RE: 11th Drive (41St Street to South Line of Harbor Bluffs)
Developer's Agreement Conditions
Indian River County, Florida
Dear Rich:
Per your email dated January 13, 2020 we are enclosing herewith the following documents
pertaining to the 11th Drive Public Roadway Improvements project:
one (1) originally executed Final Engineering Services Agreement for Design, Permitting
& Construction Services for the 11th Drive & 41St Street turn lane improvements
2. Agreement Letter from Hugh Russell
Please let me know if you need any other information take this to the Board on February 4th for
consideration.
Sincerely yours,
MASTELLER & MOLER, INC.
S ephen E. Moler, PE
Vice President
SEM/cab
Cc: Hugh Russell, Virginia W Russell Family Partnership LTD
Bruce Barkett, Collins Brown Caldwell Barkett
Dan Richey, Riverfront Groves
File#1931\General Correspondence
(ir_RSzpyrka_Desig nAg reement_20-0116.docx)
1655 271h Street, Suite 2 • Vero Beach, Florida 32960
Phone: (772) 567-5300 • Fax: (772) 794-1106
mastmolr@bellsouth.net
MJ MASTELLER & MOLER, INC.
M 1 — CIVIL ENGINEERS
December 20, 2019
Mr. Hugh L. Russell, 11, GP / Co -Trustee
Virginia W Russell FLP
1392 NE Rocky Springs Church Road
Madison, Florida 32340-4031
hughrusse112@comcast. net
RE: Harbor Bluffs Project —11th Drive Roadway Improvements & 411t Street Turn Lanes /
Design, Permitting & Bidding Services
Indian River County, FL
Our File # 1931
Dear Hugh:
Masteller & Moler, Inc. is pleased to provide you with this proposal for performance of land surveying
and civil engineering services to support the Harbor Bluffs project's proposed "Public Road". The
"Public Road" portion of the project is intended to be developed along a north to south alignment
from 41 It Street to the south line of the Harbor Bluffs site in line with existing 12th Drive.
The right-of-way for the public road to be conveyed to Indian River County is generally described as
follows:
Northern Half: 30' wide from both the Harbor Bluffs (Russell) site and 30' from the Riverfront
Grove site
Southern Half: 60' wide from the Harbor Bluffs (Russell) site reverse curving into an alignment
with 12th Drive
It is understood you are coordinating with the Riverfront Groves land owners to obtain the portion of
right-of-way needed from their site to support the construction the 11th Drive roadway improvements.
It is anticipated the Public Road will contain two (2) 12' wide lanes, five (5) bike lanes, and 5' wide
minimum sidewalks. Within our designs for 11th Drive, we shall depict the southbound left -turn lane
for the southeast Harbor Bluffs parcel at an agreed upon location. For budget purposes, the
construction costs have been estimated as follows:
County Costs
11th Drive Public Road Improvements $ 1,205,755.88
Project Related Costs
11th Drive Turn Lanes $ 83,421.62
Total Construction Cost $ 1,289,177.50
Within this proposal we have provided the proposed fees for the scope of services. Portions of the
fees are eligible for reimbursement from Indian River County based the approved Harbor Bluffs
Developer's Agreement. It is recommended you obtain the County's concurrence with the sharing of
engineering services fees prior to executing this Agreement. The breakdown of proposed
reimbursable and non -reimbursable engineering fees is included on Exhibit A attached hereto.
1655 27th Street, Suite 2 • Vero Beach, Florida 32960
Phone: (772) 567-5300 • Fax: (772) 794-1106
mastmolr@bellsouth.net
Mr. Hugh Russell, 11 — GP / Co -Trustee
December 20, 2019
Page 2 of 8
Professional Engineering Services
Harbor Bluffs Public Roadway
File # 1931
It is understood both property owners are willing to convey right-of-way for the Public Road to Indian
River County. In order to expedite the design and permitting of the project, it is understood the
Harbor Bluffs site will provide for the stormwater needs for the 11th Drive improvements on the
balance of its site via drainage easements which may be modified in the future to be consistent with
future development plans.
Therefore, Masteller & Moler, Inc. proposes herein to provide you with the necessary design plans,
engineering, and surveying services to complete the following scope of work associated with the 11th
Drive Roadway Improvements project:
SCOPE OF SERVICES
Task I — Land Surveying
A. We shall prepare Sketch & Legal Descriptions of the proposed right-of-way for 11th Drive to
be conveyed from both the "Russell" and "Riverfront" properties in accordance with the
Developer's Agreement approved by the Board of County Commissioners on October 22,
2019.
Our lump sum fee for Task IA is $ 750.00.
B. We shall prepare a Route / Topographic Survey of the Harbor Bluffs site as well as sufficient
offsite areas to support the design of the Public Road through the site. The limits of the
topographic survey will include portions of 4111 Street fronting the site, portions of the
Riverfront Groves site, and the northern end of proposed 11th Drive at the south line of Harbor
Bluffs. The survey will depict existing rights -of -ways and all aboveground physical features
encountered along the route. Elevations shall be provided on NAVD'88 datum.
Our lump sum fee for Task IB is $ 9,875.00.
C. We shall prepare a Sketch & Legal Description of proposed stormwater management tracts
to be situated on the "Russell" Harbor Bluffs property outside of the proposed 11th Drive right-
of-way limits.
Our lump sum fee for Task IC is $ 600.00.
The specific scope of services to be performed for Task 1 will be completed by Masteller, Moler
& Taylor, Inc. (MMT) based on the attached proposal dated October 31, 2019.
Task II — Roadway Construction Plans
We shall develop Roadway Construction Plans for Harbor Bluffs portion of Public 11th Drive
Improvements from 41St Street to the south line of the Harbor Bluffs site in Indian River County,
Florida. We shall also develop plans for required turn lane improvements at access locations into
the Harbor Bluffs site both east and west of the 11 th Drive alignment as required by the Conceptual
Site Plan approved Traffic Impact Analysis.
The Roadway Construction Plans shall include both Plan and Profiles views of the proposed
roadway as well as cross-sections at appropriate intervals.
Mr. Hugh Russell, 11 — GP / Co -Trustee
December 20, 2019
Page 3 of 8
Professional Engineering Services
Harbor Bluffs Public Roadway
File # 1931
The Roadway Plans shall include striping and signage details for both 11 th Drive roadway
improvements. Signing and Pavement Markings Plans shall include: Separate Plan Sheets shall
be made for Signing and Pavement Markings. Preparation of the plan layout, quantities (including
signing and pavement marking quantity) and tabulation of quantities. All plans are to be prepared
in accordance with the latest design standards and practices (MUTCD), FDOT Standard
Specifications, Indexes, and shall be accurate, legible, and complete in design, drawn at the same
scale as the Roadway Plans, and furnished in reproducible form. Plans will be included with the
Roadway Plans.
Roadway Plan sheets shall depict existing rights-of-way, section lines, property lines, temporary
construction easements, and centerline of construction. Horizontal control points with state plane
coordinates for all PC's, PT's, curve radius, curve length, and horizontal PI's shall be included on
the Plan or summarized in an alignment table.
All specifications shall reference Indian River County and/or Florida DOT Specifications for Road
and Bridge Construction. Any deviations from County and/or Florida DOT Specifications for Road
and Bridge will be noted and clarified in the Technical Specifications on the Construction Plans.
We propose to perform the Scope of Services outlined under "Task II" for the lump sum fee of
$ 65,000.00.
Task III — Stormwater Management Report
The stormwater management system will be supported by a written report substantiating that the
design has been completed in conformance with Indian River County and St. Johns River Water
Management District Rules and Regulations.
It is intended with this design that all stormwater management be accomplished within the
"Russell:" Harbor Bluffs site within easements. The easement documents we understand will be
written to allow for modification of the stormwater system supporting the 11 th Drive improvements
as well as its easements.
Any later physical modifications to the stormwater management system supporting 11 th Drive as
well as its corresponding easements proposed with future site development plans through the
County's Site Planning process are not included. (In addition, future modifications to the
stormwater management system will not be considered reimbursable by the County).
We propose to perform the Scope of Services outlined under "Task III" for the lump sum fee
of $ 15,000.00.
Task IV — Soils Investigation
In order to support the stormwater management design and to confirm the suitability of the site
soils for roadway construction, we shall obtain a soils investigation along the roadway alignment
and at the proposed stormwater management tracts.
We propose to perform the Scope of Services outlined under "Task IV" for the lump sum fee of
$ 2,450.00.
Mr. Hugh Russell, 11 — GP / Co -Trustee Professional Engineering Services
December 20, 2019 Harbor Bluffs Public Roadway
Page 4 of 8 File # 1931
Task V — Environmental Assessment
In order to confirm there are no jurisdictional wetlands and/or threatened & endangered species
we shall obtain an environmental assessment along the proposed roadway alignment and within
proposed stormwater management tracts.
We propose to perform the Scope of Services outlined under "Task V" for the lump sum not to
exceed fee of $ 3,500.00.
Task VI - Permit Applications
Following completion of the Construction Plans and Stormwater Management Report, we shall
submit permit applications to the following entities to authorize construction of the project:
Indian River County Right -of -Way
Indian River County Land Clearing Permit
Indian River County Tree Removal Permit
Indian River County Stormwater Permit
St. Johns WMD Environmental Resource Permit
We propose to perform the Scope of Services outlined under "Task VI" for the lump sum fee
of $ 3,000.00.
Task VII — Permit Acauisition Resoonses
In the event additional Requests for Additional Information (RAI's) are issued by permitting
agencies, we will work closely to develop responses to agency concerns. As the scope of work
to respond to these specific agencies' concerns is not well defined, we propose to perform "Task
V" services based upon our job classifications and schedule of hourly rates as listed in Section
(h) of this Agreement. We recommend $ 8,000.00 be budgeted for Task VII.
Task VIII — Biddina Services
This task shall include preparation of bid documents including a "takeoff of quantities" bidding
form to be used to obtain competitive bids from at least three (3) reputable general contractors
with experience in roadway construction. We shall submit a formal request for bids and schedule
a bid opening date, at which time bids will be opened at our office.
We shall review the bids and make a recommendation for award of a contract for the roadway
construction work. Our scope of service under this task does not include preparation of the
Contract to be executed by the selected general contractor.
Please note our services do not include preparation of general conditions and contract
documents. Our services relate specifically to preparation of technical specifications on the
Construction Plans and quantity takeoff to allow for unit price bidding of the work.
Xk,
Mr. Hugh Russell, 11 — GP / Co -Trustee
December 20, 2019
Page 5 of 8
Professional Engineering Services
Harbor Bluffs Public Roadway
File # 1931
We propose to perform the Scope of Services outlined under "Task VIII" for the lump sum fee of
$ 8,000.00.
Billing will be as follows: Fees shall be billed monthly based upon the Engineer's estimated
percentage of the total project services completed to that date. Payment of fees rendered is due
within thirty (30) days from billing date.
For any and all subcontract services invoiced through this office except for Masteller, Moler & Taylor,
Inc., there will be a minimum 15% surcharge on the face amount of said subcontractor's invoice, to
cover the costs associated with administration and coordination of the subcontractor's services.
Any and all items not specifically set forth in this proposal are excluded. Specifically excluded items
include but are not limited to: application fees, site plan applications, platting applications, easement
documents, signalization designs, traffic studies/link sheets, mitigation design/ environmental
permitting, consumptive use permitting, landscape/irrigation designs, construction stakeout,
construction administration / observation, and certifications.
Reimbursable expenses are considered outside our lump sum fee and will be invoiced per item Q) of the
general conditions. In addition, any expansion of the scope of work or major revisions which may be
required by any new rules or regulations enacted subsequent to the date of this proposal, are not
included.
GENERAL CONDITIONS
In addition, the following items are stipulated:
a) Application Fees
Any and all application fees required by permitting agencies will be paid for directly by the
Owner/Client.
b) Scope of Work
The scope of work as outlined above is based on our estimate of the normal engineering and design
services necessary. However, should the need arise for additional engineering design work by virtue
of revisions or redesign required by you or any governmental reviewing agencies having jurisdiction,
then additional billing will be based on the fee schedule included hereinafter under item (h), or this
Contract can be renegotiated to the satisfaction of both parties.
c) Payment of Fees
Payment of all fees for services rendered shall be paid within thirty (30) days of billing. This project
and the anticipated fees are predicated upon the prompt and continual satisfaction of our monthly
invoices. Commencing on the thirty-first day, interest shall be added to the unpaid balance at the
rate of one and one-half percent (1-1/2%) per month or a total of eighteen percent (18%) per annum.
In the event that the matter of delinquent payments shall be turned over to legal counsel for collection,
legal fees, costs and recording fees incurred for collection shall be added to the outstanding amounts
due.
d) Release/Reuse of Documents
All documents including drawings, disks, specifications and reports prepared or furnished by
Masteller & Moler, Inc. (Engineer) or Engineer's Independent Professional Associates and
Consultants pursuant to this agreement are instruments of service in respect of the Project and the
NM
Mr. Hugh Russell, 11— GP/Co-Trustee Professional Engineering Services
December 20, 2019 Harbor Bluffs Public Roadway
Page 6 of 8 File # 1931
Engineer shall retain all Ownership and property interests therein, whether or not the project is
completed. To that end, Engineer may exercise his right to execute a copyright notice upon any
document prepared by Engineer in connection with this project. All original documents shall remain
the sole property and in the sole possession of Engineer.
Owner/Client will be provided and may retain copies of said documents for his use and information;
however, said documents are not intended or represented to be suitable for reuse by Owner/Client
or others on extensions of the project or on any other project. Any reuse without express written
verification or adaptation by Engineer for the specific purpose intended, will be at Owner's/Client's
sole risk and without liability or legal exposure to Engineer or to Engineer's Independent Professional
Associates and Consultants. Owner/Client shall indemnify and hold harmless the Engineer and
Engineer's Independent Professional Associates and Consultants from all claims, damages, losses
and expenses including attorney's fees arising out of or resulting therefrom.
e) Release/Reuse of Electronic Data
All electronic data including drawings, specifications and reports prepared or furnished by Masteller
& Moler, Inc. (Engineer) or Engineer's Independent Professional Associates and Consultants
pursuant to this agreement are instruments of service in respect of the Project and the Engineer shall
retain all ownership and property interests herein, whether or not the project is completed. To that
end, the Engineer may exercise his right to withhold the release of any electronic data and evaluate
each request on an individual basis. Any Release/Reuse of Electronic Data agreed upon by the
Engineer shall automatically be encumbered by above stated Item (d) Release/Reuse of Documents.
f) Limitation of Liability
The Owner and Masteller & Moler, Inc. have considered the risks, rewards, and benefits of the project
and the Engineer's total fee for services. Risks have been allocated such that the Owner agrees
that, to the fullest extent permitted by law, the Engineer's liability to the OWNER for any and all
injuries, claims, losses, expenses, damages, or claim expenses arising out of this agreement from
any cause or causes shall not exceed the total fee received for the project. Such causes include but
are not limited to the Engineer's negligence, errors, omissions, strict liability, breach of contract, or
breach of warranty.
Pursuant to Florida Statute § 558.035, an individual employee or
agent of Masteller & Moler, Inc. may not be held individually liable for
damages resulting from negligence occurring within the course and
scope of professional services rendered under this professional
services contract.
g) Engineers Certification Definition
"Certification" shall mean a statement signed and/or sealed by a professional engineer representing
that the engineering services have been performed by the professional engineer, and based upon
the professional engineer's knowledge, information and belief, and in accordance with commonly
accepted procedures consistent with applicable standards of practice, and is not a guarantee or
warranty, either expressed or implied.
h) Additional Work Performed
Any and all work performed, other than that expressly delineated within this general contract, shall
be billed at the following job classification and rates, as applicable:
Mr. Hugh Russell, 11 — GP / Co -Trustee
December 20, 2019
Page 7 of 8
Principal of Firm
Professional Engineer (PE)
Professional Surveyor
Project Manager
Field Crew Project Coordinator
CAD Draftsperson/Designer
Field Crew
Project Field Representation (Inspector)
Administrative (Typing, etc.)
$ 175.00/hr.
$ 150.00/hr.
$ 140.00/hr.
$ 125.00/hr.
$ 100.00/hr.
$ 100.00/hr.
$ 125.00/hr.
$ 80.00/hr.
$ 70.00/hr.
Professional Engineering Services
Harbor Bluffs Public Roadway
File # 1931
No such work shall be undertaken, except upon receipt of verbal or written authorization of
Owner/Client.
i) Representations Relating to Work Performed
The plans, designs and documents which are subject to this contract shall be prepared in a
professional manner consistent with the profession's "Normal Standard of Care."
Nevertheless, no representations or warranties are made as to the success, approval or the issuance
of permits on any application submitted by Owner/client based in whole or in part upon the plans,
designs, or documents prepared by Masteller & Moler, Inc.
Backcharges will not be accepted by Masteller & Moler, Inc. unless we provide written agreement
covering all corrective action and the total amount of the backcharge necessary to accomplish the
corrective action.
j) Reimbursables
1) Print Costs
All photo copies, prints and facsimile transmissions will be billed at the following rates: Photo
copies 8'/2" x 11" $0.25/sheet; photo copies 8'/2" x 14" $0.35/sheet; photo copies oversized
$0.50/sheet; black line prints $0.333/SF; reproducible mylars $4.40/SF; and CD's $10.00.
2) Miscellaneous - Express Mail, Telephone, Travel
If at any time information must be transmitted by mail, overnight mail or courier, these charges
will be included on your monthly invoice at actual invoice cost. In addition, reimbursement for
expenses such as telephone, travel, hotel, meals, etc. will be at actual costs incurred.
3) Survey Reimbursable Expenses
The following items shall be charged the cost as described plus the hourly wage to perform such
services if significant: concrete monuments $17.50/per; lathes $0.55/per; and hubs $0.22/per.
k) Price Guarantee
Prices quoted are firm for sixty (60) days from the date of this proposal.
1) Compliance with Agency Regulations
All work will be performed in accordance with appropriate City, County and State regulations relative
to the proposed project.
TASK 1A
TASK 1 B
TASK 1C
TASK II
TASK III
TASK IV
TASK V
TASK VI
TASK VII
TASK VIII
EXHIBIT "A" 12/20/2019
Reimbursable
1111 Drive
$ 750.00
$ 7,900.00 (80%)
$ 600.00
$ 52,000.00 (80%)
$ 12,000.00 (80%)
$ 1,960.00 (80%)
$ 2,800.00 (80%)
$ 2,400.00 (80%)
$ 6,400.00 (80%)
$ 6,400.00 (80%)
$ 93,210.00
Non -Reimbursable
Proiect Turn Lanes
$ 0.00
$ 1,975.00 (20%)
$ 0.00
$ 13,000.00 (20%)
$ 3,000.00 (20%)
$ 490.00 (20%)
$ 700.00 (20%)
$ 600.00 (20%)
$ 1,600.00 (20%)
$ 1,600.00 (20%)
$ 22,965.00
Mr. Hugh Russell, 11— GP/ Co -Trustee Professional Engineering Services
December 20, 2019 Harbor Bluffs Public Roadway
Page 8 of 8 File # 1931
m) Assignment and Termination
While binding upon the parties, their successors or assigns, this Contract may not be transferred or
assigned without the written consent of both parties. Owner/Client or Engineer shall have the right
to terminate this Contract for any breach hereof after ten (10) days written notice. Should you
exercise the right to terminate this Contract after ten (10) days written notice, Masteller & Moler, Inc.
shall be compensated for services performed and expenses incurred to termination date.
We thank you for the opportunity to offer the services of our firm and look forward to working with
you.
Sincerely yours,
MASTELLER & MOLER, INC.
y Stephen E. Moler, PE
Its Vice President
SEM/cab
AUTHORIZATION TO PROCEED
If these conditions and this proposal meet with your approval, please sign and return one (1) cpAy.,.,,
.••' p�1Ml5S�••
of this letter as our formal Authorization to Proceed. This project if authorized will be perfortwlthi ��rF
due diligence, subject to acts of God, etc. beyond our control.
February 4, 2020
Date
Indian River County Board
of Commissioners
Company Name
1801 27th Street
Vero Beach, FL 32960
Address
file #1931
(1 931_Co ntract_19-1220.docx)
APPROVED AS TO Ft1rtM
AWWILL7x
BY
DEPUTY !COU14TY ATTORNEY
Sign ure oq• off''
---Su n Adams, Chairman RIfRCOU����•"
Printed Name & Title
Attest Jeffrey It Smith, Clerk or
CirvA court and comptroller
Deputy Cl**
NM
Virginia W. Russell FLP
1392 NE Rocky Springs Church Road
Madison, FL 32340-4031
January 14, 2020
Mr. Richard B. Spyrka, PE
Public Works Director
Indian River County
1801 27th Street
Vero Beach, Florida 32960
RE: Harbor Bluffs 1111 Drive Public Road Improvements
To Whom It May Concern:
I am in agreement with the breakdown of proposed reimbursable and non -reimbursable
engineering fees is included on Exhibit A of the Masteller & Moler, Inc. design agreement dated
December 20, 2019. 1 will sign said design agreement upon positive action by the Indian River
County Board of County Commissioners.
Sincerely,
ug*LsseI,
GP / Co -Trustee
Virginia W. Russell FLP