HomeMy WebLinkAbout2020-013CCNA2018 AMENDMENT 1 TO WORK ORDER 3
Former Gifford Road Landfill
This Amendment 1 to Work Order Number 3 is entered into as of this 21 day of January 2020, pursuant to
that certain Continuing Consulting Engineering Services Agreement for Professional Services entered into as of
this 17`h day of April, 2018 (collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY,
a political subdivision of the State of Florida ("COUNTY") and Geosyntec Consultants, Inc. ("Consultant").
1. The COUNTY has selected the Consultant to perform the professional services set forth in existing Work Order
Number3,Effective Date 23 October 2018.
2. The COUNTY and the Consultant desire to amend this Work Order as set forth on Exhibit A (Scope of Work)
attached to this Amendment and made part hereof by this reference. The professional services will be
performed by the Consultant for the fee schedule set forth in Exhibit B (Fee Schedule), and within the timeframe
more particularly set forth in Exhibit C (Time Schedule), all in accordance with the terms and provisions set forth
in the Agreement.
3. From and after the Effective Date of this Amendment, the above -referenced Work Order is amended as set
forth in this Amendment. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order
shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be
incorporated in each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above.
••;� �OAtM�s~•
CONSULTANT: BOARD OF COUNTY COMMISSIONERS
.'o
OF INDIAN RIVER COON .j*;' '`�•�
By: By:
Susan dams Chairwo °�•
Print ame: Jill Uhnson •''���FRcouci�''•
Title: Principal BCC Approved Date: January 21, 2020
Attest: Jeffrey R. Smith, Clerk of Court and Comptroller
Approved:
County Administrator
Approved as to form and legal sufficiency:
Dylan T. Reingold, County Attorney
EXHIBIT A
PROFESSIONAL SERVICES
engineers I scientists I innovators
Geosyntecd
consultants
Mr. Himanshu H. Mehta, P.E.
Managing Director
Solid Waste Disposal District
Indian River County
1325 74th Avenue SW
Vero Beach, Florida 32968
Subject: Amendment to Work Order Number 3
Former South Gifford Road Landfill
Vero Beach, Indian River County, Florida
Dear Mr. Mehta:
6770 South Washington Avenue, Suite 3
Titusville, Florida 32780
PH 321.269.8550
www.geosyntec.coin
19 December 2019
Geosyntec Consultants (Geosyntec) is pleased to submit this amendment to the Indian River County (IRC)
Solid Waste Disposal District (SWDD) to provide additional consulting services associated with Phase 1
of the Redevelopment Plan for the Former Gifford Road Landfill, located in Vero Beach, Indian River
County, Florida (Site). Phase 1 consists of surficial land clearing of approximately 8 -acres of land,
including 3 -acres at the north end of the Site that will serve as the Site frontage, and 5 -acres in the central
portion of the Site that will serve as an open field. Locations of these areas are shown on Figure 1.
Additionally, Phase 1 includes landscaping along the 41 st Street frontage and installation of an associated
irrigation system. As you are aware, the conceptual design for the Redevelopment Plan for the Former
South Gifford Road Landfill, including Phase 1, was prepared as part of the brownfields grant -related
planning activities conducted by the Treasure Coast Regional Planning Committee (TCRPC). The first
step in implementing Phase 1 is to finalize the design and create a formal bid specification for
subcontractors. Work Order Number 3 was issued to address this scope of work. A pre -application
meeting was held with the County on 27 August 2019 to discuss the initial design. The County provided
written comments on 27 August 2019 documenting the discussion from the meeting. This amendment is
submitted to address the comments in the 27 August 2019 comment letter.
The remainder of this proposal provides an overview of the project background, a description of the
proposed scope of work, a budget estimate, and a discussion of the schedule for accomplishment of the
work described herein.
PROPOSED SCOPE OF WORK
This proposed scope of work consists of finalization of the conceptual design for Phase 1 (implementing
the comments from the IRC), and the completion of a formal bid specification associated with Phase 1 of
the redevelopment activities. For the purpose of budgeting, the scope of work has been divided into the
following tasks:
0 Task 1 — Project Management
• Task 2 — Finalize Conceptual Design
FR0766\XR 18011 _Change Order Gifford_F
engineers I scientists I innovators
Mr. Himanshu H. Mehta, P.E. GeospteC D
19 December 2019 consultants
Page 2
• Task 3 — Bid Specification Package
The remainder of this section presents a general description of the activities to be performed as part of
each task.
Task 1— Proiect Management
Under this task, Geosyntec will perform project planning and management responsibilities, such as
correspondence with IRC and Schmidt Nichols Landscape Architecture and Urban Planning (Schmidt
Nichols), invoice review, project coordination, and project administration. The budget includes four hours
for the project manager, one hour for the principal -in -charge, and six hours for an administrative assistant.
Task 2 — Finalize Conceptual Desitin
The redevelopment plan for the Former South Gifford Road Landfill is a conceptual design that was
finalized by Schmidt Nichols for discussion at the August 2019 pre -application meeting. Some of the
comments in the 27 August 2019 comment letter was associated with the finalized design along 41 st Street;
therefore, under this task we propose to enlist the assistance of the local landscape architect (Schmidt
Nichols) to address the comments and finalize the landscaping design along 41" Street. This effort is
specific to Phase 1 and is not intended to further address the redevelopment plan for the other phases at
this time. Under this task, Geosyntec will work with our subcontractor, Schmidt Nichols, to finalize the
conceptual design for the landscaping along 41" Street. The estimated budget for this task includes
finalizing the design (including irrigation design) and completion of sealed plans by a landscape architect.
Task 3 — Bid Specification Packagre
Under this task, a tree survey of the approximate 5 -acre area and environmental summary for the area that
needs to be cleared will be completed/prepared for inclusion in the bid specification package. Geosyntec
will work with a local tree surveyor to conduct the tree survey. Once the tree survey is completed, the
landscape architect will provide a plan for the identification of tree species that is needed to obtain a
clearing permit. Please note, that there are budget line items for the landscape architect in this task, as well
as Task 2, because a landscape architect needs to review and seal a tree survey.
The tree survey will take approximately 2 days to completed and Geosyntec has assumed (as a cost -
savings measure) that onsite assistance will be provided to the tree surveyor from IRC. Additionally, as
requested by IRC, as part of this amendment, Geosyntec will provide a summary of the previous
environmental assessment and remediation activities completed at the Site, including the identification of
existing wells, discussion on how soil and groundwater contamination will be addressed, and information
needed to develop an erosion control plan. This information will be provided as part of the originally
scoped bid specification.
XRl 8011_Change Order Gifford_F
engineers I scientists I innovators
Mr. Himanshu H. Mehta, P.E.
19 December 2019
Page 3
SCHEDULE
Geosyntec
consultants
Geosyntec can begin this work immediately following written authorization. We anticipate that we can
provide draft design drawings approximately three weeks after authorization is received (this schedule is
dependent on the landscape architect, Schmidt Nichols). Additionally, Geosyntec will begin working with
the tree surveyor and anticipate completion of the tree survey within approximately four weeks after
authorization is received (this schedule is dependent on the tree survey subcontractor). Once the design
in Task 1 is finalized and the tree survey is completed, Geosyntec will prepare the bid specification
documents and will provide draft bid specification documents to IRC within four weeks from finalization
of the design. The final contractor will be selected within one week of receiving the final bid documents
from contractors.
BUDGET ESTIMATE
A budget estimate for the scope of work outlined in Tasks 1 through 3 of this amendment is summarized
in the following table. The budget estimate presented in this amendment is based on Geosyntec's
understanding of the project requirements, our experience at the Site, and experience with similar activities
for other sites. Geosyntec will not exceed the budget estimate without prior approval and written
authorization from IRC SWDD. The estimated budget includes approximately 73% subcontractor fees.
Task l — Project Management $1,158.75
Task 2 — Finalize Conceptual Design $6,834.23
Task 3 — Bid Specification Package $13,955.60
TOTAL $21,948.58
CLOSURE
Geosyntec appreciates this opportunity to offer our services. If this proposal is acceptable, please indicate
your agreement by signing the attached amendment authorization, which references this proposal. Please
return one signed amendment authorization to Ms. Johnson's attention. Please call either of the
undersigned with questions you may have as you review this proposal.
Sincerely,
GxjD�A
Cristina Graver, P.E.
Engineer
Cc: David Latham, P.G., Geosyntec Consultants
Nandra Weeks, P.E., Geosyntec Consultants
Attachments
XR18011_Change Order Gifford_F
engineers I scieIltists I innovators
c�
ill W. Johnson, P.G.
Principal
FIGURE
•I I
.I
4 II
II I
LU,
o w
1 I �zu�am�Qw oIQ�
Of Utz aww
aM.Q< Mcn= oW-j
1 aQ QwLLI
oZQ alav
Z Ww[Zg
g mLLZ
ealnuu 18402 ^eW CI �JMp'LOltli^199LOtli\SpNIMW 0\NYId 1N3WdOl3/�303M 311511I0NYl pNOidl'J -NN/99LOLi pdLp1LL\OY7%tll
N
J Q
J p
L
tl
LL E
z 0
J
LL
Z
<50
N Etaw
m
o
0 ozm
J WWO
U
Li LLaLU
LL i
OJLLJ
Y
L
W 0 L...
O =w
7pF-
O $
Owy
a
���
w
U
z
n
O �
O
U
ealnuu 18402 ^eW CI �JMp'LOltli^199LOtli\SpNIMW 0\NYId 1N3WdOl3/�303M 311511I0NYl pNOidl'J -NN/99LOLi pdLp1LL\OY7%tll
ATTACHMENT A
BUDGET ESTIMATE
Table 1
Phase 1 of the Gifford Road Landfill Redevelopment Plan
Former Gifford Road Landfill
TASK 1: Proiect ManaEement
ITEM
BASIS RATE QUANTITY
ESTIMATED
BUDGET
' Iip�. „+"k; mp4l
Principal
hr $225 1
$225.00
Professional Engineer
hr $160 1 4
$640.00
Subtotal Professional Services
$865.00
....,
77
Project Administrator
hr $65 4
$260.00
Subtotal Technical/Administrative Services
$260.00
Communications Fee
3% labor 0.03 1,125
$33.75
Subtotal Reimbursables
$33.75
�w d
Copy of Phase 1 Costing_CO_F Geosyntec Consultants
Table 2
Phase 1 of the Gifford Road Landfill Redevelopment Plan
Former Gifford Road Landfill
TASK 2: Finalize Conceptual Desien
ITEM
BASIS RATE QUANTITY
ESTIMATED
BUDGET
-
MO
,
"A,k � .��ffi g,W
Principal
hr $225.00 1
$225.00
Professional Engineer
hr $160.00 4
$640.00
Staff Engineer
hr $96.00 6
$576.00
Subtotal Professional Services
$1,��,4�4, 1.00
.r.-�
I ,gds .. p q
�l�lb?N"
�'¢ ^; S;,
,v
h
gir%mi+
Landscape Architect
LS
$5,350.00 1
$5,350.00
Communications Fee
3% labor 0.03 1,441
$43.23
SubtotalR�eimbursables
$43�.23�
Copy of Phase 1 Costing_CO_F Geosyntec Consultants
Table 3
Phase I of the Gifford Road Landfill Redevelopment Plan
Former Gifford Road Landfill
TASK 3: Bid Specification Package
ITEM
BASIS RATE
QUANTITY
ESTIMATED
BUDGET
Principal
hr $225.00
4
$900.00
Professional Engineer
hr $160.00
8
$1,280.00
Staff Engineer
hr $96.00
10
$960.00
Subtotal Professional Services
$3,140.00
. ......... . �, ", - , �l "1
�A F , — C
11 I
Landscape Architect
LS $3,745.00
1
$3,745.00
Tree Survey
LS $6,976.40
1
$6,976.40
Subtotal Subcontractor Services
$10,721.40
m �T
Communications Fee
3% labor 0.03
3,140
$94.20
Subtotal Reimbursables
$94.20
M -MR
NI'M
Copy of Phase 1 CostingCOF Geosyntec Consultants