nor any decision made by ENGINEER in good faith either to exercise or not exercise such authority or responsibility or the undertaking, exercise, or performance of any authority or responsibility by ENGINEER shall create, impose, or give rise to any duty in contract, tort, or otherwise owed by ENGINEER to CONTRACTOR, any Subcon- tractor, any Supplier, any other individual or entity, or to any surety for or employee or agent of any of them. B. ENGINEER will not supervise, direct, control, or have authority over or be responsible for CONTRACTOR's means, methods, techniques, se- quences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the performance of the Work. ENGINEER will not be responsible for CONTRACTOR's failure to perform the Work in accordance with the Contract Documents. C. ENGINEER will not be responsible for the acts or omissions of CONTRACTOR or of any Subcontractor, any Supplier, or of any other individual or entity performing any of the Work. D. ENGINEER's review of the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, Bonds, certificates of inspection, tests and approvals, and other documentation required to be delivered by paragraph 14.07.A will only be to determine generally that their content complies with the requirements of, and in the case of certificates of inspections, tests, and approvals that the results certified indicate compliance with, the Contract Documents. E. The limitations upon authority and responsibil- ity set forth in this paragraph 9.10 shall also apply to ENGINEER's Consultants, Resident Project Repre- sentative, and assistants. ARTICLE 10 - CHANGES IN THE WORK; CLAIMS 10.01 Authorized Changes in the Work A. Without invalidating the Agreement and without notice to any surety, OWNER may, at any time or from time to time, order additions, deletions, or revisions in the Work by a Written Amendment, a Change Order, or a Work Change Directive. Upon receipt of any such document, CONTRACTOR shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). B. If OWNER and CONTRACTOR are unable to agree on entitlement to, or on the amount or extent, if any, of an adjustment in the Contract Price or Contract Times, or both, that should be allowed as a result of a Work Change Directive, a Claim may be made therefor as provided in paragraph 10.05. 10.02 Unauthorized Changes in the Work A. CONTRACTOR shall not be entitled to an increase in the Contract Price or an extension of the Contract Times with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in paragraph 3.04, except in the case of an emergency as provided in paragraph 6.16 or in the case of uncovering Work as provided in paragraph 13.04.B. 10.03 Execution of Change Orders A. OWNER and CONTRACTOR shall execute appropriate Change Orders recommended by ENGI- NEER (or Written Amendments) covering: 1. changes in the Work which are: (i) ordered by OWNER pursuant to paragraph 10.01.A, (ii) required because of acceptance of defective Work under paragraph 13.08.A or OWNER's correction of defective Work under paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Times which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed in accordance with a Work Change Directive; and 3. changes in the Contract Price or Contract Times which embody the substance of any written decision rendered by ENGINEER 00700 - General Conditions REV 5-10-13 00700 - 30 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc pursuant to paragraph 10.05; provided that, in lieu of executing any such Change Order, an appeal may be taken from any such decision in accordance with the provisions of the Contract Documents and applicable Laws and Regula- tions, but during any such appeal, CONTRACTOR shall carry on the Work and adhere to the progress schedule as provided in paragraph 6.18.A. 10.04 Notification to Surety A. If notice of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Times) is required by the provisions of any Bond to be given to a surety, the giving of any such notice will be CONTRACTOR's responsibility. The amount of each applicable Bond will be adjusted to reflect the effect of any such change. 10.05 Claims and Disputes A. Notice: Written notice stating the general nature of each Claim, dispute, or other matter shall be delivered by the claimant to ENGINEER and the other party to the Contract promptly (but in no event later than 30 days) after the start of the event giving rise thereto. Notice of the amount or extent of the Claim, dispute, or other matter with supporting data shall be delivered to the ENGINEER and the other party to the Contract within 60 days after the start of such event (unless ENGINEER allows additional time for claimant to submit additional or more accurate data in support of such Claim, dispute, or other matter). A Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of paragraph 12.01.B. A Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of paragraph 12.02.B. Each Claim shall be accom- panied by claimant's written statement that the adjust- ment claimed is the entire adjustment to which the claimant believes it is entitled as a result of said event. The opposing party shall submit any response to ENGINEER and the claimant within 30 days after receipt of the claimant's last submittal (unless ENGINEER allows additional time). B. ENG/NEER's Decision: ENGINEER will render a formal decision in writing within 30 days after receipt of the last submittal of the claimant or the last submittal of the opposing party, if any. ENGINEER's written decision on such Claim, dispute, or other matter will be final and binding upon OWNER and CONTRACTOR unless: 1. an appeal from ENGINEER's decision is taken within the time limits and in accordance with the dispute resolution procedures set forth in Article 16; or 2. if no such dispute resolution procedures have been set forth in Article 16, a written notice of intention to appeal from ENGINEER's written decision is delivered by OWNER or CONTRACTOR to the other and to ENGINEER within 30 days after the date of such decision, and a formal proceeding is instituted by the appealing party in a forum of competent jurisdiction within 60 days after the date of such decision or within 60 days after Substantial Completion, whichever is later (unless otherwise agreed in writing by OWNER and CONTRACTOR), to exercise such rights or remedies as the appealing party may have with respect to such Claim, dispute, or other matter in accordance with applicable Laws and Regulations. 00700 - General Conditions REV 5-10-13 00700 - 31 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc C. If ENGINEER does not render a formal decision in writing within the time stated in paragraph 10.05.B, a decision denying the Claim in its entirety shall be deemed to have been issued 31 days after receipt of the last submittal of the claimant or the last submittal of the opposing party, if any. D. No Claim for an adjustment in Contract Price or Contract Times (or Milestones) will be valid if not submitted in accordance with this paragraph 10.05. ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK 11.01 Cost of the Work A. Costs Included: The term Cost of the Work means the sum of all costs necessarily incurred and paid by CONTRACTOR in the proper performance of the Work. When the value of any Work covered by a Change Order or when a Claim for an adjustment in Contract Price is determined on the basis of Cost of the Work, the costs to be reimbursed to CONTRACTOR will be only those additional or incremental costs required because of the change in the Work or because of the event giving rise to the Claim. Except as otherwise may be agreed to in writing by OWNER, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items, and shall not include any of the costs itemized in para- graph 11.01.B. 1. Payroll costs for cmployccs in the direct employ of CONTRACTOR in thc perfor mance of the Work under schedules of job -- -:e -- e . , , CONTRACTOR. Such cmployccs shall include without limitation superintendents, foremen, Site. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. salaries and wages plus thc cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, the extent authorized by OWNER. 2. Cost of all materials and equipment furnished and incorporated in the Work, includ- ing costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. All cash discounts shall accrue to CONTRACTOR unless OWNER deposits funds with CONTRACTOR with which to make payments, in which case the cash discounts shall accrue to OWNER. All trade discounts, rebates and refunds and returns from sale of surplus materials and equipment shall accrue to OWNER, and CONTRACTOR shall make provisions so that they may be obtained. 3. Payments made by CONTRACTOR to Subcontractors for Work performed by Subcontractors. If required by OWNER, CON- TRACTOR shall obtain competitive bids from subcontractors acceptable to OWNER and CONTRACTOR and shall deliver such bids to OWNER, who will then determine, with the advice of ENGINEER, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as CONTRACTOR's Cost of the Work and fee as provided in this para- graph 11.01. 4. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 5. Supplemental costs including the following: a. The proportion of necessary trans- portation, travel, and subsistence expenses of CONTRACTOR's employees incurred in dis- charge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equip- ment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not con- sumed which remain the property of CON- TRACTOR. 00700 - General Conditions REV 5-10-13 00700 - 32 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc c. Rentals of all construction equip- ment and machinery, and the parts thereof whether rented from CONTRACTOR or others in accordance with rental agreements approved by OWNER with the advice of ENGINEER, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. d. Sales, consumer, use, and other similar taxes related to the Work, and for which CONTRACTOR is liable, imposed by Laws and Regulations. e . Deposits lost for causes other than negligence of CONTRACTOR, any Sub- contractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. f. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sus- tained by CONTRACTOR in connection with the performance of the Work (except losses and damages within the deductible amounts of property insurance established in accordance with paragraph 5.06.D), provided such losses and damages have resulted from causes other than the negligence of CONTRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of OWNER. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining CONTRACTOR's fee. g. The cost of utilities, fuel, and sanitary facilities at the Site. h. Minor expenses such as telegrams, long distance telephone calls, telephone service at the Site, expressage, and similar petty cash items in connection with the Work. i. When the Cost of the Work is used to determine the value of a Change Order or of a Claim, the cost of premiums for additional Bonds and insurance required because of the changes in the Work or caused by the event giving rise to the Claim. j. When all the Work is performed on the basis of cost-plus, the costs of premiums for all Bonds and insurance CONTRACTOR is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of CONTRACTOR's officers, executives, princi- pals (of partnerships and sole proprietorships), general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by CONTRACTOR, whether at the Site or in CONTRACTOR's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in paragraph 11.01.A.1 or specifically covered by paragraph 11.01.A.4, all of which are to be considered administrative costs covered by the CONTRACTOR's fee. 2. Expenses of CONTRACTOR's princi- pal and branch offices other than CONTRACTOR's office at the Site. 3. Any part of CONTRACTOR's capital expenses, including interest on CONTRACTOR's capital employed for the Work and charges against CONTRACTOR for delinquent payments. 4. Costs due to the negligence of CON- TRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind and the costs of any item not specifically and expressly included in paragraphs 11.01.A and 11.01.B. C. CONTRACTOR's Fee: When all the Work is performed on the basis of cost-plus, CONTRACTOR's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change 00700 - General Conditions REV 5-10-13 00700 - 33 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc Order or when a Claim for an adjustment in Contract Price is determined on the basis of Cost of the Work, CONTRACTOR's fee shall be determined as set forth in paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to paragraphs 11.01.A and 11.01.B, CONTRACTOR will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to ENGINEER an itemized cost breakdown together with supporting data. 11.02 Cash Allowances A. It is understood that CONTRACTOR has in- cluded in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums as may be acceptable to OWNER and ENGINEER. CONTRACTOR agrees that: 1. the allowances include the cost to CONTRACTOR (less any applicable trade discounts) of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and 2. CONTRACTOR's costs for unloading and handling on the Site, labor, installation costs, overhead, profit, and other expenses contemplated for the allowances have been included in the Contract Price and not in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. B. Prior to final payment, an appropriate Change Order will be issued as recommended by ENGINEER to reflect actual amounts due CONTRACTOR on account of Work covered by allowances, and the Con- tract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. The estimated quantities of items of Unit Price Work are not guaran- teed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Deter- minations of the actual quantities and classifications of Unit Price Work performed by CONTRACTOR will be made by ENGINEER subject to the provisions of paragraph 9.08. B. Each unit price will be deemed to include an amount considered by CONTRACTOR to be ade- quate to cover CONTRACTOR's overhead and profit for each separately identified item. C. OWNER or CONTRACTOR may make a Claim for an adjustment in the Contract Price in accor- dance with paragraph 10.05 if: 1. the quantity of any item of Unit Price Work performed by CONTRACTOR differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect any other item of Work; and 3. if CONTRACTOR believes that CONTRACTOR is entitled to an increase in Contract Price as a result of having incurred additional expense or OWNER believes that OWNER is entitled to a decrease in Contract Price and the parties are unable to agree as to the amount of any such increase or decrease. ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order or by a Written Amendment. Any Claim for an adjustment in the Contract Price shall be based on written notice submitted by the party making the Claim to the ENGINEER and the other party to the Contract in accordance with the provisions of para- graph 10.05. B. The value of any Work covered by a Change Order or of any Claim for an adjustment in the Contract Price will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of paragraph 11.03 ); or 2. where the Work involved is not cov- ered by unit prices contained in the Contract 00700 - General Conditions REV 5-10-13 00700 - 34 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc Documents, by a mutually agreed lump sum (which may include an allowance for overhead and profit not necessarily in accordance with paragraph 12.01.C.2); or 3. where the Work involved is not cov- ered by unit prices contained in the Contract Documents and agreement to a lump sum is not reached under paragraph 12.01.6.2, on the basis of the Cost of the Work (determined as provided in paragraph 11.01) plus a CONTRACTOR's fee for overhead and profit (determined as provided in paragraph 12.01.C). C. CONTRACTOR's Fee: The CONTRACTOR's fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under para- graphs 11.01.A.1 and 11.01.A.2, the CONTRACTOR's fee shall be 15 percent; b. for costs incurred under paragraph 11.01.A.3, the CONTRACTOR's fee shall be five percent; c. where one or more tiers of subcon- tracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of paragraph 12.01.C.2.a is that the Subcontractor who actually performs the Work, at whatever tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under paragraphs 11.01.A.1 and 11.01.A.2 and that any higher tier Subcontractor and CONTRACTOR will each be paid a fee of five percent of the amount paid to the next lower tier Subcon- tractor; d. no fee shall be payable on the basis of costs itemized under paragraphs 11.01.A.4, 11.01.A.5, and 11.01.6; e. the amount of credit to be allowed by CONTRACTOR to OWNER for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in CONTRACTOR's fee by an amount equal to five percent of such net decrease; and f. when both additions and credits are involved in any one change, the adjustment in CONTRACTOR's fee shall be computed on the basis of the net change in accordance with paragraphs 12.01.C.2.a through 12.01.C.2.e, inclusive. 12.02 Change of Contract Times A. The Contract Times (or Milestones) may only be changed by a Change Order or by a Written Amendment. Any Claim for an adjustment in the Contract Times (or Milestones) shall be based on written notice submitted by the party making the claim to the ENGINEER and the other party to the Contract in accordance with the provisions of paragraph 10.05. B. Any adjustment of the Contract Times (or Milestones) covered by a Change Order or of any Claim for an adjustment in the Contract Times (or Milestones) will be determined in accordance with the provisions of this Article 12. 12.03 Delays Beyond CONTRACTOR's Control A. Where CONTRACTOR is prevented from completing any part of the Work within the Contract Times (or Milestones) due to delay beyond the control of CONTRACTOR, the Contract Times (or Milestones) will be extended in an amount equal to the time lost due to such delay if a Claim is made therefor as provided in paragraph 12.02.A. Delays beyond the control of CONTRACTOR shall include, but not be limited to, acts or neglect by OWNER, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. 12.04 Delays Within CONTRACTOR's Control A. The Contract Times (or Milestones) will not be extended due to delays within the control of CONTRACTOR. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of CONTRAC- TOR. 12.05 Delays Beyond OWNER's and CONTRACTOR's Control A. Where CONTRACTOR is prevented from completing any part of the Work within the Contract Times (or Milestones) due to delay beyond the control of both OWNER and CONTRACTOR, an extension of the Contract Times (or Milestones) in an amount 00700 - General Conditions REV 5-10-13 00700 - 35 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc equal to the time lost due to such delay shall be CONTRACTOR's sole and exclusive remedy for such delay. 12.06 Delay Damages A. In no event shall OWNER or ENGINEER be liable to CONTRACTOR, any Subcontractor, any Supplier, or any other person or organization, or to any surety for or employee or agent of any of them, for damages arising out of or resulting from: 1. delays caused by or within the control of CONTRACTOR; or 2. delays beyond the control of both OWNER and CONTRACTOR including but not limited to fires, floods, epidemics, abnormal weather conditions, acts of God, or acts or neglect by utility owners or other contractors performing other work as contemplated by Article 7. B. Nothing in this paragraph 12.06 bars a change in Contract Price pursuant to this Article 12 to compensate CONTRACTOR due to delay, interference, or disruption directly attributable to actions or inactions of OWNER or anyone for whom OWNER is responsible. ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects A. Prompt notice of all defective Work of which OWNER or ENGINEER has actual knowledge will be given to CONTRACTOR. All defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work A. OWNER, ENGINEER, ENGINEER's Con- sultants, other representatives and personnel of OWNER, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspecting, and testing. CONTRACTOR shall provide them proper and safe conditions for such access and advise them of CONTRACTOR's Site safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. CONTRACTOR shall give ENGINEER timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. - cervices of an independent testing laboratory to 1. for inspections, tests, or approvals below; that costs incurred in connection with the Contract Documents. C. If Laws or Regulations of any public body having jurisdiction require any Work (or part thereof) specifically to be inspected, tested, or approved by an employee or other representative of such public body, CONTRACTOR shall assume full responsibility for arranging and obtaining such inspections, tests, or approvals, pay all costs in connection therewith, and furnish ENGINEER the required certificates of inspec- tion or approval. D. CONTRACTOR shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, or approvals required for OWNER's and ENGINEER's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to CONTRACTOR's purchase thereof for incorporation in the Work. Such inspections, tests, or approvals shall be performed by organizations acceptable to OWNER and ENGINEER. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by CON- TRACTOR without written concurrence of ENGI- NEER, it must, if requested by ENGINEER, be uncov- ered for observation. F. Uncovering Work as provided in paragraph 13.03.E shall be at CONTRACTOR's expense unless CONTRACTOR has given ENGINEER timely notice 00700 - General Conditions REV 5-10-13 00700 - 36 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc of CONTRACTOR's intention to cover the same and ENGINEER has not acted with reasonable prompt- ness in response to such notice. 13.04 Uncovering Work A. If any Work is covered contrary to the written request of ENGINEER, it must, if requested by ENGI- NEER, be uncovered for ENGINEER's observation and replaced at CONTRACTOR's expense. B. If ENGINEER considers it necessary or advisable that covered Work be observed by ENGI- NEER or inspected or tested by others, CONTRAC- TOR, at ENGINEER's request, shall uncover, expose, or otherwise make available for observation, inspec- tion, or testing as ENGINEER may require, that portion of the Work in question, furnishing all neces- sary labor, material, and equipment. If it is found that such Work is defective, CONTRACTOR shall pay all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observa- tion, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); and OWNER shall be entitled to an appropriate decrease in the Contract Price. If the parties are unable to agree as to the amount thereof, OWNER may make a Claim therefor as provided in paragraph 10.05. If, however, such Work is not found to be defective, CONTRACTOR shall be allowed an increase in the Contract Price or an extension of the Contract Times (or Milestones), or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. If the parties are unable to agree as to the amount or extent thereof, CONTRACTOR may make a Claim therefor as provided in paragraph 10.05. 13.05 OWNER May Stop the Work A. If the Work is defective, or CONTRACTOR exercise this right for thc benefit of CONTRACTOR, any of them. 13.06 Correction or Removal of Defective Work A. CONTRACTOR shall correct all defective Work, whether or not fabricated, installed, or completed, or, if the Work has been rejected by ENGI- NEER, remove it from the Project and replace it with Work that is not defective. CONTRACTOR shall pay all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). 13.07 Correction Period any applicable special guarantee required by the defective, CONTRACTOR shall promptly, without cost (ii) correct such defective Work or, if thc dcfcctivo the Project and replace it with Work that is not remove and replace any damage to other Work, to the from. If CONTRACTOR does not promptly comply with the terms of such instructions, or in an emergency where delay would cause serious risk of loss or damage, OWNER may have the defective Work corrected or repaired or may have the rejected Work removed and replaced, and all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by CONTRACTOR. 00700 - General Conditions REV 5-10-13 00700-37 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this paragraph 13.07, the correction period hereunder with respect to such Work will be extended for an additional period of one year after such correction or removal and replacement has been satisfactorily completed. D. CONTRACTOR's obligations under this paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this paragraph 13.07 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work A. If, instead of requiring correction or removal and replacement of defective Work, OWNER (and, prior to ENGINEER's recommendation of final pay- ment, ENGINEER) prefers to accept it, OWNER may do so. CONTRACTOR shall pay all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) attributable to OWNER's evaluation of and determination to accept such defective Work (such costs to be approved by ENGINEER as to reasonableness) and the diminished value of the Work to the extent not otherwise paid by CONTRACTOR pursuant to this sentence. If any such acceptance occurs prior to ENGINEER's recom- mendation of final payment, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and OWNER shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. If the parties are unable to agree as to the amount thereof, OWNER may make a Claim therefor as provided in paragraph 10.05. If the acceptance occurs after such recommendation, an appropriate amount will be paid by CONTRACTOR to OWNER. 13.09 OWNER May Correct Defective Work A. If CONTRACTOR fails within a reasonable time after written notice from ENGINEER to correct defective Work or to remove and replace rejected Work as required by ENGINEER in accordance with paragraph 13.06.A, or if CONTRACTOR fails to perform the Work in accordance with the Contract Documents, or if CONTRACTOR fails to comply with any other provision of the Contract Documents, OWNER may, after seven days written notice to CONTRACTOR, correct and remedy any such deficiency. B. In exercising the rights and remedies under this paragraph, OWNER shall proceed expeditiously. In connection with such corrective and remedial action, OWNER may exclude CONTRACTOR from all or part of the Site, take possession of all or part of the Work and suspend CONTRACTOR's services related thereto, take possession of CONTRACTOR's tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for which OWNER has paid CONTRACTOR but which are stored elsewhere. CONTRACTOR shall allow OWNER, OWNER's representatives, agents and employees, OWNER's other contractors, and ENGINEER and ENGINEER's Consultants access to the Site to enable OWNER to exercise the rights and remedies under this paragraph. C. All Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred or sustained by OWNER in exercising the rights and remedies under this paragraph 13.09 will be charged against CON- TRACTOR, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and OWNER shall be entitled to an appropriate decrease in the Contract Price. If the parties are unable to agree as to the amount of the adjustment, OWNER may make a Claim therefor as provided in paragraph 10.05. Such claims, costs, losses and damages will include but not be limited to all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of CONTRACTOR's defective Work. D. CONTRACTOR shall not be allowed an extension of the Contract Times (or Milestones) because of any delay in the performance of the Work attributable to the exercise by OWNER of OWNER's rights and remedies under this paragraph 13.09. 00700 - General Conditions REV 5-10-13 00700 - 38 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values A. The schedule of values established as provid- ed in paragraph 2.07.A will serve as the basis for progress payments and will be incorporated into a form of Application for Payrnent acceptable to ENGI- NEER. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments 1. At least 20 days before the date established for each progress payment (but not more often than once a month), CONTRACTOR shall submit to ENGINEER for review an Application for Payment filled out and signed by CONTRACTOR covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payrnent shall also be accompanied by a bill of sale, invoice, or other documentation warranting that OWNER has received the materials and equip- ment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect OWNER's interest therein, all of which must be satisfactory to OWNER. 2. Beginning with the second Application for Payment, each Application shall include an affidavit of CONTRACTOR stating that all previous progress payments received on account of the Work have been applied on account to discharge CONTRACTOR's legitimate obligations associated with prior Applications for Payment. 3. The amount of retainage with respect to progress payments will be as stipulated in the Agreement. B. Review of Applications 1. ENGINEER will, within 10 days after receipt of each Application for Payment, either indicate in writing a recommendation of payment and present the Application to OWNER or return the Application to CONTRACTOR indicating in writing ENGINEER's reasons for refusing to recommend payment. In the latter case, CON- TRACTOR may make the necessary corrections and resubmit the Application. 2. ENGINEER's recommendation of any payment requested in an Application for Payment will constitute a representation by ENGINEER to OWNER, based on ENGINEER's observations on the Site of the executed Work as an experienced and qualified design professional and on ENGINEER's review of the Application for Payment and the accompanying data and schedules, that to the best of ENGINEER's knowledge, information and belief: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents, to a final determination of quantities and classifications for Unit Price Work under paragraph 9.08, and to any other qualifications stated in the recommendation); and c. The conditions precedent to CONTRACTOR's being entitled to such payment appear to have been fulfilled in so far as it is ENGINEER's responsibility to observe the Work. 3. By recommending any such payment ENGINEER will not thereby be deemed to have represented that: (i) inspec- tions made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsi- bilities specifically assigned to ENGINEER in the Contract Documents; or (ii) that there may not be other matters or issues between the 00700 - General Conditions REV 5-10-13 00700 - 39 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc parties that might entitle CONTRACTOR to be paid additionally by OWNER or entitle OWNER to withhold payment to CONTRACTOR. 4. Neither ENGINEER's review of CONTRACTOR's Work for the purposes of recommending payments nor ENGINEER's recommendation of any payment, including final payment, will impose responsibility on ENGINEER to supervise, direct, or control the Work or for the means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for CONTRACTOR's failure to comply with Laws and Regulations applicable to CONTRACTOR's performance of the Work. Additionally, said review or recommendation will not impose responsibility on ENGINEER to make any examination to ascertain how or for what purposes CONTRACTOR has used the moneys paid on account of the Contract Price, or to determine that title to any of the Work, materials, or equipment has passed to OWNER free and clear of any Liens. 5. ENGINEER may refuse to recom- mend the whole or any part of any payment if, in ENGINEER's opinion, it would be incorrect to make the representations to OWNER referred to in paragraph 14.02.B.2. ENGINEER may also refuse to recommend any such payment or, because of subsequently discovered evidence or the results of subsequent inspections or tests, revise or revoke any such payment recommendation previously made, to such extent as may be necessary in ENGINEER's opinion to protect OWNER from loss because: a. the Work is defective, or completed Work has been damaged, requiring correction or replacement; b. the Contract Price has been reduced by Written Amendment or Change Orders; c. OWNER has been required to correct defective Work or complete Work in accor- dance with paragraph 13.09; or the occurrence of any of the events cnumcr atcd in paragraph 15.02.A. C. Payment Becomes Due 1. Tcn days after presentation of the Application for Payment to OWNER with ENGINEER's recommendation, the amount recommended will (subject to the provisions of paragraph 14.02.D) become due, and when D. Reduction in Payment 1. OWNER may refuse to make payment of the full amount recommended by ENGINEER because: a. claims have been made against OWNER on account of CONTRACTOR's performance or furnishing of the Work; b. Liens have been filed in connection with the Work, except where CONTRACTOR has delivered a specific Bond satisfactory to OWNER to secure the satisfaction and discharge of such Liens; c. there are other items entitling OWN- ER to a set-off against the amount recommended; or d. OWNER has actual knowledge of the occurrence of any of the events enumerated in paragraphs 14.02.B.5.a through 14.02.B.5.c or paragraph 15.02.A. 2. If OWNER refuses to make payment of the full amount recommended by ENGINEER, OWNER must give CONTRACTOR immediate written notice (with a copy to ENGINEER) stating the reasons for such action and promptly pay CONTRACTOR any amount remaining after deduction of the amount so withheld. OWNER shall promptly pay CONTRACTOR the amount so withheld, or ahy adjustment thereto agreed to by OWNER and CONTRACTOR, when CONTRACTOR corrects to OWNER's satisfaction the reasons for such action. 3. If it is subsequently determined that OWNER's refusal of payment was not justified, the amount wrongfully withheld shall be treated as an amount due as determined by paragraph 14.02.C.1. 14.03 CONTRACTOR's Warranty of Title A. CONTRACTOR warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated 00700 - General Conditions REV 5-10-13 00700 - 40 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc in the Project or not, will pass to OWNER no later than the time of payment free and clear of all Liens. 14.04 Substantial Completion A. When CONTRACTOR considers the entire Work ready for its intended use CONTRACTOR shall notify OWNER and ENGINEER in writing that the entire Work is substantially complete (except for items specifically listed by CONTRACTOR as incomplete) and request that ENGINEER issue a certificate of Substantial Completion. Promptly thereafter, OWNER, CONTRACTOR, and ENGINEER shall make an inspection of the Work to determine the status of completion. If ENGINEER does not consider the Work substantially complete, ENGINEER will notify CONTRACTOR in writing giving the reasons therefore. If ENGINEER considers the Work substantially complete, ENGINEER will prepare and deliver to OWNER a tentative certificate of Substantial Completion which shall fix the date of Substantial before final payment. OWNER shall have seven days that the Work is not substantially complete, ENGINEER will within 11 days after cubmiscion of the - e . , e in writing, stating the reasons therefor. If, after consideration of OWNER's objections, ENGINEER considers the Work substantially complete, ENGINEER will within said 11 days execute and certificate of Substantial Completion (with a revised tentative list of items to be completed or corrected) any objections from OWNER. At the time of delivery of the tentative certificate of Substantial Completion ENGINEER will deliver to OWNER and CONTRAC responsibilities pending final payment between OWNER and CONTRACTOR with respect to security, operation, safety, and protection of the Work, and guarantees. a, ar Unlcsc OWNER and inform ENGINEER in writing prior to ENGINEER'S binding on OWNER and CONTRACTOR until final payment B. OWNER shall have the right to exclude CONTRACTOR from the Site after the date of Substantial Completion, but OWNER shall allow CON- TRACTOR reasonable access to complete or correct items on the tentative list. 14.05 Partial Utilization A. Use by OWNER at OWNER's option of any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which OWNER, ENGINEER, and CONTRACTOR agree constitutes a separately functioning and usable part of the Work that can be used by OWNER for its intended purpose without significant interference with CONTRACTOR's performance of the remainder of the Work, may be accomplished prior to Substantial Completion of all the Work subject to the following conditions. 1. OWNER at any time may request CONTRACTOR in writing to permit OWNER to use any such part of the Work which OWNER believes to be ready for its intended use and substantially complete. If CONTRACTOR agrees that such part of the Work is substantially complete, CONTRACTOR will certify to OWNER and ENGINEER that such part of the Work is substantially complete and request ENGINEER to issue a certificate of Substantial Completion for that part of the Work. CONTRACTOR at any time may notify OWNER and ENGINEER in writing that CONTRACTOR considers any such part of the Work ready for its intended use and substan- tially complete and request ENGINEER to issue a certificate of Substantial Completion for that part of the Work. Within a reasonable time after either such request, OWNER, CONTRACTOR, and ENGINEER shall make an inspection of that part of the Work to determine its status of completion. If ENGINEER does not consider that part of the Work to be substantially complete, ENGINEER will notify OWNER and CONTRACTOR in writing giving the reasons therefor. If ENGINEER considers that part of the Work to be substantially complete, the provisions of paragraph 14.04 will apply with respect to certification of Substantial Completion of that part of the Work and the division of responsibility in respect thereof and access thereto. 2. No occupancy or separate operation of part of the Work may occur prior to 00700 - General Conditions REV 5-10-13 00700 - 41 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc compliance with the requirements of paragraph 5.10 regarding property insurance. 14.06 Final Inspection A. Upon written notice from CONTRACTOR that the entire Work or an agreed portion thereof is complete, ENGINEER will promptly make a final inspection with OWNER and CONTRACTOR and will notify CONTRACTOR in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. CONTRACTOR shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 14.07 Final Payment A. Application for Payment 1. After CONTRACTOR has, in the opinion of ENGINEER, satisfactorily completed all corrections identified during the final inspection and has delivered, in accordance with the Contract Documents, all maintenance and operating instructions, schedules, guaran- tees, Bonds, certificates or other evidence of insurance certificates of inspection, marked -up record documents (as provided in paragraph 6.12), and other documents, CONTRACTOR may make application for final payment follow- ing the procedure for progress payments. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: (i) all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by subparagraph 5.04.8.7; (ii) consent of the surety, if any, to final payment; and (iii) complete and legally effective releases or waivers (satisfactory to OWNER) of all Lien rights arising out of or Liens filed in connection with the Work. 3. In lieu of the releases or waivers of Liens specified in paragraph 14.07.A.2 and as approved by OWNER, CONTRACTOR may furnish receipts or releases in full and an affidavit of CONTRACTOR that: (i) the releases and receipts include all labor, services, material, and equipment for which a Lien could be filed; and (ii) all payrolls, material and equipment bills, and other indebtedness connected with the Work for which OWNER or OWNER's property might in any way be responsible have been paid or otherwise satis- fied. If any Subcontractor or Supplier fails to furnish such a release or receipt in full, CON- TRACTOR may furnish a Bond or other collateral satisfactory to OWNER to indemnify OWNER against any Lien. B. Review of Application and Acceptance 1. If, on the basis of ENGINEER's observation of the Work during construction and final inspection, and ENGINEER's review of the final Application for Payment and accompanying documentation as required by the Contract Documents, ENGINEER is satisfied that the Work has been completed and CONTRACTOR's other obligations under the Contract Documents have been fulfilled, ENGINEER will, within ten days after receipt of the final Application for Payment, indicate in writing ENGINEER's recommendation of payment and present the Application for Payment to OWNER for payment. At the same time ENGINEER will also give written notice to OWNER and CONTRACTOR that the Work is acceptable subject to the provisions of paragraph 14.09. Otherwise, ENGINEER will retum the Application for Payment to CONTRACTOR, indicating in writing the reasons for refusing to recommend final payment, in which case CONTRACTOR shall make the necessary corrections and resubmit the Application for Payment. C. Payment Becomes Due 1. Thirty days after the presentation to accompanying documentation, the amount and, whcn due, will be paid by OWNER to CONTRACTOR. 14.08 Final Completion Delayed A. If, through no fault of CONTRACTOR, final completion of the Work is significantly delayed, and if ENGINEER so confirms, OWNER shall, upon receipt of CONTRACTOR's final Application for Payment and recommendation of ENGINEER, and without terminat- ing the Agreement, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by OWNER for Work not fully completed or corrected is less than the retainage stipulated in the Agreement, and if Bonds have been furnished as required in paragraph 5.01, the written consent of the surety to the payment of the balance due for that portion of the Work fully completed and accepted shall be submitted 00700 - General Conditions REV 5-10-13 00700 - 42 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc by CONTRACTOR to ENGINEER with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Claims. 14.09 Waiver of Claims A. The making and acceptance of final payment will constitute: 1. a waiver of all Claims by OWNER against CONTRACTOR, except Claims arising from unsettled Liens, from defective Work appearing after final inspection pursuant to paragraph 14.06, from failure to comply with the Contract Documents or the terms of any special guarantees specified therein, or from CONTRACTOR's continuing obligations under the Contract Documents; and 2. a waiver of all Claims by CONTRAC- TOR against OWNER other than those previously made in writing which are still unsettled. ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION 15.01 OWNER May Suspend Work A. At any time and without cause, OWNER may suspend the Work or any portion thereof for a period of not more than 90 consecutive days by notice in writing to CONTRACTOR and ENGINEER which will fix the date on which Work will be resumed. CON- TRACTOR shall resume the Work on the date so fixed. 15.02 OWNER May Terminate for Cause A. The occurrence of any one or more of the following events will justify termination for cause: 1. CONTRACTOR's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment or failure to adhere to the progress schedule established under paragraph 2.07 as adjusted from time to time pursuant to paragraph 6.04); 2. CONTRACTOR's disregard of Laws or Regulations of any public body having jurisdiction; 3. CONTRACTOR's disregard of the authority of ENGINEER; or 4. CONTRACTOR's violation in any substantial way of any provisions of the Contract Documents. B. If one or more of the events identified in paragraph 15.02.A occur, OWNER may, after giving CONTRACTOR (and the surety, if any) seven days written notice, terminate the services of CONTRACTOR, exclude CONTRACTOR from the Site, and take possession of the Work and of all CONTRACTOR's tools, appliances, construction equipment, and machinery at the Site, and use the same to the full extent they could be used by CONTRACTOR (without liability to CONTRACTOR for trespass or conversion), incorporate in the Work all materials and equipment stored at the Site or for which OWNER has paid CONTRACTOR but which are stored elsewhere, and finish the Work as OWNER may deem expedient. In such case, CONTRACTOR shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by OWNER arising out of or relating to completing the Work, such excess will be paid to CONTRACTOR. If such claims, costs, losses, and damages exceed such unpaid balance, CONTRACTOR shall pay the difference to OWNER. Such claims, costs, losses, and damages incurred by OWNER will be reviewed by ENGINEER as to their reasonableness and, when so approved by ENGINEER, incorporated in a Change Order. When exercising any rights or remedies under this paragraph OWNER shall not be required to obtain the lowest price for the Work performed. C. Where CONTRACTOR's services have been so terminated by OWNER, the termination will not affect any rights or remedies of OWNER against CONTRACTOR then existing or which may thereafter accrue. Any retention or payment of moneys due CONTRACTOR by OWNER will not release CON- TRACTOR from liability. 00700 - General Conditions REV 5-10-13 00700 - 43 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc 15.03 OWNER May Terminate For Convenience A. Upon seven days written notice to CON- TRACTOR and ENGINEER, OWNER may, without cause and without prejudice to any other right or remedy of OWNER, elect to terminate the Contract. In such case, CONTRACTOR shall be paid (without duplication of any items): 1. for completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. for expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; 3. for all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) in- curred in settlement of terminated contracts with Subcontractors, Suppliers, and others; and 4. for reasonable expenses directly attributable to termination. B. CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other eco- nomic loss arising out of or resulting from such term ination. 15.04 CONTRACTOR May Stop Work or Terminate A. If, through no act or fault of CONTRACTOR, the Work is suspended for more than 90 consecutive days by OWNER or under an order of court or other public authority, or ENGINEER fails to act on any Application for Payment within 30 days after it is submitted, TRACTOR any cum finally determined to be duc, then CONTRACTOR may, upon seven days written notice to OWNER and ENGINEER, and provided OWNER or ENGINEER do not remedy such suspension or failure within that time, terminate the Contract and recover from OWNER payment on the same terms as provided in paragraph 15.03. In lieu of terminating the Contract and without prejudice to any other right or remedy, if ENGINEER has failed to act on an - -= -- Application for Payment within 30 days after it is submitted, or OWNER has failed for 30 days to pay CONTRACTOR may, seven days after written notice to OWNER and ENGINEER, stop the Work until payment is made of all such amounts due CONTRACTOR, including interest thereon. The provisions of this paragraph 15.04 are not intended to preclude CONTRACTOR from making a Claim under paragraph 10.05 for an adjustment in Contract Price or Contract Times or otherwise for expenses or damage directly attributable to CONTRACTOR's stopping the Work as permitted by this paragraph. ARTICLE 16 - DISPUTE RESOLUTION 16.01 Methods and Procedures A. Dispute resolution methods and procedures, if any, shall be as set forth in the Supplementary Conditions. If no method and procedure has been set forth, and subject to the provisions of paragraphs 9.09 and 10.05, OWNER and CONTRACTOR may exercise such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any dispute. ARTICLE 17 - MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. 17.02 Computation of Times A. When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day will be omitted from the computation. 17.03 Cumulative Remedies 00700 - General Conditions REV 5-10-13 00700 - 44 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc A. The duties and obligations imposed by these General Conditions and the rights and remedies avail- able hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents, and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. 17.04 Survival of Obligations A. All representations, indemnifications, warran- ties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or comple- tion of the Agreement. 17.05 Controlling Law A. This Contract is to be govemed by the law of the state in which the Project is located. 00700 - General Conditions REV 5-10-13 00700 - 45 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE GENERAL CONDITIONS Article Title Article Number Introduction SC — 1.00 Defined Terms SC — 1.01 Terminology SC — 1.02 Before Starting Construction SC — 2.05 Preconstruction Conference SC — 2.06 Coordination of Plans, Specifications, and Special Provisions SC — 3.06 Subsurface and Physical Conditions SC — 4.02 Performance, Payment and Other Bonds SC — 5.01 Certificates of Insurance SC — 5.03 CONTRACTOR's Liability Insurance SC — 5.04 OWNER's Liability Insurance SC — 5.05 Property Insurance SC — 5.06 Waiver of Rights SC — 5.07 Receipt and Application of Insurance Proceeds SC — 5.08 Acceptance of Bonds and Insurance; Option to Replace SC — 5.09 Labor; Working Hours SC — 6.02 Concerning Subcontractors, Suppliers and Others SC — 6.06 Permits SC — 6.08 Cost of the Work SC — 11.01 Test and Inspections SC — 13.03 OWNER May Stop the Work SC — 13.05 Correction Period SC — 13.07 Progress Payments SC — 14.02 Substantial Completion SC — 14.04 00800-i 00800 - Supplementary Conditions 05-13 rev 00800 IF:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc Final Payment SC — 14.07 OWNER May Suspend Work SC — 15.01 OWNER May Terminate for Cause SC — 15.02 CONTRACTOR May Stop Work or Terminate SC — 15.04 Mediation SC —16.02 Liens SC — 17.06 +++ END OF THIS SUPPLEMENTARY CONDITIONS INDEX +++ 00800 -ii 00800 - Supplementary Conditions 05-13 rev 00800 iiF:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE GENERAL CONDITIONS SC -1.00 Introduction These Supplementary Conditions amend or supplement the Standard General Conditions of the Construction Contract (No. 1910-8, 1996 Edition) and other provisions of the Contract Documents as indicated below. All provisions, which are not so amended or supplemented, remain in full force and effect. The terms used in these Supplementary Conditions will have the meanings indicated in the General Conditions. SC -1.01 Defined Terms SC -1.01.A.20. Delete paragraph GC 1.01.A.20 in its entirety. SC -1.02 Terminology SC -1.02.D.1, 2, and 3 Delete paragraphs GC -1.02.D.1, 2, and 3 in their entirety and insert the following paragraphs in their place: D. Furnish, Install, Perform, Provide 1. The word "furnish" shall mean to supply and deliver services, materials, or equipment to the Site (or some other specified location) ready for use or installation and in usable or operable condition. 2. The word "install" shall mean to put into use or place in final position services, materials, or equipment complete and ready for intended use. 3. The words "perform" or "provide" shall mean to furnish and install services, materials, or equipment complete and ready for intended use. SC -2.05 Before Starting Construction SC -2.05.C. Delete paragraph GC 2.05.0 in its entirety and insert the following paragraph in its place: C. Evidence of Insurance: CONTRACTOR shall not commence work under this Contract until he has obtained all insurance required under Article 5 and such insurance has been delivered to the OWNER and approved by the OWNER, nor shall the CONTRACTOR allow any Subcontractor to commence work on his subcontract until all similar insurance required of the Subcontractor has been so obtained and approved. All such insurance shall remain in effect until final payment and at all times thereafter when CONTRACTOR may be correcting, removing or replacing defective Work in accordance with Article 13. SC -2.06 Preconstruction Conference SC -2.06 Delete paragraph GC -2.06.A in its entirety and insert the following paragraph in its place: A. Immediately after awarding the contract, but before the CONTRACTOR begins work, the Project Manager will call a preconstruction conference at a place the ENGINEER designates to establish an understanding among the parties as to the work and to discuss schedules referred to in paragraph 2.05.B, procedures for handling Shop Drawings and other submittals, and maintaining required 00800-1 00800 - Supplementary Conditions 05-13 rev 00800 1F:\ Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street 96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc records. Utility companies and others as appropriate will be requested to attend to discuss and coordinate work. B. Per the FDOT Standard Specifications for Road and Bridge Construction, the Contractor will certify to the Engineer the following: 1. A listing of on-site clerical staff, supervisory personnel and their pro -rated time assigned to the contract, 2. Actual Rate for items listed in Table 4-3.2.1 (see below), 3. Existence of employee benefit plan for Holiday, Sick and Vacation benefits and a Retirement Plan, and, 4. Payment of Per Diem is a company practice for instances when compensation for Per Diem is requested. Such certification must be made by an officer or director of the Contractor with authority to bind the Contractor. Timely certification is a condition precedent to any right of the Contractor to recover compensations for such costs, and failure to timely submit the certification will constitute a full, complete, absolute and irrevocable waiver by the Contractor of any right to recover such costs. Any subsequent changes shall be certified to the Engineer as part of the cost proposal or seven calendar days in advance of performing such extra work. FDOT Table 4-3.2.1 Item Rate FICA Rate established by Law FUTA/SUTA Rate established by Law Medical Insurance Actual Holidays, Sick & Vacation Benefits Actual Retirement Benefits Actual Workers Compensation Rates based on the National Council on Compensation Insurance basic rates tables adjusted by Contractor's actual experience modification factor in effect at the time of the additional work or unforeseen work Per Diem Actual but not to exceed State of Florida's rate Insurance* Actual *Compensation for Insurance is limited solely to General Liability Coverage and does not include any other insurance coverage (such as, but not limited to, Umbrella Coverage, Automobile Insurance, etc.). SC -3.06 Coordination of Plans, Specifications, and Special Provisions SC -3.06 Add the following new paragraphs immediately after paragraph GC -3.05: SC -3.06 Coordination of Plans, Specifications, and Special Provisions A. In case of discrepancy, the governing order of the documents shall be as follows: 1. Written Interpretations 2. Addenda 3. Specifications 4. Supplementary Conditions to the General Conditions 5. General Conditions 6. Approved Shop Drawings 7. Drawings 8. Referenced Standards. B. Written/computed dimensions shall govern over scaled dimensions. 00800-2 00800 2F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents \00800 - Supplementary Conditions 05-13 rev.doc 00800 - Supplementary Conditions 05-13 rev SC -4.02 Subsurface and Physical Conditions SC -4.02 Add the following new paragraphs immediately after paragraph GC -4.02.B: C. In the preparation of Drawings and Specifications, ENGINEER or ENGINEER's Consultants relied upon the following reports of explorations and tests of subsurface conditions at the Site: NONE. SC -5.01 Performance, Payment and Other Bonds SC -5.01.A. Delete paragraph GC -5.01.A in its entirety and insert the following paragraphs in its place: Within fifteen (15) days of receipt of the Contract Documents for execution, the CONTRACTOR shall furnish a Public Construction Bond in an amount equal to 100% of the Contract Price. 1. In lieu of the Public Construction Bond, the CONTRACTOR may furnish an alternative form of security in the form of cash, money order, certified check, cashier's check, irrevocable letter of credit or a security as listed in Part II of F.S. Chapter 625. Any such alternative form of security shall be for the same purpose, and be for the same amount and subject to the same conditions as those applicable to the bond otherwise required. The determination of the value of an alternative form of security shall be made by the OWNER. 2. Such Bond shall continue in effect for one (1) year after acceptance of the Work by the OWNER. 3. The OWNER shall record the Public Construction Bond with the Public Record Section of the Indian River County Courthouse located at 2000 16th Avenue, Vero Beach, Florida 32960. SC -5.03 Certificates of Insurance SC -5.03 Delete the second sentence of paragraph GC -5.03 in its entirety. SC -5.04 CONTRACTOR's Liability Insurance SC -5.04 Add the following new paragraphs immediately after paragraph GC -5.04.B: C. The limits of liability for the insurance required by paragraph 5.04 of the General Conditions shall provide coverage for not less than the following amounts or greater where required by Laws and Regulations: 1. Worker's Compensation: To meet statutory limits in compliance with the Worker's Compensation Law of Florida. This policy must include Employer Liability with a limit $100,000 for each accident, $500,000 disease (policy limit) and $100,000 disease (each employee). Such policy shall include a waiver of subrogation as against OWNER and ENGINEER on account of injury sustained by an employee(s) of the CONTRACTOR. 2. Commercial General Liability: Coverage shall provide minimum limits of liability of $1,000,000 per occurrence Combined Single Limit for Bodily Injury and Property Damage. This shall include coverage for: a. Premises/Operations b. Products/Completed Operations 00800-3 00800 - Supplementary Conditions 05-13 rev 00800 3F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street 96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc c. Contractual Liability d. Independent Contractors e. Explosion f. Collapse g. Underground. 3. Business Auto Liability: Coverage shall provide minimum limits of liability of $1,000,000 per occurrence Combined Single Limit for Bodily Injury and Property Damage. This shall include coverage for: a. Owned Autos b. Hired Autos c. Non -Owned Autos. 4. Special Requirements: a. Ten (10) days prior to the commencement of any work under this Contract, certificates of insurance and endorsement forms in the exact wording and format as presented in these Contract Documents will be provided to the OWNER's Risk Manager for review and approval. b. "Indian River County Florida" will be named as "Additional Insured" on both the General Liability and Auto Liability. c. The OWNER will be given thirty (30) days notice prior to cancellation or modification of any stipulated insurance. Such notification will be in writing by registered mail, return receipt requested and addressed to the OWNER's Risk Manager. d. An appropriate "Indemnification" clause shall be made a provision of the Contract (see paragraph 6.20 of the General Conditions). e. It is the responsibility of the CONTRACTOR to insure that all subcontractors comply with all insurance requirements. f. It should be remembered that these are minimum requirements, which are subject to modification in response to high hazard operation. g. Insured must be authorized to do business and have an agent for service of process in Florida and have Best's Rating of A -VII or better. D. Additional Insureds: 1. In addition to "Indian River County, Florida," the following individuals or entities shall be listed as "additional insureds" on the CONTRACTOR's liability insurance policies: a. NONE SC -5.05 OWNER's Liability Insurance SC -5.05 Delete paragraph GC -5.05.A in its entirety. SC -5.06 Property Insurance SC -5.06 Delete paragraphs GC -5.06.A, B, and C in their entirety and insert the following paragraphs in their place: A. CONTRACTOR shall purchase and maintain property insurance upon the Work at the Site in the amount of the full replacement cost thereof. This insurance shall: 1. include the interests of OWNER, CONTRACTOR, Subcontractors, ENGINEER, ENGINEER's Consultants and any other individuals or entities identified in the Supplementary Conditions, and the officers, directors, partners, employees, agents 00800-4 00800 - Supplementary Conditions 05-13 rev 00800 4F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street 96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc and other consultants and subcontractors of any of them each of whom is deemed to have an insurable interest and shall be listed as an insured or additional insured; 2. be written on a Builder's Risk "All Risk" or open peril or special causes of loss policy form that shall at least include insurance for physical loss and damage to the Work, temporary buildings, falsework, and materials and equipment in transit and shall insure against at least the following perils or causes of loss: fire, lightning, extended coverage, theft, vandalism and malicious mischief, earthquake, collapse, debris removal, demolition occasioned by enforcement of Laws and Regulations, water damage, and such other perils or causes of loss as may be specifically required by the Supplementary Conditions. 3. include expenses incurred in the repair or replacement of any insured property (including but not limited to fees and charges of engineers and architects); 4. cover materials and equipment stored at the Site or at another location that was agreed to in writing by OWNER prior to being incorporated in the Work, provided that such materials and equipment have been included in an Application for Payment recommended by ENGINEER; and 5. allow for partial utilization of the Work by OWNER; 6. include testing and startup; and 7. be maintained in effect until final payment is made unless otherwise agreed to in writing by OWNER, CONTRACTOR and ENGINEER with 30 days written notice to each other additional insured to whom a certificate of insurance has been issued. B. CONTRACTOR shall be responsible for any deductible or self-insured retention. C. The policies of insurance required to be purchased and maintained by CONTRACTOR in accordance with this paragraph SC -5.06 shall comply with the requirements of paragraph 5.06.0 of the General Conditions. SC -5.06.E Delete paragraph GC -5.06.E in its entirety and insert the following in its place: E. Additional Insureds: 1. The following individuals or entities shall be listed as "additional insureds" on the CONTRACTOR's property insurance policies: a. Indian River County, Florida SC -5.07 Waiver of Rights SC -5.07 Delete GC -5.07 (paragraphs A, 8, and C) in its entirety. SC -5.08 Receipt and Application of Insurance Proceeds SC -5.08 Delete GC -5.08 (paragraphs A and 8) in its entirety. SC -5.09 Acceptance of Bonds and Insurance; Option to Replace SC -5.09 Delete GC-5.09(paragraph A)in its entirety. SC -6.02 Labor; Working Hours 00800-5 00800 - Supplementary Conditions 05-13 rev 00800 5F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street 96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc SC -6.02.B. Add the following paragraphs immediately after paragraph GC -6.02.B: 1. Regular working hours are defined as Monday through Friday, excluding Indian River County Holidays, from 7 a.m. to 5 p.m. 2. Indian River County Holidays are: New Year's Day, Martin Luther King, Jr. Day, Good Friday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, Christmas Eve and Christmas Day. Working on these days will not be permitted without prior written permission and approval from the Construction Coordination Manager. 3. The CONTRACTOR shall receive no additional compensation for overtime work, i.e., work in excess of eight hours in any one calendar day or 40 hours in any one calendar week, even though such overtime work may be required under emergency conditions and may be ordered by the ENGINEER in writing. 4. All costs of inspection and testing performed during overtime work by the CONTRACTOR, which is allowed solely for the convenience of the CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to the OWNER to deduct the costs of all such inspection and testing from any payments otherwise due the CONTRACTOR. 5. All costs of OWNER's employees and costs of ENGINEER's Consultant resulting from overtime work by the CONTRACTOR, which is allowed solely for the convenience of the CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to OWNER to deduct all such costs from any payments otherwise due the CONTRACTOR. 6. No work shall commence before 7 a.m. or continue after 5 p.m. except in case of emergency upon specific permission of the ENGINEER. SC -6.06 Concerning Subcontractors, Suppliers, and Others SC -6.06.C. Add the following sentence at the end of paragraph GC -6.06.C: OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or entity, to the extent practicable, information about amounts paid to CONTRACTOR on account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or other individual or entity. SC -6.08 Permits SC -6.08 Add the following paragraphs immediately after paragraph GC -6.08.A: 1. The OWNER has obtained the following permits (copies of these permits are contained in Appendix "A"): NONE REQUIRED 2. The CONTRACTOR shall obtain and pay for all other required permits and licenses. The CONTRACTOR shall provide copies of the permits to the OWNER and ENGINEER and shall comply with all conditions contained in the permits at no extra cost to the OWNER. 3. The CONTRACTOR shall be familiar with all permit requirements during construction and shall be responsible for complying with these requirements. The cost of this effort shall be included in the pay item in which the work is most closely associated with. SC -11.01 Cost of the Work 00800-6 00800 - Supplementary Conditions 05-13 rev 00800 6F:\ Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc SC -11.01.A.1. Delete paragraph GC -11.01.A.1 in its entirety, and insert the following sentences in its place: 1. CONTRACTOR will receive payment for actual costs of direct labor and burden (see SC -2.06.B) for the additional or unforeseen work. Labor includes foremen actually engaged in the work; and will not include project supervisory personnel nor necessary on-site clerical staff, except when the additional or unforeseen work is a controlling work item and the performance of such controlling work item actually extends completion of the project due to no fault of the Contractor. Compensation for project supervisory personnel, but in no case higher than a Project Manager's position, shall only be for the pro -rata time such supervisory personnel spent on the contract. In no case shall an officer or director of the Company, nor those persons who own more than 1% of the Company, be considered as project supervisory personnel, direct labor or foremen hereunder. The expenses of performing Work outside of regular working hours, on Saturday, Sunday, or legal holidays, shall be included in the above to the extent authorized by OWNER. SC -13.03 Test and Inspections SC -13.03.B. Delete paragraph GC -13.03.8 in its entirety, and insert the following sentences in its place: B. OWNER shall employ and pay for the services of an independent testing laboratory to perform all initial inspections, tests, or approvals required by the Contract Documents except those inspections, tests, or approvals listed immediately below. Subsequent inspections, tests, or approvals required after initial failing inspections, tests, or approvals shall be paid for by the CONTRACTOR by back charge to subsequent applications for payment. The CONTRACTOR shall arrange, obtain, and pay for the following inspections, tests, or approvals: 1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D below; 2. costs incurred in connection with tests or inspections conducted pursuant to paragraph 13.04.B shall be paid as provided in said paragraph 13.04.B; 3. tests otherwise specifically provided in the Contract Documents. SC -13.05 OWNER May Stop the Work SC -13.05.A. Delete paragraph GC -13.05.A in its entirety and insert the following paragraph in its place: If the Work is defective, or CONTRACTOR fails to supply sufficient skilled workers or suitable materials or equipment, or fails to comply with permit requirements, or fails to comply with the technical specifications, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of OWNER to stop the Work shall not give rise to any duty on the part of OWNER to exercise this right for the benefit of CONTRACTOR, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. SC -13.07 Correction Period 00800-7 00800 - Supplementary Conditions 05-13 rev 00800 7F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street 96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc SC -13.07 A. Delete the first sentence of paragraph GC -13.07.A in its entirety and insert the following sentence in its place A. If within one year after the date of Final Completion or such longer period of time as may be prescribed by Laws or Regulations or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, any Work is found to be defective, or if the repair of any damages to the land or areas made available for CONTRACTOR's use by OWNER or permitted by Laws and Regulations as contemplated in paragraph 6.11.A is found to be defective, CONTRACTOR shall promptly, without cost to OWNER and in accordance with OWNER's written instructions: (i) repair such defective land or areas, or (ii) correct such defective Work or, if the defective Work has been rejected by OWNER, remove it from the Project and replace it with Work that is not defective, and (iii) satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. SC -13.07 B. Delete paragraph GC -13.07.8 in its entirety and insert the following sentence in its place B. In special circumstances where a particular item of equipment is placed in continu- ous service before Final Completion of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Specifications or by Written Amendment. SC -14.02 Progress Payments SC -14.02.B.5. Delete paragraph GC -14.02.8.5.d in its entirety and insert the following paragraph in its place: d. ENGINEER has actual knowledge of the occurrence of any of the events enumerated in paragraph 15.02.A; or SC -14.02.6.5. Add the following sentences at the end of paragraph GC -14.02.8.5: e. OWNER has been required to pay ENGINEER additional compensation because of CONTRACTOR delays or rejection of defective Work; or f. OWNER has been required to pay an independent testing laboratory for subsequent inspections, tests, or approvals taken after initial failing inspections, tests, or approvals. SC -14.02.C.1. Delete paragraph GC -14.02.C.1 in its entirety and insert the following paragraph in its place: C. Payment Becomes Due 1. Payment shall be made by OWNER to CONTRACTOR according to the Local Government Prompt Payment Act. F.S. 218.70 et. seq. SC -14.04 Substantial Completion SC -14.04A. After the third sentence in paragraph GC -14.04A of the General Conditions, delete the remainder of paragraph 14.04A in its entirety and replace with the following: "If Engineer considers the Work substantially complete, Engineer will prepare and deliver to Owner a tentative certificate of Substantial Completion that shall fix 00800-8 00800 8F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street 96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc 00800 - Supplementary Conditions 05-13 rev the date of Substantial Completion. In accordance with the provisions of Florida Statutes section 208.735(7)(a)(2005), upon receipt of the tentative certificate of Substantial Completion from Engineer, the Owner, the Engineer, and the Contractor shall conduct a walk-through inspection of the Project to document a list of any items required to render the Work on the Project complete, satisfactory, and acceptable under this Agreement (herein the "Statutory List"). The Statutory List shall be reduced to writing and circulated among the Owner, the Engineer, and the Contractor by the Owner or the Engineer within 30 calendar days after substantial completion. The Owner and Contractor acknowledge and agree that: 1) the failure to include any corrective work, or pending items that are not yet completed, on the Statutory List does not alter the responsibility of the Contractor to complete all of the Work under this Agreement; 2) upon completion of all items on the Statutory List, the Contractor may submit a pay request for all remaining retainage except as otherwise set forth in this Agreement; and 3) any and all items that require correction under this Agreement and that are identified after the preparation of the Statutory List remain the obligation of the Contractor to complete to the Owner's satisfaction under this Agreement. After receipt of the Statutory List by the Contractor, the Contractor acknowledges and agrees that it will diligently proceed to complete all items on the Statutory List and schedule a final walk-through in anticipation of final completion on the Project." SC -14.04B Add the following new paragraph immediately after paragraph GC 14.048: C. At the time of delivery of the tentative certificate of Substantial Completion, Engineer will deliver to Owner and Contractor a written recommendation as to division of responsibilities pending final payment between Owner and Contractor with respect to security, operation, safety, and protection of the Work, maintenance, heat, utilities, insurance, and warranties and g uarantees SC -14.07 Final Payment SC -14.07.C.1. Delete paragraph GC -14.07.C.1 in its entirety and insert the following paragraph in its place: C. Payment Becomes Due 1. Payment shall be made by OWNER to CONTRACTOR according to the " Local Government Prompt Payment Act" Florida Statutes section 218.70, et. seq. SC -15.01 OWNER May Suspend Work SC -15.01.A Delete the last sentence in paragraph GC -15.01.A and insert the following in its place: CONTRACTOR shall be allowed an extension of the Contract Times, directly attributable to any such suspension if CONTRACTOR makes a Claim for an extension as provided in paragraph 10.05. CONTRACTOR shall not be allowed an adjustment of the Contract Price and CONTRACTOR shall not be paid on account of Toss of anticipated profits or revenue or other eco- nomic Toss arising out of or resulting from such Work suspension. SC -15.02 OWNER May Terminate For Cause SC -15.02.A.5 and SC -15.02.A.6 Add the following new paragraphs immediately after paragraph GC -15.02.A.4: 00800-9 00800 - Supplementary Conditions 05-13 rev 00800 9F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street 96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc 5. CONTRACTOR's violation of Section 02225 — "Erosion Control and Treatment of Dewatering Water From the Construction Site." 6. CONTRACTOR's failure to make payment to Subcontractors or Suppliers for materials or labor in accordance with the respective agreements between the CONTRACTOR and the Subcontractors or Suppliers. 7. CONTRACTOR certifies that it and those related entities of respondent as defined by Florida law are not on the Scrutinized Companies that Boycott Israel List, created pursuant to s. 215.4725 of the Florida Statutes, and are not engaged in a boycott of Israel. In addition, if this agreement is for goods or services of one million dollars or more, CONTRACTOR certifies that it and those related entities of respondent as defined above by Florida law are not on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, created pursuant to Section 215.473 of the Florida Statutes and are not engaged in business operations in Cuba or Syria. OWNER may terminate this Contract if Company is found to have submitted a false certification as provided under section 287.135(5), Florida Statutes, been placed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or been engaged in business operations in Cuba or Syria, as defined by section 287.135, Florida Statutes. OWNER may terminate this Contract if Company, including all wholly owned subsidiaries, majority-owned subsidiaries, and parent companies, that exist for the purpose of making profit, is found to have been placed on the Scrutinized Companies that Boycott Israel List or is engaged in a boycott of Israel as set forth in section 215.4725, Florida Statutes. SC -15.04 CONTRACTOR May Stop Work or Terminate SC -15.04 Delete the following text from the first sentence of paragraph GC -15.04.A: SC -15.04 Delete the following text from the second sentence of paragraph GC -15.04.A: . , . -= -- - SC -16 DISPUTE RESOLUTION SC -16.02 Mediation SC -16 Add the following new paragraph immediately after paragraph GC -16.01. SC -16.02 Mediation A. OWNER and CONTRACTOR agree that they shall submit any and all unsettled Claims or counterclaims, disputes, or other matters in question between them arising out of or relating to the Contract Documents or the breach thereof, to mediation by a certified mediator of the 19th Judicial Circuit in Indian River County 00800-10 00800 - Supplementary Conditions 05-13 rev 00800 1 OF: \Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street 96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc unless delay in initiating mediation would irrevocably prejudice one of the parties. The mediator of any dispute submitted to mediation under this agreement shall not serve as arbitrator of such dispute unless otherwise agreed. SC -17 Miscellaneous SC -17.06 Liens Add the following new paragraphs immediately after paragraph GCI7.05: SC -17.06 Liens A. This project is a "Public Works" under Chapter 255, Florida Statutes. No merchant's liens may be filed against the OWNER. Any claimant may apply to the OWNER for a copy of this Contract. The claimant shall have a right of action against the CONTRACTOR for the amount due him. Such action shall not involve the OWNER in any expense. Claims against the CONTRACTOR are subject to timely prior notice to the CONTRACTOR as specified in Florida Statutes Section 255.05. The CONTRACTOR shall insert the following paragraph in all subcontracts hereunder: "Notice: Claims for labor, materials and supplies are not assessable against Indian River County and are subject to proper prior notice to (CONTRACTOR'S Name) and to (CONTRACTOR Surety Company Name), pursuant to Chapter 255 of the Florida Statutes. This paragraph shall be inserted in every sub - subcontract hereunder." The payment due under the Contract shall be paid by the OWNER to the CONTRACTOR only after the CONTRACTOR has furnished the OWNER with an affidavit stating that all persons, firms or corporations who are defined in Section 713.01, Florida Statutes, who have furnished labor or materials, employed directly or indirectly in the Work, have been paid in full. The OWNER may rely on said affidavit at face value. The CONTRACTOR does hereby release, remiss and quit -claim any and all rights he may enjoy perfecting any lien or any other type of statutory common law or equitable lien against the job. ++END OF SUPPLEMENTARY CONDITIONS++ 00800-11 00800 - Supplementary Conditions 05-13 rev 00800 11 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc SECTION 00942 - Change Order Form No. DATE OF ISSUANCE: EFFECTIVE DATE: OWNER: Indian River County CONTRACTOR Project: VERO LAKE ESTATES 851 STREET MILLINGS FROM 101St AVENUE TO 96th AVENUE OWNER's Project No. IRC -1628 OWNER'S Bid No. 2019012 You are directed to make the following changes in the Contract Documents: Description: Reason for Change Order: Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: Description Amount Original Contract Price $ Net Increase (Decrease) from previous Change Orders No. to . $ Substantial Completion: Final Completion: Contract Price prior to this Change Order: $ Net increase (decrease) of this Change Order: $ Contract Price with all approved Change Orders: $ ACCEPTED: By: CONTRACTOR (Signature) Date: CHANGE IN CONTRACT TIMES Description Time Original Contract Time: Substantial Completion: Final Completion: (days or dates) Net change from previous Change Orders No. to (days) Substantial Completion: Final Completion: Contract Time prior to this Change Order: Substantial Completion: Final Completion: (days or dates) Net increase (decrease) this Change Order: Substantial Completion: Final Completion: (days or dates) Contract Time with all approved Change Orders: Substantial Completion: Final Completion: (days or dates) RECOMMENDED: By: ENGINEER (Signature) Date: APPROVED: By: OWNER (Signature) Date: 00942 - Change Order Form REV 04-07 00942 - 1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\00942 - Change Order Form REV 04-07.doc Rev. 05/01 SECTION 00946 - Field Order Form Field Change No.: DATE OF ISSUANCE: EFFECTIVE DATE: OWNER: Indian River County CONTRACTOR Project: VERO LAKE ESTATES 851 STREET MILLINGS FROM 101St AVENUE TO 961 AVENUE OWNER's Project No. IRC -1628 OWNER'S Bid No. 2019012 Field Activity Description: Reason for Change: Recommended Disposition: Field Operations Officer / Engineer (Signature) Date Disposition: Contractor's Onsite Supervisor (Signature) Date Distribution: Field Operations Officer Others as Required: On-site Supervisor Project File * * END OF SECTION * * 00946 - Field Order Form REV 04-07 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\00946 - Field Order Form REV 04-07.doc SECTION 00948 - Work Change Directive No. DATE OF ISSUANCE: EFFECTIVE DATE: OWNER: Indian River County CONTRACTOR: Project: VERO LAKE ESTATES 85th STREET MILLINGS FROM 101St AVENUE TO 961 AVENUE OWNER's Project No. IRC -1628 OWNER's Bid No. 2019012 You are directed to proceed promptly with the following changes: Description: Purpose of Work Change Directive: Attachments: (List documents supporting change) If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents. Method of determining change in Contract Prices Q Unit Prices ❑ Lump Sum 0 Other: 0 By Change Order: Estimated increase (decrease) of Change Directive Method of determining change in Contract Times Q Contractor's Records Q Engineer's Records 0 Other: 0 By Change Order: this Work Estimated increase (decrease) in Contract Times: Substantial Completion: days; Ready for Final Completion: days. If the change involves an increase, the estimated time is not to be exceeded without further authorization. If the change involves an increase, the estimated amount is not to be exceeded without further authorization. ACCEPTED: By: RECOMMENDED: By: APPROVED: By: CONTRACTOR (Signature) Date: ENGINEER (Signature) Date: OWNER (Signature) Date: * * END OF SECTION * * F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\00948 - Work Change Directive Rev 06-2013.doc DIVISION 1 GENERAL REQUIREMENTS TITLE SECTION NO. SPECIAL PROVISIONS 01009 FORCE ACCOUNT 01024 FIELD ENGINEERING AND LAYOUT 01050 REFERENCE STANDARDS 01091 GENERAL QUALITY CONTROL 01215 PROGRESS MEETINGS 01220 CONSTRUCTION SCHEDULES 01310 SUBMITTAL OF SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01340 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 01520 PROTECTION OF THE WORK AND PROPERTY 01541 ACCESS ROADS, PARKINGS AREAS AND USE OF PUBLIC STREETS 01550 TRANSPORTATION AND HANDLING OF MATERIALS 01610 AND EQUIPMENT STORAGE OF MATERIAL AND EQUIPMENT 01611 SUBSTITUTIONS 01630 SITE CLEANUP AND RESTORATION 01710 POST FINAL INSPECTION 01820 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\ Master Contract Documents\DIVISION 1 GENERAL REQUIREMENTS.doc SECTION 01009 SPECIAL PROVISIONS 1.1 GENERAL A. Visits to the construction site may be made by representatives of permitting or governing bodies. Submit details of all instructions from the above to the ENGINEER immediately. The Work will not be accepted by the OWNER until final acceptance has been received from the various Regulatory Agencies having jurisdiction. B. Furnish sufficient labor, construction equipment and materials, and work such hours, including night shifts and overtime operations, as may be necessary to insure the prosecution of the work in accordance with the approved progress schedule. If, in the opinion of the ENGINEER, the CONTRACTOR falls behind the progress schedule, take such steps as may be necessary to improve progress, all without additional cost to the OWNER. The ENGINEER shall be compensated for his overtime services in accordance with the Supplementary Conditions, SC -6.02. C. All salvageable material and equipment for which specific use, relocation or other disposal is not specifically noted, shall remain the property of the OWNER and shall be delivered to the OWNER at the following location: 4550 41st Street, at the CONTRACTOR's expense. All material and equipment not in salvageable condition, as determined by the ENGINEER and the OWNER, shall be disposed of by the CONTRACTOR, at the CONTRACTOR's expense. D. In addition to these Specifications all work must comply with the requirements of the local governing agency, St. Johns River Water Management District, Department of Environmental Protection, Army Corps of Engineers, Indian River Farms Water Control District, and all other applicable State or Federal agencies' specifications and permits. In the event of a conflict, the more stringent specification or requirement shall govern. E. Before performing any work outside the designated limits of the work site, secure any necessary permits and authorization from the applicable owner, or verify in writing that such has been previously obtained. Follow all requirements of any said permits or authorization. Give the ENGINEER and appropriate owner ten (10) days minimum notice before commencing construction operations outside the designated limits of the work site. 01009-1 01009 -Special Provisions F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01009 - Special Provisions.doc SECTION 01024 FORCE ACCOUNT 1.1 General CONTRACTOR shall furnish all labor, materials, equipment and incidentals necessary to perform additional work not covered on the Contract Drawings. The force Account is intended as a contingency for unforeseen work. 1.1 PAYMENT A. Lump sum amount for force account work is included in the bid schedule. The value of force account work will be determined in accordance with Article 12 of the General Conditions. + + END OF SECTION + + 01024- 1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01024 - Force Account.doc SECTION 01050 FIELD ENGINEERING AND LAYOUT 1.1 GENERAL A. The CONTRACTOR will furnish all construction staking for the project. All staking from control will be under the supervision of a Florida Registered Land Surveyor. B. Develop and make all detail surveys and measurements needed for construction including but not limited to, slope stakes, batter boards, piling layouts and all other working lines, elevations and cut sheets. C. Keep a transit and leveling instrument on the site at all times and a skilled instrument man available whenever necessary for layout of the Work. D. Provide all material required for benchmarks, control points, batter boards, grade stakes, and other items. E. Be solely responsible for all locations, dimensions and levels. No data other than written orders of the ENGINEER shall justify departure from the dimensions and levels required by the Drawings. F. Safeguard all points, stakes, grademarks, monuments and benchmarks made or established on the Work, and reestablish same, if disturbed. Rectify all Work improperly installed because of not maintaining, not protecting or removing without authorization such established points, stakes, marks and monuments. G. When requested by the ENGINEER, provide such facilities and assistance as may be necessary for the ENGINEER to check line and grade points placed by the CONTRACTOR. Do no excavation or embankment work until all cross -sectioning necessary for determining pay quantities has been completed and checked by the ENGINEER. H. The cost of performing engineering and layout work described above shall be included in the contract unit prices for the various items of work to which it is incidental. No separate payment will be made for surveying or engineering. 1.2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR A. Prior to commencing work, the CONTRACTOR shall satisfy himself as to the accuracy of all survey and existing site information as indicated in the Contract Documents. Immediately notify the ENGINEER upon discovery of any errors, inaccuracies or omissions in the survey data. The commencing of any of the work by the CONTRACTOR shall be held as the CONTRACTOR's acceptance that all survey or existing site information is correct and accurate, without any reasonably inferable errors, inaccuracies or omissions. 1050-1 01050 Field Engineering F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01050 - Field Engineering.doc B. The CONTRACTOR shall carefully preserve all control stakes, benchmarks, reference points and property corners and will be responsible for any mistake or Toss of time caused by their unnecessary loss or disturbance. If the loss or disturbance of the stakes or marks cause a delay in the Work, the CONTRACTOR shall have no claim for damages or extension of time. Control stakes, benchmarks, reference points and property corners disturbed by the CONTRACTOR's work shall be replaced by a Florida Registered Land Sur- veyor and Mapper, at the CONTRACTOR's expense. In the event the Owner must provide the services of the Florida Registered Surveyor and Mapper to perform this replacement work, the cost of the surveying services will be deducted from any sums due the CONTRACTOR for the work performed under this Contract. C. All survey work shall be performed under the guidance and direction of a Florida Registered Surveyor and Mapper. D. All survey work for Record Drawings shall be performed by a Florida Registered Surveyor and Mapper. 1.3 STATION BOARDS A. CONTRACTOR shall erect and maintain white/black standard FDOT station markers every 100 feet. 1.4 LAYOUT OF STRIPING Establish by instrument, and mark the finished surface, the points necessary for striping finished roadway in conformance with Section 5-7 of FDOT Standard Specifications. + + END OF SECTION + + 1050-2 01050 Field Engineering F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\01050 - Field Engineering.doc SECTION 01091 REFERENCE STANDARDS 1.1 GENERAL A. Whenever reference is made to the furnishing of materials or testing thereof to conform to the standards of any technical society, organization or body, it shall be construed to mean the latest standard, code, specification or tentative specification adopted and published at the date of advertisement for bids, unless noted otherwise in the Technical Specifications or on the Drawings. When a reference standard is specified, comply with requirements and recommendations stated in that standard, except when they are modified by the Contract Documents, or when applicable laws, ordinances, rules, regulations or codes establish stricter standards. The list of specifications presented in Paragraph B is hereby made a part of the Contract, the same as if repeated herein in full. B. Reference to a technical society, organization, or body may be made in the Specifications by abbreviations, in accordance with the following list: AASHTO The American Association of State Highway and Transportation Officials ACI American Concrete Institute AGA American Gas Association AISC American Institute of Steel Construction AISI American Iron and Steel Institute ANSI American National Standards Institute ASCE American Society of Civil Engineers ASTM American Society for Testing and Materials AWPA American Wood Preservers Association AWWA American Water Works Association AWS American Welding Society FED.SPEC. Federal Specifications 01091-1 01091 Reference Standards F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01091 - Reference Standards.doc CRSI Concrete Reinforcing Steel Institute FDEP/DEP Florida Department of Environmental Protection DNR Department of Natural Resources NCPI National Clay Pipe Institute NEMA National Electrical Manufacturers Association NEC National Electric Code NSPE National Society of Professional Engineers OSHA Occupational Safety and Health Administration PCI Prestressed Concrete Institute FDOT/DOT Florida Department of Transportation U. L., Inc. Underwriter's Laboratories, Inc. SSPC Steel Structures Painting Council SJRWMD St. Johns River Water Management District C. When no reference is made to a code, standard or specification, the standard specifications of ASTM, FDOT, or ANSI shall govern. D. In the event of a conflict between the specifications prepared by the ENGINEER and the above referenced specifications and standards, or any other regulatory specification or standard, the more stringent requirement prevails. + + END OF SECTION + + 01091-2 01091 Reference Standards F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids \Bid Documents\Master Contract Documents\01091 - Reference Standards.doc SECTION 01215 GENERAL QUALITY CONTROL 1.1 DESCRIPTION OF REQUIREMENTS A. Definitions: Specific quality control requirements for the work are indicated throughout the Contract Documents. The requirements of this section are primarily related to the performance of the work beyond the furnishing of manufactured products. The term "Quality Control" includes, but is not necessarily limited to, inspection and testing and associated requirements. This section does not specify or modify the OWNER and. ENGINEER duties relating to quality review and Contract surveillance. 1.2 RESPONSIBILITY FOR INSPECTIONS AND TESTS A. Residual OWNER Responsibility: The OWNER will employ and pay for the services of independent testing laboratories to perform those required inspections and tests. B. CONTRACTORS General Responsibility: No failure of test agencies, whether engaged by the OWNER or CONTRACTOR, to perform adequate inspections of tests or to properly analyze or report results, shall relieve the CONTRACTOR of responsibility for the fulfillment of the requirements of the Contract Documents. It is recognized that the required inspection and testing program is intended to assist the CONTRACTOR, OWNER, ENGINEER, and governing authorities in the nominal determination of probable compliance with requirements for certain crucial elements of work. The program is not intended to limit the CONTRACTOR in his regular quality control program, as needed for general assurance of compliance. 1.3 QUALITY ASSURANCE A. General Workmanship Standards: It is a requirement that each category of tradesman or installer performing the work be pre -qualified, to the extent of being familiar with the applicable and recognized quality standards for his category of work, and being capable of workmanship complying with those standards. 1.4 PRODUCT DELIVERY -STORAGE -HANDLING Handle, store and protect materials and products, including fabricated components, by methods and means which will prevent damage, deterioration and losses (and resulting delays), thereby ensuring highest quality results as the performance of the work progresses. Control delivery schedules so as to minimize unnecessary long-term storage at the project site prior to installation. 01215-1 01215 General Quality Control F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01215 General Quality.doc SECTION 01215 GENERAL QUALITY CONTROL 1.5 PROJECT PHOTOGRAPHS/VIDEOS A. The CONTRACTOR shall make provisions, at his expense, for photographs and video tapes of all work areas just prior to construction, and for unusual conditions during construction. The photographs and videos shall show pertinent physical features along the line of construction. The purpose of the videos is to determine any damage to private or public property during construction. The video must be performed by a professional videographer. B. Pre -Construction Photographs and Video: 1. Contractor shall provide the Owner with photographs and video record and one copy of the existing conditions prior to construction. These photographs and videos shall be a standard DVD format and shall be narrated. 2. The photographs and video shall include, but not be limited to, the following items shown in a clear manner: 1) All existing features within the right-of-way. 2) All existing features within the temporary construction easement. 3) All existing features within permanent easements. 4) All existing features adjacent to any construction. 3. Detail of the photographs and video shall be such that the following examples shall be clear and visible: 1) Cracks in walls. 2) Condition of fencing. 3) Condition of planted areas and types of vegetation. 4) Condition of sodded areas. 5) Conditions of sprinkler systems and associated controls and wiring. 6) Condition of signs. 7) Conditions of lighting and associated wiring. 8) Significant detail of any pre-existing damages physical features shall be shown. The coverage of the photographs and video should include the limits of effects of the use of vibratory rollers. 9) These photographs and video record shall be presented and approved by the Owner prior to the Notice to Proceed. A copy shall be kept in the Contractor's field office. 10)Payment — No additional payment will be made for this work. + + END OF SECTION + + 01215-2 01215 General Quality Control F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01215 General Quality.doc SECTION 01220 PROGRESS MEETINGS 1.1 SCOPE A. Date and Time: 1. Regular Meetings: As mutually agreed upon by ENGINEER and CONTRACTOR. 2. Other Meetings: On call. B. Place: CONTRACTOR'S office at Project site or other mutually agreed upon location. C. ENGINEER shall prepare agenda, preside at meetings, and prepare and distribute a transcript of proceedings to all parties. D. CONTRACTOR shall provide data required and be prepared to discuss all items on agenda. 1.2 MINIMUM ATTENDANCE A. CONTRACTOR B. SUBCONTRACTOR: When needed for the discussion of a particular agenda item, CONTRACTOR shall require representatives of Subcontractors or suppliers to attend a meeting. C. CONSTRUCTION COORDINATION MANAGER D. OWNER'S representative, if required. E. Utility Representatives F. Others as appropriate. G. Representatives present for each party shall be authorized to act on their behalf. 1.3 AGENDA Agenda will include, but will not necessarily be limited to, the following: 1. Transcript of previous meeting. 2. Progress since last meeting. 3. Planned progress for next period. 4. Problems, conflicts and observations. 5. Change Orders. 6. Status of Shop Drawings. 7. Quality standards and control. 8. Schedules, including off-site fabrication and delivery schedules. Corrective measures, if required. 9. Coordination between parties. 10. Safety concerns. 11. Other business. + + END OF SECTION + + 01220-1 01220 Progress Meetings F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01220 - Progress Meetings.doc SECTION 01310 CONSTRUCTION SCHEDULES 1.1 GENERAL REQUIREMENTS A. No partial payments shall be approved by the ENGINEER until there is an approved construction progress schedule on hand. B. Designate an authorized representative who shall be responsible for development and maintenance of the schedule and of all progress and payment reports. This representative shall have direct project control and complete authority to act on behalf of the CONTRACTOR in fulfilling the commitments of the CONTRACTOR's schedules. 1.2 REVISIONS TO THE CONSTRUCTION SCHEDULES When the ENGINEER requires the CONTRACTOR to submit revised (updated) progress schedules on a monthly basis the CONTRACTOR shall: A. Indicate the progress of each activity to the date of submission. B. Show changes occurring since the previous submission listing: 1. Major changes in scope. 2. Activities modified since the previous submission. 3. Revised projections of progress and completion. 4. Other identifiable changes. C. Provide a narrative report as needed to define: 1. Problem areas, anticipated delays, and the impact on the schedule. 2. Corrective action recommended and its effect. 3. The effect of changes on schedules of other prime contractors. 1.3 SUBMISSION OF THE CONSTRUCTION SCHEDULES On or before the tenth day after the effective date of the Agreement, submit the initial schedules to the ENGINEER. The ENGINEER will review the schedules and return a review copy to the CONTRACTOR within 21 days after receipt. If required by the ENGINEER, resubmit revised schedules on or before the seventh day after receipt of the review copy. If required by the ENGINEER, submit revised monthly progress schedules with that month's application for payment. 01310-1 01310 Construction Schedule F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01310 - Construction Schedule.doc SECTION 01310 CONSTRUCTION SCHEDULES 1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES A. After receiving approval by the ENGINEER, distribute copies of the approved initial schedule and all reviewed revisions (updated) to: 1. Job site file. 2. Subcontractors. 3. Other concerned parties. 4. OWNER (two copies). 5. ENGINEER B. In the cover letter, instruct recipients to report promptly to the CONTRACTOR, in writing, any problems anticipated by the projections shown in the schedules. + + END OF SECTION + + 01310-2 01310 Construction Schedule F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01310 - Construction Schedule.doc SECTION 01340 SUBMITTAL OF SHOP DRAWINGS 1.1 SCOPE A. Submit shop drawings, product data and samples as required by or inferred by the Drawings and Specifications. Submittals shall conform to the requirements of Article 6.17 of the General Conditions, Section 00700, and as described in this Section. 1.2 SHOP DRAWINGS A. Shop drawings are original drawings, prepared by the CONTRACTOR, a subcontractor, supplier, or distributor, which illustrate some portion of the work; showing fabrication, layout, setting, or erection details. Shop drawings are further defined in Article 6.17, Section 00700. B. Shop drawings shall be prepared by a qualified detailer and shall be identified by reference to sheet and detail numbers on the Contract Drawings. 1.3 PRODUCT DATA A. Product data are manufacturer's standard schematic drawings and manufacturer's catalog sheets, brochures, diagrams, schedules, performance charts, illustrations, and other standard descriptive data. Product data are further defined in Article 6.17, Section 00700. B. Modify standard drawings to delete information which is not applicable to the project and supplement them to provide additional information applicable to the project. C. Clearly mark catalog sheets, brochures, etc., to identify pertinent materials, products, or models. 1.4 SAMPLES Samples are physical examples to illustrate materials, equipment, or workmanship and to establish standards by which work is to be evaluated. Samples are further defined in Article 6.17, Section 00700. 01340 - Submittal of Shop Drawings 01340-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street 96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01340 - Submittal of Shop Drawings.doc SECTION 01340 SUBMITTAL OF SHOP DRAWINGS 1.5 CONTRACTOR'S RESPONSIBILITIES FOR SUBMITTAL OF SHOP DRAWINGS, PRODUCT DATA AND SAMPLES A. The CONTRACTOR's responsibilities for submittal of shop drawings, product data, and samples are set forth in paragraph 6.17 of the General Conditions and as further explained herein. B. Prior to submission, thoroughly check shop drawings, product data, and samples for completeness and for compliance with the Contract Documents, verify all dimensions and field conditions, and coordinate the shop drawings with the requirements for other related work. Also review each shop drawing before submitting it to the ENGINEER to determine that it is acceptable in terms of the means, methods, techniques, sequences and operations of construction, safety precautions and programs incidental thereto, all of which are the CONTRACTOR's responsibility. 1. It is CONTRACTOR'S responsibility to review submittals made by his suppliers and Subcontractors before transmitting them to ENGINEER to assure proper coordination of the Work and to determine that each submittal is in accordance with its desires and that there is sufficient information about materials and equipment for ENGINEER to determine compliance with the Contract Documents. 2. Incomplete or inadequate submittals will be returned for revision without review. C. The CONTRACTOR's responsibility for errors and omissions in submittals is not relieved by the ENGINEER's review of submittals. The CONTRACTOR shall approve the shop drawings based on his in -the -field measurements, prior to submittal to the ENGINEER for his review. D. Notify the ENGINEER, in writing at the time of submission, of deviations in submittals from the requirements of the Contract Documents. The CONTRACTOR's responsibility for deviations in submittals from the requirements of the Contract Documents is not relieved by the ENGINEER's review of submittals, unless the ENGINEER gives written acceptance of specific deviations. E. Begin no work, which requires submittals until return of submittals with the ENGINEER's stamp and initials or signature indicating the submittal has been reviewed. 01340 - Submittal of Shop Drawings 01340-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01340 - Submittal of Shop Drawings.doc SECTION 01340 SUBMITTAL OF SHOP DRAWINGS 1.6 SUBMITTAL REQUIREMENTS AND ENGINEER'S REVIEW FOR SHOP DRAWINGS, PRODUCT DATA AND SAMPLES A. Submit to: Indian River County Engineering Division 1801 27th Street Vero Beach, FL 32960 B. A letter of transmittal shall accompany each submittal. If data for more than one Section of the Specifications is submitted, a separate transmittal letter shall accompany the data submitted for each Section. C. At the beginning of each letter of transmittal, provide a reference heading indicating the following: 1. OWNER'S Name 2. Project Name 3. Project Number 4. Transmittal Number 5. Section Number D. All submittals shall have a title block with complete identifying information satisfactory to the ENGINEER. The following is a sample Submittal Form that the CONTRACTOR may use: [The remainder of this page has been left blank intentionally] 01340 - Submittal of Shop Drawings 01340-3 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents \01340 - Submittal of Shop Drawings.doc SECTION 01340 SUBMITTAL OF SHOP DRAWINGS CONTRACTOR SUBMITTALS SUBMITTAL NO. Contractor: Date Sent to County No. Copies Sent to County ❑ Original Submittal ❑ Re -Submittal Project Name: VERO LAKE ESTATES 85th STREET MILLINGS FROM 101§1 AVENUE TO 96th AVENUE Project No.: IRC -1628 ❑ Shop Drawing ❑ Cut Sheet ❑ Other Description: Sub -Contractor: Remarks: *********************************************************** Reviewing Agency: (As checked below) Date Received ❑ I R C Engineering Div. ❑ I R C Utilities Services Remarks: Date Returned No. Copies Ret'd * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * IRC Engineering Division 1801 27th Street Vero Beach, FI. 32960 Remarks: Date Rec'd from Contractor Date Ret'd to Contractor No. Copies Ret'd Distribution of Copies: IRC Engineering Division Office File Field Office File 01340 - Submittal of Shop Drawings 01340-4 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01340 - Submittal of Shop Drawings.doc SECTION 01340 SUBMITTAL OF SHOP DRAWINGS E. All submittals shall bear the stamp of approval and signature of CONTRACTOR as evidence that they have been reviewed by CONTRACTOR. Submittals without this stamp of approval will not be reviewed by the ENGINEER and will be returned to CONTRACTOR. F. Assign a number to each submittal starting with No. 1 and thence numbered consecutively. Identify resubmittals by the original submittal number followed by the suffix "A" for the first resubmittal, the suffix "B" for the second resubmittal, etc. G. Initially submit to ENGINEER a minimum of two (2) copies of all submittals that are on 11 -inch by 17 -inch or smaller sheets (no less than 8 1/2 -inch x 11 -inch). H. After ENGINEER completes his review, Shop Drawings will be marked with one of the following notations: 1. Approved 2. Approved as Noted 3. NOT Approved - Resubmit If a submittal is acceptable, it will be marked "Approved" or "Approved as Noted". One (1) electronic copy of the submittal will be returned to CONTRACTOR. J. Upon return of a submittal marked "Approved" or "Approved as Noted", CONTRACTOR may order, ship or fabricate the materials included on the submittal, provided it is in accordance with the corrections indicated. K. If a submittal is unacceptable, one (1) copy will be returned to CONTRACTOR with following notation, "NOT Approved - Resubmit". L. Upon return of a submittal marked "NOT Approved - Resubmit", make the corrections indicated and repeat the initial approval procedure. Upon return of a submittal so marked, repeat the initial approval procedure utilizing acceptable material or equipment. M. Work shall not be performed nor equipment installed with an ENGINEER "Approved" or "Approved as Noted" Shop Drawing. N. Submit Shop Drawings well in advance of the need for the material or equipment for construction and with ample allowance for the time required to make delivery of material or equipment after data covering such is approved. CONTRACTOR shall assume the risk for all materials or 01340 - Submittal of Shop Drawings 01340-5 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street 96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids \Bid Documents\Master Contract Documents\01340 - Submittal of Shop Drawings.doc SECTION 01340 SUBMITTAL OF SHOP DRAWINGS equipment which is fabricated or delivered prior to the approval of Shop Drawings. Materials or equipment requiring Shop Drawings which have not yet received approval by the ENGINEER shall not be installed on the project. Materials or equipment will not be included in periodic progress payments until approval thereof has been obtained in the specified manner. O. ENGINEER will review and process all submittals promptly, but a reasonable time should be allowed for this, for the Shop Drawings being revised and resubmitted, and for time required to return the approved Shop Drawings to CONTRACTOR. P. Furnish required submittals with complete information and accuracy in order to achieve required approval of an item within three submittals. All costs to ENGINEER involved with subsequent submittals of Shop Drawings, Samples or other items requiring approval, will be back -charged to CONTRACTOR in accordance with the General Conditions and the Supplementary Conditions. If the CONTRACTOR requests a substitution for a previously approved item, all of ENGINEER'S costs in the reviewing and approval of the substitution will be back -charged to CONTRACTOR unless the need for such substitution is beyond the control of CONTRACTOR. + + END OF SECTION + + 01340 - Submittal of Shop Drawings 01340-6 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01340 - Submittal of Shop Drawings.doc SECTION 01520 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 1.1 SCOPE A. Provide all construction equipment and facilities and temporary controls required to satisfactorily complete the work represented on the Drawings and described in the Specifications. 1.2 RESPONSIBILITY A. All construction facilities and temporary controls remain the property of the Contractor establishing them and shall be maintained in a safe and useful condition until removed from the construction site. B. All false work, scaffolding, ladders, hoistways, braces, pumps, roadways, sheeting, forms, barricades, drains, flumes, and the like, any of which may be needed in construction of any part of the work and which are not herein described or specified in detail, must be furnished, maintained and removed by the CONTRACTOR, who is responsible for the safety and efficiency of such work and for any damage that may result from their failure or from their improper construction, maintenance or operation. C. In accepting the Contract, the CONTRACTOR assumes full responsibility for the sufficiency and safety of all hoists, cranes, temporary structures or work and for any damage which may result from their failure or their improper construction, maintenance or operation and will indemnify and save harmless the OWNER and ENGINEER from all claims, suits or actions and damages or costs of every description arising by reason of failure to comply with the above provision. 1.3 TEMPORARY UTILITIES AND SERVICES A. TEMPORARY WATER 1. Provide a temporary water service as required for all construction purposes and pay for all water used. 2. Furnish potable drinking water in suitable dispensers and with cups for use of all employees at the job. 3. Provide all temporary piping, hoses, etc., required to transport water to the point of usage by all trades. 4. When temporary water service is no longer required, remove all temporary water lines. 01520-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01520 - Construction Facilities.doc SECTION 01520 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS B. TEMPORARY SANITARY FACILITIES 1. Provide temporary toilet facilities separate from the job office. Maintain these during the entire period of construction under this Contract for the use of all construction personnel on the job. Provide enough chemical toilets to conveniently serve the needs of all personnel. Properly seclude toilet facilities from public observation. 2. Chemical toilets and their maintenance shall meet the requirements of State and local health regulations and ordinances. Immediately correct any facilities or maintenance methods failing to meet these requirements. Upon completion of work, remove the facilities from the premises. 1.4 SECURITY Full time watchmen will not be specifically required as a part of the Contract, but the CONTRACTOR shall provide inspection of work area daily and shall take whatever measures are necessary to protect the safety of the public, workmen, and materials, and provide for the security of the site, both day and night. 1.5 TEMPORARY CONTROLS Take all necessary precautions to control dust and mud associated with the work of this Contract. In dry weather, spray dusty areas daily with water in order to control dust. Take necessary steps to prevent the tracking of mud onto adjacent streets and highways. 1.6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES Remove the various temporary facilities, services, and controls and legally dispose of them as soon as the work is complete. The areas of the site used for temporary facilities shall be properly reconditioned and restored to a condition acceptable to the OWNER. + + END OF SECTION + + 01520-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01520 - Construction Facilities.doc SECTION 01541 PROTECTION OF THE WORK AND PROPERTY 1.1 GENERAL A. CONTRACTOR shall be responsible for taking all precautions, providing all programs, and taking all actions necessary to protect the Work and all public and private property and facilities from damage as specified in the General Conditions and herein. B. In order to prevent damage, injury or loss, CONTRACTOR'S actions shall include, but not be limited to, the following: 1. Store apparatus, materials, supplies, and equipment in an orderly, safe manner that will not unduly interfere with the progress of the Work or the Work of any other Contractor or utility service company. 2. Provide suitable storage facilities for all materials, which are subject to injury by exposure to weather, theft, breakage, or otherwise. 3. Place upon the Work or any part thereof, only such loads as are consistent with the safety of that portion of the Work. 4. Clean up frequently all refuse, rubbish, scrap materials, and debris caused by construction operations, so that at all times, the site of the Work presents a safe, orderly, and workmanlike appearance. 5. Provide barricades and guard rails around openings, for scaffolding, for temporary stairs and ramps, around excavations, elevated walkways and other hazardous areas. C. Except after written consent from proper parties, do not enter or occupy privately -owned land with men, tools, materials or equipment, except on easements provided herein. D. Assume full responsibility for the preservation of all public and private property or facility on or adjacent to the site. If any direct or indirect damage is done by or on account of any act, omission, neglect or misconduct in the execution of the Work by the CONTRACTOR, it shall be restored by the CONTRACTOR, at its expense, to a condition equal to or better than that existing before the damage was done. 1.2 BARRICADES AND WARNING SIGNALS CONTRACTOR's responsibility for the maintenance of barricades, signs, lights, and for providing watchmen shall continue until OWNER accepts the Project. 1.3 TREE AND PLANT PROTECTION 01541-1 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01541 - Protection of Property.doc SECTION 01541 PROTECTION OF THE WORK AND PROPERTY A. Protect existing trees, shrubs and plants on or adjacent to the site that are shown or designated to remain in place against unnecessary cutting, breaking or skinning of trunk, branches, bark or roots. B. Do not store or park materials or equipment within the drip line of trees that are to remain. C. Install temporary fences or barricades to protect trees and plants in areas subject to traffic. D. Fires shall not be permitted under or adjacent to trees and plants. E. Within the limits of the Work, water trees and plants that are to remain, in order to maintain their health during construction operations. F. Cover all exposed roots with burlap and keep it continuously wet. Cover all exposed roots with earth as soon as possible. Protect root systems from mechanical damage and damage by erosion, flooding, run-off or noxious materials in solution. G. If branches or trunks are damaged, prune branches immediately and protect the cut or damaged areas with emulsified asphalt compounded specifically for horticultural use. H. Remove all damaged trees and plants that die or suffer permanent injury and replace them with a specimen,of equal or better quality. I. Coordinate Work in this Section with requirements of other sections herein. 1.4 PROTECTION OF IRRIGATION The CONTRACTOR shall be responsible for maintaining in good condition all irrigation systems within the easements, which could be damaged by construction activities. The CONTRACTOR shall repair any irrigation systems damaged by construction activities within two (2) days. Irrigation systems partially within the right-of-way of 85th Street and all intersecting side streets within project limits may be cut off and capped or connected to same system to maintain functionality. The CONTRACTOR shall be responsible for maintaining the functionality of the remaining portion of the system if it should fall outside of the right-of-way. 1.5 PROTECTION OF EXISTING STRUCTURES 01541-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01541 - Protection of Property.doc SECTION 01541 PROTECTION OF THE WORK AND PROPERTY A. Underground Structures: 1. Underground structures are defined to include, but not be limited to, all sewer, water, gas, and other piping, and manholes, chambers, electrical conduits, tunnels and other existing subsurface work located within or adja- cent to the limits of the Work. 2. All underground structures known to ENGINEER except service connections for water, sewer, electric, and telephone are shown. This information is shown for the assistance of CONTRACTOR in accordance with the best information available, but is not guaranteed to be correct or complete. The existing utilities shown on the Contract Drawings are located according to the information available to the ENGINEER at the time the Drawings were prepared and have not been independently verified by the OWNER or the. ENGINEER. Guarantee is not made that all existing underground utilities are shown or that the locations of those shown are accurate. The locations shown are for bidding purposes only. Finding the actual location of any existing utilities is the CONTRACTOR's responsibility and shall be done before it commences any work in the vicinity. Furthermore, the CONTRACTOR shall be fully responsible for any and all damages, which might be occasioned by the CONTRACTOR's failure to exactly locate and preserve any and all underground utilities. The OWNER or ENGINEER will assume no liability for any damages sustained or costs incurred because of the CONTRACTOR's operations in the vicinity of existing utilities or structures, nor for temporary bracing and shoring of same. If it is necessary to shore, brace, or swing a utility, contact the utility company or department affected and obtain their permission regarding the method to use for such work. 3. Contact the various utility companies which may have buried or aerial utilities within or near the construction area before commencing work. Provide 48 hours minimum notice to all utility companies prior to beginning construction. 4. Schedule and execute all work involving existing utilities in order to minimize necessary interruption of services. Whenever such interruption is necessary for completion of the work, notify the ENGINEER and the appropriate utility at least 48 hours in advance. Perform all work to repair/restore utility service to the satisfaction of the appropriate utility. Include all costs related to service maintenance, interruption, and restoration in the appropriate line item in the Contract. 5. Where it is necessary to temporarily interrupt house or business services, the CONTRACTOR shall notify the owner or occupant, both before the interruption (24-hour minimum), and again immediately before service is resumed. Before disconnecting and pipes or cables, the CONTRACTOR shall obtain permission from their owner, or shall make suitable arrangement for their disconnection by their owner. 01541-3 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01541 - Protection of Property.doc SECTION 01541 PROTECTION OF THE WORK AND PROPERTY 6. Explore ahead of trenching and excavation work and uncover all obstructing underground structures sufficiently to determine their location, to prevent damage to them and to prevent interruption of the services which such structures provide. If CONTRACTOR damages an underground structure, restore it to original condition at CONTRACTOR's expense. 7. Necessary changes in the location of the Work may be made by ENGINEER, to avoid unanticipated underground structures. 8. If permanent relocation of an underground structure or other subsurface facility is required and isnot otherwise provided for in the Contract Documents, ENGINEER will direct CONTRACTOR in writing to perform the Work, which shall be paid for under the provisions of Article 11 of the General Conditions. B. Surface Structures: 1. Surface structures are defined as structures or facilities above the ground surface. Included with such structures are their foundations and any extension below the surface. Surface structures include, but are not limited to, buildings, tanks, walls, bridges, roads, dams, channels, open drainage, piping, poles, wires, posts, signs, markers, curbs, walks and all other facil- ities that are visible above the ground surface. C. Protection of Underground and Surface Structures: 1. Sustain in their places and protect from direct or indirect injury, all underground and surface structures located within or adjacent to the limits of the Work. Such sustaining and supporting shall be done carefully, and as required by the party owning or controlling such structure. Before proceeding with the work of sustaining and supporting such structure, satisfy the ENGINEER that the methods and procedures to be used have been approved by the party owning same. 2. Assume all risks attending the presence or proximity of all underground and surface structures within or adjacent to the limits of the Work. CONTRACTOR shall be responsible for all damage and expense for direct or indirect injury caused by its Work to any structure. CONTRACTOR shall repair immediately all damage caused by his work, to the satisfaction of the OWNER of the damaged structure. D. All other existing surface facilities, including but not limited to, guard rails, posts, guard cables, signs, poles, markers, and curbs which are temporarily removed to facilitate installation of the Work shall be replaced and restored to their original condition at CONTRACTOR'S expense. 01541-4 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01541 - Protection of Property.doc SECTION 01541 PROTECTION OF THE WORK AND PROPERTY 1.6 DAMAGE TO EXISTING STRUCTURES AND UTILITIES A. The CONTRACTOR shall be responsible for and make good all damage to pavement beyond the limits of this Contract, buildings, telephone or other cables, water pipes, sanitary pipes, or other structures which may be encountered, whether or not shown on the Drawings. B. Information shown on the Drawings as to the location of existing utilities has been prepared from the most reliable data available to the Engineer. This information is not guaranteed, however, and it shall be this CONTRACTOR's responsibility to determine the location, character and depth of any existing utilities. He shall assist the utility companies, by every means possible to determine said locations. Extreme caution shall be exercised to eliminate any possibility of any damage to utilities resulting from his activities. 1.7 ADJUSTMENTS OF UTILITY CASTINGS, COVERS AND BOXES A. All existing utility castings, including valve boxes, junction boxes, manholes, pull boxes, inlets and similar structures in the areas of construction that are to remain in service shall be adjusted by the CONTRACTOR to bring them flush with the surface of the finished work. B. The CONTRACTOR shall coordinate the utilities to ensure proper construction sequencing. CONTRACTOR shall make available survey reference markers to the various utility companies. + + END OF SECTION + + 01541-5 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01541 - Protection of Property.doc SECTION 01550 ACCESS ROADS, PARKING AREAS AND USE OF PUBLIC STREETS 1.1 GENERAL A. Provide all temporary construction roads, walks and parking areas required during construction and for use of emergency vehicles. Design and maintain temporary roads and parking areas so they are fully usable in all weather conditions. B. Prevent interference with traffic and the OWNER's operations on existing roads. Indemnify and save harmless the OWNER from any expenses caused by CONTRACTOR's operations over these roads. C. Roadways damaged by CONTRACTOR shall be restored to their original condition by the CONTRACTOR subject to approval of the OWNER or ENGINEER. D. Remove temporary roads, walks and parking areas prior to final acceptance and return the ground to its original condition, unless otherwise required by the Contract Documents. 1.2 USE OF PUBLIC STREETS The use of public streets and alleys shall be such as to provide a minimum of inconvenience to the public and to other traffic. Any earth or other excavated material spilled from trucks shall be removed immediately by the CONTRACTOR and the streets cleaned to the satisfaction of the Owner. 1.3 USE OF PUBLIC STREETS FOR HAUL ROADS A. Prior to construction, the CONTRACTOR shall designate all proposed haul roads to be used during the life of the project. Any earth or other materials spilled from trucks shall be removed by the CONTRACTOR and streets cleaned to the satisfaction of the Owner. He further shall be responsible for repairs to any damages caused by his operations, prior to final payment. B. All trucks carrying earth shall be covered while moving with an appropriate tarpaulin. Should trucks hauling earth fail to cover their loads, the CONTRACTOR will be given two (2) written warnings, after which the CONTRACTOR shall pay a fine of $50 per uncovered truck to the Owner when invoked by the Owner to Owner's Engineer. All cleanup shall be the responsibility of the CONTRACTOR. 01550 Access Roads 01550-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01550 - Access Roads.doc SECTION 01550 ACCESS ROADS, PARKING AREAS AND USE OF PUBLIC STREETS C. All trucks/moving equipment shall have backup warning horns in proper working order while on the job site. + + END OF SECTION + + 01550 Access Roads 01550-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01550 - Access Roads.doc SECTION 01610 TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT 1.1 GENERAL A. Make all arrangements for transportation, delivery and handling of equipment and materials required for prosecution and completion of the Work. B. Shipments of materials to CONTRACTOR or Subcontractors shall be delivered to the site only during regular working hours. Shipments shall be addressed and consigned to the proper party giving name of Project, street number and city. Shipments shall not be delivered to OWNER except where otherwise directed. C. If necessary to move stored materials and equipment during construction, CONTRACTOR shall move or cause to be moved materials and equipment without any additional compensation. 1.2 DELIVERY A. Arrange deliveries of products in accord with construction schedules and in ample time to facilitate inspection prior to installation. B. Coordinate deliveries to avoid conflict with Work and conditions at site and to accommodate the following: 1. Work of other contractors, or OWNER. 2. Limitations of storage space. 3. Availability of equipment and personnel for handling products. 4. OWNER'S use of premises. C. Do not have products delivered to project site until related Shop Drawings have been approved by the ENGINEER. D. Do not have products delivered to site until required storage facilities have been provided. E. Have products delivered to site in manufacturer's original, unopened, labeled containers. Keep ENGINEER informed of delivery of all equipment to be incorporated in the Work. F. Partial deliveries of component parts of equipment shall be clearly marked to identify the equipment, to permit easy accumulation of parts, and to facilitate assembly. 01610-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01610 - Transportation and Handling of Materials and Equipment.doc SECTION 01610 TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT G. Immediately on delivery, Contractor shall inspect shipment to assure: 1. Product complies with requirements of Contract Documents and reviewed submittals. 2. Quantities are correct. 3. Containers and packages are intact, labels are legible. 4. Products are properly protected and undamaged. 1.3 PRODUCT HANDLING A. Provide equipment and personnel necessary to handle products, including those provided by OWNER, by methods to prevent soiling or damage to products or packaging. B. Provide additional protection during handling as necessary to prevent scraping, marring or otherwise damaging products or surrounding surfaces. C. Handle products by methods to prevent bending or overstressing. D. Lift heavy components only at designated lifting points. E. Materials and equipment shall at all times be handled in a safe manner and as recommended by manufacturer or supplier so that no damage will occur to them. Do not drop, roll or skid products off delivery vehicles. Hand carry or use suitable materials handling equipment. + + END OF SECTION + + 01610-2 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01610 - Transportation and Handling of Materials and Equipment.doc SECTION 01611 STORAGE OF MATERIAL AND EQUIPMENT 1.1 GENERAL A. Store and protect materials and equipment in accordance with manufacturer's recommendations and requirements of Specifications. B. Make all arrangements and provisions necessary for the storage of materials and equipment. Place all excavated materials, construction equipment, and materials and equipment to be incorporated into the Work, so as not to injure any part of the Work or existing facilities, and so that free access can be had at all times to all parts of the Work and to all public utility installations in the vicinity of the Work. Keep materials and equipment neatly and compactly stored in locations that will cause a minimum of inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. Arrange storage in a manner to provide easy access for inspection. C. Areas available on the construction site for storage of material and equipment shall be as shown or approved by the ENGINEER. D. Store materials and equipment which are to become the property of the OWNER to facilitate their inspection and insure preservation of the quality and fitness of the Work, including proper protection against damage by extreme temperatures and moisture. E. Do not use lawns, grass plots or other private property for storage purposes without written permission of the OWNER or other person in possession or control of such premises. F. CONTRACTOR shall be fully responsible for loss or damage to stored materials and equipment. G. Do not open manufacturers containers until time of installation unless recommended by the manufacturer or otherwise specified. H. When appropriate store materials on wood blocking so there is no contact with the ground. + + END OF SECTION + + 01611-1 01611—Storage of Material F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01611 - Storage of Materials.doc SECTION 01630 SUBSTITUTIONS 1.1 GENERAL A. Requests for review of a substitution shall conform to the requirements of Article 6.05, "Substitutes and Or -Equals," of the General Conditions, and shall contain complete data substantiating compliance of the proposed substitution with the Contract Documents. 1.2 CONTRACTOR'S OPTIONS A. For materials or equipment (hereinafter products) specified only by reference standard, select product meeting that standard by any manufacturer, fabricator, supplier or distributor (hereinafter manufacturer). To the maximum extent possible, provide products of the same generic kind from a single source. B. For products specified by naming several products or manufacturers, select any one of the products or manufacturers named which complies with Specifications. C. For products specified by naming one or more products or manufacturers and stating "or equivalent," submit a request for a substitution for any product or manufacturer which is not specifically named. D. For products specified by naming only one product or manufacturer and followed by words indicating that no substitution is permitted, there is no option and no substitution will be allowed. E. Where more than one choice is available as a CONTRACTOR's option, select product which is compatible with other products already selected or specified. 1.3 SUBSTITUTIONS A. During a period of 15 days after date of commencement of Contract Time, ENGINEER will consider written requests from CONTRACTOR for substitution of products or manufacturers, and construction methods (if specified). 1. After end of specified period, requests will be considered only in case of unavailability of product or other conditions beyond control of CONTRACTOR. B. Submit 5 copies of Request for Substitution. Submit a separate request for each substitution. In addition to requirements set forth in Article 6.05 of General Conditions, include in the request the following: 1. For products or manufacturers: a. Product identification, including manufacturer's name and address. b. Manufacturer's literature with product description, performance and test data, and reference standards. 01630-1 01630 Substitutions F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01630 - Substitutions.doc SECTION 01630 SUBSTITUTIONS c. Samples, if appropriate. d. Name and address of similar projects on which product was used, and date of installation. 2. For construction methods (if specified): a. Detailed description of proposed method. b. Drawings illustrating method. 3. Such other data as the ENGINEER may require to establish that the proposed substitution is equal to the product, manufacturer or method specified. C. In making Request for Substitution, CONTRACTOR represents that: 1. CONTRACTOR has investigated proposed substitution, and deter- mined that it is equal to or superior in all respects to the product, manufacturer or method specified. 2. CONTRACTOR will provide the same or better guarantees or warranties for proposed substitution as for product, manufacturer, or method specified. 3. CONTRACTOR waives all claims for additional costs or extension of time related to a proposed substitution that subsequently may become apparent. D. A proposed substitution will not be accepted if: 1. Acceptance will require changes in the design concept or a substantial revision of the Contract Documents. 2. It will delay completion of the Work, or the work of other contractors. 3. It is indicated or implied on a Shop Drawing and is not accompanied by a formal Request for Substitution from CONTRACTOR. E. If the ENGINEER determines that a proposed substitute is not equal to that specified, furnish the product, manufacturer, or method specified at no additional cost to OWNER. F. Approval of a substitution will not relieve CONTRACTOR from the requirement for submission of Shop Drawings as set forth in the Contract Documents. G. The procedure for review by Engineer will include the following: 1. Requests for review of substitute items of material and equipment will not be accepted by Engineer from anyone other than CONTRACTOR. 2. Upon receipt of an application for review of a substitution, Engineer will determine whether the review will be more extensive than a normal shop drawing review for the specified item. 3. If the substitution will not require a more extensive review, Engineer will proceed with the review without additional cost to CONTRACTOR. 01630-2 01630 Substitutions F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01630 - Substitutions.doc SECTION 01630 SUBSTITUTIONS 4. If the substitution requires a more extensive review, Engineer will proceed with the review only after CONTRACTOR has agreed to reimburse Owner for the review cost. 5. Engineer may require CONTRACTOR to furnish at CONTRACTOR's expense additional data about the proposed substitute. H. Any redesign of structural members shall be performed by, and the plans signed and sealed by, a Professional Engineer registered in the State of Florida. The redesign shall be at the CONTRACTOR's expense. Any redesign will require an extensive review by the Engineer. The CONTRACTOR must agree to reimburse the Owner for the review cost prior to the Owner's Engineer proceeding with the design review. The ENGINEER's estimated cost of review shall be provided to the CONTRACTOR prior to proceeding with the review to allow the CONTRACTOR the opportunity to rescind the request. Engineer will be allowed a reasonable time within which to evaluate each proposed substitution. Engineer will be the sole judge of acceptability and shall have the right to deny use of any proposed substitution. The CONTRACTOR shall not order, install, or utilize any substitution without either an executed Change Order or Engineer's notation on the reviewed shop drawing. Owner may require CONTRACTOR to furnish at CONTRACTOR's expense a special manufacturer's performance guarantee(s) or other surety with respect to any substitute and an indemnification by the CONTRACTOR. ENGINEER will record time required by Engineer and Engineer's consultants in evaluating substitutions proposed by CONTRACTOR and in making changes in the Contract Documents occasioned thereby. Whether or not a proposed substitute is sued, CONTRACTOR shall reimburse Owner for the charges of Engineer and Engineer's consultants for evaluating each proposed substitute. J. Substitute materials or equipment may be proposed for acceptance in accordance with this Section. In the event that substitute materials or equipment are used and are less costly than the originally specified material or equipment, than the net difference in cost shall benefit the Owner and CONTRACTOR in equal proportions. This cost difference shall not be reduced by any failure of the CONTRACTOR to base his bid on the named materials or equipment. + + END OF SECTION + + 01630-3 01630 Substitutions F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\01630 - Substitutions.doc SECTION 01710 SITE CLEANUP AND RESTORATION 1.1 SCOPE Furnish all labor, equipment, appliances, and materials required or necessary to clean up and restore the site after the construction is completed. 1.2 REQUIREMENTS A. During the progress of the project, keep the work and the adjacent areas affected thereby in a neat and orderly condition. Remove all rubbish, surplus materials, and unused construction equipment. Repair all damage so that the public and property owners will be inconvenienced as little as possible. B. Provide onsite containers for the collection of waste materials, debris, and rubbish and empty such containers in a legal manner when they become full. C. Where material or debris has been deposited in watercourses, ditches, gutters, drains, or catch -basins as a result of the CONTRACTOR's operations, such material or debris shall be entirely removed and satisfactorily disposed of during the progress of the work, and the ditches, channels, drains, etc., shall be kept clean and open at all times. D. Before the completion of the project, unless otherwise especially directed or permitted in writing: 1. Tear down and remove all temporary buildings and structures; 2. Remove all temporary works, tools, and machinery, or other construction equipment furnished; 3. Remove all rubbish from any grounds occupied; and 4. Leave the roads, all parts of the premises, and adjacent property affected by construction operations, in a neat and satisfactory condition. E. Restore or replace any public or private property damaged by construction work, equipment, or employees, to a condition at least equal to that existing immediately prior to the beginning of the operations. To this end, the CONTRACTOR shall restore all highway, roadside, and landscaping work within any right-of-way, platted or prescriptive. Acceptable materials, equipment,and methods shall be used for such restoration. F. Thoroughly clean all materials and equipment installed and on completion of the work, deliver the facilities undamaged and in fresh and new - appearing condition. 01710 Site Cleanup 01710-1 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01710 - Site Cleanup.doc G. It is the intent of the Specifications to place the responsibility on the CONTRACTOR to restore to their original condition all items disturbed, destroyed, or damaged during construction. Particular attention will be placed on restoration of canals to equal or better condition than prior to construction. H. When finished surfaces require cleaning with cleaning materials, use only those cleaning materials which will not create hazards to health or property and which will not damage the surfaces. Use cleaning materials only on those surfaces recommended by the manufacturer. Follow the manufacturer's directions and recommendations at all times. Keep the amount of dust produced during construction activities to a minimum. At CONTRACTOR's expense, spray water or other dust control agents over the areas, which are producing the dust. Schedule construction operations so that dust and other contaminants will not fall on wet or newly coated surfaces. 1.3 SITE CLEANUP AND RESTORATION Prior to final completion, the OWNER, ENGINEER, and CONTRACTOR shall review the site with regards to site cleanup and restoration. Clean and/or restore all items determined to be unsatisfactory by the OWNER or ENGINEER, at no additional expense. + + END OF SECTION + + 01710 Site Cleanup 01710-2 F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\01710 - Site Cleanup.doc SECTION 01820 Post Final Inspection 1.1 GENERAL A. Approximately one year after Final Completion, the OWNER will make arrangements with the Construction Coordination Manager and the CONTRACTOR for a post final inspection and will send a written notice to said parties to inform them of the date and time of the inspection. B. Corrections of defective work noted by OWNER and Construction Coordination Manager shall comply with the applicable sections of Article 13, General Conditions. C. After the inspection, the OWNER will inform the CONTRACTOR of any corrections required to release the performance and payment bonds. 001820 - Post Final Inspection rev 05-13 001820 - 1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\001820 - Post Final Inspection rev 05-13.doc DIVISION 2 TECHNICAL PROVISIONS SECTION NO. 001 Technical Specifications SECTION NO. 004 Scope of Work SECTION NO. 101 Mobilization SECTION NO. 102 Maintenance of Traffic SECTION NO. 104 Prevention, Control, and Abatement of Erosion and Water Pollution SECTION NO. 110 Clearing and Grubbing SECTION NO. 120 Excavation and Embankment SECTION NO. 160 Stabilizing SECTION NO. 284 Reclaimed Asphalt Pavement Millings SECTION NO. 285 Optional Base Course SECTION NO. 334 Superpave Asphalt Concrete SECTION NO. 337 Asphalt Concrete Friction Courses SECTION NO. 425 Inlets, Manholes, and Junction Boxes SECTION NO. 430 Pipe Culverts SECTION NO. 536 Guardrail SECTION NO. 570 Performance Turf SECTION NO. 700 Highway Signing SECTION NO. 999 Record Drawings/As-Built Drawings F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\DIVISION 2 TECHNICAL PROVISIONS Table of Contents REVISED 10-2-08.doc SECTION 1 - Technical Specifications STANDARD SPECIFICATIONS A. All work of this Contract shall conform to the applicable technical specifications of Florida Department of Transportation Standard Specifications for Road and Bridge Construction, January, 2018, and Supplemental Specification, Special Provisions and addenda thereto, except as modified and supplemented hereinafter. Reference to Article numbers herein -after apply to the FDOT Standard Specifications, and reference in FDOT Standard Specifications to Department shall be taken as the Owner or its appointed Representative. Wherever the Specifications, Supplementals, etc. may refer to the "Owner", "Department", "State of Florida Department of Transportation", or words relating to offices of State Government, such words shall be taken as meaning Owner or Indian River County, Florida. Wherever the word "Owner's Engineer", "District Engineer", "Engineer", "Project Engineer", etc., appears, it shall be taken to mean the Registered Professional Project Engineer of the Indian River County Public Works Department, Engineering Division acting directly or through duly authorized representatives. Wherever the word "Resident Engineer" appears, it shall be taken to mean an authorized representative of the Owner's Engineer on the Project (Resident Construction Inspector) who will act as an agent for Indian River County, assigned to observe the progress quantity and quality of the work. The work to be performed per line item 700 shall conform to the applicable standards of Indian River County Typical Drawings for Pavement Markings, Signing & Geometrics Revised March 2012. SECTION 4 - SCOPE OF WORK Section 4-3.9 Value Engineering Incentive is deleted in its entirety. SECTION 101 - MOBILIZATION The work specified in this section shall conform to Section 101 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 101-1 - Mobilization — Per Lump Sum SECTION 102 - MAINTENANCE OF TRAFFIC The work specified in this item shall conform to Section 102 of the Florida Department of 01025-1 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc Transportation Standard Specifications for Road and Bridge Construction, except as modified herein. A. GENERAL PROVISIONS -DESCRIPTION: The work specified in this Section consists of maintaining traffic within the limits of the project for the duration of the construction period, including any temporary suspensions of the work. It shall include the construction and maintenance of any necessary detour facilities; the providing of necessary facilities for access to residences, businesses, etc., along the project; the furnishing, installing and maintaining of traffic control and safety devices during construction, the control of dust through the use of calcium chloride if necessary, and any other special requirements for safe and expeditious movement of traffic as may be called for on the plans. The term, Maintenance of Traffic, as used herein, shall include all of such facilities, devices and operations as are required for the safety and convenience of the public as well as for minimizing public nuisance; all as specified in this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions Section. B. BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall present his Maintenance of Traffic Plan at the pre -construction conference. The Maintenance of Traffic Plan shall indicate the type and location of all signs, lights, barricades, striping and barriers to be used for the safe passage of pedestrians and vehicular traffic through the project and for the protection of the workmen. The plan will indicate conditions and setups for each phase of the Contractor's activities. When the project plans include or specify a specific Maintenance of Traffic Plan, alternate proposals will be considered when they are found to be equal to or better than the plan specified. In no case may the Contractor begin work until the Maintenance of Traffic Plan has been approved in writing by the Engineer. Modifications to the Maintenance of Traffic Plan that become necessary shall also be approved in writing. Except in an emergency, no changes to the approved plan will be allowed until approval to change such plan has been received. The cost of all work included in the Maintenance of Traffic Plan shall be included in the pay item for Maintenance of Traffic. The Contractor shall be responsible for performing daily inspections, including weekends and holidays, with some inspections at nighttime, of the installations on the project and replace all equipment and devices not conforming with the approved standards during that inspection. The project personnel will be advised of the schedule of these inspections and be given the opportunity to join in the inspection as is deemed necessary. C. TRAFFIC CONTROL - STANDARDS: The FDOT Design Standards For Design, Construction, Maintenance and Utility Operations On The State Highway System, Edition as dated on the plans set forth the basic principles and prescribes minimum standards to be followed in the design, application, installation, maintenance and 01025-2 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc removal of all traffic control devices and all warning devices and barriers which are necessary to protect the public and workmen from hazards within the project limits. The standards established in the aforementioned manual constitute the minimum requirements for normal conditions, and additional traffic control devices warning devices, barriers or other safety devices will be required where unusual, complex or particularly hazardous conditions exist. The above referenced standards were developed using F.H.W.A., U.S.D.O.T. Manual on Uniform Traffic Control Devices (MUTCD). D. TRAFFIC CONTROL DEVICES, WARNING DEVICES AND BARRIERS - INSTALLATION: The responsibility for installation and maintenance of adequate traffic control devices, warning devices and barriers, for the protection of the travel in public and workmen, as well as to safeguard the work area in general shall rest with the Contractor. Consideration shall be given to recommendations of the Engineer. The required traffic control devices, warning devices and barriers shall be erected by the Contractor prior to creation of any hazardous condition and in conjunction with any necessary re-routing of traffic. The Contractor shall immediately remove, turn or cover any devices or barriers which do not apply to existing conditions. All traffic control devices shall conform to MUTCD standards and shall be clean and relatively undamaged. Damaged devices diminishing legibility and recognition, during either night or day conditions, are not acceptable for use. E. NO WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a manner that no undue hazard will result due to the requirements of this article, and the procedures and policies described therein shall in no way act as a waiver of any of the terms of the liability of the Contractor or his surety. F. Contractor's Maintenance of Traffic Plan shall maintain continuous vehicular traffic on 85th Street at all times. The Contractor shall maintain one lane of traffic at all times during 85th Street cross drain culvert constructions. G. In addition to above, the Contractor shall comply with INDIAN RIVER COUNTY TRAFFIC ENGINEERING DIVISION SPECIAL CONDITIONS FOR RIGHT-OF- WAY CONSTRUCTION in Appendix C. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 102-1 - Maintenance of Traffic — Per Lump Sum SECTION 104 - PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION PART 1 — GENERAL 01025-3 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc 1.1 SCOPE A. This Section covers erosion control and the treatment of dewatering water and stormwater runoff from the construction site and work area. Pollution control measures shall prevent polluted or turbid waters from being discharged from the construction site or work area to undeveloped portions of the site or offsite, including but not limited to Multiple Separate Storm Sewer Systems (MS4s) and Waters of the State. B. The OWNER considers pollution from dewatering water and stormwaterrunofffrom a construction site or work area to be a very serious offense. The CONTRACTOR is solely responsible for preventing pollution caused by dewatering water and stormwater runoff from the construction site or work area. Note that state regulations do not allow mixing stormwater and dewatering groundwater in the same release — separate and independent discharges are required. C. Pollution control measures specified herein represent minimum standards to be adhered to by the CONTRACTOR throughout the Project's construction. The OWNER reserves the right to require the CONTRACTOR to employ additional pollution control measures, when in the sole opinion of the OWNER, they are warranted. If site specific conditions require additional erosion and stormwater pollution control measures during any phase of construction or operation to prevent erosion or to control sediment or other pollution, beyond those specified in the Drawings, the Project's approved Stormwater Pollution Prevention Plan (SWPPP), or herein, implement additional best management practices as necessary, in accordance with Chapter 4, "Best Management Practices for Erosion and Sedimentation Control" of the Florida Erosion and Sediment Control Inspector's Manual and other references as may be applicable or required by regulatory permits. D. The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this Section. Alternatively, the OWNER may halt the CONTRACTOR's operations until the CONTRACTOR is in full compliance with this Section. If the OWNER halts the CONTRACTOR's Work as a result of failure to comply with this Section, the Contract time clock will continue to run. E. In addition to these Specifications, comply with Chapter 4 - "Best Management Practices for Erosion and Sedimentation Control" and Chapter 5 — "Best Management Practices for Dewatering" of the Florida Erosion and Sediment Control Inspector's Manual. In the event of a conflict between the referenced chapters and these Specifications, the more stringent requirement shall prevail. F. Submit to SJRWMD a "Notice to District of Dewatering Activity" (SJRWMD Form No. 40C-2.900(12)) prior to commencement of dewatering in accordance with F.A.C. 40C-2.042(9). Provide a copy of the Notice to Indian River County. 1.2 PERMITS 01025-4 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc A. The OWNER has obtained certain permits for this project and they are listed in paragraph 6.08.B of the EJCDC Standard General Conditions of the Construction Contract (General Conditions). Per paragraph 6.08.0 of the General Conditions, apply for and obtain all other required federal, state, and local permits, licenses, sampling, and tests. B. Provide copies of all approved permits to the OWNER and ENGINEER and comply with all conditions contained in all permits at no extra cost to the OWNER. If there is a conflict between any permit requirement and these Specifications or requirements between permits, the more stringent specification or requirement shall govern. C. Pay for all required water quality sampling and laboratory tests. 1.3 GENERAL A. Do not begin any other construction work until the pollution control and treatment system has been constructed in accordance with approved plans, permits, and these Specifications; and the installed system has been examined by the OWNER for compliance. B. From time to time, the OWNER or ENGINEER will inspect the pollution control and treatment system and may take effluent samples for analysis by a testing laboratory selected and paid for by the OWNER. If at any time, the OWNER or ENGINEER determines that the pollution control and treatment system is not in compliance with the approved system, the OWNER or ENGINEER will shut the portion of the project down that is not in compliance, and it shall remain shut -down until the pollution control and treatment system is properly constructed or repaired, and complies with the approved pollution control and treatment system plans, specifications, contract documents, and permits. C. Schedule construction to minimize erosion and stormwater runoff from the construction site. Implement erosion control measures on disturbed areas as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than 7 days after the construction activity in that portion of the site has temporarily or permanently ceased. In addition to other temporary erosion control measures that may be implemented, application of polyacrylamide is required on all such disturbed areas within 7 days after the construction activity in that portion of the site has temporarily or permanently ceased, unless final landscaping has been installed. Polyacrylamide application shall be as specified herein. Include polyacrylamide application in the Project's SWPPP. D. Inspect each pollution control system at least once per day and after each rainfall event. Clean and maintain each pollution control system as required until the system is no longer needed. If a water quality violation occurs, immediately cease. all work contributing to the water quality violation and correct the problem. Immediately report all water quality violations to the OWNER. Immediately report 01025-5 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc the discharge of any hazardous substance to the State Warning Point at 800-320- 0519 or 850-413-9911. E. Discharge shall not violate State or local water quality standards in receiving waters, nor cause injury to the public health or to public or private property, nor to the Work completed or in progress. The receiving point for water from construction operations shall be approved by the applicable owner, regulatory agency, and the ENGINEER. The receiving point shall be shown on the Project SWPPP. F. Promptly repair all damage at no cost to the OWNER. 1.4 SUBMITTALS A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment systems in accordance with Section 1340. B. Approved Stormwater Pollution Prevention Plan. C. "Contractor's Affidavit Regarding Erosion Control and Treatment of Dewatering Water and Stormwater From Construction Activities" 1.5 STORMWATER TREATMENT AND EROSION CONTROL SYSTEM RESPONSIBILITY A. Prepare a site-specific design of the erosion and stormwater pollution control system. Install and maintain all erosion and stormwater pollution control devices under the supervision of a State Certified Stormwater, Erosion, and Sedimentation Control Inspector. Maintain the erosion and stormwater pollution control devices until in the ENGINEER's sole opinion, the devices are no longer necessary (such time not to extend past the date the OWNER formally accepts the project as complete). Before beginning construction, submit to Indian River County, Florida Department of Environmental Protection (FDEP) and other applicable regulatory agencies for review and approval, a Stormwater Pollution Prevention Plan (SWPPP), prepared by the certified erosion control subcontractor. Construction shall not begin until the SWPPP has been approved by Indian River County, FDEP, and all applicable regulatory agencies. Submit the approved SWPPP to the ENGINEER before beginning construction. Include in the SWPPP, the "Contractor's Affidavit Regarding Erosion Control and Treatment of Dewatering Water and Stormwater From Construction Activities" (located at the end of this Section). 1.6 "POLLUTION" AND CERTAIN UNCONTESTABLE POLLUTION EVENTS DEFINED A. With respect to this Section and as may be further defined in paragraphs 1.6.B, 1.6.C, and 1.6.D, "pollution" is the presence in off-site waters of any substances, contaminants, or manmade or human -induced impairment of off-site waters or alteration of the chemical, physical, biological, or radiological integrity of off-site water in quantities or at levels which are or may be potentially harmful or injurious to 01025-6 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc human health or welfare, animal or plant life, or property. Pollutants to be removed include but are not limited to, sediment and suspended solids, solid and sanitary wastes, phosphorus, nitrogen, pesticides, oil and grease, concrete truck washout, stucco mixer washout, curb machine washout, washout from other construction equipment, construction chemicals, and construction debris. B. When the Discharge is Directly Into an Existing Water Body An existing water body (including ditches and canals) is defined to be polluted by the CONTRACTOR's operations when at any time, the turbidity of the water immediately downstream of the CONTRACTOR's discharge point(s) is at least 29 nephelometric turbidity units (NTUs) higher than the turbidity of the background water upstream of the discharge point(s). [See Fla. Administrative Code 62-302.530] Exception: When the discharge is directly into or through an outfall discharging into "Outstanding Florida Waters," designated by Florida Statute 403.061(27), the turbidity of the discharged water cannot exceed the turbidity of the immediate receiving water. The ENGINEER or OWNER shall determine the locations where the turbidity is measured. C. When the Discharge is not Directly Into an Existing Water Body In some instances, dewatering water or stormwater runoff from the construction site or work area may reach a water body indirectly, such as by overland flow. If the discharge water's TSS and turbidity measurements exceed pre -construction background values by 20 percent for TSS and 29 NTUs for turbidity, then the discharge is defined to be polluted. D. When Pollution Always Occurs The discharge from a construction site or work area is defined to be polluted whenever the pH of the discharge is less than 6.5 or greater than 8.5, or whenever any of the following is present in the discharge water: (1) Hazardous waste or hazardous materials in any quantity, (2) Any petroleum product or by-product in any quantity, (3) Any chemical in any quantity, or (4) Concentrated pollutants. E. Above paragraphs 1.6.B, 1.6.C, and 1.6.D do not in any way, limit the types of conditions in which pollution may be determined to occur. 1.7 PENALTIES FOR NONCOMPLIANCE WITH THIS SECTION A. In addition to the OWNER's specific remedies, if erosion or pollution is caused by dewatering water or stormwater runoff from the construction site, the OWNER may report the violations to Indian River County Stormwater Enforcement, SJRWMD, FDEP, Indian River Farms Water Control District (or other F. S. Chapter 298 Drainage District, as appropriate), and other pertinent regulatory or enforcement agencies. PART 2 - MATERIALS AND INSTALLATION 2.1 GENERAL 01025-7 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc A. Polyacrylamide: As required in Paragraph 1.3.C, place polyacrylamide (PAM) on bare ground to reduce the potential for erosion and cover it with hay, jute, or mulch. PAM may also be used in water bodies to remove turbidity. In all cases, use the anionic form of polyacrylamide that does not stick to fish gills. For PAM information and its proper application, a contact is Applied Polymer Systems, Inc., (678) 494- 5998, www.siltstop.com. B. Staked Silt Fences: 1. General: Use silt fences to control runoff from the construction site where the soil has been disturbed. 2. Installation: Install per the manufacture's recommendations and as specified herein. In general, install the silt fence in a manner that allows it to stop the water long enough for the sediment to settle while the water passes through the silt fence fabric. All supporting posts shall be on the down-slope side of the fencing. Place the bottom of the fabric 6 -inches minimum, under compacted soil to prevent the flow of sediment underneath the fence. Place silt fences away from the toe of slopes. Otherwise, work shall conform to Section 104 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction. 3. Product: All material shall be new and unused. Use FDOT Types III through IV silt fences where Targe sediment Toads are anticipated, where slopes are 1:2 (vertical: horizontal) or steeper, or as directed by the ENGINEER; otherwise use FDOT Type II silt fence. C. Turbidity Barriers: 1. General: Use turbidity barriers to control sediment contamination of rivers, lakes, ponds, canals, etc. 2. Installation: Install per the manufacturer's recommendations and per Section 104 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction unless directed otherwise by the ENGINEER. 3. Product: All material shall be new and unused. The turbidity barrier shall be a pervious barrier and the fabric color shall be yellow. Use staked turbidity barriers in water Tess than one -foot deep. Use floating turbidity barriers in water one -foot or deeper. D. Sedimentation Control From Dewatering or Pumping Operations Using Filter Bags: 1. Filter bags shall be manufactured using a polypropylene non -woven geotextile and sewn by a double -needle machine, using a high strength nylon thread. The bag shall have a fill spout large enough to accommodate a 4 - inch pump discharge hose. Straps shall be attached to the bag to secure the hose and prevent pumped water from escaping without being filtered. 2. Installation: Install in accordance with the manufacturer's specifications. Use as many filter bags as required, at no additional cost to the OWNER. Legally dispose of the bags offsite, at no cost to the OWNER. If the bags are placed on aggregate to facilitate filtration efficiency, do not use limerock aggregate — use non -calcareous rock. 3. Product: The filter bag shall be supplied with lifting straps. 01025-8 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc a. "DIRTBAG 53 or 55 as applicable," supplied by ACF Environmental, Inc. (1-800-448-3636). b. "DANDY DEWATERING BAG" supplied by Dandy Products, Inc. (1-800-591-2284). c. Or equivalent. E. Curb Inlet Protection: 1. Filter stormwater before it enters curb inlets. 2. Installation: Install in accordance with the manufacturer's specifications. Use as many of the specified filtration devices as required, at no additional cost to the OWNER. 3. Product: All materials shall be new and unused. The length of the curb inlet filtration device shall be at least 2 -feet longer than the curb inlet opening. a. "GUTTERBUDDY," supplied by ACF Environmental, Inc. (1-800-448- 3636). b. Or equivalent. F. Catch Basin Protection: 1. Filter stormwater before it enters catch basins (drop inlets). The filter "sack" shall be manufactured from woven polypropylene geotextile and sewn by a double -needle machine, using a high strength nylon thread. The sack shall be manufactured to fit the opening of the catch basin or drop inlet and it shall have the following features: two dump straps attached at the bottom to facilitate emptying; lifting loops as an integral part of the system to be used to lift the sack from the basin; and a colored restraint chord approximately halfway up the sack to keep the sides away from the catch basin walls. The colored restraint chord shall also serve as a visual means of indicating when the sack should be emptied. 2. Installation: Install in each catch basin in accordance with the manufacturer's specifications. Use as many of the specified filtration devices as required, at no additional cost to the OWNER. 3. Product: All materials shall be new and unused. a. "SILTSACK" (regular flow), supplied by ACF Environmental, Inc. (1- 800-448-3636). b. "FloGuard+PLUS," supplied by Kristar Enterprises, Inc. (1-800-579- 8819). c. Or equivalent. G. Construction Site Egress Driveways: Minimize the transport of sediment and soil from the construction site or work area by vehicle wheels. Construct a crushed rock driving surface at the vehicle exit point(s). Locate the site egress driveways a minimum of 25 feet from all drainage inlets or pipes. Provide an area Targe enough to remove the sediment and soil from vehicle wheels before the vehicle leaves the construction site or work area. Provide wash -down stations as required to wash vehicle tires and retain all washwater on-site. Do not use limerock. H. Rock and Stone for Erosion Control and Pollution Control and Treatment: 1. Crushed Limerock: Limerock shall not be used under any circumstance. 01025-9 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc 2. Acceptable Material: FDOT #4 non -calcareous aggregate, washed and meeting the requirements of FDOT Standard Specifications for Road and Bridge Construction, Section 901. Hay Bales: Hay bales shall not be used. PART 3 - EXECUTION A. Design, construct, and maintain the pollution control and treatment system to minimize erosion and capture and remove pollutants from the construction site and from all other areas disturbed by construction activities. B. Apply polyacrylamide in strict accordance with the polyacrylamide manufacturer/supplier's recommendations and specifications. C. REPAIR ALL EROSION DAMAGE — At no additional cost to the OWNER and regardless of the state of completion of the Work, immediately clean all dirt and debris from all pipes and drainage structures; and repair all flooding, washouts, and all other erosion damage to the Work. This responsibility shall not end until Final Acceptance of the Work by the OWNER. Included is damage caused by erosion of any kind (e.g. wind, waves, stormwater runoff, hurricanes, etc.) including Acts of God. Restore all erosion damaged areas to design grades and elevations. Also, refer to General Conditions 6.13.B. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 104-1 - Artificial Coverings/Rolled Erosion Control Products (Jute Mesh) — Per Square Yard Bid Item No. 104-10-3 — Sediment Barrier - Per Linear Foot Bid Item No. 104-18 — Inlet Protection System — Per Each Bid Item No. 104-20 — Chemical Treatment -Floc Logs, Drums — Per Each [The remainder of this page was left blank intentionally] 01025-10 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street 96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master contract Documents\Technical Specifications uPDATED 5-25-2017.doc PERMITTEE'S AFFIDAVIT REGARDING POLLUTION This sworn statement is submitted to Indian River County for the following project (list project name and site address): VERO LAKE ESTATES 851' STREET MILLINGS FROM 101St AVENUE TO 960 AVENUE, VERO BEACH, FLORIDA 32967 STATE OF COUNTY OF Personally before me the undersigned authority, appeared administered, stated as follows: 1. This sworn statement is submitted by the PERMITTEE, , who upon oath duly whose business address is and (if applicable) its Federal Identification No.(FEIN) is 2. My name is and my relationship to the entity named above is (If signing as Owner's Agent, attach Letter of Authorization to Sign from Owner) 3. Permittee understands and agrees that in addition to complying with the terms and conditions of the Stormwater Management System Permit issued by Indian River County, Permittee is responsible for complying with the terms and conditions of the following as applicable to the site: (a) State of Florida Generic Permit for Stormwater Discharge From Large and Small Construction Activities (for projects one acre or larger), (b) Stormwater Pollution Prevention Plan (regardless of project size), (c) St. Johns River Water Management District permit(s) (regardless of project size), (d) Florida Department of Environmental Protection permit(s) (regardless of project size), (e) All other permits required for this project not specifically listed herein, and (f) All Codes and Ordinances of Indian River County. 4. Permittee understands and agrees that "pollution" as defined by Florida Statutes Chapter 403.031(7) includes: "... the presence in the outdoor atmosphere or waters of the state of any substances, contaminants, noise, or manmade or human -induced impairment of air or waters or alteration of the chemical, physical, biological, or 01025-11 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc radiological integrity of air or water in quantities or at levels which are or may be potentially harmful or injurious to human health or welfare, animal or plant life, or property or which unreasonably interfere with the enjoyment of life or property, including outdoor recreation unless authorized by applicable law." 5. Permittee understands and agrees that in addition to the definition set forth in Item 4 above, "pollution" is also defined by Florida Administrative Code 62-302.530 and as may be further defined in the Indian River County permit(s). 6. Permittee understands that Indian River County requires the design, installation, and maintenance of proper erosion control measures at all times during construction until complete stabilization is achieved at the project site. Permittee understands that this requirement is for this project regardless of the project size. 7. Permittee understands that there are civil and criminal penalties for pollution listed in Florida Statutes Ch. 403.141 and Ch. 403.161 and that there are other penalties listed in Indian River County's permits, including but not limited to, Indian River County issuing a Cease and Desist Order for the project. Permittee understands that it may be liable for these and other penalties if offsite pollution occurs as a result of activities associated with the Project. 8. Transfer of Ownership or County Issued Permits: (a) Transfer of Interest in Real Property: Within twenty-one (21) days of any transfer of ownership or control of the real property at which the permitted activity, facility, or system is located or authorized; the Permittee shall notify in writing, both the Indian River County Engineering Division and the Indian River County Stormwater Division of the transfer. Permittee shall provide the name, mailing address, and telephone number of the transferee and a copy of the instrument effectuating the transfer. Said notification is in addition to notifying the County Attorney's Office as required by County Code. (b) Transfer of a County Permit. To transfer a County issued permit, Permittee must provide (1) the information required in Item 8(a); (2) a written statement from the proposed transferee that it will be bound by all terms and conditions of the permit; and (3) a new "Permittee's Affidavit" form properly executed by the transferee. Upon proper receipt of these items the County shall transfer the permit to the transferee. (c) Permittee is encouraged to request a permit transfer prior to the sale or legal transfer of the real property at which a permitted facility, system, or activity is located or authorized. However, the transfer shall not be effective prior to the sale or legal transfer. (d) An "Illicit Discharge Sign" must be present at the site at the time of transfer. Replacement or additional signs may be obtained from the Indian River County Public Works Department at a cost of $30.00 per sign. 01025-12 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc Under penalty of perjury, Permittee declares that it has read the foregoing affidavit and the facts stated in it are true. Permittee: FURTHER AFFIANT SAYETH NAUGHT Authorized Signature: Printed Name: (If signing as Owner's Agent, attach Letter of Authorization to Sign from Owner) Date: Work Telephone: Mobile Telephone: Email Address: ********************************* The foregoing instrument was subscribed and sworn to before me this day of , 20 by who is personally known to me or has produced as identification and who did take oath. My Commission expires: Notary Public State of Florida at Large +++END OF SECTION+++ 01025-13 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc SECTION 110 - CLEARING AND GRUBBING The work specified in this item shall conform to Section 110 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction with the following modifications: A. Prior to any clearing and grubbing, the contractor will stake the right-of-way. Unimproved areas shall be cleared of trees, logs, stumps, brush, vegetation, rubbish and other perishable or objectionable matter within limits shown on the plans excepting for certain trees and shrubs shown on the plans or as directed by the Engineer which are to remain undisturbed and protected. Stumps and roots between slope stakes in cuts and in embankments 3 feet or less in depth shall be removed to a depth of p 18 inches below subgrade. No stumps, roots, or perishable matter of any description shall remain under concrete slabs or footing, including pavement and sidewalks. B. No trees shall be removed or relocated until the Engineer or his representative has marked all trees to be saved, after a review of the project site with the Contractor's representative. C. Where the final pavement or structural work will be close to existing trees, the Contractor shall exercise care in the vicinity of the trees. Further, the Contractor shall saw cut along the edge of the outside limits of the stabilization, structure subgrade or sidewalk to a minimum depth of 4 feet below the finish grade and paint with a commercial grade pruning paint the ends of all sawn roots. If directed by the Engineer or where shown on the drawings, work shall be done by hand in order to protect the trees. D. The Contractor shall exercise care when working in the vicinity of all trees to remain so as to not damage or remove major root structures. The Contractor shall not pull hair or major root structures. All severed roots shall be sawn clean and paint with pruning paint. Stumps, roots, etc., shall be completely removed and disposed of by the Contractor. Undesirable, dead, and/or damaged trees (as so designated by the Engineer) shall be removed. E. All trees to be removed shall be disposed off site; burning will be strictly prohibited. F. All trees or shrubs which are to remain shall be preserved and protected by the Contractor. Where the removal of valuable trees or shrubs specifically for transplanting is required, this work shall be done in cooperation with the Owner and at no additional expense to the Owner. G. All items to be removed shall be excavated to their full depth. All culverts removed from residential driveway entrances within the right-of-way shall become the property of the respective homeowner. Those homeowners not desiring the culverts may donate them to the County free of charge. (See Paragraph C, Special Provisions) The Contractor shall transport the culverts to the County's storage yard. All metal castings for catch basins, manholes, or other structures shall be carefully 01025-14 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc removed and stored in the County's Storage Yard if they are deemed salvageable by the Engineer. The excavated materials shall be removed from the job site and disposed in a location designated or approved by the Owner. Any culverts, structures or any material excavated or removed from the project site under clearing and grubbing deemed unsalvageable by the Engineer shall be disposed of in a legal manner by the Contractor. Where required, suitable material as approved by the Engineer shall then be backfilled and compacted to restore the original contour of the ground. The fill material shall be backfilled and compacted in accordance with Section 120 of these specifications. H. No additional payment will be made, nor will additional work, or change orders be authorized for work needed to remove, relocate, protect, or otherwise account for in the construction of the work depicted in the plans, for any feature, or item that would be apparent from a careful inspection of the site and review of the plans, even though such feature or item is not specifically called out in the plans. It is therefore essential the contractor make such inspection and review. I. The unit price bid for this item shall include the cost of all labor, tools, and equipment necessary to excavate, remove, and dispose of those items as directed by the Engineer and where designated on the Drawings. The cost of restoration and backfill and compaction for the specific area of removal shall also be included under this item. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 110-1-1 - Clearing and Grubbing — Per Lump Sum Bid Item No. 110-7-1 — Mailbox, F&I Single (Relocation) — Per Each SECTION 120 - EXCAVATION AND EMBANKMENT A. Earthwork, including earthwork for drives outside the right-of-way limits, shall be paid for as embankment. Cost shall include all work specified in this section and Section 120 of the FDOT Standard Specifications for Road and Bridge Construction. Such price and payment shall specifically include all cost of any roadway, lateral ditch or canal, and final dressing operations. B. Earthwork quantities shall be considered as in-place material with no shrinkage or expansion factors. C. Subsoil Excavation - Any excavation below the proposed bottom elevation of the select fill, isolated swale bottom locations, isolated locations for pipe installations and as approved by the engineer shall be paid for as subsoil excavation. Approximately 2.0 ft of subsoil excavation is required in sublateral canals. Cost of replacement embankment shall be included in cost of subsoil excavation. Contractor shall coordinate with county representative prior to any subsoil excavation. D. Embankment - General Requirements for Embankment Materials: The following 01025-15 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc is added after the first paragraph of Subarticle 120-7.2: Roadway Design Standard Index No. 505, Embankment Utilization Details is modified by the addition of the following: Any stratum or stockpile or soil which contains obvious pockets of highly organic material may be designated as muck or unsuitable for construction of subgrade by the Owner. Backfill material containing more than 2.0% by weight of organic material, as determined by FM 1-T 267 and by averaging the test results for three randomly selected samples from each stratum or stockpile of a particular material, shall not be used in construction of the reinforced volume. If an individual test value of the three samples exceeds 3.0%, the stratum or stockpile will not be suitable for construction of the reinforced volume. No A-8 material permitted in embankment. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 120-1 — Regular Excavation — Per Cubic Yard Bid Item No. 120-6 - Embankment - Per Cubic Yard SECTION 160 - STABILIZING A. Section 160 is modified by the addition of the following: "The stabilization thickness indicated on plans shall be considered a minimum thickness. Thickness will vary to conform to the lines, and grades shown in the plans." Minimum L.B.R. = 40 - No under -tolerance. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 160-4 - Type "B" Stabilization (12" Subgrade LBR40) (Roadway) - Per Square Yard SECTION 284 — RECLAIMED ASPHALT PAVEMENT MILLINGS A. Description Construct a base course composed of reclaimed asphalt pavement millings (RAPM) material. Use RAPM material as a base course only on non -limited access paved shoulders, shared use paths, or other non -traffic bearing applications. B. Materials Obtain the RAPM material by either milling or crushing an existing asphalt pavement. 01025-16 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc Use material so that 100% passes a 1" sieve and at least 97% (by weight) pass a 3/ inch sieve and is graded uniformly down to dust. The following procedure will be used for approval: 1. Conduct a minimum of six extraction gradation analyses of the RAPM material. Take samples at random locations in the stockpile. The average asphalt cement content of the six stockpile samples must be 4% or greater with no individual result below 3-1/2%. 2. Request the Engineer to make a visual inspection of the stockpile of RAPM material. Based on this visual inspection of the stockpiled material and the results of the Contractor's extraction gradation analyses, the Engineer will determine the suitability of the materials. 3. The Engineer may require crushing of stockpiled material to meet the gradation criterion. Perform all crushing before the material is placed. C. Spreading RAPM Material. 1. Method of Spreading: Spread the RAPM with a blade or device which strikes off the material uniformly to laying thickness and produces an even distribution of the RAPM. The Contractor may also place the RAPM material directly from the milling machine into the trench by a conveyor. When placing the RAPM material by conveyor directly from the milling machine, obtain the Engineer's approval of the milling process. 2. Number of Courses: When the specified compacted thickness of the base is greater than 6 inches, construct the base in two courses. Place the first course to a thickness of approximately one half the total thickness of the finished base, or sufficient additional thickness to bear the weight of construction equipment without disturbing the subgrade. Except as might be permitted by the Engineer for special cases, conduct all RAPM base construction operations for shoulders before placing the final pavement on the adjacent traveled roadway. D. Compacting and Finishing Base. 1. General: Construct mainline pavement lanes, turn lanes, ramps, parking lots, concrete box culverts and retaining wall systems meeting the requirements of 120- 8.1, except replace "embankment" with "pavement". Construct shoulder -only areas, bike/shared use paths, and sidewalks. Meet the requirements of 120-8.1 except replace "embankment" with "pavement" meeting the acceptance criteria of 200-7.2. Shoulders compacted separately shall be considered separate LOTs a) Single -Course Base: After spreading, scarify the entire surface, then shape the asphalt to produce the required grade and cross-section, free of scabs and laminations, after compaction. b) Multiple -Course Base: Clean the first course of foreign material, then blade and bring it to a surface cross-section approximately parallel to the finished base. Before spreading any material for the upper courses, allow the Engineer to make density tests for the lower courses to determine that the required compaction has been obtained. After spreading the material for the top course, scarify finish and shape its surface to produce the required grade and cross-section, free of scabs and laminations, after compaction. 2. Moisture Content: When the material does not have the proper moisture content to ensure the required density, wet or dry it as required. When adding water, uniformly 01025-17 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc mix it in to the full depth of the course that is being compacted. During wetting or drying operations, manipulate, as a unit, the entire width and depth of the course that is being compacted. 3. Density Requirements: Compact the material to a density of not less than 98% of maximum density as determined by FM 1-T 180. Where the width of the base construction is not sufficient to permit use of standard base compaction equipment, perform compaction using vibratory compactors, trench rollers, or other special equipment which will provide the density requirements specified herein. Water may be added to the asphalt material as needed to obtain the proper compaction. 4. Density Tests: Meet the requirements of 200-7 with the exception of 200-7.2.1. Within the entire limits of the width and depth of the base, obtain a minimum density in any LOT of 98% of the maximum density as determined by FM 1-T 180. 5. Testing Surface: Test the surface in accordance with the requirements of 200-7.3.1. Asphalt millings shall be applied with a wetting agent in two lifts not to exceed 6" per lift and compacted to provide a smooth travel surface. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 284-1 — Asphalt Millings (8" Thick) (Two Lifts) — Per Square Yard Bid Item No. 284-1A — Asphalt Millings (6" Thick) (Driveways) — Per Square Yard SECTION 285 - OPTIONAL BASE COURSE A. Sub Article 285-4 is modified by the addition of the following: Base material, thickness and requirements are described in the construction plans. Only one type of alternate base material shall be used. No additional payment will be made for base thickness in excess of the specified thickness Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 285-706 — Optional Base, Base Group 06 (8" Cemented Coquina Shell Base, LBR 100, 2 Lifts) - Per Square Yard SECTION 334 - SUPERPAVE ASPHALT PAVEMENT The work specified in this item shall conform to Section 334 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction. Sub article 334-8.1 through 334-8.3 — Basis of Payment shall be deleted in its entirety. 01025-18 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc Sub article 334-8.4 — Payment shall be amended as follows: Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 334-1-13 — Superpave Asphaltic Conc., Traffic C (Type SP 12.5, 1- 1/2" Thick) — Per Ton SECTION 337 - ASPHALT CONCRETE FRICTION COURSES The work specified in this item shall conform to Section 337 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction. Sub article 337-12.1 through 337-12.3 — Basis of Payment shall be deleted in its entirety. Sub article 337-12.4 — Payment shall be amended as follows: Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 337-7-82 — Asphalt Concrete Friction Course, Traffic C, Type FC -9.5, PG 76-22 (1" Thick) — Per Ton SECTION 425 — INLETS, MANHOLES, AND JUNCTION BOXES The work specified in this item shall conform to Section 425 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 425-1-521 — Inlets, DT Bot, Type C, <10' — Per Each SECTION 430 — PIPE CULVERTS The work specified in this item shall conform to Section 430 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 430-174-215 — Pipe Culvert, Other Shape — Ellip/Arch, 15" SD (12"x18") (RCP) — Per Linear Foot 01025-19 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc Bid Item No. 430-175-115 — Pipe Culvert, Round — 15" S/CD (PP) (Class II) (Storm) — Per Linear Foot Bid Item No. 430-175-118 — Pipe Culvert, Round 18" S/CD (PP) (Class II) (Storm) — Per Linear Foot Bid Item No. 430-175-118A — Pipe Culvert, Round 18" S/CD (CMP) — Per Linear Foot Bid Item No. 430-982-123 — Mitered End Section, 15" CD — Per Each Bid Item No. 430-984-623 — Mitered End Section, Ellip/Arch, 15" SD (12'x18") — Per Each SECTION 536 - GUARDRAIL The work specified in this item shall conform to Section 536 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 536-1-0 — Guardrail — Roadway, General/Low Speed TL -2 — Per Linear Foot SECTION 570 — PERFORMANCE TURF The work specified in this item shall conform to Section 570 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction. A. Description: Sod for the project shall be of the variety that is common to the area and of a variety approved by the Engineer. This work shall also include mowing, to be mowed at maximum 6" height with a mulching mower. B. Work Included: Scope of Work: The work specified in this section consists of the establishing of a stand of grass, within the project, right-of-way, easements, and other areas indicated on the Drawings, by furnishing and placing grass sod. Also included are fertilizing, watering and maintenance as required to assure a healthy stand of grass. Two applications of fertilizer will be required with the initial application being fertilizer and the second application being "weed and feed". C. Guarantee: All sodded areas shall be guaranteed for one year after date of final acceptance. Replacement of Defective Sod: Any dead sod or sod showing (less than 95% of a square) indication of probable non -survival or lack of health and vigor, or which do not exhibit the characteristics to meet specifications, shall be replaced within two weeks of notice from Owner or Engineer. All replacement sod shall be furnished/installed at no additional cost to the Owner and shall be guaranteed for three months. All replacement shall meet original specifications. 01025-20 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc The Contractor shall notify the Owner and Engineer ten days prior to the end of the guarantee period and such guarantee shall be extended until notification is received. At the end of the guarantee period, all sod that is dead or in unsatisfactory growth shall be replaced within two weeks. D. Fertilizer: Commercial fertilizers shall comply with the Indian River County Fertilizer Ordinance 2013-012 and Supplement Ordinance 2013-014 (see Appendix B). E. Water for Grassing: Contractor shall provide the water used in the sodding operations as necessary to meet the requirements of Article 570-3.6. F. Preparation of Ground: The area over which the sod is to be placed shall be scarified or loosened to a depth and then raked smooth and free from debris. Where the soil is sufficiently loose and clean, the Owner, at his discretion, may authorize the elimination of ground preparation. G. Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a range of 6.0-7.0. Contractor shall apply two (2) applications. The initial shall be fertilizer and the second application shall be "weed and feed". The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds per acre, or 10 pounds per 1,000 square feet, by a spreading device capable of uniformly distributing the material at the specified rate. Contractor shall apply applications as per manufacturer's specification. All tickets from bags shall be handed over to the County Inspector. On steep slopes, where the use of a machine for spreading or mixing is not practicable, the fertilizer shall be spread by hand and raked in and thoroughly mixed with the soil to a depth of approximately 2 inches. H. Placing Sod: The sod shall be placed on the prepared surface, with edges in close contact and shall be firmly and smoothly embedded by light tamping with appropriate tools. Where sodding is used in drainage ditches, the setting of the pieces shall be staggered so as to avoid a continuous seam along the line of flow. Along the edges of such staggered areas, the offsets of individual strips shall not exceed 6 inches. In order to prevent erosion caused by vertical edges at the outer limits, the outer pieces of sod shall be tamped so as to produce a featheredge effect. Where sodding is placed abutting paved shoulder, the contractor is to ensure that the finished sod elevation is 1'/2" below paved shoulder. On slopes greater than 3:1, the Contractor shall prevent the sod from sliding by means of wooden pegs driven through the sod blocks into firm earth, at suitable intervals. Sodding shall not be performed when weather and soil conditions are, in the Engineer's opinion, unsuitable for proper results. Sod shall be placed around all structures, equipment pads, etc. Watering: The areas on which the sod is to be placed shall contain sufficient 01025-21 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc moisture, as determined by the Engineer, for optimum results. After being placed, the sod shall be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks. Thereafter, the Contractor shall apply water as needed until the sod roots and starts to grow for a minimum of 60 days (or until final acceptance, whichever is latest). J. Maintenance: The Contractor shall, at his expense, maintain the sodded areas in a satisfactory condition until final acceptance of the project. Such maintenance shall include repairing of any damaged areas and replacing areas in which the establishment of the grass stand does not appear to be developing satisfactorily. Replanting or repair necessary due to the Contractor's negligence, carelessness or failure to provide routine maintenance shall be at the Contractor's expense. The Contractor shall maintain the sodded area up to the final acceptance date as directed by the Engineer. Grass height shall not exceed 6" without mowing. Clippings shall be removed from sidewalk. K. Article 570-9. The first two paragraphs under this Article are deleted and the following is added: The contract unit price for performance turf shall include the costs of sod, fertilizer (2 applications), sidewalk sweeping after mowing, mowing, pegging disposal of clippings, water, tools, equipment, labor and all other incidentals necessary. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 570-1-2 — Performance Turf, Sod (Bahia) - Per Square Yard SECTION 700 — HIGHWAY SIGNING A. Signing for traffic control shall conform to the requirements of the Standard Specifications, Manual on Uniform Traffic Control Devices, Supplemental Specifications, Roadway and Traffic Design Standards, manufacturer's specifications. B. Traffic Signs: All existing signs which are the property of the Owner shall be transported to the Indian River County Road and Bridge Maintenance Yard by the Contractor during construction if they are within the construction limits. Care shall be exercised by the Contractor during removal, storage and relocation so as not to damage the signs. If any damage occurs, as determined by the Owner's Engineer or Resident Construction Inspector, the sign shall be replaced by the Contractor with no compensation. Item of Payment Payment for the work specified in this item shall be made under: 01025-22 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc Bid Item No. 700-1-50 — Single Post Sign, Relocate - Per Assembly SECTION — 999 RECORD DRAWINGS/AS-BUILTS GENERAL Maintain, prepare and provide the ENGINEER with record documents as specified below, except where otherwise specified or modified within the scope of work provided in the specific project contract documents. The Contractor and/or Developer shall be responsible for, and required to provide, Record Drawings as outlined in this section. MAINTENANCE OF RECORD DOCUMENTS: 1. Maintain in CONTRACTOR's field office in clean, dry, legible condition complete sets of the following project documents: Drawings, Specifications, Addenda, approved Shop Drawings, samples, photographs, Change Orders, other modifications of Contract Documents, test records, survey data, Field Orders, and all other documents pertinent to CONTRACTOR'S Work. 2. Provide files and racks for proper storage and easy access. 3. Make documents available at all times for inspection by ENGINEER and OWNER. 4. Do not use record documents for any other purpose and do not remove them from the field office. 5. Label each document "RECORD DRAWING" in 2 -inch high printed letters. 6. Keep record documents current at all times. 7. No work shall be permanently concealed until the required record data has been obtained. RECORD / AS -BUILT DRAWINGS A. During the construction operation, the CONTRACTOR shall maintain records of all deviations from the approved Project Plans and Specifications and shall prepare therefrom "RECORD" drawings showing correctly and accurately all changes and deviations from the work made during construction to reflect the work as it was actually constructed. B. The Record/As-Built survey shall be performed and subsequent plans prepared by a Professional Surveyor and Mapper, registered in the state of Florida and certified to the standards set forth in Chapter 472, Florida Statutes and Chapter 5J-17.050 Florida Administrative Code (Florida Minimum Technical Standards). C. Field measurements of vertical or horizontal dimensions of constructed improvements shall be obtained so that the constructed facility can be delineated in such a way that the location of the construction may be compared with the construction plans. Clearly shown by symbols, notations, or delineations, those constructed improvements located by the survey. 01025-23 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc D. All vertical information (elevations) provided on the Record Drawings shall be referenced to the North American Vertical Datum of 1988 (NAVD 88) unless otherwise specified by the Project Engineer. E. The horizontal information provided on the Record Drawings shall be referenced to the State of Florida, State Plane Coordinate System, Florida East Zone as established by Global Positioning System (GPS) which meets or exceeds Third Order Class I Accuracy Standards according to current publication of the Federal Geodetic Control Committee (FGCC) procedures. F. All Record/As-Built drawings shall be prepared in digital format (ACAD Civil 3D 2013) and shall utilize the digital design drawings as prepared by the Project Engineer as a base for the Record/As-Built drawings. It is the responsibility of the Surveyor to request these files from the Contractor or Project Owner in order to produce the Record/As-Built drawing set. G. ALL improvements proposed to be constructed as shown on the approved construction plans shall be field measured upon completion and shown on the Record/As-Built survey. Any improvements that appear in both plan and profile views shall show the Record/As-Built information in both views. H. The following items are required to be shown on all Indian River County project Record/As-Built drawings submitted to the County: DRAINAGE: 1. Right-of-way Swale/Drainage — All culvert inverts, elevations and station offsets; inlet grate and bottom elevations; swale beginning and end bottom elevations; and highs and lows along top of bank. Size of swale. 2. Pipe Culvert/PVC Sleeves — All inverts, pipe size, stations and offsets. 3. Outfalls — All pipe inverts, pipe size, elevations and station offsets, weir box elevations, weir elevation, bleeder elevation and sizes. 4. Roadway/Off Site Drainage — All inverts, elevations and station offsets; manhole top elevation; grate top elevations. 5. Retention Ponds — Provide perimeter elevations, grade breaks, depths and calculated pond areas at control elevation and grade breaks above and below water surface. Show as -built of typical cross section as shown on design plan. ROADWAY: 1. Stations and offsets related to controlling baseline and elevations of all structures, side street and major driveway radius returns (edge of pavement), bends and/or change in direction of roadway alignment, minimum of 1000' intervals along roadway alignment. 2. Elevations along Profile Grade Line (PGL), of all edge of pavements on each side of Profile Grade Line (PGL), at medians at the high/low and PVI points along Profile Grade Line (PGL). 01025-24 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc 3. All final Elevations to be plotted on PGL AND Plan & Profile sheets as applicable. 4. Elevations of edge of pavement and flow line at curb inlets and on the adjacent edge of pavement at curb inlets. WATER, FORCE, AND RECLAIMED WATER MAINS: 1. Show size and type of material used to construct mains. 2. Show horizontal location and elevation of all tees, crosses, bends, terminal ends, valves, fire hydrants, air release valves, and sampling points, etc., by distances from known reference points. 3. Show location, size and type of material of all sleeves and casing pipes. 4. Elevation and horizontal location of all storm sewers, gravity sewers including laterals, force mains, water mains, etc. which are crossed; including clearance dimension at all conflicts or crossings. 5. Top of pipe elevation and horizontal location of all water and force main stub- outs. 6. Horizontal location of all services at the property lines. 7. Horizontal and vertical location of pipe including size of all mains and ground elevation shall be obtained at one -hundred (100) foot intervals. Contractor shall place temporary PVC stand pipes (tell -tales) at each of the one - hundred (100) foot intervals and at all fittings and conflicts/crossings to facilitate the record drawing survey. The tell-tale pipes shall be constructed of 2 -inch PVC pipe, shall be placed on the top of the pipes to be surveyed, and shall be removed by the Contractor after completion of the field survey by the "As -Built" Professional Surveyor. 8. Location of fire lines. 9. Dedicated easement locations, identified by O.R. Book and Page Number. GRAVITY SEWER: 1. Manholes: Elevation of top rim, bottom elevation and invert of each influent and effluent line. 2. Show distance between manholes center -to -center and horizontal location by baseline station and offset. 3. Show material size and type used to construct sewer mains. 4. Show length (center of manhole to end of stub) distances from known reference points or baseline offsets, and elevation of stub -outs. 5. Show which services have twenty (20) foot length of DIP at water main crossings. 6. Show station and offset location of sanitary services at property line. Particular care in dimensioning needed in special situations, i.e., cul-de-sacs and locations where services are not perpendicular to wye. 7. Show invert elevation of sanitary service at property line. 8. Any and all necessary dedicated easement locations, identified by O.R. Book and Page Number. 01025-25 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc PUMP / LIFT STATION: Record Drawings shall show elevations for the top and bottom and diameter of wet well along with invert of effluent line. Record Drawings should also indicate the make, model number, horsepower, impeller and condition point of pumps selected and installed, shape of wet well, location of control panel, location of pump out connection, float level settings, any deviation from the plans, and serial number(s) of the pump(s). SURVEY CONTROL 1. Install/re-establish: It shall be the contractor's responsibility to hire a Professional Surveyor and Mapper as defined per Chapter 472, Florida Statutes, to replace any horizontal and vertical control shown on the engineering plans that was destroyed during construction. 2. New roadway alignment control points (survey baseline or controlling line and all points as indicated on the plans or control sheet) upon final roadway completion. Include all intersections and side streets. State plane coordinates and elevations for all control points. 3. If shown on plans or not: Any Public Land Corner or Governmental Survey Control point(s), vertical control (bench marks), property corners destroyed and/or disturbed during the scope of the project shall be properly re-established as per standards as set forth within Florida Statutes, Administrative code and Minimum Technical Standards for that type of survey. All said surveying mentioned above shall be performed under the direct supervision of a registered Professional Surveyor and Mapper in the state of Florida and certified accordingly. Said Governmental agency(s) shall be notified in writing of disturbance and re -establishments. RECORD/AS-BUILTS DRAWINGS FORMAT - SUBMITTAL A. ENGINEER will supply the CONTRACTOR with the electronic file of the approved construction plans for the input of the As -Built (record) information. B. CONTRACTOR shall deliver seven (7) certified sets of Record/As-Builts with Electronic Drawing files prepared in AutoCAD Civil 3D 2013 AND PDF format or in current version as agreed by the ENGINEER. C. CONTRACTOR's surveyor shall review, sign and seal As-Builts or Record drawing(s). Said drawing(s) shall clearly state type of survey, positional tolerances, adhere and be certified to by a registered Professional Surveyor and Mapper in the state of Florida, any standards set forth by Florida Statutes, Administrative code and Minimum Technical Standards for As-Built/Record surveys. 01025-26 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc D. All Record/As-Built drawings are subject to review and approval by County Surveyor. ACCURACY The CONTRACTOR will be held responsible for the accuracy and completeness of Record Drawings and Electronic As-Builts and shall bear any costs incurred in finding utilities as a result of incorrect data furnished by the CONTRACTOR. COMPLETION OF WORK Upon Substantial Completion of the Work, deliver Record Drawings/As-Built Drawings to ENGINEER. Final payment will not be made until satisfactory record documents are received and approved by ENGINEER. Item of Payment Payment for the work specified in this item shall be made under: Bid Item No. 999-1 — As -Built Drawing (By Registered Surveyor) — Per Lump Sum [The remainder of this page was left blank intentionally] 01025-27 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc Lic. Name Board of Professional Surveyors and Mappers Record As -Built Survey Checklist Date: Project Name: VERO LAKE ESTATES 85th STREET MILLINGS FROM 101St AVENUE TO 961 AVENUE Project No.: IRC -1628 Chapter 61G17-6 Minimum Technical Standards F.A.C. 61G17-6.003 General Survey, Map, and Report Content Requirements ❑ (1) REGULATORY OBJECTIVE: The public must be able to rely on the accuracy of measurements and maps produced by a surveyor and mapper. In meeting this objective, surveyors and mappers must achieve the following minimum standards of accuracy, completeness, and quality: ❑ (a) Accuracy of survey measurements based on the type of survey and expected use. O (b) Measurements made in accordance with the United States standard, feet or meters. ❑ (c) Records of measurements maintained for each survey (check field notes.) ❑ (d) Measurement and computation records dated. ❑ (e) Measurement and computation records substantiate the survey map. ❑ (f) Measurement and computation records support accuracy statement (closure calculations or redundant measurements, if applicable.) (2) Other More Stringent Requirements: ❑ (a) Met more stringent requirements set by federal, state, or local governmental agencies. (3) Other Standards and/or Requirements that Apply to All Surveys, Maps, and/or Survey Products: ❑ (a) REGULATORY OBJECTIVE: In order to avoid misuse of a survey and map, the surveyor and mapper must adequately communicate the survey results to the public through a map, report, or report with an attached map. (b) Survey map or report identified the responsible surveyor and mapper and contain standard content. In meeting this objective, surveyors and mappers must meet the following minimum standards of accuracy, completeness, and quality: ❑ (c) Type survey stated on map and report: As -Built Survey Control Survey Boundary Survey Hydrographic Survey Condominium Survey Mean High Water Line Survey Construction Layout Survey Quantity Survey 01025-28 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc Record Survey Survey Specific or Special Purpose Topographic Survey ❑ (d) Name, certificate of authorization number, and street and mailing address of the business entity on the map and report. ❑ (e) Name and license number of the surveyor and mapper in responsible charge. ❑ (f) Name, license number, and street and mailing address of a surveyor and mapper practicing independent of any business entity on the map and report. ❑ (g) Survey date (date of data acquisition.) ❑ (h) Revision date for any graphic revisions (when survey date does not change.) ❑ (i) Map and report statement "Survey map and report or the copies thereof are not valid without the signature and the original raised seal of a Florida licensed surveyor and mapper." ❑ (j) Insurance statement in '/4" high letters "The survey depicted here is not covered by professional liability insurance" if there is no professional liability insurance. ❑ (k) Additions or deletions to survey maps or reports by other than the signing party or parties is prohibited without written consent of the signing party or parties. ❑ (I) All computed data or plotted features shown on survey maps supported by accurate survey measurements unless clearly stated otherwise. ❑ (m) Bearings, distances, coordinates, and elevations shown on a survey map shall be substantiated by survey measurements unless clearly stated otherwise. ❑ (n) Bearing reference (well established and monumented line) ❑ (o) A designated "north arrow" ❑ (p) Stated scale or graphic scale ❑ (q) Abbreviations in legend or notes. ❑ (r) Special conditions and any necessary deviation from the standards noted upon the map or report. ❑ (s) Responsibility for all mapped features stated on the map or report ❑ (t) Map or report clearly states the individual primarily responsible for the map or report when mapped features have been integrated with others. (u) Map Accuracy. 01025-29 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc (1) Vertical Feature Accuracy: ❑ (a) Vertical Control: Field -measured control for elevation information shown upon survey maps or reports shall be based on a level loop or closure to a second benchmark. ❑ (b) Closure in feet must be accurate to a standard of plus or minus .05 ft. times the square root of the distance in miles. ❑ (c) All surveys and maps or reports with elevation data shall indicate the datum and a description of the benchmark(s) upon which the survey is based. ❑ (d) Minor elevation data may be obtained on an assumed datum provided the base elevation of the datum is obviously different than the established datum. (2) Horizontal Feature Accuracy: ❑ (a) Horizontal Control: All surveys and maps or reports expressing or displaying features in a publicly published coordinate system shall indicate the coordinate datum and a description of the control points upon which the survey is based. ❑ (b) Minor coordinate data may be obtained and used on an assumed datum provided the numerical basis of the datum is obviously different than a publicly published datum. ❑ (c) The accuracy of control survey data shall be verified by redundant measurements or traverse closures. All control measurements shall achieve the following closures: Commercial/High Risk Linear: 1 foot in 10,000 feet; Suburban: Linear: 1 foot in 7,500 feet; Rural: Linear: 1 foot in 5,000 feet; ❑ (d) When statistical procedures are used to calculate survey accuracies, the maximum acceptable positional tolerance, based on the 95% confidence level, should meet the same equivalent relative distance standards as set forth in 61G17- 6.003(3)(p)(2.)(c) F.A.C. ❑ (e) Intended Display Scale: All maps or reports of surveys produced and delivered with digital coordinate files must contain a statement to the effect of: "This map is intended to be displayed at a scale of 1/_ or smaller". 61G17-6.004 Specific Survey, Map, and Report Requirements (1) As-Built/Record Survey: ❑ (a) Obtained field measurements of vertical or horizontal dimensions of constructed improvements so that the constructed facility can be delineated in such a way that the location of the construction may be compared with the construction plans. 01025-30 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc ❑ (b) Clearly shows by symbols, notations, or delineations, those constructed improvements located by the survey. ❑ (c) All maps prepared shall meet applicable minimum technical standards. ❑ (d) Vertical and horizontal accuracy of the measurements made shall be such that it may be determined whether the improvements were constructed consistent with planned locations. (END OF SECTION) 01025-31 Technical Specifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin\Bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc APPENDIX A PERMITS None Required Appendix A -Permits F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin \Bids\Bid Documents\Master Contract Documents\APPENDIX A - Permits.doc APPENDIX B Indian River County Fertilizer Ordinances Appendix B -IRC Fertilized Ordinances F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1- Admin \Bids\Bid Documents\Master Contract Documents\APPENDIX B - FERTILIZER ORDINANCES (title sheet).doc ORDINANCE NO. 2013 - 9 AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, AMENDING TIIE CODE OF INDIAN RIVER COUNTY TO ESTABLISH A NEW CHAPTER 316, ENTITLED "FERTILIZER AND LANDSCAPE MANAGEMENT;" ADOPTING THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION'S MODEL ORDINANCE FOR FLORIDA -FRIENDLY USE OF FERTILIZER ON URBAN LANDSCAPES, WITH MODIFICATIONS; MAKING FINDINGS AND PROVIDING FOR SEVERABILITY, CODIFICATION; DIRECTING COUNTY ATTORNEY'S OFFICE TO POST SUMMARY ON COUNTY WEBSITE, AND AN EFFECTIVE DATE. WHEREAS, as a result of impairment to Indian River County's surface waters caused by excessive nutrients, or, as a result of increasing levels of nitrogen in the surface and/or ground water within the aquifers or canals within the boundaries of Indian River County, the Board of County Commissioners has determined that the use of fertilizers on lands within Indian River County creates a risk of contributing to adverse effects on surface and/or ground water; and WHEREAS, in order to address this risk, the Board of County Commissioners has determined that it is not only critical to adopt the Florida Department of Environmental Protection's Model Ordinance for Florida -Friendly Use of Fertilizer on Urban Landscapes, but that as part of Indian River County's science -based, and economically and technically feasible, comprehensive program to address nonpoint sources of nutrient pollution, additional and more stringent standards are necessary in order to adequately address urban fertilizer contributions to nonpoint source nutrient loading to the surface and/or ground water of Indian River County; and WHEREAS, this ordinance regulates the proper use of fertilizers by any applicator; requires proper training of Commercial Fertilizer Applicators and Institutional Fertilizer Applicators; establishes training and licensing requirements; establishes a Prohibited Application Period; and specifies allowable fertilizer application rates and methods, fertilizer -free zones, low maintenance zones, and exemptions. The ordinance requires the use of Best Management Practices which provide specific management guidelines to minimize negative secondary and cumulative environmental effects associated with the misuse of fertilizers. These secondary and cumulative effects have been observed in and on Indian River County's natural and constructed stormwater conveyances, rivers, creeks, canals, lakes, estuaries and other water bodies. Collectively, these water bodies are an asset critical to the environmental, recreational, cultural and economic well-being of Indian River County residents and the health of the public. Overgrowth of algae and vegetation hinder the effectiveness of flood attenuation provided by natural and constructed stormwater conveyances. Regulation of nutrients, including both phosphorus and nitrogen contained in fertilizer, will help improve and maintain water and habitat quality, FA41BornpdUrdoKiENERALLYsrowla+r& pn6.mnmL?ntumer XeTid'rer de1FertitresOrtt ..tou (F+eMj(Aaguu 10A6. = Page 1 of 9 ORDINANCE NO. 2013 - 012 NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, THAT: Section 1. Enactment Authority. Article VIII, §1 of the Florida Constitution and Chapter 125, Florida Statutes vest broad home rule powers in counties to enact ordinances, not inconsistent with general or special law, for the purpose of promoting the public health, safety and welfare of the residents of the county. The Board specifically determines that the enactment of this ordinance is consistent with general or special law, and is necessary and appropriate to promote the health, safety and welfare of the residents of Indian River County. Section 2. Findings. The Board finds that the above "Whereas" clauses are true and correct, and hereby incorporates such clauses as findings of the Board. Section 3. Adoption of Chapter 316 of the Code of Indian River County (the "Code"). Chapter 316 of the Code is hereby adopted, as follows (new language is indicated by underline): Section 316.1. Title. This chapter shall be known as the "Indian River County Fertilizer and Landscape Management Ordinance." Section 316.2. Definitions. For the purposes of this chapter, the following terms shall have the following meanings: "Administrator" shall mean the County Administrator, or an administrative official of the County designated by the County Administrator to administer and enforce the provisions of this chapter. "Application" or "apply" shall mean the actual physical deposit of -fertilizer to turf or Iandscape plants. "Applicator" shall mean any Person who applies fertilizer on turf and/or landscape plants in Indian River County. "Board" shall mean the Indian River County Board of County Commissioners. "Best Management Practices" shall mean turf and landscape practices or combination of practices based on research, field-testing, and expert review, determined to be the most effective Frid&ortyVind&GENERALVtndutim & QdnnamlOrd4wnerstm&Intdadel FrKYirrOsAanxe-20Uf}7nM(g.#26)..M. Page 2 of 9 ORDINANCE NO. 201.3 - and practicable on -location means, including economic and technological considerations, for improving water quality, conserving water supplies and protecting natural resources. "Chapter 85-427" shall mean The Indian River County Environmental Control Act, Chapter 85- 427, Special Acts, Laws of Florida. "Code Enforcement Officer shall mean any designated employee or agent of Indian River County whose duty it is to enforce codes and ordinances enacted by Indian River County. "Commercial Fertilizer Applicator," except as provided in §482.1562(9), Florida Statutes, shall mean any person who applies fertilizer for payment or other consideration to property not owned by the person or firm applying the fertilizer or the employer of the applicator. "Code" shall mean The Code of Indian River County. "Environmental Control Officer" shall mean the Indian River County Environmental Control Officer appointed by the Board pursuant to Chapter 85-427, and Chapter 303 (Part I) of this Code, and his or her designees. "Fertilize," "fertilizing," or `fertilization" shall mean the act of applying fertilizer to turf specialized turf, or landscape plants. "Fertilizer" shall mean an substance or mixture of substances that contains one or more recognized plant nutrients and promotes plant growth, or controls soil acidity or alkalinity, or provides other soil enrichment, or provides other corrective measures to the soil. "Heavy rain" shall mean rainfall greater than two inches in a 24 hour period. "Institutional Fertilizer Applicator" shall mean any person, other than a private, non-commercial applicator or a Commercial Fertilizer Applicator unless suchdefinitions also apply under the circumstances). that applies fertilizer for the purpose of maintaining turf andlor landscape plants. Institutional Fertilizer Applicators shall include, but shall not be limited to, owners, managers or employees of public lands, schools, parks, religious institutions, utilities, industrial or business sites and any residential properties maintained in condominium and/or common ownership. "Landscape plant" shall mean any native or exotic tree, shrub, or groundcover (excluding turf). "Low maintenance zone" shall mean an area a minimum of ten feet wide adjacent to water courses which is planted and managed in order to minimize the need for fertilization, watering, mowing, etc. "Person" shall mean any natural person business corporation limited liability compaanv partnership, limited partnership, association, club, organization, and/or any group of people acting as an organized entity. FMAcnr. lIA:MONERALIP. 1. an#Ontnanrnt0 Rnazutivral1nrWodelPerMrzerAA2ana- 2013( N.9(4upeaf30ydxr Page 3 of 9 ORDINANCE NO. 2013 - 012 "Restricted Season" shall mean June 1 through September 30. "Saturated soil" shall mean a soil in which the voids are filled with water. Saturation does not require flow. For the purposes of this chapter, soils shall be considered saturated if standing water is present or the pressure of a person standing on the soil causes the release of free water. "Slow Release Nitro -en" shall mean nitrogen in a form which delays its availability for plant uptake and use after application, or which extends its availability to the plant longer than a reference rapid or quick release product. "Turf" "sod," or "lawn" shall mean a piece of grass -covered soil held together by the roots of the grass. "Urban landscape" shall mean pervious areas on residential, commercial, industrial, institutional, highway rights-of-way, or other nonagricultural lands that are planted with turf or horticultural plants. For the purposes of this section agriculture has the same meaning as in §570.02, Florida Statutes. Section 316.3. Timing of fertilizer application. No applicator shall apply fertilizers containing nitrogen and/or phosphorus to turf and/or landscape plants during the Restricted Season, to saturated soils, or during a period in which a Flood Watch or Warning, or a Tropical Storm Watch or Warning, or a Hurricane Watch or Warning is in effect for any portion of Indian River County, issued by the National Weather Service, or if heavy rain is likely. Section 316.4. Fertilizer -free zones. Fertilizer shall not be applied within ten feet of any pond, stream, watercourse, lake. canal, or wetland as defined by the Florida Department of Environmental Protection (Chapter 62-340, Florida Administrative Code) or from the top of a seawall. If more stringent Indian River County Code regulations apply, this provision does not relieve the requirement to adhere to the more stringent regulations. Newly planted turf and/or landscape plants may be fertilized in this zone only for a 60 -day period beginning thirty days after planting if needed to allow the plants to become well established. Caution shall be used to prevent nutrients from being directly deposited into the water. Section 316.5. Low maintenance zones. A voluntary ten foot low maintenance zone is strongly recommended. but not mandated, from any pond, stream, water course, lake, wetland or from the top of a seawall. A swale/berm system is recommended for installation at the landward edge of this low maintenance zone to capture and filter runoff. If more stringent Indian River County Code regulations apply, this provision FArmrneyAtrndolGENCRADRe harrow 6OrdmmKlndin.emiFoNlwrlldarlFnNf+eOrdaw.,x- 2013(F`mm1)(Augcw 29j.dec Page 4 of 9 ORDINANCE NO. 2013 - 012 does not relieve the requirement to adhere to the more stringent regulations. Notwithstanding the voluntary nature of the above sentences, no mowed or cut vegetative material may be deposited or left remaining in this zone or deposited in the water. Care should be taken to prevent the over - spray of aquatic weed products in this zone. Section 316.6. Fertilizer content and application rates. (a) No fertilizer containing phosphorous shall be applied to turf or landscape plants in Indian River County unless a soil or plant tissue deficiency is verified by a Universitx of Florida, Institute of Food and Agriculture Sciences, approved testing methodology. In the case that a deficiency has been verified, the an -plication of a fertilizer containing phosphorous shall be in accordance with the rates and directions for the Central Region of Florida as provided by Rule 5E-1.003(2), Florida Administrative Code. Deficiency verification shall be no more than 2 years old. However, recent application of compost, manure, or top soil shall warrant more recent testing to verify current deficiencies. (b) The nitro en content of fertilizer applied to turf or landscape plants within Indian River County shall contain at least 50% slow release nitrogen per guaranteed analysis label. (c) Fertilizers applied to an urban Iawn or turf within Indian River County shall be applied in accordance with requirements and directions set forth on the label or tag for packaged fertilizer products, or in the printed information accompanying the delivery of bulk fertilizer products, as provided by Rule 5E-1 00 2) Florida Administrative Code Lobelin Reuiuirerents For Urban Turf Fertilizers. All packaged and bulk fertilizer products sold in Indian River County shall be sold in packages with labels or tags, or, if sold in bulk, be accompanied by printed information, which complies with the requirements of Rule 5E-1.003(2), Florida Administrative Code. (d) Fertilizer containing nitrogen or phosphorus shall not be applied before seeding or sodding.A site, and shall not be applied for the first 30 days after seeding or sodding, except when hydro - seeding for temporary or permanent erosion control in an emergency situation (wildfire, etc.). or in accordance with the Stormwater Pollution Prevention Plan for that site. Section 316.7. Application practices. (a) Spreader deflector shields are required when fertilizing via rotary (broadcast) spreaders. Deflectors must be positioned such that fertilizer granules are deflected away from all impervious surfaces, fertilizer -free zones and water bodies. including wetlands. lb) Fertilizer shall not be applied, spilled, or otherwise deposited on any impervious surfaces. (c) Any fertilizer applied, spilled, or deposited, either intentionally or accidentally, on any impervious surface shall be immediately and completely removed to the greatest extent practicable. F.•UaameylGndelGENERALUlaelealene etGMbwaeedOYdlronepiferod erWad l FinRlmOrdlnmer-2013 (n n21)(4.got 20Abct Page 5 of 9 ORDINANCE NO. 2013 - 012 (d) Fertilizer released on an impervious surface must be immediately contained and either legally applied to turfor any other legal site or returned to the original or other appropriate container. (e) In no case shall fertilizer be washed, swept, or blown off impervious surfaces into stormwater drains, ditches, conveyances, or water bodies. Section 316.8. Management of grass clippings and vegetative materials. In no case shall grass clippings, vegetative material, and/or vegetative debris be washed, swept or blown off into stormwater drains, ditches, conveyances, water bodies, wetlands, or sidewalks or roadways. Any material that is accidentally so deposited shall be immediately removed to the maximum extent practicable. Section 316.9. Exemptions. The provisions set forth above in this chapter shall not apply to: (a) bona fide farm operations as defined in the Florida Right to Farm Act, § 823.14, Florida Statutes; (b) other properties not subject to or covered under the Florida Right to Farm Act that have pastures used for grazing livestock; (c) any lands used for bona fide scientific research, including, but not limited to, research on the effects of fertilizer use on urban stormwater, water quality, agronomics, or horticulture.; (d) golf courses when landscaping is performed within the provisions of .the Florida Department of Environmental Protection document, "Best Management Practices for the Enhancement of Environmental Quality on Florida Golf Courses", these provisions shall be followed when applying fertilizer to golf course practice and play areas; (e) athletic fields at public parks and school facilities that apply the concepts and principles embodied in the Florida Green BMPs, while maintaining the health and function of their specialized turf areas; (f) vegetablegardens owned by individual property owners or a community, and trees grown for their edible fruit. Section 316.10. Training. (a) Within the time period set forth in section 316.12 of this Chapter, all Commercial Fertilizer Applicators and Institutional Fertilizer Applicators within Indian River County shall abide by and successfully complete the six -hour training program in the "Florida friendly Best F.'UtwftryttrdalGTVFR.iL rsatueow@OrdinrmualD,dianastFen[5eetWartFnNrttrOr&.et,- 2673 risal)Glvdarcl4l4,. Page 6 of 9 ORDINANCE NO. 2013 - Management Practices for Protection of Water Resources by the Green Industries" offered by the Florida Department of Environmental Protection through the University of Florida Extension "Florida -Friendly Landscapes" program, or an approved equivalent. (b) Private, non-commercial applicators are encouraged to follow the recommendations of the University of Florida Institute of Food and Agriculture Sciences Florida Yards and Neighborhoods program when applying fertilizers. Section 316.11. General education s ro ram. The Public Works Department shall have an employee who shall address issues pertaining to this Chapter. This employee shall implement a programto inform the general public of the requirements of this chapter, which program shall include, among other things, informative postings on the County website, printing and distributing informative brochures and other print materials, and speaking engagements at community associations, civic organizations, etc. The program shall also include, to the extent practicable, use of any materials from the Be Floridian program and coordination and collaboration with University of Florida Institute of Food and Agriculture Sciences educational activities. Any claimed or alleged deficiency in the County's general education program shall not constitute a defense to any action brought to enforce the provisions of this chapter. Section 316.12. Licensing of commercial fertilizer applicators. (a) No later than December 31, 2013, all Commercial Fertilizer Applicators within Indian River County. shall abide by and successfully complete training and continuing education requirements in the "Florida friendly Best Management Practices for Protection of Water Resources by the Green Industries," offered by the Florida Department of Environmental Protection through the University of Florida Institute of Food and Agriculture Sciences "Florida -friendly Landscapes" program, or an approved equivalent program, prior to obtaining an Indian River County Local Business Tax Certificate for any category of occupation which may apply any fertilizer to turf and/or landscape plants. Commercial Fertilizer Applicators shall provide proof of completion of the program to the Indian River County Tax Collector's Office within 180 days of the effective date of this ordinance. (b) After December 31, 2013, all Commercial Fertilizer Applicators within Indian River County shall have and carry in their possession at alltimes when applying fertilizer, evidence of certification by the Florida Department of Agriculture and Consumer Services as a Commercial Fertilizer Applicator per Rule 5E-14.1.17(18), Florida Administrative Code. (c) All businesses applying fertilizer to turf and/or landscape plants (including but not Limited to residential lawns, golf courses, commercial properties, and multi -family and condominium properties) Must ensure that at least one employee has a "Florida -friendly Best Management Practices for Protection of Water Resources by the Green Industries" training certificate prior to the business owner obtaining a Local Business Tax Certificate. Owners for any category of FAAvorneyLndeYr£NPFALUPesol.Mmu kOrdtrlown,tOnkorcrxVvaAhartfodd FenlaurCMnance. 25Z3(F'.d)fA pn2O?der Page 7 of 9 ORDINANCE NO. 2013 - 012 occupation which may apply any fertilizer to turf and/or landscape plants shall provide proof of completion of the program to the Indian River County Tax Collector's Office. Section 316.13. Enforcement. This chapter may be enforced by the Code Enforcement Officer in the Public Works Department who is devoted to issues pertaining to this Chapter, pursuant to Chapter 162, Florida Statutes, and §103.07 of this Code. In addition, this chapter may be enforced by the Environmental Control Officer pursuant to Chapter 85-427, Special Acts, Laws of Florida, and §303.14 of this Code. Penalties and remedies for violations shall be as set forth in 4100.05 of this Code, and, to the extent applicable, Chapter 85-427, Special Acts, Laws of Florida. Funds generated by penalties imposed under this section shall be used by Indian River County for the administration and enforcement of *403.9337, Florida Statutes. and the corresponding sections of this chapter. and to further water conservation and nonpoint pollution prevention activities. Section 316.14. References to state law. Any references in this chapter to Florida Statutes, rules or regulations shall refer to such statutes, rules or regulations, as amended from time to time. Section 316.15. Applicability, This chapter shall be applicable to and shall regulate any and all applicators of fertilizer and areas of application of fertilizer within the area of Indian River County, unless such applicator is specifically exemptedprovided, however that this chapter shall not apply within the limits of any municipality which has adopted an ordinance regulating the same subject matter. This chapter shall be prospective only, and shall not impair any existing contracts. Section 4. Severability. If any part of this ordinance is held to be invalid or unconstitutional by a court of competent jurisdiction, the remainder of this ordinance shall not be affected by such holding and shall remain in full force and effect. Section 5. Codification. It is the intention of the Board of County Commissioners that the provisions of this ordinance shall become and be made part of the Indian River County Code, and that the sections of this ordinance may be renumbered or re -lettered and the word ordinance may be changed to section, article or such other appropriate word or phrase in order to accomplish such intention. F.4tronayWmta1GP11ERAZU2uapwiorasR Orlimnrrsl0 mmeasiP fberkWodAFerdlhnOrdlonee 2013 pnindlygpuz 70}Aaa Page 8 of 9 ORDINANCE NO. 2013 - 012 Section 6. Directing County Attorney's Office to Post Summary on County Website. The County Attorney's Office is directed to post a summary of this ordinance on the County's website within 15 days of the filing of this ordinance with the Florida Department of State. Section 7. Effective Date. This ordinance shall become effective 45 days after the filing of the ordinance with the Florida Department of State. This ordinance was advertised in the Vero Beach Press Journal, on the 8th day of July, 2013, for a public hearing to be held on the 186 day of July, 2013, and on the 10th day of August, 2013 for an additional public hearing to be held on the 20th day of August, 2013, at which time it was moved for adoption by Commissioner Solari, seconded by Commissioner O'Bryan, and adopted by the following vote: Chairman Joseph E. Flescher Vice Chairman Wesley S. Davis Commissioner Peter D. O'Bryan Commissioner Bob Solari Commissioner Tim Zorc AYE AYE AYE AYE AYE The Chairman thereupon declared the ordinance duly passed and adopted this 20th day of August, 2013. `ate • =_r f. • . ATTEST: Jeffrey R. Smith, Clerk": d J ptroller 1:1:4 BY: Depuu Clerk BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA 'By: n.: seph P. Flescher, Chairman Approved as to form and legal sufficiency: Dy t R ingold, County Attorney EFFECTIVE DATE: This ordinance was filed with the Florida Department of State on the day of , 2013. FrArearneylltad.ZENLAELVterelmdonsR LLarwn rstaiimmathrs• Wad FarnrtGxrOrdannee- IOli (FinsIKAegau 20)d Page 9 of 9 ORDINANCE NO. 2013 - 034 AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA CONCERNING THE FERTILIZER AND LANDSCAPE MANAGEMENT ORDINANCE, AMENDING SECTION 316.6 (FERTILIZER CONTENT AND APPLICATION RATES) AND SECTION 316.15 (APPLICABILITY) OF CHAPTER 316 (INDIAN RIVER COUNTY FERTILIZER AND LANDSCAPE MANAGEMENT ORDINANCE) OF THE CODE OF INDIAN RIVER COUNTY TO ALLOW FOR THE GRADUAL AMORTIZATION OF THE SUPPLY OF CERTAIN NITROGEN CONTAINING FERTILIZER AND APPLYING CHAPTER 316 TO UNINCORPORATED INDIAN RIVER COUNTY, AND MAKING FINDINGS AND PROVIDING FOR SEVERABILITY, CODIFICATION; AND AN EFFECTIVE DATE. WHEREAS, the Board of County Commissioners adopted an ordinance regulating the proper use of fertilizers in order to protect the water quality of Indian River County's natural and constructed storrnwater conveyances, rivers, creeks, canals, lakes, estuaries and other water bodies; and WHEREAS, the new fertilizer regulations require that the nitrogen content of fertilizer applied to turf or landscape plants within Indian River County shall contain at least 50% slow release nitrogen per guaranteed analysis label; and WHEREAS, the new fertilizer regulations go into effect on October 14, 2013; and WHEREAS, in order to provide adequate time for the supply of fertilizer containing nitrogen that does not comply with these regulations to be eliminated, it is necessary to provide additional time for retailers to eliminate those supplies that meet at least a minimum threshold of slow release nitrogen, NOW, THEREFORE, BE -I1' ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, THAT: Section 1. Enactment Authority. Article VIII, §1 of the Florida Constitution and Chapter 125, Florida Statutes vest broad home rule powers in counties to enact ordinances, not inconsistent with general or special. law, for the purpose of promoting the public health, safety and welfare of the residents of the county. The Board specifically determines that the enactment of this ordinance is consistent with general or special law, and is necessary and appropriate to promote the health, safety and welfare of the residents of Indian River County. Section 2. Findings. The Board finds that the above "Whereas" clauses are true and correct, and hereby incorporates such clauses as findings of the Board. 11Mort,f,MS,Gretic u•x..,r,h..,..e ,hn;,,,nn-.0 hs...K,-,.r....l,,r,:1 uemcmnm r..nm_e. (MA.. Page 1 of 3 ORDINANCE NO. 2013 - 014 Section 3. Amendment of Section 316.6 (Fertilizer content and application rates) of Chapter 316 (Indian River County Fertilizer and Landscape Management Ordinance) of the Code of Indian River County (the "Code"). Section 316.6 (Fertilizer content and application rates) of Chapter 316 (lndian River County Fertilizer and Landscape Management Ordinance) of the Code is hereby amended as follows: Section 316.6. Fertilizer content and application rates. (b) As of the effective date of this chapter, the The nitrogen content of fertilizer applied to turf or landscape plants within Indian. River County shall contain at least 2550% slow release nitrogen • per guaranteed analysis label. As of June 1. 2014. the nitrogen content of fertilizer applied to turf or landscape plants within Indian • River County shall contain at least 50% slow release nitrogen per guaranteed analysis label. Section 4. Amendment of Section 316.15 (Applicability) of Chapter 316 (Indian River - County Fertilizer and Landscape Management Ordinance) of the Code of lndian River County (the "Code"). Section 316.15 {Applicability) of Chapter 316 (Indian River County Fertilizer and Landscape Management Ordinance) of the Code is hereby amended as follows: Section 316.15. Applicability. This chapter shall be applicable to and shall regulate any and all applicators of fertilizer and areas of application of fertilizer within the unincorporated area of Indian River County, unless such applicator is specifically exempted; matter. This chapter shall be prospective only, and shall not impair any existing contracts. Section 5. Severability. If any part of this ordinance is held to be invalid or unconstitutional by a court of competent jurisdiction, the remainder of this ordinance shall not be affected by such holding and shall remain in full force and effect. Section 6. Codification. It is the intention of the Board of County Commissioners that the provisions of this ordinance shall become and be made part of the Indian River County Code, and that the sections of this ordinance may be renumbered or re -lettered and the word ordinance may be changed to section, article or such other appropriate word or phrase in order to accomplish such intention. •Anowe3,1Jndo-cexex47,aers,ewn..,anni,,.,n.O..r,., t:rnli:•rae.,v.callonrro,rc.,w.ak.,�.x.-n.. Page 2 of 3 ORDINANCE NO. 2013 - 014 Section 7. Effective Date. This ordinance shall become effective upon filing with the Florida Department of State. This ordinance was advertised in the Vero Beach Press Journal, on the 16th day of September , 2013, for a public hearing to be held on the 1st day of 2013, at which time it was moved for adoption by Commissioner Solari O' Bryan , and adopted by the following vote: Commissioner Chairman Joseph E. Flescher Aye Vice Chairman Wesley S. Davis Aye Commissioner Peter D. O'Bryan Aye Commissioner Bob Solari Aye Commissioner Tim Zorc Aye October seconded by The Chairman thereupon declared the ordinance duly passed and adopted this 1st day of October, 2013. BOARD OF COUNTY COMMISSIONERS JNDIAN RIVER COUNTY, FLORIDA ATTEST: Jeffrey R. Smith, Clerk otOOtitt` and Comptroller By: Dep Clerk e57— /7 eph E. Flescher, Chairman Approved as to form and legal sufficiency: an Reingold, County Attorney EFFECTIVE DATE: This ordinance was filed with the Florida Department of State on the day of , 2013. F: ;1+rnnrr,�+LUruniilcFX I/./,csdmi,m d (ben c'lhr:Jnnnn'�1 rHrh_:. _Jn,ivl4nXnn i-erli:a.r (Mh,w,xc ,Gres Page 3 of 3 APPENDIX C INDIAN RIVER COUNTY TRAFFIC ENGINEERING DIVISION SPECIAL CONDITIONS FOR RIGHT-OF-WAY CONSTRUCTION F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\APPENDIX C - IRC Traffic Engineering Special Conditions.doc INDIAN RIVER COUNTY TRAFFIC ENGINEERING DIVISION SPECIAL CONDITIONS FOR RIGHT-OF-WAY CONSTRUCTION SPECIAL CONDITIONS: 1. All work performed under this permit shall be in accordance with the Florida Department of Transportation Design Standards (http://www.dot.state.FDOT 2016 Design Standards), Indices 600. The Manual on Uniform Traffic Control Devices, and Indian River County Typical Drawings, latest editions. 2. All special conditions listed are in addition to the attached Indian River County Traffic Engineering Regulations for Maintenance of Traffic. 3. It shall be the contractor's responsibility to contact Sunshine State One Call System (1-800-432-4770) at least 72 hours in advance of commencing construction work to coordinate traffic control and obtain locations of underground traffic signal conduit for the County's Computerized Traffic Signal Coordination System. 4. The contractor shall be responsible for using the applicable Traffic Control Plan for the type of work being performed. All job supervisors shall have a copy of the control plan on site at all times and shall be familiar with the correct set-up of the plan. 5. At least one lane of traffic shall be maintained at all times. One -lane traffic shall be controlled with at least two (2) flagmen. Flagmen shall use STOP/SLOW paddles at all times. Flags shall not be used for one -lane traffic control. 6. After proper notification to Traffic Engineering, consideration will be given to the contractor to close roadways to through traffic on a daily basis during daylight hours on narrow roadways where maintaining one -lane traffic would be difficult. The roadway shall be open to traffic at the end of each work day and on weekends. It shall be the contractor's responsibility to provide all necessary construction signs and traffic control devices to close the road and provide a detour route in accordance with Indian River County standards. Signing shall be installed that clearly indicates the time periods the road is closed to traffic. 7. There shall be no construction work after dark. 8. All open excavations shall be back filled before the close of each work day. F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\IRC TRAFFIC ENGINEERING SPECIALCONDITIONS FOR RIGHT OF WAY CONSTRUCTION.docx Rev. 4/11/2016 Special Conditions for Right of Way Construction Page 2 9. A compacted roadway shall be provided at the end of each work day. Disrupted roadways shall be clearly marked as a construction area. 10. Refer to the attached Traffic Engineering Regulations for construction work on Indian River County roadways for maintenance of traffic inspection policy and procedure. Field inspection for work zone safety and maintenance of traffic will be coordinated by the Traffic Engineering Division. 11. All construction equipment, materials, etc. shall be stored outside of the clear zone. Equipment and construction materials that are stored within the clear zone shall be clearly marked with Type II barricades with flashing yellow lights. 12. All projects and work within Indian River County right-of-way shall have an approved Traffic Control Plan (TCP). All work shall be executed under the established TCP and Indian River County approved procedures. The TCP shall provide the proposed detour route, traffic control devices, and other pertinent information for the proposed project and shall be submitted for review and approval by the Public Works Department. The TCP shall be prepared by personnel with a minimum of an Intermediate Maintenance of Traffic current certification in the State of Florida. (Denote on the TCP, certification number and name of the certified personnel that prepared the MOT plan.) The FDOT Design Standards, Indices 600, 2015 do not include a Traffic Control Plan for a full road closure. For full road closures, a TCP is required to be submitted by the contractor a minimum of two (2) weeks prior to the proposed road closure. All traffic control devices shall be in accordance with the Florida Depaitinent of Transportation (FDOT) Design Standards, Indices 600, 2015, the Manual on Uniform Traffic Control Devices, 2009 Edition, and Indian River County Typical Drawings for Signing, Pavement Markings, and Geometrics, latest edition. 13. For full road closures, Portable Changeable Message Signs are required to pre -advertise the roadway closure, a minimum of seven (7) days in advance of the road closure and during the duration of the road closure. The use of Portable Changeable Message Signs for lane closures on thoroughfare plan roadways will be required. Messages are to be as approved by the Public Works Depai tment and shown on the TCP. TRAFFIC ENGINEERING REGULATIONS Maintenance and Protection of Traffic: It shall be the responsibility of the contractor to provide for the maintenance and protection of traffic in accordance with the applicable indices in the most current edition of the Florida Department of Transportation Roadway and Traffic Design Standards and the Federal Highway Administration Manual on Uniform Traffic Control Devices. The indices shall be considered the minimum standards and a more extensive work zone set-up or modifications F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\IRC TRAFFIC ENGINEERING SPECIALCONDITIONS FOR RIGHT OF WAY CONSTRUCTION.docx Rev. 4/11/2016 Special Conditions for Right of Way Construction Page 3 may be required by the County Public Work Director or his designee for the protection of personnel in the work area as well as the traveling public. It shall be the responsibility of the contractor to ensure that all subcontractors are in full compliance with all traffic control regulations. It shall be the responsibility of the contractor working on County roadways or within Right -of -Ways to establish maintenance of traffic prior to any work being performed. The contractor shall frequently monitor the work zone set-up to ensure that all signing is properly placed and that warning signs remain at the proper advance posting distance from the work area. Any signs that do not apply to the work zone shall be removed or covered. The contractor shall remove the work zone set-up at the conclusion of the work. Traffic Engineering shall be notified twenty-four (24) hours in advance of any lane closings and ten (10) days in advance of any road closures. Lane closures are restricted to outside the normal peak hours of traffic, lane closures shall occur during the hours of 9:00 AM to 4:00 PM unless otherwise approved by the Public Works Director or his designee. Traffic Engineering staff shall inspect the Maintenance of Traffic prior to construction commencement to ensure compliance with the approved Traffic Control Plan. It is the policy of the Traffic Engineering Division to randomly monitor the contractor's compliance with all regulations while working on County roadways and within right-of-ways. Matters of public safety shall be attended to immediately upon notification by the County Public Work Director or his designee. If the contractor is found to be negligent in maintaining proper work zone set-up in accordance with the County's Right -of -Way ordinance (Chapter 312), the County Public Work Director or his designee shall impose penalties in the amount of $250.00 for working without the proper traffic control. Construction at or Near Signalized Intersections: The contractor shall have full responsibility for any work performed at or near any traffic signals in Indian River County. The contractor shall request that the County locate buried interconnect conduit and cable, loop sensors, and pull boxes prior to commencing construction. Any damage to the interconnect conduit, loop sensors, and pull boxes or any other traffic signal equipment shall be repaired at the contractor's expense. It shall be the responsibility of the contractor to notify Traffic Engineering Division 72 hours prior to any work being performed near a signalized intersection or flashing beacon. Once the proper notification and locate procedures are satisfied, the contractor working in or near signalized intersections or around traffic signal poles, signal cabinets, or flashing beacons shall be advised of the following regulations: 1. No excavation shall be performed within a 15 -foot radius of any traffic signal pole. If excavation is necessary within a 15 -foot radius, it will be the contractors responsibility to provide the following: F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements\ 1-Admin\Bids \Bid Documents\Master Contract Documents ARC TRAFFIC ENGINEERING SPECIALCONDITIONS FOR RIGHT OF WAY CONSTRUCTION.docx Special Conditions for Right of Way Construction Page 4 a. In a manner approved by the County Public Works Director or his designee, the contractor shall provide constant support of the traffic signal pole to prevent movement during excavation and backfill operations. b. Compaction around the excavation site to a 98% density, bringing the backfill up in 1 foot lifts. c. Density reports from a licensed testing company provided to the County Public Works Director. d. Restore the traffic signal and all support equipment to original condition or better. 2. There shall be no pavement cuts made within 500 feet of a signal or flashing beacon without contacting Indian River County Traffic Engineering Division at (772-226-1547), 72 hours prior to construction. 3. Any traffic signal, loop sensors, conduit, interconnect cable, or any support equipment damaged by a contractor shall be repaired/replaced at the contractor's expense. 4. Any contractor that works at or in the vicinity of a signalized intersection shall have full responsibility for any liability incurred by causing damage to signal equipment that results in the failure of the traffic signal functions. If such a failure occurs, the contractor shall notify the police and the Traffic Engineering Division immediately at (772-226-1547). F:\Public Works\ENGINEERING DIVISION PROJECTS \1628 -85th Street 96th Ave to 101st Ave_ Roadway Improvements\1-Admin\Bids\Bid Documents\Master Contract Documents\IRC TRAFFIC ENGINEERING SPECIALCONDITIONS FOR RIGHT OF WAY CONSTRUCTION.docx Rev. 4/11/2016 BOARD OF COUNTY COMMISSIONERS August 13, 2019 via Email Timothy Rose Contracting, Inc. Attn: Timothy Rose 1360 SW Old Dixie Highway, Suite 106 Vero Beach, FL 32962 TimRose7@comcast.net NOTICE OF AWARD Reference: Indian River County Bid No. 2019012 Vero Lake Estates 85th Street Petition Paving from 1015` Avenue to 96`h Avenue Project (Alternate Bid) Dear Mr. Rose: It is my pleasure to inform you that on August 13, 2019 the Board of County Commissioners awarded the above - referenced project to your company. The following documents are required before the applicable County department can issue a "Notice to Proceed" letter. 1. Public Construction Bond (unrecorded) in the amount of 100% of the contract amount $921,263.40. 2. Two Signed Copies of Enclosed Agreement. 3. Certificate of Insurance indicating coverage required by Article 5 of the General Conditions (section 00700 of the bid documents) and Supplemental Conditions (Section 00800 of the bid documents). Certificate(s) must name Indian River County as additional insured and must provide for a 30 day Notice of Cancellation. In accordance with section 255.05(1)(a), Florida Statutes, you are required to execute a Public Construction Bond for the above referenced project. Please submit the Bond, the Certificate(s) of Insurance and two fully -executed copies of the enclosed agreement to this office at the address provided below no later than Wednesday, August 28, 2019. Failure to comply with the established deadline for submittal of required documents may be grounds for cancellation of award. Thank you for your prompt attention and if you have any questions, please do not hesitate to contact our office. Sincerely, Purchasing Manager Office of Management and Budget • Purchasing Division 1800 27th Street, Vero Beach, Florida 32960•(772) 226-1416•Fax: (772) 770-5140 E-mail: purchasingCaaircgov.com