Loading...
HomeMy WebLinkAbout2019-211A APTIM November 20, 2019 Ms. Kendra Cope, M.S. Natural Resources Manager Indian River County Public Works 1801 27th Street Vero Beach, FL 32960 Subject: Indian River County, FL Sector 4 - Work Order 2018008-2 Critically Eroded Area Analysis Dear Kendra: Aptim Environmental & Infrastructure, LLC 2481 NW Boca Raton Blvd. Boca Raton, FL 33431 Tel: +1 561 391 8102 Fax: +1 561 391 9116 www.aptim.com This proposal outlines a scope of work for the services required to submit a request to FDEP for designation of Sector 4 as a Critically Eroded Area (CEA). Currently, there are three CEAs in Indian River County including the shorelines from R-1 to R-51.3, R-70 to R-86, and R-99 to R-115.7. Scope of Work Aptim Environmental & Infrastructure, LLC (APTIM) will develop a request to FDEP to extend the CEA from R-51.3 to R-70 to include the southern portion of Sector 3 (R-51.3 to R-55) and the majority of Sector 4 (R-55 to R-70). Historic monitoring reports and data analyzed as part of the 2019 Beach Preservation Plan update will be reviewed to support this designation. In addition, research will be conducted to see if any new information is available that meets the eligibility criteria. The following definition has been adopted by the FDEP to identify CEA eligibility: Critically eroded area is a segment of the shoreline where natural processes or human activity have caused or contributed to erosion and recession of the beach or dune system to such a degree that upland development, recreational interests, wildlife habitat, or important cultural resources are threatened or lost. Critically eroded areas may also include peripheral segments or gaps between identified critically eroded areas which, although they may be stable or slightly erosional now, their inclusion is necessary for continuity of management of the coastal system or for the design integrity of adjacent beach management projects. APTIM will conduct a simple profile recession analysis using SBEACH to see if the beach is vulnerable to over wash under 25 year or 100 year average storm conditions. This analysis will be conducted based on existing information and does not include any field investigations, complex calculations or advanced numerical modeling. The engineer may conduct a site visit if deemed appropriate in support of the request. A APTIM November 20, 2019 Page 2 of 4 Deliverable Based on this analysis, APTIM will submit a request on the County's behalf that FDEP designate R-51.3 to R-70 as a Critically Eroded Area. This task includes responses to one request for additional information. Schedule & Assumptions APTIM will proceed with the task described herein upon receipt of a signed work order from Indian River County. It is estimated that the CEA request will be submitted within 6 months from receipt of the signed work order. Cost The total lump sum cost to complete this task is a fixed price of $25,839.25. This cost was developed following the provisions of the Continuing Contract Agreement for Continuing Engineering Services 2018008 (dated April 17, 2018) between Indian River County and APTIM. Thank you for the opportunity to serve Indian River County. Please do not hesitate to call if you have any questions. Sincerely, Sincerely, Christopher Paul, PE Coastal Engineer Aptim Environmental & Infrastructure, LLC 3"1 tags Authorized Co a Signatur Whitney Thompson, PE Printed Name Program Manager Title cc: Whitney Thompson, P.E., APTIM Rich Szpyrka, PE, Indian River County James Ennis, PE, PMP, Indian River County Tom Pierro, PE, D.CE, Coastal Protection Engineering (CPE) Stacy Buck, Coastal Protection Engineering (CPE) A APTIM Aptim Environmental & Infrastructure, LLC 2481 NW Boca Raton Blvd. Boca Raton, FL 33431 Tel: +1 561 391 8102 Fax: +1 561 391 9116 www.aptim.com EXHIBIT 2 Indian River County, FL Sector 4 - 2018008 - Work Order #2 Critically Eroded Area Analysis Summary of Cost by Task Task Number Task Name Labor Subcontractors Equipment Materials Other ODCs Mobilization/ Travel Totals Task 1 • Critically Eroded Area Analysis $ 13,087.00 $ 12,752.25 $ 25,839.25 $ $' $_ Totals = $ 13,087.00 $ 12,752.25 $ $ $ 25,839.25 A APTIM Indian River County, FL Sector 4 - 2018008 - Work Order #2 Critically Eroded Area Analysis Summary of Labor Hours and Cost November 20, 2019 Page 2 of 4 Labor Title Labor Bill Rate Critically Eroded Area Analysis Totals Task 1 a•or Hours Cost a•or Hours Cost P - ! = ' • LAPA $ 250.00 �, x. a u =Rig= es mon ' $ 300.00 - `..` . tF = . t Pro. ram Mana • er $ 190.00 2 yaw 2 I l` att i= �I_ - /P • IWIi>;!Ani $ 165.00 25 # 5.00 25 Coastal En! ineer 111 $ 150.00 -.': ,.., .. ,., Coastal En • ineer II $ 125.00, '_, ; °u"� Coastal En•ineer 1 $ 105.00 8 8 Coastal Modeler 11 $ 130.00 -.- Coastal Modeler 1 $ 110.00 40 °. ,. +; _ 40 a I'�t•�t=Alta i�� .1, • &• & • • -.7531/ $ 145.00 -a::�', � H dr.. ra.her 135.00 Surve or $ 95.00 - ,k '&.... - s . Surve Technician $ 80.00 -rt`r „;' - a Senior Marine Biolo • ist $ 135.00 � �� .� �„„ Marine Biol• •ist 11 $ 95.00 16 } 16 eta Marine Biolo' ist I $ 72.00 _` _ - � Professional Geol . • ist $ 150.00 - ,.. Geol • . ist III $ 130.00 - ar , ;. Geol. •istll $ 95.00 Geol..istl $ 80.00 ��. _r- � Senior CAD 0. -rator $ 140.00- CAD O. -gator $ 105.00 -” q. s. a=. z °' GIS O. -rator $ 105.00 16 !,R '� a #; 16 Boat Ca • tain $ 80.00 - _ ° n Bookkee. -$ 80.00 - ward ` .,s,,..,• u., "',a.. Clerical $ 71.00 2 w 2 Technician $ 60.00 - ? A're - Subcontractors - - r 'o E. ui.ment - - g.��E.��, .�� Materials - - 3" r .,� .... ,�. Other ODCs - - . ;,' MobilizatioNTravel - - , TOTAL - 109 > . "" .� 109 Sector 4 — Work Order 2018008-2 - Approved by the Board of County Commissioners 12/17/19 INDIAN RIVER COUNTY, FLORIDA;;; BOARD OF COUNTY CO IS By: Sus. dams, Chairman Attest: Jeffrey R. Smith, Clerk of Circuit Court And Comptroller By: Approved: Jason :. Br wn Coun A•. inistrator Approved as to form and legal sufficiency: illiam K. DeBraal Deputy County Attorney